|
(11) | EP 0 551 353 A1 |
| (12) |
|
|
|
|
|||||||||||||||||||
| (54) | A METHOD TO PREVENT EROSION OR INJURIOUS INFLUENCE OF EROSION AND AN ARRANGEMENT FOR CARRYING OUT THE METHOD |