| (19) |
 |
|
(11) |
EP 0 450 271 B1 |
| (12) |
EUROPEAN PATENT SPECIFICATION |
| (45) |
Mention of the grant of the patent: |
|
03.04.1996 Bulletin 1996/14 |
| (22) |
Date of filing: 24.01.1991 |
|
|
| (54) |
Armour jointing method
Verfahren zum Verbinden von Bewehrungsdrähten
Procédé de jonctionnement d'armure
|
| (84) |
Designated Contracting States: |
|
FR IT SE |
| (30) |
Priority: |
30.03.1990 NO 901471
|
| (43) |
Date of publication of application: |
|
09.10.1991 Bulletin 1991/41 |
| (73) |
Proprietor: ALCATEL STK A/S |
|
N-0508 Oslo 5 (NO) |
|
| (72) |
Inventors: |
|
- Roald, Ove Elias
N-1440 Drobak (NO)
- Pettersen, Bjorn
N-1185 Oslo 11 (NO)
|
| (74) |
Representative: Pohl, Herbert, Dipl.-Ing et al |
|
Alcatel SEL AG
Patent- und Lizenzwesen
Postfach 30 09 29 D-70449 Stuttgart D-70449 Stuttgart (DE) |
| (56) |
References cited: :
EP-A- 0 113 053 DE-C- 465 409
|
EP-B- 0 046 544 US-A- 3 701 080
|
|
| |
|
|
|
|
| |
|
| Note: Within nine months from the publication of the mention of the grant of the European
patent, any person may give notice to the European Patent Office of opposition to
the European patent
granted. Notice of opposition shall be filed in a written reasoned statement. It shall
not be deemed to
have been filed until the opposition fee has been paid. (Art. 99(1) European Patent
Convention).
|
[0001] The present invention relates to a method for replacing the armour over a cable joint.
The process includes the steps of making a number of pretwisted armour elements, placing
the elements over the joint and clamping, welding or soldering the ends of the elements
to the cable armour on both sides of the joint. Such a method is known (EP-B-0 046
544).
[0002] The armour elements required to make up the armour over a cable joint, such as a
submarine power cable joint, are usually made one by one by winding an armour wire
over a mandrel. Difficulties are experienced in obtaining the correct diameter and
length of lay. Furthermore, the process takes relatively long time. When making repairs
on submarine cables the jointing process must take as short time as possible, and
the main object of the invention is to improve this process.
[0003] The main features of the invention are defined in the claims. By using the invention
there is obtained a reliable process which requires relatively short time.
[0004] Above mentioned and other features and objects of the present invention will clearly
appear from the following detailed description of embodiments of the invention taken
in conjunction with the drawings, where
Figure 1 schematically illustrates an armouring line for cables,
Figures 2 - 4 shows two alternative tube-supported element sections, and
Figures 5 - 8 illustrate four steps during the process of replacing the armouring
elements over a cable joint in accordance with the invention.
[0005] In Figure 1 is illustrated a cable armouring line 1 having an wire armouring machine
2, the details of which are not shown. A cable 3 has just been passed through the
machine so that its left end is about to leave the machine to the right in the drawing.
The machine may provide single or double layer armour on the cable core. A pipe or
tube 4 of desired length and diameter is inserted into the machine 2 at its left side.
[0006] In order to obtain a number of spiralled armour elements having the correct diameter
and lay length, the elements must be wound onto a tube having a smaller diameter than
that at which they were wound onto the cable core. If, as an example, the diameter
of a cable core is 100 mm, the tube could have a diameter of 80 mm. If an armour layer
of a cable has 32 wires, it would be practical to wind 16 wires onto a tube which
is twice as long as the joint, and cut the wires to size afterwards. If the length
of the joint is 5 m, the length of the tube should be 10 m. The tube-supported elements
must be bonded, taped or otherwise fastened to the tube at both ends, to prevent the
elements from unwinding and loosening. The tube may be cut into a number of required
sections and both ends of the elements must be secured on the tubes. The tube with
the tube-supported elements may be worked, i. e. it may be bent back and forth a number
of times to take the unspiralling tendency out of the elements.
[0007] The spiralled armouring elements of the present invention may be wound or inserted
over a power cable joint in a predetermined number, one by one, after the cable core
joint has been completed, but this is not considered to give the best results. In
some cases it will be necessary to do it this way.
[0008] The wire elements which are wound onto the smaller diameter pipe or tube 4 should,
preferably, and in accordance with the invention be transferred to a tube section
10, (Figures 2 and 3) having a larger diameter than the cable core and even larger
than the diameter of the armoured cable. The number of spiralled wires transferred
to the tube 10 in this intermediate step should correspond to the number of wires
in the cable armour. The tube-10-supported wire element section can then be stored
until its use is required. The tube 10 should be made of a (plastic) material strong
enough to withstand the radial tension of the spiralled wire elements.
[0009] The tube section 10 itself, with spiralled armour elements 11, can then be pushed
over one of the cable ends before completing the cable core joint, so that after completion
of the joint, the tube-supported elements can be pushed back to cover the joint. One
side of the elements can then be welded to the armour elements of one of the cable
ends. The tube 11 can then be withdrawn from the elements 12 before welding or otherwise
securing the other side of the elements to the ends of the armour of the other cable
end. The surface of the tube should preferably be lubricated to facilitate withdrawal
of the tube from between the cable core and the armour elements.
[0010] An alternative to using one piece of tube 11 for a set of elements 12 as illustrated
in Figures 2 and 3, is to use a large diameter tube 13 consisting of two parts, e.g.
one long part 14 and one short part 15, as illustrated in Figure 4, and having a correct
number of armour elements 16. The two parts may be interconnected so that the tube
can be handled as one unit, but the interconnection should not be stronger than allowing
one part to be torn away from the other part in the axial direction.
[0011] In Figure 5 is schematically illustrated a power cable joint 20, showing two cable
ends 21 and 22, each having a conductor 23, 24, coned insulation 25, 26 and armour
layers 27, 28. To the left in the drawing is indicated the end of an armour tube 10
or 13 which is to be pulled over the joint to complete the armour layer when the cable
conductors have been jointed and the insulation replaced.
[0012] In Figure 6 is illustrated how a tube 13 with armour wires 16 is placed over the
joint. In Figure 7 the short part 15 of the tube has been separated from the long
part 14 and pulled to the right so as to allow the armour element ends 30 to be joined
or secured to the cable armour wires 28. Thereafter the long tube 14 is pulled to
the left as shown in Figure 8 so that the left hand end 31 of the armour elements
can be joined or secured to the cable armour wires 27. Finally the tubes 14 and 15
can be removed from the cable or they can be left on the cable joint as protection.
[0013] It will be understood that in the case of two layer armoured cables or cross armoured
cables there can be prepared two sets of tube-supported armour elements which can
be placed one over the other. Each of the sets can be prepared as described above.
[0014] The above detailed description of embodiments of this invention must be taken as
examples only and should not be considered as limitations on the scope of protection.
1. Method for replacing the armour over a cable joint (20), including the steps of making
a number of pretwisted armour elements, placing the elements over the joint and clamping,
welding or soldering the ends of the elements to the cable armour (27,28) on both
sides of the joint,
characterized by arranging a number of stranded or spiralled wire elements (12,16) on a tube (11,14-15)
having a diameter larger than the cable core and the cable armour, in order to constitute
an armouring device (10,13) and replacing the cable armour by inserting the tube (10,13)
over one of the cable ends (21) before making the cable joint (20), sliding the tube
over the cable joint when this is finished, withdrawing the tube (11,14-15) from underneath
the armour elements (12,16), and clamping, welding or soldering the ends of the elements
to the cable armour (27,28).
2. Method according to claim 1, characterized in that the elements are premade by stranding a number of armour elements (12) over a length
of pipe or tube (4) having a diameter smaller than the cable core and cable core joint
and thereafter transferring the elements from the tube (4) to the tube (11,14-15)
of the armouring device (10,13).
3. Method according to claim 2, characterized in this that the elements (12) are cut to correct length from a tube (4) which is long enough
to support a number of successive lengths of armour element sections.
4. Method according to claim 2 or 3, characterized in this that the elements (12) are stranded onto a tube (4) in a cable armour stranding machine
(2).
5. Method according to claim 2, 3 or 4,
characterized in this that after stranding the elements onto the tube (4), the tube is worked so as to take
out the spring tension of the elements.
6. Method according to claim 1, characterized in this that the tube consists of two parts, e.g. one long (14) and one short (15), the shortest
tube being withdrawn first so that the released armour ends (30) can be clamped to
the cable armour (28) on one of the cable ends (22) before withdrawing the long tube
(14) and clamping the other end (31) of the elements to the armour (27) of the other
cable end (21).
7. Method according to claim 1, characterized in this that it makes use of a tube or pipe made of reinforced plastic material.
1. Verfahren zum Ersetzen der Ummantelung über einer Kabelverbindung (20), das die Schritte
des Herstellens einer Anzahl von vorverdrillten Ummantelungselementen, des Anordnens
der Elemente über der Verbindung und des Klemmens, Schweißens oder Lötens der Enden
der Elemente an die Kabelummantelung (27, 28) auf beiden Seiten der Verbindung umfaßt,
gekennzeichnet durch Anordnen einer Anzahl von litzenförmigen oder spiralförmigen
Drahtelementen (12, 16) auf einer Röhre (11, 14 bis 15), die einen größeren Durchmesser
als der Kabelkern und die Kabelummantelung aufweist, um eine Ummantelungsvorrichtung
(10, 13) zu bilden, und Ersetzen der Kabelummantelung durch Führen der Röhre (10,
13) über eines der Kabelenden (21), bevor die Kabelverbindung (20) hergestellt wird,
Schieben der Röhre über die Kabelverbindung, wenn diese vollendet ist, Zurückziehen
der Röhre (11, 14 bis 15) unterhalb der Ummantelungselemente (12, 16) und Klemmen,
Schweißen oder Löten der Enden der Elemente an die Kabelummantelung (27, 28).
2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Elemente vorgefertigt werden,
indem eine Anzahl von Ummantelungselementen (12) über einen Längenabschnitt eines
Rohrs oder einer Röhre (4), die einen kleineren Durchmesser als der Kabelkern und
die Kabelkernverbindung aufweist, gelitzt wird und danach die Elemente von der Röhre
(4) auf die Röhre (11, 14 bis 15) der Ummantelungsvorrichtung (10, 13) übertragen
werden.
3. Verfahren nach Anspruch 2, dahingehend gekennzeichnet, daß die Elemente (12) auf eine
korrekte Länge von einer Röhre (4) zugeschnitten werden, die lang genug ist, um eine
Anzahl von aufeinanderfolgenden Längenstücken von Ummantelungselementabschnitten zu
unterstützen.
4. Verfahren nach Anspruch 2 oder 3, dahingehend gekennzeichnet, daß die Elemente (12)
auf eine Röhre (4) in einer Kabelummantelungslitzenmaschine (2) gelitzt werden.
5. Verfahren nach Anspruch 2, 3 oder 4, dahingehend gekennzeichnet, daß nach dem Litzen
der Elemente auf die Röhre (4) die Röhre derart bearbeitet wird, daß die Federspannung
der Elemente entfernt wird.
6. Verfahren nach Anspruch 1, dahingehend gekennzeichnet, daß die Röhre aus zwei Teilen
besteht, z.B. einem langen (14) und einem kurzen (15), wobei die kürzere Röhre zuerst
zurückgezogen wird, so daß die freigegebenen Ummantelungsenden (30) mit der Kabelummantelung
(28) an einem der Kabelenden (22) verklemmt werden können, bevor die lange Röhre (14)
zurückgezogen wird und das andere Ende (31) der Elemente mit der Ummantelung (27)
des anderen Kabelendes (21) verklemmt wird.
7. Verfahren nach Anspruch 1, dahingehend gekennzeichnet, daß eine Röhre oder ein Rohr
aus verstärktem Plastikmaterial verwendet wird.
1. Procédé pour remplacer l'armature sur une jointure de câble (20), comprenant les étapes
de fabrication d'un certain nombre d'éléments d'armature à prétorsion, de placement
des éléments sur la jointure et de serrage, de soudage ou de brasage des extrémités
des éléments de l'armature de câble (27, 28) sur les deux côtés de la jointure, caractérisé
par la disposition d'un certain nombre d'éléments de fils toronnés ou en spirale (12,
16) sur un tube (11, 14-15) ayant un diamètre supérieur à celui de l'âme du câble
et de l'armature du câble, afin de constituer un dispositif de blindage (10, 13) et
la mise en place de l'armature de câble en insérant le tube (10, 13) sur l'une des
extrémités du câble (21) avant de constituer la jointure du câble (20), en faisant
glisser le tube sur la jointure de câble lorsque cette dernière est terminée, en retirant
le tube (11, 14-15) qui se trouve sous les éléments d'armature (12, 16) et en serrant,
soudant ou brasant les extrémités des éléments sur l'armature de câble (27, 28).
2. Procédé selon la revendication 1, caractérisé en ce que les éléments sont préfabriqués
en toronnant un certain nombre d'éléments d'armature (12) sur la longueur d'un tuyau
ou d'un tube (4) ayant un diamètre inférieur à celui de l'âme du câble et de la jointure
de l'âme du câble, puis en transférant les éléments du tube (4) au tube (11, 14-15)
du dispositif de blindage (10, 13).
3. Procédé selon la revendication 2, caractérisé en ce que les éléments (12) sont coupés
à la longueur correcte à partir d'un tube (4) qui est suffisamment long pour soutenir
plusieurs longueurs de sections d'éléments d'armature.
4. Procédé selon la revendication 2 ou 3, caractérisé en ce que les éléments (12) sont
toronnés sur un tube (4) dans une machine à toronner les armatures de câble (2).
5. Procédé selon la revendication 2, 3 ou 4, caractérisé en ce que, lorsque les éléments
ont été toronnés sur le tube (4), le tube est travaillé de façon à évacuer la tension
de ressort des éléments.
6. Procédé selon la revendication 1, caractérisé en ce que le tube se compose de deux
parties, par exemple une longue (14) et une courte (15), le tube le plus court étant
tiré en premier, afin que les extrémités libérées de l'armature (30) puissent être
fixées sur l'armature de câble (28) sur une des extrémités du câble (22) avant le
retrait du tube long (14) et la fixation de l'autre extrémité (31) des éléments sur
l'armature (27) de l'autre extrémité du câble (21).
7. Procédé selon la revendication 1, caractérisé en ce qu'il utilise un tube ou un tuyau
fait de matière plastique renforcée.