|
(11) | EP 0 686 114 B1 |
| (12) | EUROPEAN PATENT SPECIFICATION |
|
|
| (54) |
BOAT HULL CLEANING APPARATUS BOOTSRUMPFREINIGUNGSGERÄT APPAREIL DE NETTOYAGE DE COQUE DE BATEAU |
|
|
||||||||||||||||||||||||
| Note: Within nine months from the publication of the mention of the grant of the European patent, any person may give notice to the European Patent Office of opposition to the European patent granted. Notice of opposition shall be filed in a written reasoned statement. It shall not be deemed to have been filed until the opposition fee has been paid. (Art. 99(1) European Patent Convention). |
1. Bogie for robot. Runs along the rail and keeps the right pressure against the boat body. The movements are effected by electric motors or another power source.
2. Robot attached to bogie. The robotarm can have one link, as the drawing shows, but it can also have more than one. An electric motor or another power source drives the linked part. In the outer end of the arm there is a spray unit. The construction can have one or more robot arms.
3. Rail construction for bogie. It is attached to the ground and have a shape, that makes the bogie runs smoothly along it unto the mechanic buffer stops, that are placed in each end. The rail can be in one piece, but if there are any obstacles during mounting or transportation, it can be divided in suitable pieces.
4. Bogie for fixation arm. The bogie runs along the rail and is driven by an electric motor or another power source. The bogie drives the fixation arm with a hydraulic cylinder construction or another power source, which guarantees, that the opposite fixation arm gets the same position and power in the movement and in that way fix the object (the boat) to the centre of the washing construction.
5. Fixation arm attached to its bogie. This arm can be in one piece or divided in one or more links. In the end of the arm there are protective rolls edgeways, and they can be of a model, that prevents rotation in both directions. The rolls are made of a material, that can't damage the boat body. The construction can be provided with 2 or more fixation arms.
6. Rolls or bumper guards. These will protect the boat from being damaged by the construction. They are placed where they are most useful; along sides, gates, bogie arms and other out-sticking parts.
7. Suspension attachment for net and canvas intended for collection of mud and particles from washed boat bodies. The arrangement can be taken care of by service presonnel. It is placed in a pontoon or in a stationary construction.
8. Net or som other arrangement for stabilization of canvas for collection of mud and particles from washed boat bodies. The arrangement is fixed to the suspension attachment )pos 7). It can be made of any material.
9. Cnavas for collection of particles and mud from cleande boat bottoms, in order to prevent the mud from getting out of the construction. This mud will be removed regularly.
10. Weights attached to the canvas to keep it intact. The weights can be of any form or construction.
11. Mobile pontoon-bridges or stationary constructions. The pontoon-bridges can also be semi-detached to one unit. This construction can have a gate in one or both ends. See pos 15.
12. Anchorage for pontoon-bridge in shape of a pole or an anchor with chain.
13. Construction for movable pipes.
14. Lights.
15. The construction can be provided with a gate. It can be operated by hydraulic cylinders or another power source. The construction is mounted in the pontoon or in the stationary construction. Stripes are placed between the construction and the canvas (pos 8) to prevent the mud from coming out of the construction. The arrangement is used as a connection between pontoons or stationary constructions.
16. Arrangement for locking the gates together. The arrangement can be rigid or movable.
17. Docking arrangement for boat stem. It will lock the stem to the centre line of the construction.
18. Handle to be used by the boat driver to steer the stem into the docking arrangement.
19. Hut for operation- and charging systems.
20. Desk for operating- and charging systems. Operating- and charging systems see pos 25 and 26.
21. High pressure pump for spray nozzles.
22. Spray unit placed in front of the robotarm. See separate description.
23. The sea bottom profile.
24. Dredged sea bottom profile, if necessary.
25. Automatic system for steering and controlling the construction. The washing is activated by an operation panel.
26. Charging system that communicates with the steering system (pos 25).
| Pos 22 Spray unit | |
| Pos | Description |
| 1. | Wheel of a material that protects the boat body. |
| 2. | Spray nozzle. |
| 3. | Movable suspension attachment. |
| 4. | High pressure pipe for distribution of water to the nozzles. |
| 5. | Inlet for water from pump. |
| 6. | Off-centre mounted shaft for wheel to get an automatically positioned angle of the nozzles against the boat body. |
| 7. | Robotarm. |
| The spray unit can be combined with fixed or driven brushes. | |
- introducing a boat for washing and fixing its position,
- displacing the bogies for the robots along the rails during the washing,
- introducing the robot's arms under the boat hull,
- spraying the boat bottom with the cleaning spray nozzles.
- releasing the boat from the centering unit and leaving the construction.
- Einlaufen des Bootes zum Waschen und Festlegen seiner Position,
- Verschiebung der Roboter-Laufkatzen auf den Gleisen während des Waschvorganges,
- Versenken der Roboterarme unter den Rumpf,
- Absprühen der Bootsunterseite mittels der Reinigungs-Sprühdüsen,
- Lösen des Bootes aus der Zentriervorrichtung und Auslaufen aus der Anlage.
- d'introduction d'un bateau pour le lavage et de fixation de sa position,
- de déplacement des bogies pour les robots le long des rails pendant le lavage,
- d'introduction des bras du robot sous la coque du bateau,
- d'arrosage du fond du bateau avec les gicleurs d'arrosage de nettoyage,
- de relâcher le bateau du dispositif de centrage et de laisser la construction.