A method for applying a sheet pile wall, and auxiliary profile to be used therewith
Verfahren zum Ausführen einer Spundwand und dazu gebrauchtes Hilfsprofil
Méthode pour appliquer un rideau de palplanches et profil auxiliaire à employer à
cet effet
|
| (84) |
Designated Contracting States: |
|
BE DE FR GB IT NL |
| (30) |
Priority: |
22.06.1988 NL 8801592
|
| (43) |
Date of publication of application: |
|
27.12.1989 Bulletin 1989/52 |
| (73) |
Proprietor: van Halteren, Tijmen |
|
NL-3751 ET Bunschoten (NL) |
|
| (72) |
Inventor: |
|
- van Halteren, Tijmen
NL-3751 ET Bunschoten (NL)
|
| (74) |
Representative: Boelsma, Gerben Harm, Ir. et al |
|
van Exter Polak & Charlouis B.V.,
P.O. Box 3241 2280 GE Rijswijk 2280 GE Rijswijk (NL) |
| (56) |
References cited: :
DE-C- 446 471 GB-A- 518 727 NL-A- 6 917 636 US-A- 2 400 694
|
DE-C- 657 158 NL-A- 6 406 159 US-A- 1 847 655
|
|
| |
|
|
|
|
| |
|
| Note: Within nine months from the publication of the mention of the grant of the European
patent, any person may give notice to the European Patent Office of opposition to
the European patent
granted. Notice of opposition shall be filed in a written reasoned statement. It shall
not be deemed to
have been filed until the opposition fee has been paid. (Art. 99(1) European Patent
Convention).
|
[0001] The invention relates to a method for applying a sheet pile wall by successively
driving sheet piles into the ground and causing the longitudinal edges of said sheet
piles to interlock and guide each other.
[0002] US-A-2 400 694 already discloses (in particular in figure 11 and page 3 left-hand
column, lines 20 to 58) a method for driving a sheet pile wall by successively driving
sheet piles of concrete into the ground and causing the longitudinal edges of said
sheet piles to engage and guide each other (see in particular lines 47 to 58 of the
above cited column), wherein each time a (following) sheet pile is driven an auxiliary
section made of several parts is "inserted", whereby a complementarily formed longitudinal
edge of said section is caused to engage the free longitudinal edge of said sheet
pile, said section functioning as a support for at least one nozzle through which
an hydraulic liquid is injected adjacent the free longitudinal edge of said sheet
pile and said auxiliary section being retracted from the ground prior to driving a
following sheet pile (see page 3, left hand column, lines 41 to 43).
[0003] The invention aims at providing an improved method of driving original sheet piles
of steel i.e. interlockingly formed sheet piles of steel by enlightening the driving
of such sheet piles while providing for conditions for a better water-tightness of
the sheet pile wall when formed of relatively long sheet piles (i.c. a length of 30
m).
[0004] Accordingly the invention provides a method for driving a sheet pile wall by successively
driving sheet piles of steel into the ground and causing the longitudinal edges of
said sheet piles to interlock and guide each other, whereby each time a (following)
sheet pile is driven an auxiliary section is inserted and a complementarily formed
longitudinal edge of said section is caused to engage the free longitudinal edge of
said sheet pile, said section functioning as a support for at least one nozzle, through
which an hydraulic liquid, such as water, is injected adjacent the free longitudinal
edge of said sheet pile, and said auxiliary section being retracted from the ground
prior to driving a following sheet pile.
[0005] In a practical embodiment of the method of the invention the insertion and retraction
of the auxiliary section is carried out in an intermediary phase between the insertion
of two successive sheet piles or sheet pile pairs. The effect of the auxiliary section
is to be seen in that the soil in the area around the free longitudinal edge of the
last driven sheet pile is loosened up and pressed away, so that a next sheet pile
(pair) may "smoothly" run into the key-way of the last driven sheet pile. The advantage
of the effect of the auxiliary section may be taken even in an earlier stage by driving
it each time simultaneously with a sheet pile (pair) into the ground.
[0006] A particular performance of the method of the invention is achieved by filling the
hollow space which is created around the free longitudinal edge of the last driven
sheet pile as a result of the retraction of the section, by a sealing substance, such
as bentonite, which is injected under pressure through said nozzle.
[0007] This means that upon driving of a next sheet pile a high degree of water-tightness
of the connection between the two sheet piles or sheet pile pairs is obtained, because
the interconnected edges will become embedded in a column of the said sealing substance.
[0008] This manner of performing the method according to the invention is particularly suitable
for applications such as those, whereby polluted soil areas have to be isolated. In
this case the method according to the invention offers substantial advantages over
the method which been used until sofar and according to which at first "bentonit piles"
are formed into the ground at locations where - in a later stage - the joints between
the individual sheet piles of the future sheet pile wall are expected to be located.
With such a method there is a great chance that in the process of drilling said bentonite
piles an undesired deviation will take place which may not be simply controllable,
while with the subsequent driving of the sheet pile wall horizontal deviations relative
to the location of the previously inserted bentonite piles may also easily occur.
[0009] The invention will be hereinafter explaned by way of example with reference to the
accompanying drawing.
Fig. 1 is a perspective view of a part of a sheet pile wall of steel, showing the
last driven sheet pile in engagement with an auxiliary profile according to this invention;
fig. 2 is a cross-sectional view of a sheet pile and the auxiliary profile in engagement
therewith and
fig. 3 is a cross-sectional view on an enlarged scale of the auxiliary profile according
to this invention.
[0010] The sheet pile wall according to fig. 1 is composed of sheet piles 1 having a trapezoidal
cross-section, the longitudinal edges of said piles engaging one another. The sheet
piles are e.g. in sets of two previously interconnected sheet piles driven into the
ground in a manner known per se, i.e. by hammering or vibrating. In Fig. 1 the sheet
piles 1c and 1d constitute a set which is the latest one driven into the ground, while
the sheet pile 1b has been driven in in an earlier stage. The key-way connection 2
between the sheet piles 1c and 1d may be easily rendered watertight by applying, beforehand,
to the key-way of both of said sheet piles a substance adapted to form a sealing mass
when it gets into contact with water. The drawing shows the right hand edge (key-way)
3 of the sheet pile set 1c, 1d in engagement with the auxiliary section 4 according
to the invention. In the example shown use is made of an existing section, a so-called
"delta" section, which is normally used to connect two sheet piles which are positioned
perpendicularly to the other when seen in a horizontal plane. The web 5 of this well-known
section constitutes a strip shaped carrier for a tube 6 which is connected thereto
e.g. by welding and which extends substantially along the entire length (= length
of the sheet pile) of the section. Said tube 6 is positioned at a slight distance
opposite to the opening of the key-way 7 of the profile which has been formed complementarily
to the key-way 3 at the longitudinal edge of the sheet pile 1d. A second tube 8 is
connected to the side of the key-way wall 7a turned away from said tube 6. The tubes
6 and 8 have a rectangular cross-section. As a result of this the wall of the tube
6 facing to the opening of the key-way 7 may also function as a guide for the key-way
wall 3a (vide fig. 2). To the upper ends of the tubes 6 and 8 conduits (not shown)
may be connected, by means of which a liquid under pressure may be supplied. For example
water may be supplied when driving section 4. The water which discharges from the
tubes 6 and 8 at the lower ends of the latter will remove the soil from the area of
the key-way 3 of the sheet pile 1d, as a result of which a next sheet pile may run
easier into the key-way 3 of sheet pile 1d.
[0011] The tubes 6 and 8 may be further untilized to inject a sealing substance, such as
bentonite, into the space left around the key-way 3 when retracting the section.
1. A method for driving a sheet pile wall by successively driving sheet piles (1) of
steel into the ground and causing the longitudinal edges (3) of said sheet piles (1)
to interlock and guide each other, whereby each time a sheet pile (1) is driven, an
auxiliary section (4) is inserted and a complementarily formed longitudinal edge (7)
of said section (4) is caused to engage the free longitudinal edge (3) of said sheet
pile (1), said section functioning as a support for at least one nozzle (6; 8), through
which an hydraulic liquid, such as water, is injected adjacent the free longitudinal
edge (3) of said sheet pile, and said auxiliary section (4) being retracted from the
ground prior to driving a following sheet pile.
2. A method according to claim 1, characterized in that the insertion and retraction
of the auxiliary section is carried out in an intermediary phase between the insertion
of two successive sheet piles or sheet pile pairs.
3. A method according to claim 1, characterized in that the auxiliary section and a sheet
pile are simultaneously driven into the ground.
4. A method according to claims 1-3, characterized in that the hollow space - which is
created around the free longitudinal edge (3) of the last driven sheet pile (1) as
a result of the retraction of the section (4) - is filled by a sealing substance,
such as bentonite, which is injected under pressure through said nozzle (6; 8).
1. Verfahren zum Eintreiben einer Spundwand, wobei Spundbohlen aus Stahl hintereinander
in den Boden getrieben werden und die Längsränder (3) dieser Stahlbohlen (1) ineinander
greifen und einander führen, und wobei jeweils beim Eintreiben einer Stahlbohle (1)
ein Hilfsprofil (4) hineingebracht wird, welches mit einem komplementär geformten
Langsrand (7) m den freien Langsrand (3) der Stahlbohle (1) greift, welches Hilfsprofil
als Träger für mindestens eine Düse (6; 8) dient, durch welche hydraulische Flüssigkeit,
wie Wasser, in der Nähe des freien Langsrandes (3) der Stahlbohle injektiert wird,
und welches Hilfsprofil (4) aus dem Boden zurückgezogen wird bevor eine folgende Bohle
eingetrieben wird.
2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass das Hineinbringen und Zurückziehen
des Hilfsprofils in einer Zwischenphase zwischen dem Eintreiben zweier aufeinanderfolgenden
Stahlbohlen oder Stahlbohlenpaare durchgeführt wird.
3. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass das Hilfsprofil und eine Stahlbohle
gleichzeitig in den Boden getrieben
4. Verfahren nach Ansprüchen 1-3, dadurch gekennzeichnet, dass der beim Zurückziehen
des Hilfsprofils (4) um den freien Langsrand (3) der zuletzt eingetrieben Stahlbohle
(1) gebildete Hohlraum mit einem Abdichtungsmittel, wie Bentonit, welches durch die
Düse (6; 8) unter Druck injektiert wird, ausgefüllt wird.
1. Procédé pour enfoncer un mur de palplanches en enfonçant successivement des palplanches
en acier (1) dans le sol et en amenant les bords longitudinaux (3) desdites palplanches
à sse verrouiller entre eux et se guider mutuellement, opération dans laquelle, chaque
fois qu'une palplanche (1) est enfoncée, un profilé auxiliaire (4) est inséré et un
bord longitudinal (7) de forme complémentaire dudit profilé (4) est amené à entrer
en prise avec le bord longitudinal (3) libre de ladite palplanche (1), ledit profilé
jouant le rôle de support pour au moins une buse (6,8) à travers laquelle un liquide
hydraulique tel que de l'eau, est injecté le long du bord longitudinal libre (3) de
ladite palplanche, et ledit profilé auxiliaire (4) est retiré du sol avant l'enfoncement
d'une palplanche suivante.
2. Procédé selon la revendication 1, caractérisé en ce que l'insertion et le retrait
du profilé auxiliaire s'effectuent dans une phase intermédiaire entre l'insertion
de deux palplanches successives ou de deux paires de palplanches successives.
3. Procédé selon la revendication 1, caractérisé en ce que le profilé auxiliaire et une
palplanche sont simultanément enfoncés dans le sol.
4. Procédé selon les revendications 1 à 3, caractérisé en ce que l'espace creux - qui
est créé autour du bord longitudinal libre (3) de la dernière palplanche (1) enfoncée,
sous l'effet du retrait du profilé (4) - est rempli d'une substance d'étanchéité telle
que de la bentonite, qui est injectée sous pression à travers ladite buse (6; 8).