[0001] The invention relates to a method of adsorption particularly for adsorption of a
hydrocarbon in a gas containing same during hydrocarbon, or combined water and hydrocarbon,
dewpoint control. Hitherto, variations in processed gas quality were obtained unless
multiple - i.e. three or more bed-systems were used, with at least two beds adsorbing
and at least one regenerating at any one time. This process is more complex than for
a two bed system, requiring additional control valves and pipework, and hence the
capital cost of a plant is increased.
[0002] It is an advantage of the invention to seek to mitigate these disadvantages.
[0003] According to one aspect of the invention there is provided a method of operating
an adsorption system for control of output quality of a gas containing a hydrocarbon,
comprising providing two adsorption beds, providing a gas supply which is to be passed
through the beds for adsorption of hydrocarbon, passing the gas through one bed from
the source in an initial adsorption mode whilst regenerating the second bed, and then
before changeover of the beds from continuous adsorption to regeneration and vice
versa, splitting the adsorption feed gas flow into streams flowing in parallel through
both beds and recombining the gas from the adsorbing bed and the regenerated bed.
[0004] The process may include the step in which the parallel flow may be ceased and the
flow passed to a single adsorbing bed by means of monitoring the condition of the
recombined gas.
[0005] Preferably the monitoring step may comprise monitoring the hydrocarbon dewpoint of
the recombined gas.
[0006] The process may include the step of regenerating a bed saturated with hydrocarbon
after cessation of the parallel flow.
[0007] The process may comprise repeating the splitting of the gas flow and passing the
streams in parallel through the beds operated in the opposite mode to their initial
operating mode during passage of the split streams.
[0008] The step of splitting the gas streams may comprise providing two gas streams of equal
flow rate.
[0009] There may be the provision of a control system to adjust the ratio of the flow rates
to maintain minimum variation of desired parameters of the recombined gas stream.
[0010] According to a second aspect the invention provides a two-bed adsorption system when
operated by a method as hereinbefore defined.
[0011] A process embodying the invention is hereinafter described, by way of example, with
reference to the accompanying drawings.
Figure 1 shows schematically a conventional two bed adsorption system;
Figure 2 shows schematically a method of operation of a two bed system according to
the invention;
Figures 3 and 3B show graphically respectively a predicted variation in hydrocarbon
dewpoint for a system like that of Figure 1 and for a method of operation as depicted
in Figure 2;
Figures 4A and 4B show graphically respectively a predicted variation in Calorific
Value (CV) for a system like that of Figure 1, and for a method of operation as depicted
in Figure 2; and
Figures 5A and 5B show graphically respectively the variation in Wobbe Number for
a system like that of Figure 1 and for a method of operation as depicted in Figure
2.
[0012] Referring to the drawings, Figure 1 shows a conventional two bed adsorption system
for hydrocarbon, or combined water and hydrocarbon, dewpoint control. In such a system
one bed 1 is "on line" adsorbing whilst the second bed 2 is undergoing regeneration
or is on standby. A proportion of the feed gas 3 is used for regeneration, which flows
through a regeneration gas heater 4 (except during cooling when the heater is bypassed),
and then through the bed 2 in a downwards direction. The outlet regeneration gas is
cooled (when necessary) and the desorbed hydrocarbons are condensed from the gas.
The regeneration gas 5 after separation of the desorbed liquids rejoins the feed gas
to the adsorbing bed 1. The adsorption gas also flows through the bed in a downward
direction and the hydrocarbon dewpoint of the outlet or processed gas increases as
the adsorption time increases. Changeover from the adsorbing bed 1 to the regenerated
bed 2 occurs before the hydrocarbon dewpoint specification is exceeded, with the regenerated
bed held on standby if the regeneration is completed within the adsorption time. (For
combined water and hydrocarbon dewpoint control, the water dewpoint specification
will never be exceeded if the hydrocarbon dewpoint specification is met. This is because
water is much more strongly adsorbed than hydrocarbons and is retained in the upper
section of the bed, therefore water should never be present in the processed gas).
[0013] Turning now to Figure 2, there is shown therein schematically a method of operation
of a two bed system according to the invention. The method reduces variation in gas
quality of processed gas, for example the method reduces variations in Calorific Value
(CV), Wobbe Number, dewpoint and the like.
[0014] There are two adsorbing beds A and B. Before complete bed changeover from adsorption
to regeneration, the adsorption feed gas flow is "split" into two equal streams flowing
through both beds in parallel. During this period which could be termed an "overlapping"
period of operation of both adsorbers A and B, the processed gas from the recently
regenerated bed and the continuously adsorbing bed is recombined. This has the advantage
of "dampening" the gas quality variations by combining gas from the start of an adsorption
period, which has relatively low CV, Wobbe and dewpoint with gas from the end of an
adsorption period, which has relatively high CV, Wobbe and dewpoint. Changeover from
the "overlapping" period to single bed operation is determined by the hydrocarbon
dewpoint of the recombined gas. In addition to the "dampening" effect on the CV, Wobbe
and dewpoint, the "overlapping" mode also achieves a greater utilization of the adsorbent
in terms of hydrocarbon saturation. Thus the "overlapping" mode requires less adsorbent
inventory than a conventional design when processing gas to the same specification.
This is because during the "overlapping" period the hydrocarbon dewpoint of the gas
from the continuously adsorbing bed is above specification whilst the dewpoint of
the recombined gas remains within specification.
[0015] After the "overlapping" period the hydrocarbon saturated bed, say A, is regenerated
with all the adsorption feed gas flowing through the bed B that has only experienced
regenerating flow during the "overlapping" period. At the end of this adsorption period
another "overlapping" period of "split" flow begins, and the cycle is repeated.
[0016] It will be understood that although the adsorption feed gas flow during the "overlapping"
periods is described as "split" into two streams of equal flowrate, this value is
not necessarily the optimum, but is the easiest to control as it gives equal pressure
drops through both beds A and B. An "intelligent" control system could be used to
adjust the ratio of the two flows to maintain minimum variations of hydrocarbon dewpoint,
CV or Wobbe in the recombined gas; or to reduce operating costs by maximizing the
time between regenerations.
[0017] Referring now to Figures 3 to 6, Figures 3A and 3B show the predicted variation in
hydrocarbon dewpoint for a conventional two bed design and for a method embodying
the invention. The variation in dewpoint for the conventional design Figure 3A is
51°C (92°F), whilst for the method of the invention Figure 3B, it is only 27°C (49°F).
Also shown is the increased adsorption time for the "overlapping" design before the
method of the invention the dewpoint specification is exceeded. For the dewpoint is
exceeded after 180 minutes; this time is made up of two 30 minute "overlapping" periods
of "split" flow operation and 120 minutes of single bed operation. Hence the equivalent
adsorption time for all the feed gas through one bed is 150 minutes; this is 15% greater
than the 130 minutes for the conventional design.
[0018] Figures 4A and 4B show the predicted variation in CV for a conventional two bed design
and for a method embodying the invention. The variation in CV for the conventional
design, Figure 4A, is 0.58 MJ/m³ (15.3 BTU/ft³), whilst for the method of the invention,
Figure 4B, is reduced by more than 50% to only 0.25 MJ/m³ (6.6 BTU/ft³).
[0019] Figures 5A and 5B show the predicted variation in Wobbe Number for a conventional
two bed design and for the method of the invention. The variation in Wobbe Number
for the conventional design is 0.36 MJ/m³ (10.8 BTU/ft³), whilst for the method according
to the invention this is reduced by more than 50% to only 0.14 MJ/m³ (4.2 BTU/ft³).
[0020] Using the method of the invention, it is possible to provide for a limitation on
variations in processed gas quality using only two adsorption beds. Moreover, the
"overlapping" two bed design achieves greater utilization of adsorbent compared with
a conventional two bed design. This advantage is achieved by adsorbing an increased
loading of hydrocarbons prior to regeneration.
1. A method of operating an adsorption system for control of output quality of a gas
containing a hydrocarbon, comprising providing two adsorption beds, providing a gas
supply which is to be passed through the beds for adsorption of hydrocarbon, passing
the gas through one bed from the source in an initial adsorption mode whilst regenerating
the second bed, and then before changeover of the beds from continuous adsorption
to regeneration and vice versa, splitting the adsorption feed gas flow into streams
flowing in parallel through both beds and recombining the gas from the adsorbing bed
and the regenerated bed.
2. A process according to Claim 1, in which the parallel flow is ceased and the flow
is passed to a single adsorbing bed by means of monitoring the condition of the recombined
gas.
3. A process according to Claim 2, the monitoring step comprising monitoring the hydrocarbon
dewpoint of the recombined gas.
4. A process according to Claim 2 or Claim 3, comprising the step of regenerating
a bed saturated with hydrocarbon after cessation of the parallel flow.
5. A process according to Claim 4, comprising repeating the splitting of the gas flow
and passing the streams in parallel through the beds operated in the opposite mode
to their initial operating mode during passage of the split streams.
6. A method according to any preceding claim, the step of splitting the gas stream
comprising providing two gas streams of equal flow rate.
7. A method according to any of Claims 1 to 6, comprising providing a control system
to adjust the ratio of the flow rates to maintain minimum variation of desired parameters
of the recombined gas stream.
8. A method according to Claim 1, substantially as hereinbefore described with reference
to Figures 2 to 5B of the accompanying drawings.
9. A method according to Claim 1, substantially as hereinbefore described.
10. A two bed adsorption system for adsorbing hydrocarbon from a gas containing same,
whenever operated by a method according to any preceding claim.