[0001] The invention relates to a grouting method and apparatus, and in particular for the
placement of self-setting cementitious grouts in wet conditions. In particular, the
invention is applicable to the placement of grout in the clearance or void between
segmental blocks of a lining in a tunnel and the facing tunnel bore wall, and more
especially to carrying out this step when a tunnel is being bored at a fast rate.
One specific use of the invention is in the drilling of the Channel Tunnel where there
can be a severe seepage of water into the clearance and despite this the tunnel boring
must be advanced at a fast rate.
[0002] US patent-A-3672173 published in 1972 is concerned with the formation of a self-supporting
water-impermeable barrier in a mine passage by means of apparatus controlled from
a remote location, e.g. outside the passage. In the method, an aqueous cement slurry
is combined with an aqueous silicate solution to form a fast setting cement composition
which is sprayed on to the floor and walls of the desired shape. The formed barrier
is a rigid mass erosive to running water and able to withstand the hydrostatic pressures
encountered within the passage after the barrier has been formed. Example 1 shows
that under laboratory conditions a fast setting mixture was made up and allowed to
thicken; the thickened mass was placed in water running at about 0.7 gallons/minute
(3.15 litres per minute) and allowed to harden. About 4% of the mass was washed away
by erosion. The document teaches that fillers such as fly ash or silica flour can
be added to retard the setting time and that bentonite can be included as a thixotropic
agent. Our work has shown that such a composition cannot set in fast running water.
[0003] US patent-A-3483007 published in 1969 teaches that the addition of a hydroxyalkyl
ether cellulose to an aqueous cement grout useful in well cementing will reduce the
loss of liquid through porous earth walls defining the well bore. The cement solution
comprised 100 parts cement, 35 to 65 parts water, at least 5 parts of a salt, and
0.01 to 2.5 parts of the cellulose.
[0004] US patent-A-4470463 published in 1984 relates to the cementing of deep wells in a
weak formation not able to bear the weight of a dense cement. The document proposes
the use of a lightweight cement slurry comprising 150 to 250 parts water, 100 parts
cement, 10 to 15 parts bentonite, 0.5 to 1.5 parts of sodium silicate and 0.1 to 1.5
parts of hydroxyethyl cellulose. In an example, Example 7, a slurry is pumped down
12000 feet (11076 metres) to return to the surface.
[0005] There is a problem in setting a cement in the presence of fast running water present
in a void when one is drilling in the void, e.g. a tunnel or like excavation, in order
to form a structure such as a lining in the tunnel. The water emerges at a fast rate
from the walls of the bore in the formation and of course where and when it emerges
and how fast cannot be predicted. It has now been discovered, according to the invention,
that by including a defined retarder in the cement grout and setting the cement by
means of a gelling agent, one can cause the cement to set quickly and develop high
early strength.
[0006] According to the invention in one aspect there is provided a method of placing and
setting a cementitious material in an a void containing water, the method comprising
supplying a cement grout of cement and water to the void, and at or immediately before
placement adding a gelling agent therefor, wherein the cement grout contains an anti-washout
retarder, and the formed mixture of grout and gelling agent is supplied to the void
containing the water, the content of the gelling agent relative to the retarder being
selected so that the cement will set rapidly to develop high compressive strength.
[0007] Preferably, the gelling agent is selected according to the nature of the self-setting
material of the grout. Most preferably the gelling agent is a sodium silicate, aluminium
sulphate or magnesium sulphate or the like. Because such agents tend to be rapid acting,
the grout contains an anti-washout retarder, e.g. a water soluble natural or synthetic
polymer which will surround particles of the cement or other self-setting material
to protect such particles from being washed out by the static or flowing water present
in the void. By adjustment of the quantity of the retarder, the quantity of the gelling
agent relative to the dry cement or other hydraulic ingredients can be up to say 8%,
preferably 3 or 4%, better to control the rate of placement.
[0008] The cement may be a cement such as Ordinary Portland Cement and a pozzolanic or like
material such as pulverised fly ash, blast furnace slag or the like may be present
in the grout. Sand and/or aggregates may be present. Preferably the retarder is selected
so that the grout may be held in a holding tank for several hours, e.g. six. The anti-washout
retarder may be a hydroxyethyl cellulose ether or the like. The quantity of the anti-washout
retarder will be about 0.25% by weight, relative to the cement or other dry hydraulic
ingredients. Additives may be present provided that they do not significantly affect
the rate of set or strength development of the cement composition. It is preferred
to add an anti-foaming agent, to prevent air entrainment which would weaken the set
material.
[0009] The formed composition of grout and gelling agent is preferably delivered to the
void by injection. For this purpose the invention provides apparatus comprising delivery
means for delivering the grout to a void and means for injecting a gelling agent at
or immediately before placement. Most preferably the gelling agent is supplied to
an inline mixer in the delivery means located at or near the outlet of the delivery
means.
[0010] The void is usually present in an excavation, e.g. mine passage or a tunnel, and
is usually the gap between the bore wall and the lining.
[0011] In order that the invention may be well understood it will now be described by way
of example only with reference to the accompanying drawing in which:
Figure 1 is a schematic longitudinal sectional elevation of the grout preparation
stage of the apparatus of the invention
Figure 2 is a schematic view showing the circuit of the grout dispensing stage of
the apparatus.
[0012] A tunnel boring machine (not shown) comprises a leading tunnel boring head, followed
by a segment laying section and trailing section including apparatus for grouting
the segments into position, laying rail track and the like. The machine measures about
25 metres long.
[0013] The segments are usually formed of concrete and are laid in portions, three to the
floor (the invert), two for the sides and then the top section. Grout is supplied
from apparatus mounted on the trailing section via pipes which end in lances directed
into the clearance between the outer wall of the segments and the facing wall of the
bore. Often water has seeped or is flowing fast into that clearance before the grout
is placed.
[0014] Figure 1 shows a portion of the trailing section. A storage hopper 1 contains a dry
cementitious powder such as a pulverised fly ash/Ordinary Portland Cement mixture
in the weight ratio of 3:1. Feeders 2, such as scroll mixers, lead from the storage
hopper 1 to a top hopper 3 mounted above and connected to two mixing chambers 4A,
4B. Each contains a mixing device 5, e.g. a paddle. The flow of powder is controlled
by volumetric or weight flow meters 6. Water is supplied via pipes 7 into each mixing
chamber 4A, 4B. A liquid solution containing an anti-washout retarder for the cement
powder is present in a hopper 8 and is supplied into each mixing chamber 4A, 4B also
under the control of a volume flowmeter 6. In operation, powder, water and retarder
are drawn from their respective stores into mixing chambers in turn, and the mixed
composition is then fed to a holding chamber 9. The chamber 9 is in circuit with a
long pipe 10 having injection lances 11, some at the leading end for invert grouting
and others at the trailing end for grouting between segmental rings. A pump 12 is
present in the circuit. An inline static mixer 13 is present at the forward end of
each lance 11, and is connected to an inlet 14 for a line 15 containing a liquid containing
a gelling agent such as sodium silicate, aluminium sulphate or the like. A water flushing
pipe 16 is present just rearwardly of the lance outlet.
[0015] In use, when one or more segments are placed, the operator activates the pump 12
using controls (not shown) to pump grout from the holding chamber 9 into the pipe
10 and the lances 11, and then gelling agent solution is supplied through the lance
to the dispensed grout just before placement, the rate of addition of gelling agent
being selected relative to the content of retarder in the grout so that the placed
grout will gel and/or set in 10 to 15 minutes, despite the presence of any static
or running water in the annulus between the segment and the bore wall. The cement,
water, retarder and gelling agent are selected so that the set material will have
a load bearing compressive strength after 24 hours of about 0.6 to 1 Newton/mm² so
that rail track can be laid on the floor segments whereby the tunnel boring machine
can move forward at a predetermined rate. When the gelling agent (sodium silica sol)
was added at the rate of 4% vol/vol, the gel time was 20 minutes and the strength
after 1 day was 1.92 N/mm². The set material will attain a compressive strength after
28 days of about 6 to 8 N/mm².
1. A method of placing and setting a cementitious material in a void containing running
water, the method comprising supplying a cement grout of cement and water to the void,
and at or immediately before placement adding a gelling agent therefor, characterised in that the cement grout contains an anti-washout retarder, and the formed mixture of grout
and gelling agent is supplied to the void containing the water, the content of the
gelling agent relative to the retarder being selected so that the cement will set
rapidly to develop high compressive strength.
2. A method according to Claim 1 characterised in that the content of gelling agent and of the anti-washout retarder are selected so that
the placed material will gel or set in about 10 to about 20 minutes after placement.
3. A method according to Claim 1 or 2 characterised in that an antifoaming agent is present to prevent air entrainment which would cause weakness
in the set material.
4. A method according to any preceding Claim characterised in that the gelling agent comprises a silicate such as sodium silicate or silica sol or a
sulphate such as aluminium sulphate or magnesium sulphate.
5. A method according to any preceding Claim characterised in that the retarder is a cellulose ether present in a concentration of about 0.25% of the
weight of the dry cement.
6. A method according to any preceding Claim characterised in that the cement grout comprises a pozzolanic material and a cement, preferably pulverised
fuel ash and Ordinary Portland cement, in a weight ratio of 3:1, and water
7. A method according to any preceding Claim characterised in that the retarder is added to the slurry and is selected to retard the setting for at
least six hours.
8. A method according to any preceding Claim characterised by pumping the grout to the void via a pipeline including an inline mixer present at
or near the outlet end and injecting the gelling agent into the pipeline via the mixer.
9. A method according to any preceding Claim characterised in that the set material has a strength 24 hours after placement of at least 1 Newton/mn².
10. A method according to any preceding Claim characterised in that the void comprises the annulus between a tunnel bore and the tunnel lining therein.