| (19) |
 |
|
(11) |
EP 0 361 039 A3 |
| (12) |
EUROPEAN PATENT APPLICATION |
| (88) |
Date of publication A3: |
|
17.07.1991 Bulletin 1991/29 |
| (43) |
Date of publication A2: |
|
04.04.1990 Bulletin 1990/14 |
| (22) |
Date of filing: 08.08.1989 |
|
|
| (84) |
Designated Contracting States: |
|
AT BE CH DE ES FR GB GR LI LU NL SE |
| (30) |
Priority: |
28.09.1988 IT 1256088
|
| (71) |
Applicant: MINISTERO DELL' UNIVERSITA' E DELLA RICERCA SCIENTIFICA E TECNOLOGICA |
|
I-00196 Roma (IT) |
|
| (72) |
Inventor: |
|
- Tamburini, Mario
c/o Consorzio Ediltra 1
I-40050 Funo di Argelato (Bologno) (IT)
|
| (74) |
Representative: Porsia, Attilio, Dr. et al |
|
c/o Succ. Ing. Fischetti & Weber-Dr. Porsia
Via Caffaro 3 16124 Genova 16124 Genova (IT) |
|
| |
|
| (54) |
Prefabricated building |
(57) A prefabricated multi-storied building is described, which if desired may be disassembled,
with recovery of the components up to over 90%, which may be stowed with minimum space-requirements
and then re-assembled within a much reduced time, and which due to the above and other
characteristics is particularly suitable to solve emergency building problems. The
building is of the framework construction type, constituted by metallic modules (P-TP-TS)
of standard dimensions, which are repeated spatially with either square or rectangular
grid-formations or meshes. The frames constituting the structural assembly of the
building result from the assembling, by means of bolted type connections, of pillar
modules (P) and of primary beams (TP) and secondary beams (TS) which are repeated
horizontally and vertically and which constitute the main framework of said building.