FIELD OF THE INVENTION
[0001] The present invention relates generally to the technology of induction heating and
more particularly to the use of induction heating devices for case-hardening of machine
components such as gears.
[0002] Machine components such as gears, splined shaves and sprockets are frequently subjected
to high torque loads, frictional wear and impact loading. Gears of this type are typically
used in power transmission drive trains. An apparatus and method for induction-hardening
of such machine components is disclosed in US-A-4,845,328 to Storm et al.
[0003] The Storm et al. patent and this application are both owned by the same assignee,
Contour Hardening Inc., of Indianapolis, Indiana.
[0004] As is well known in the art, a known device for gear teeth hardening includes a dual-frequency
arrangement for induction heating wherein a low frequency current is used for preheating
the gear teeth and then a high frequency (Radio Frequency) current is then used for
final heating prior to quench hardening of the gear teeth. The dual frequency induction
hardening concept is described in the article "Induction Gear Hardening by the Dual-Frequency
Method" which appeared in
Heat Treating Magazine, Vol. 19, No. 6, published in June, 1987.
[0005] As explained in the article, dual-frequency heating employs both high and low frequency
heat sources. The gear is first induction heated with a relatively low frequency source
(3-10 kHz), providing the energy required to preheat the mass of the gear teeth. This
step is followed immediately by induction heating with a high-frequency source which
typically ranges from 100-300 kHz depending on the gear size and diametral pitch of
the gear teeth. The high-frequency source will rapidly final heat the entire tooth
contour surface to a case hardening temperature. The gears are then quenched to a
desired hardness and tempered.
[0006] Induction heating is the fastest known way of heating an iron alloy gear. In some
applications a pre-heat low frequency heat process precedes the final heat RF heating.
Heating times for the high-frequency RF heating step typically range from 0.10 to
2.0 seconds. In induction heating, the gear is mounted on a spindle and spun while
positioned within the induction heating coil. A quick pulse of power is supplied to
the induction heating coil which achieves an optimum final heat of the gear teeth.
Next, the piece is manually or automatically moved into a water-based quench. Because
induction hardening puts only the necessary amount of heat into the part, case depth
requirements and distortion specifications are met with great accuracy.
[0007] Within the induction heating process, whether dual- or single frequency, and regardless
of the type of part and its material, the part characteristics dictate the optimum
design of both the induction heating coil or coils and the most appropriate machine
settings. In particular, the amount of time that the high-frequency power signal is
supplied to the induction heating coil to generate the final heat is a most critical
parameter. The exact amount of heat required to harden the gear is directly related
to the precise amount of time that the power signal is supplied to the induction heater
coil.
[0008] Traditionally, there are two systems well-known in the art for supplying power to
an induction heater coil as described above. The first system utilizes what is known
in the art as a "solid state" generator approach wherein high power amplification
devices such as transistors, be they bipolar or CMOS, are used in the high-frequency
RF generator to supply a high-frequency oscillator signal to the induction heater
coil. An alternate approach is to use a vacuum tube RF generator and utilize thyristor
type devices to switch power on and off to the high-frequency, high power vacuum tube
oscillator circuit. The output of either oscillator circuit is coupled to the induction
heater coil by way of a transformer. Some experts in the art of induction heating
coil machines designed for case hardening metallic structures have heretofore preferred
the solid state high-frequency RF generators for their exact timed control of power
delivery to the induction heater coil. A vacuum tube RF generator typically receives
its input power subject to the on/off timing characteristics of thyristor devices
such as silicon controlled rectifiers (SCR's) which are also known in their JEDEC
description as reverse blocking triode thyristors. The power delivery timing variance
created by the SCR is intrinsic in the operation of such devices. Specifically, once
an SCR is "turned on" for a partial cycle, even though the on/off signal supplied
to the gate is removed or deactivated, the SCR will continue to conduct current so
long as the anode to cathode terminals are biased with a positive voltage. In the
worst case of a 60-cycle power signal being transferred by the SCR, this results in
over an 8 millisecond additional power signal transmitted by the SCR, since half of
a 60-cycle waveform is 8.33 milliseconds in duration.
[0009] It is recognized that the vacuum tube RF generator is preferred by some in the induction
heating art for its characteristic power delivery curve in supplying power to an induction
heater coil. Additionally, since SCR's are the device of choice for repeated high
power switching circuits, a technique for accurately controlling SCR's to deliver
specific quantities of power to a high-power vacuum tube RF generator is needed.
[0010] An example of such an induction hardening apparatus is disclosed in US-A-4,317,975,
which discloses an induction heating apparatus using a gate-controlled switching device
for detecting each zero-crossing of a high-frequency energization current. This zero-crossing
data is thereafter used to provide multiple trigger signals to a configuration of
SCRs to thereby produce a heating signal.
[0011] A method and apparatus for more accurately controlling the timed power output of
a silicon controlled rectifier power supply is needed for accurately controlling the
power signal supplied to induction heater coils used in case hardening devices.
[0012] One object of the present invention is to provide an improved induction hardening
machine.
[0013] Another object of the present invention is to provide a method for more accurately
controlling the power signal supplied to induction heater coils of an induction hardening
machine to precisely control the power supplied and thus the heating of a gear during
case hardening.
[0014] According to one aspect of this invention there is provided an induction hardening
machine as claimed in claim 1. According to another aspect of this invention there
is provided a method for accurately controlling heating of a gear as claimed in claim
2.
[0015] These and other objects of the present invention will become more apparent from the
following description of the preferred embodiment.
BRIEF DESCRIPTION OF THE DRAWINGS
[0016] FIG. 1 is a block diagram of a typical embodiment of an induction-hardening system
according to the present invention
[0017] FIG. 2 is a timing diagram showing variations in the active or "on" state of an SCR
with respect to certain input conditions applied to the gate of the SCR.
[0018] FIG. 3 is a graph depicting a deviation in power output signals produced by power
switching SCR circuits of the present invention as compared with prior art devices.
[0019] FIG. 4 is a block diagram of another embodiment of an induction-hardening system
according to the present invention.
DESCRIPTION OF THE PREFERRED EMBODIMENT
[0020] For the purposes of promoting an understanding of the principles of the invention,
reference will now be made to the embodiment illustrated in the drawings and specific
language will be used to describe the same. It will nevertheless be understood that
no limitation of the scope of the invention is thereby intended, such alterations
and further modifications in the illustrated device, and such further applications
of the principles of the invention as illustrated therein being contemplated as would
normally occur to one skilled in the art to which the invention relates.
[0021] Referring now to FIG. 1, an induction-hardening system 10 according to the present
invention is shown. Switch SW1 provides an activation signal to the system processor
12 for inv king or initiating the case hardening of a gear. System processor 12 is
programmed by the user with timing parameters for controlling the power signal supplied
to the induction heater coil. Processor 12 supplies an on/off power switching signal
to power switching SCR circuit 14. System processor 12 receives a zero crossing indicator
input signal from zero crossing detector 16. One phase
b₁ from 3
b high voltage power source 18 is supplied to an input of zero crossing detector 16.
The 3
b high-voltage power source 18 supplies three phases of high voltage power to the power
switching SCR circuits 14. Power switching SCR circuits 14, when activated, supply
either half-wave or full-wave AC power signals to the primary windings of step-up
transformer 22. Transformer 22 steps up the AC power signals
b₁,
b₂ and
b₃, typically 480 volts three-phase signals, to a voltage level sufficiently high that
rectifier and filter 24 produces a 24,000 volts DC signal at its output.
[0022] The 24,000 volts DC signal at the output of rectifier filter 24 is the power source
for a vacuum tube type high-energy RF oscillator 26. The output of the high-energy
oscillator 26 is AC coupled to the induction heater coil 28 via windings 29. Induction
heater coil 28 supplies a case-hardening heating signal to the gear teeth of gear
30 when an RF signal is supplied to its input.
[0023] The components 22, 24 and 26 of the system 10 are part of RF generator 20 which is
a high-frequency, high-power RF generator. The RF generator 20 is an off-the-shelf
system supplied by Pillar industries, Inc., N92 W15800 Megal Drive, Menomonee Falls,
Wisconsin 53051. The RF generator 20 is referred to as a "450/600 kilowatt RF Generator".
[0024] The particular geometry and physical attributes of gear 30 dictate the precise amount
of time that power switching SCR circuits 14 are "turned on" by system processor 12
in order to produce the appropriate case hardening result. In some instances, the
amount of time that the SCR circuits 14 are turned on is as small a time period as
0.10 seconds to accomplish the desired heating and case hardening of gear 30. with
this condition in mind, it is easy to see why the prior art devices which did not
include zero crossing detector 16, were unable to accurately control the amount of
power signal or total power supplied to the induction heater coil 28.
[0025] The system processor 12 of the present invention typically includes a computer having
adequate memory and computing capability, and a programming input device such as a
CRT/keyboard device. Additionally the processor 12 has mass storage devices such as
floppy or hard disk drives for use in storing and recalling control programs. Operationally
speaking, an operator programs the system processor 12 through a keyboard for a particular
"on-time" or heat time which is the exact time that the power switching SCR circuits
14 shall be turned on to supply a fixed quantity of high-frequency power signal to
the induction heater coil 28. In response to the programmed "on time" information,
the system processor 12 will compute a complement value for the specific "on time"
which is equal to the difference between the "on time" divided by 8.33 milliseconds
(the period of a 60 Hz waveform). The remainder from this calculation is subtracted
from 8.33 milliseconds to produce a time value which is the delay time that the processor
12 should delay after detecting a zero crossing of the 60 Hz signal present at the
input of detector 16 prior to activating the SCR circuits 14 to supply power to the
RF generator. The time delay calculation is designed so that the end of the on or
conducting period for the SCR devices corresponds exactly with or just prior to a
zero crossing of the power signal
b₁ supplied to the input of zero crossing detector 16. Thus, the SCR's, which remain
in the conducting state so long as the anode to cathode terminals are forward biased,
will not remain on a substantial period of time after the system processor 12 signals
the SCR circuits 14 to turn off by deactivating the input to the circuits 14.
[0026] It is well known in the art that SCR circuits 14 may supply a half-wave or full-wave
3
b output signal to the transformer 22. If the signal is half-wave in nature, the divide-by
factor described above (8.33 milliseconds) becomes 16.67 milliseconds and the remainder
is subtracted from 16.67 milliseconds. Additionally, negative-slope zero crossovers
must be detected to determine the appropriate timing reference points for activating
a half-wave output SCR circuit. Thus, the "on time" desired is divided by 16.67, and
any remainder therefrom is subtracted from 16.67. The result of the subtraction process
is the delay period required after a negative-slope zero crossover of the power signal
prior to activating the SCR circuits 14 for half-wave outputs therefrom. Although
the other phases (
b₂ and
b₃) of the SCR circuits 14 may remain "on" after the input to circuits 14 is deactivated,
the above technique produces an accurate and repeatable power output from SCR circuits
14.
[0027] Referring now to FIG. 2, a timing diagram showing variations in active or "on" state
of an SCR with respect to certain gate signal conditions is shown. Curve 40 is a standard
sine wave power signal representing the
b₁ signal at the input of detector 16. Curve 40 is a 60 Hz signal plotted with respect
to time. Curves 42 and 46 represent the signal produced by the system processor 12
and supplied to the gate input of the SCR circuits 14. Curves 42 and 46 are the "on
time" desired to produce a predetermined amount of heat in a particular gear 30 to
be induction hardened.
[0028] The circuits 14 are activated or caused to supply a power signal to generator 20
at the point in time which is the off-on transition of the curve 42. At the end of
the "on time" of curve 42, or time T
D, the signal changes from the "on" state to the "off" state. The precise timing of
the on-off transition does not occur near a zero crossing of curve 40. Since the activation
signal represented by curve 42 does not return to the "off" state until after the
zero crossing at time T
C, the power signal which is supplied to the RF generator 20, represented by curve
44, is continuously "on" until time T
e, which may be as much as 8.33 milliseconds after the on-off transition of curve 42.
Thus, if the on signal produced by system processor 12 begins at time T
B and continues until time T
D, the total power signal supplied to the RF generator will last from time T
B until time T
E on the graph, for a total time period of T₂.
[0029] In order to precisely control the power supplied to the induction heater coil, and
thus achieve more accurate control of the induction hardening process, the system
according to the present invention computes a time delay beyond a zero crossing (here
the zero crossing at T₀) for turning on the SCR circuits 14 so that the SCR activation
signal, represented by curve 46, will change from the "on" state to the "off" state
at or just prior to a zero crossing of curve 40. For example, in order to eliminate
the additional "on time" of the power signal 44 as compared to the gate on-time input
signal represented by curve 42 which switches the SCR circuits, the system processor
12 will compute a time T₃ which corresponds to the desired "on time" T₁ divided by
8.33 milliseconds and subtract the remainder from 8.33 milliseconds to produce time
T₃. Then, the system processor delays activating SCR circuits 14 a period of time
T₃ after a zero crossing so that the activation curve 46, which coincidentally is
exactly equal in "on time" duration to curve 42, changes from the "on" to the "off"
state at time T
C, which corresponds with a zero crossing of the power signal curve 40.
[0030] Since the curve 46 is so closely related at time T
C to a zero crossing, an accurate amount of "on time" of the SCR circuits 14 is achieved,
thereby accurately controlling the amount of time that power is supplied to RF generator
20 with precision not heretofore known with SCR circuits. In so doing, the amount
of power which is supplied to induction heater coil 28 is accurately controlled. Thus,
a tube type RF generator, which is preferred by some skilled in the art over the solid
state semiconductor type high-frequency RF generators, may be used to produce an accurate
quantity of power signal and a correspondingly precise quantity of power supplied
to the induction heater coil 28.
[0031] Although only one phase (
b₁) of the power source 18 is shown in FIG. 2, it should be apparent to one skilled
in the art that in a 3
b system all three phases are related by 120 degrees. Thus, a fixed amount of additional
power signal will be supplied by the other phases (
b₂ and
b₃) of the power source 18 beyond the time T
C with the activation signal represented by curve 46. Nevertheless, the additional
power supplied by the other two phases will be a constant quantity since the deactivation
signal occurs at a predetermined time and phase relative to the other power phases.
Therefore, the amount of power delivered to the gear 30 by the system 10 is repeatable
by establishing a fixed timing reference (with respect to one phase) for switching
on and off a 3
b power source.
[0032] Referring now to FIG. 3, a graph of the power output of the RF generator 20 is shown.
The maximum power output of the generator 20, represented by curve 50, can be adjusted
vertically to achieve higher or lower total instantaneous power output. The variance
in "on time", represented by times T₁ and T₂, as a result of the intrinsic functionality
of SCR circuits is shown at the bottom of the graph. If the SCR circuits remain on
for a length of time T₂ as opposed to T₁, which is the desired "on time", the additional
power represented by the shaded portion 52 underneath the curve 50 is supplied to
the heater coil 28 in addition to the actual desired power, represented by the unshaded
portion underneath the curve 50 and extending up to the end of time T1. The additional
amount of power supplied to the induction heater coil 28 causes excessive heating
of the gear 30.
[0033] As is seen in the graph of FIG. 3, timing variations make for greater variations
in the case hardening process, particularly when the "on time" T1 is approximately
0.10 seconds. The maximum difference between times T2 and T1 can be as much as 8.33
milliseconds, and thus the power represented by area 52 can represent as much as 8-10%
difference in power supplied to the induction heater coil 28 when a 0.10 second power
signal is desired for heater coil 28. Another recognized fact is that once the gear
30 has been heated, the additional heating time represented by the area 52 can seriously
increase the heat of the gear, as the heat transfer properties of the gear are non-linear
and cause heat to transfer deeper into the gear face once the gear is heated around
the perimeter. Thus, it is highly desirable to control the power supplied to the induction
heater coil 28 via the technique shown and described above.
[0034] Referring now to FIG. 4, another embodiment of an induction-hardening system 110
according to the present invention is shown. Switch SW2 provides a reset/start signal
to single pulse timer circuit 116. AC power source 118 supplies an AC signal to phase
angle detector 112 and power switching devices 114. Phase angle detector 112 provides
a series of pulses to an input of single pulse timer circuit 116. Each pulse from
detector 112 corresponds to the detection of a predetermined phase angle of the AC
power signal from power source 118. Upon receiving a reset/start signal from switch
SW2, single pulse timer circuit 116 is triggered or activated by the next pulse from
detector 112 to produce a pulse or signal having a predetermined duration. The predetermined
duration pulse enables the power switching devices 114. Thus, the initiation of the
heating cycle as a result of the closure of switch SW2 is delayed until a predetermined
phase angle is detected by phase angle detector 112. Phase angle detector 112 provides
a phase detector means for detecting a predetermined phase angle in the power signal
from AC power source 118.
[0035] As in the previous embodiment, the RF generator 120 receives a power signal from
the power switching devices 114 and in response thereto supplies a high frequency,
high power signal to the induction heater coil 128 via windings 129. Windings 129
provide impedance matching between the output of the RF generator 120 and the induction
heater coil 128. Single-phase and multi-phase power supplies are contemplated.
[0036] The phase angle detector 112 is implemented using a triac phase angle controller
Part No. TDA1185A manufactured by Motorola Incorporated of Phoenix, Arizona. The TDA1185A
device is programmable to produce an output signal corresponding to detection of a
predetermined phase angle of the AC signal. This predetermined phase angle is variable
with the TDA1185A device in accordance with an external set voltage representing the
conduction angle desired. (See discussion of control signals, infra.) Since the TDA1185A
device detects firing angles only on the positive half of the AC signal, should a
firing angle on the negative half of the AC signal be desired, an inverting operational
amplifier may be inserted between the AC power source and the phase angle detector
112 to invert the AC signal, and thus provide an input signal to the phase angle detector
112 such that activation in the negative half of the AC signal may occur.
[0037] Signal pulse timer circuit 116 is implemented using a retriggerable monostable multivibrator
integrated circuit, part No. 74LS123 manufactured by Texas Instruments. The 74LS123
is a rising-edge triggered device and thus the pulses produced by the phase angle
detector 112 can be used to trigger the production of an output pulse from the timer
circuit 116. The signal produced by switch SW2 provides a retrigger, enable or rearming
signal to the timer circuit 116. Since the 74LS123 device can be configured to produce
an output pulse from less than 1 millisecond to a very large time duration, such as
hours, the combination of the phase angle detector 112 and the timer circuit 116 provides
infinitely variable control of the timing functions necessary to activate power switching
devices 114 in accordance with the previously described conditions calling for a supply
of a specific duration power signal to the RF generator 120.
[0038] Optional control signals, represented by broken lines 132 and 134, provide phase
angle selection and pulse width duration signals to detector 112 and circuit 116,
respectively. Specifically, the phase angle control signal, present on signal path
134 and supplied to an input of detector 112, provides phase angle selection information
to detector 112. In response to the signal on signal path 134, detector 112 produces
an output pulse corresponding in time to the occurrence of the desired phase angle
established by the signal on signal path 134. Likewise, the duration control signal
present on signal path 132 controls the time duration of the pulse produced by circuit
116. The signal on signal path 132 is typically implemented via a potentiometer/capacitor
combination establishing a decaying signal well known with such circuits.
[0039] The device 110 of FIG. 4 includes several components which are identical with components
of the device 10 of FIG. 1. In particular, the AC power source 118 corresponds with
the three-phase high voltage power source 18, power switching devices 114 correspond
with power switching SCR circuits 14, RF generator 120 corresponds with RF generator
20, induction heater coil 128 corresponds with induction heater coil 28, and gear
130 corresponds with gear 30. Triacs or Silicon Controlled Rectifiers (SCR's) are
contemplated as the power switching devices in block 114.
[0040] Operationally speaking, the pulses produced at the output of phase angle detector
112 correspond in time with a predetermined phase angle of the AC signal indicated
by time line T
B in FIG. 2. Likewise, the output pulse produced by timer circuit 116 will correspond
with time T₂. Thus, the difficulties of energizing an AC power source with precise
timing and power output control are overcome by the embodiment of FIG. 1 wherein a
time delay after a zero crossing is used to determine turn on time of the power signal,
or as in the embodiment of FIG. 4, a particular phase angle is detected to determine
the point in time when an activation signal is desired for activating the power switching
devices. With both embodiments of the invention, a predetermined timing reference
point relative to the AC power signal is located or detected prior to the activation
of the power switching devices to produce an activation signal which will subside
before or simultaneously with a subsequent zero crossing of the power signal so that
the power switching devices will be turned off or switched off at a precise predetermined
time, typically a zero crossing as is the case with most thyristors .
[0041] Alternately, it is also contemplated that the phase angle detector 112 and timer
circuit 116 are portions of a microcomputer based controller (not shown) wherein an
A/D converter (not shown) is used to monitor the amplitude (which corresponds with
the phase angle) of the signal from source 118. Further, user-changeable software
enables control of the desired phase angle detected and the width of the control pulse
supplied to the power switching devices 114.
1. An induction-hardening machine (10) for contour hardening of a gear (30) comprising:
an AC power source (18) for producing an AC power signal;
a zero-crossing detector (16) connected to said AC power source (18) for detecting
zero crossings of said AC power signal and producing a zero-crossing signal corresponding
thereto;
a high-frequency generator (20) having a power input and an output for producing a
high-frequency high-power signal in response to a signal supplied to said power input;
a high-frequency induction heater coil (28) sized to fit said gear (30) and connected
to said output of said generator (20), said coil (28) generating a high-frequency
electrical signal through said gear (30);
thyristor power switching means (14) having an activation input, a power input connected
to said AC power source (18), and a power output, said power switching means (14)
supplying an AC power signal to said power input of said high-frequency generator
(20) in response to a signal supplied to said activation input; characterised by
processor means (12), connected to said zero-crossing detector (16) and said thyristor
power switching means (14) activation input, for computing activation times and supplying
a corresponding activation signal to said activation input, wherein said processor
means (12) includes:
1) means for entering a desired activation time;
2) means for computing a delay time so that the sum of the activation time and the
delay time corresponds to a minimum whole number multiple of the period of said AC
power signal; and
3) input means for receiving a user supplied manual cycle start input signal;
said processor (12) responding to a cycle start input signal by detecting a zero crossing
signal and delaying a period of time equal to said delay time before supplying an
activation signal to said activation input so that the activation signal is extinguished
substantially simultaneously with a subsequent zero crossing of said AC power signal.
2. A method for accurately controlling heating of a gear (30) from an induction-hardening
device (10), the induction-hardening device (10) including an AC power source (18),
thyristor power switching means (14) having an activation input for producing a power
signal in response to a signal appearing at the activation input, an RF generator
(20) responsive to said power signal to produce a high-frequency, high-power signal,
and an induction heater coil (28) connected to said RF generator (20) and producing
an electrical signal in the gear (30) in response to the high-frequency, high-power
signal, said method characterised by the steps of:
determining a desired activation time for supplying power to the induction heater
coil (28) based upon the geometry of the gear (30);
dividing the desired activation time by one-half the period of the AC power supply
signal to produce a remainder quantity;
subtracting the remainder quantity from one-half the period of the AC power supply
signal to produce a delay time;
detecting a zero crossing of said AC power supply signal; and
supplying an activation signal to the activation input of said thyristor power switching
means (14) for a time period corresponding to said activation time after a time equal
to said delay time has expired.
1. Gerät (10) zum Induktionshärten für das Formhärten eines Zahnrades (30) aufweisend:
eine AC-Leistungsquelle (18) zur Erzeugung eines AC-Leistungssignals;
einen Nullpunkt-Durchgangsdetektor (16), der an die AC-Leistungsquelle (18) zur Bestimmung
von Nullpunkt-Durchgängen des AC-Leistungssignals und zur Erzeugung eines damit übereinstimmenden
Nullpunkt-Durchgangssignals;
einen Hochfrequenzgenerator (20) mit einem Leistungseingang und einem Ausgang zur
Erzeugung eines hochfrequenten Hochleistungssignals in Reaktion auf ein an dem Leistungseingang
anliegendes Signal;
eine Hochfrequenzinduktionserhitzungsspule (28), die so bemessen ist, daß sie das
Zahnrad (30) aufnimmt, und an den Ausgang des Generators (20) angeschlossen ist, wobei
die Spule (28) ein hochfrequentes elektrisches Signal durch das Zahnrad (30) erzeugt;
eine Thyristor-Leistungschaltvorrichtung (14) mit einem Aktivierungseingang, einem
Leistungseingang, der an die AC-Leistungsquelle (18) angeschlossen ist, und einem
Leistungsausgang, wobei die Leistungsschaltvorrichtung (14) ein AC-Leistungssignal
dem Leistungseingang des Hochfrequenzgenerators (20) als Reaktion auf ein Signal,
das dem Aktivierungseingang zugeführt wird, zuführt; gekennzeichnet durch
eine Prozessorvorrichtung (12), die an den Nullpunkt-Durchgangsdetektor (16) und den
Aktivierungseingang der Thyristor-Leistungsschaltvorrichtung (14) angeschlossen ist,
zur Berechnung von Aktivierungszeiten und zur Zuführung eines entsprechenden Aktivierungssignals
zu dem Aktivierungseingang, wobei die Prozessorvorrichtung (12) aufweist:
1) eine Vorrichtung zur Eingabe einer gewünschten Aktivierungszeit;
2) eine Vorrichtung zur Berechnung einer Verzögerungszeit, so daß die Summe der Aktivierungszeit
und der Verzögerungszeit einem kleinsten ganzzahligem Vielfachen der Periode des AC-Leistungssignals
entspricht; und
3) Eingabemittel zum Empfangen eines manuellen vom Benutzer zugeführten Eingangssignals
für einen Zyklusstart; wobei der Prozessor (12) als Reaktion auf ein Eingangssignal
für einen Zyklusstart ein Nullpunkt-Durchgangssignal bestimmt und für eine Zeitperiode,
die gleich der Verzögerungszeit ist, verzögert, bevor er ein Aktivierungssignal dem
Aktivierungseingang zuführt, so daß das Aktivierungssignal im wesentlichen gleichzeitig
mit einem nachfolgenden Nullpunkt-Durchgang des AC-Leistungssignals ausgelöscht wird.
2. Verfahren zur genauen Regelung der Erhitzung eines Zahnrads (30) durch ein Gerät (10)
zum Induktionshärten, wobei das Gerät (10) zum Induktionshärten eine AC-Leistungsquelle
(18), eine Thyristor-Leistungsschaltvorrichtung (14) mit einem Aktivierungseingang
zur Erzeugung eines Leistungssignals als Reaktion auf ein an dem Aktivierungseingang
erscheinendes Signal, einen RF-Generator (20), der für das Leistungssignal empfänglich
ist, um ein hochfrequentes Hochleistungssignal zu erzeugen, und eine Induktionserhitzungsspule
(28) aufweist, die an den RF-Generator (20) angeschlossen ist und ein elektrisches
Signal in dem Zahnrad (30) als Reaktion auf das hochfrequente Hochleistungssignal
erzeugt, wobei das Verfahren durch folgende Schritte gekennzeichnet ist:
Bestimmen einer gewünschten Aktivierungszeit für die Zuführung von Leistung zu der
Induktionserhitzungsspule (28) in Abhängigkeit von der Geometrie des Zahnrades (30);
Teilen der erwünschten Aktivierungszeit durch die Hälfte der Periode des AC-Leistungszuführsignals,
um eine Restmenge zu erzeugen;
Abziehen der Restmenge von einer Hälfte der Periode des AC-Leistungszuführsignals,
um eine Verzögerungszeit zu erzeugen; Bestimmen eines Nullpunkt-Durchgangs des AC-Leistungszuführsignals;
und
Zuführen eines Aktivierungssignals zu dem Aktivierungseingang der Thyristor-Leistungsschaltvorrichtung
(14) für eine Zeitdauer, die mit der Aktivierungszeit übereinstimmt, nachdem eine
Zeit verstrichen ist, die gleich der Verzögerungszeit ist.
1. Une machine de chauffage par induction (10) pour la trempe d'un contour d'un engrenage
(30) comprenant :
une source d'énergie électrique à courant alternatif (18) pour produire un signal
d'énergie électrique à courant alternatif ;
un détecteur de passage par zéro (16) relié à ladite source d'énergie électrique à
courant alternatif (18) pour détecter les passages par zéro dudit signal d'énergie
électrique à courant alternatif et produire un signal de passage par zéro correspondant
à celui-ci ;
un générateur haute fréquence (20) présentant une entrée de puissance et une sortie
pour produire un signal haute fréquence de puissance élevée en réponse à un signal
fourni à ladite entrée de puissance ;
une bobine de chauffage par induction haute fréquence (28) dimensionnée pour s'adapter
audit engrenage (30) et reliée à ladite sortie dudit générateur (20), ladite bobine
(28) produisant un signal électrique haute fréquence à travers ledit engrenage (30)
;
un moyen de commutation de puissance à thyristors (14) présentant une entrée d'activation,
une entrée de puissance reliée à ladite source d'énergie électrique à courant alternatif
(18), et une sortie de puissance, ledit moyen de commutation de puissance (14) fournissant
un signal d'énergie électrique à courant alternatif à ladite entrée de puissance dudit
générateur haute fréquence (20) en réponse à un signal fourni à ladite entrée d'activation
; caractérisée par
un moyen à processeur (12), relié audit détecteur de passage par zéro (16) et à ladite
entrée d'activation du moyen de commutation de puissance à thyristors (14), pour calculer
des temps d'activation et appliquer un signal d'activation correspondant à ladite
entrée d'activation, dans lequel ledit moyen à processeur (12) comprend :
1) un moyen pour entrer un temps d'activation désiré ;
2) un moyen pour calculer un temps de retard tel que la somme du temps d'activation
et du temps de retard correspond à un nombre entier minimum multiple de la période
dudit signal d'énergie électrique à courant alternatif ; et
3) un moyen d'entrée pour recevoir un signal d'entrée de démarrage d'un cycle manuel
fourni par un utilisateur ;
ledit processeur (12) répondant à un signal d'entrée de démarrage d'un cycle en détectant
un signal de passage par zéro et en retardant une période de temps égale audit temps
de retard avant d'appliquer un signal d'activation à ladite entrée d'activation de
sorte que le signal d'activation est éteint sensiblement en même temps qu'un passage
ultérieur par zéro dudit signal d'énergie électrique à courant alternatif.
2. Un procédé pour commander avec précision le chauffage d'un engrenage (30) à partir
d'un dispositif de trempe par induction (10), le dispositif de trempe par induction
(10) comprenant une source d'énergie électrique à courant alternatif (18), un moyen
de commutation de puissance à thyristors (14) présentant une entrée d'activation pour
produire un signal de puissance en réponse à un signal apparaissant à l'entrée d'activation,
un générateur HF (20) répondant audit signal de puissance pour produire un signal
haute fréquence de puissance élevée, et une bobine de chauffage par induction (28)
reliée audit générateur HF (20) et produisant un signal électrique dans l'engrenage
(30) en réponse au signal haute fréquence de puissance élevée, ledit procédé caractérisé
par les opérations consistant à :
déterminer un temps d'activation désiré pour appliquer de la puissance à la bobine
de chauffage par induction (28) sur la base de la géométrie de l'engrenage (30) ;
diviser le temps d'activation désiré par la moitié de la période du signal d'énergie
électrique à courant alternatif afin de produire une valeur formant reste ;
soustraire la valeur formant reste de la moitié de la période du signal d'énergie
électrique à courant alternatif afin de produire un temps de retard ;
détecter un passage par zéro dudit signal d'énergie électrique à courant alternatif
; et
appliquer un signal d'activation à l'entrée d'activation dudit moyen de commutation
de puissance à thyristors (14) pendant une période de temps correspondant audit temps
d'activation après que se soit écoulé un temps égal audit temps de retard.