[0001] The present invention relates to a plant for supplying yarn to a loom and comprising
a yarn rack, which is placed next to the loom and which comprises a number of juxtaposed,
replaceable carriers that are suspended by means of carrier rolls in a ceiling rail
arrangement and on which yarn spools are suspended.
[0002] The invention further relates to a method for supplying yarn to a loom from a yarn
rack, which comprises a number of juxtaposed, replaceable carriers that are suspended
by means of carrier rolls in a ceiling rail arrangement and on which yarn spools are
placed.
[0003] The present description discusses the supply of yarn to a loom. However, the plant
may also be used for supplying yarn to other machines, e.g. knitting machines.
[0004] Plants are known in which a loom is supplied with yarn from a large number of yarn
spools suspended in a yarn rack. Yarn racks may be fixed installations in which the
yarn spools are placed on a fixedly mounted yarn rack and in which the replacement
of the yarn spools is effected directly in the yarn rack, which is positioned in immediate
vicinity of the loom. Between the different rows of yarn spools in the yarn rack it
will be necessary to have sufficient distance for a person to be able to enter with
a trolley and replace the yarn spools when they have been emptied or almost emptied.
Therefore, such a plant is disadvantageous since the yarn rack requires much space.
Furthermore, a replacement of the yarn spools in the yarn rack will require the loom
to be idle for a long time. This is disadvantageous since the shortest possible idle
periods of the loom are desirable. It is further a hard job for an operator who has
to lift the yarn spools from the trolley and place them on the pins of the yarn rack.
The job is also difficult because the space in the yarn rack is narrow.
[0005] In order to reduce the time in which the loom is idle, it has been suggested to construct
a plant with a yarn rack consisting of replaceable carriers on which the yarn spools
are placed. When the yarn spools have been emptied, the carriers are pushed out individually
from the yarn rack and other carriers with full yarn spools are driven individually
into the yarn rack. This system reduces the time in which the loom is idle. In this
situation the loom must only be idle for the time in which the yarns from the almost
empty yarn spools are cut, the carriers are replaced, and the yarn ends of the loom
are spliced with the yarn ends of the new yarn spools.
[0006] However, a plant of this type also involves disadvantages. The yarn spools are normally
mounted in the yarn carriers on pins projecting on either side. A large number of
pins are mounted one over the other which means that the carrier will have an elevated
centre of gravity. This leads to a risk that the carrier may overturn. This risk is
particularly distinct if the carrier is only provided with yarn spools on one side.
Furthermore, the actual handling of the carriers is hard work, and when replacement
of the carriers is done, there will be a risk that a carrier is placed in a wrong
position in the yarn rack. Then the goods formed on the loom will be useless.
[0007] So-called double racks are known as well. These are yarn racks having two receiver
pins/yarn spools for each yarn to be fed to the loom. In these racks an operator will
transfer around in the very yarn rack removing the empty yarn spools and inserting
the full ones. This leads to wind transfers, which may cause the yarns in the rack
to become entangled with each other. Due to this a situation arises in which the loom
has to be stopped.
[0008] US patent No. 3,602,456 discloses a plant having a ceiling rail arrangement by means
of which replaceable yarn carriers may be moved into a number of branch rails via
a main rail. The carriers with yarn spools are entered into the main rail via the
branch of the main rail. However, the storage station is located at a long distance
from the feeding station or the yarn rack, and when the carriers are moved along the
main rail, there will be a risk of misplacing carriers on wrong branch rails.
[0009] In US patent No. 4,988,252 a yarn carrier is described which moves along a guide
rail on the floor of a supplying station in which yarn spools are supplied to the
yarn carrier.
[0010] However, this publication does not disclose any means of fast and secure replacement
of yarn carriers.
[0011] US patent No. 4,783,021 discloses yarn carriers that are suspended in ceiling rails.
However, this publication does not disclose any means of fast and secure replacement
of yarn carriers.
[0012] It is the object of the present invention to remedy the disadvantages of the known
plants and the known methods and to provide a mechanically simple plant and a method
that makes it possible to accomplish a fast and secure replacement, which at the same
time results in an improved working environment for the operator.
[0013] According to the present invention this is achieved by a plant characterised in that
the yarn rack comprises a feeding station having a number of juxtaposed rails, each
of which is able to carry one or more carriers, said feeding station being placed
in immediate vicinity of the loom, as well as an adjacent storage station, which is
connected with the feeding station via the rail arrangement and which comprises at
least two related rails for each rail in the feeding station.
[0014] The method according to the invention is characterised in in that the yarns are unwound
from the spools while each carrier is located on a rail of its own in a feeding station
in immediate vicinity of the loom, that when the yarn spools have been emptied, the
carriers are transferred via the ceiling rail arrangement from the rail in the feeding
station to a first related rail in a storage station, that a carrier with full yarn
spools is transferred from a second related rail in the storage station onto said
related rail in the feeding station for subsequent supply to the loom.
[0015] As the carriers are hanging in a ceiling rail arrangement by means of the carrier
rolls, the risk of overturning will be totally eliminated, even in those cases when
a carrier is provided with yarn spools only on one side.
[0016] The ceiling rail arrangement further makes it possible to ensure that carriers are
always placed in their correct positions in the feeding station of the yarn rack.
As there are at least two rails in the storage station for each rail in the feeding
station, it will be possible during replacement of the carriers to enter the empty
carriers on one of these at least two rails. The second one of these at least two
related rails will then hold the carriers that are subsequently to be transferred
into the feeding station. Thus, it will be possible to ensure beforehand, possibly
by means of supervision by a central computer unit, that the carriers positioned on
the rail of the storage station for subsequent transfer onto the rail in the feeding
station are the right ones.
[0017] Owing to the rail system, a replacement will be made very quickly as an operator
may transfer 4 to 6 carriers or more simultaneously from the feeding station to the
storage station as well as from the storage station to the feeding station. This may
result in considerable time and work savings compared to individual replacement of
carriers.
[0018] The operator work of replacing yarn spools is eased considerably since in may be
done in the separate emptying/filling stations. In these stations the operator may
have ample space, and at the same time the full yarn spools may be lifted to an adequate
working height by means of a forklift, a lifting truck or similar equipment, for which
there will be room outside the yarn rack. As replacement of the spools is done outside
the yarn rack, there is no risk of wind transfers and wind gusts in the yarn rack,
and consequently the risk of yarn entanglement has been eliminated.
[0019] With the ceiling rail arrangement it is possible in a simple manner to construct
a mechanically simple plant. This is possible since the rail arrangement may be constructed
from rail units known per se and having switches for guiding carriers correctly between
the different stations of the plant. Such switch points may be operated manually by
the operator who replaces the carriers in the yarn rack. Alternatively, it is possible
to operate the switch points by means of a central computer unit. The switch points
may be traditional type ones activated mechanically, electrically or pneumatically.
[0020] As the rail arrangement always connects a yarn rack feeding station with the corresponding
nearby storage station, there will be no risk of misplacing carriers in the feeding
station. Since the feeding station and the storage station are close to each other,
the replacement may take place very quickly.
[0021] Consequently, the loom only has to be stopped for the time in which the yarns are
cut, the row of carriers is transferred from the feeding station to the storage station,
and during the subsequent introduction of new carriers and splicing of yarn ends of
the loom with yarn ends of the full spools.
[0022] The invention will now be explained in detail with reference to the accompanying
schematic drawing, in which
- Fig. 1
- shows a view illustrating a plant according to the invention;
- Fig. 2
- shows a view illustrating a carrier that forms part of a yarn rack in the plant according
to the invention;
- Fig. 3
- shows a view of a part of the carrier shown in fig. 3,
- Fig. 4
- shows a partial section view illustrating the connection between the carrier and a
ceiling rail that forms part of the plant according to the invention; and
- Fig. 5
- shows a partial view illustrating a floor rail that forms part of the plant according
to the invention.
[0023] Fig. 1 shows a schematic view of a plant 1 according to the invention. Fig. 1 illustrates
schematically the structure of the plant. Thus, a number of details that will be within
the skilled person's option in the light of the description have not been included
in the figure.
[0024] A number of looms 2 are shown in Fig. 1, which are supplied with yarn from the yarn
rack 3 of the plant 1. The yarn rack 3 comprises a number of juxtaposed carriers 4
(see Fig. 2), on which yarn spools 5 are suspended. The yarn rack has a feeding station
6 positioned in immediate vicinity of the looms 2, and an adjacent storage station
7. The carriers 4 are suspended by means of carrier rolls 8 (see Fig. 2) in a ceiling
rail arrangement 9.
[0025] The rail arrangement 9 may be mounted on a number of posts or be suspended in the
ceiling. The ceiling rail arrangement 9 in the feeding station 6 comprises a number
of first rail lengths 10 for each loom 2. In the embodiment shown there are four first
rail lengths 10 for each loom 2. For each of the juxtaposed first rail lengths 10
in the feeding station 6 there are at least two second rail lengths 11 in the storage
station 7. In the embodiment shown there are three second rail lengths 11 for each
first rail length 10. The rail arrangement further comprises a central rail length
12. Each of the second rail lengths 11 is connected by means of switch points 13 and
the central rail length 12 with the corresponding first rail length 10. It is thus
possible to transfer the carriers 4 between different stations in the rail arrangement.
[0026] In Fig. 1 a row of carriers 4 is indicated by 14, which carriers 4 are suspended
in a first rail length 10. Each row 14 comprises preferably four to six carriers of
the type shown in Fig. 2. These carriers occupy a width 15 when supplied with yarn
spools 5. The width 15 comprises the width of the full yarn carrier 15' itself which
is approximately 700 mm, and a free space 15'' of approximately 400 mm on either side
of it in order to ensure unhampered unwinding of the yarns, which are fed to the loom
in traditional manner via a pipe system (not shown) on either side of the row 14 of
yarn carriers 4.
[0027] Between each carrier 4 there will be a distance or a passage area 16, which only
has to be wide enough for an operator to be placed between the yarn carriers in order
to perform the necessary operations of cutting and splicing yarns in a manner known
per se during replacement of the yarn spools. This distance will preferably be between
700 and 800 mm, preferably around 800 mm. This is a space saving of about 20% compared
to traditional plants in which an operator must also be able to bring a trolley for
replacement of yarn spools.
[0028] The rail arrangement 9 connects the yarn rack 3 via the central rail length 12 with
a filling station 17, in which full yarn spools are placed in the carriers. The yarn
rack 3 is likewise connected with an emptying station 18, in which spools with any
remaining yarn are removed from the carriers 4. The plant 1 is optionally connected
with a computer unit (not shown) controlling the transfer of the carriers 4 between
the different stations as well as the settings of the different switch points 13 when
the carriers are transferred on the rail arrangement 9. Alternatively, the plant may
be supervised manually, and the transfer of carriers 4 between the different stations
will then be accomplished by the operator setting the switch points 13 according to
requirements. The switch points may be set by means of electric, pneumatic or mechanical
actuators, which will be known to a person skilled in the art.
[0029] Figs. 2 to 5 show different details of the plant 1 as well as the carrier 4. The
carrier rolls 8 comprise wheels 19 rotating around substantially horizontal axles
20. It is seen in Fig. 4 that the rail arrangement comprises a substantially C-shaped
profile having an opening 21 at its downward side. A connection flange 22 for the
carrier roll 8 passes through the opening 21. The connection flange 22 is connected
with an upper carrier profile 23 forming part of the carrier 4.
[0030] Each carrier profile 23 in the embodiment shown is provided with four vertical posts
24. Alternatively, a larger number of posts may be used, e.g. up to eight. At their
bottoms the posts 24 are connected by means of a lower support profile 25. Mounted
at the underside of the lower support profile 25 are guiding rolls 26 rotating around
substantially vertical axles.
[0031] The guiding rolls 26 co-operate with a floor rail 27, which is intended to be placed
at least in the feeding station 6 of the yarn rack 3 under a corresponding first rail
length 10. This provides secure vertical orientation of the carriers when they are
placed in the feeding station. This is important in respect to correct unwinding of
the yarns from the yarn spools 5.
[0032] At the entrance of the feeding station 6 the floor rail 27 has the shape of a funnel
28 so that the guiding rolls 26 will easily get into correct engagement with the guiding
rail 27.
[0033] Each of the vertical posts 24 is provided with a number of pins 29 arranged one over
the other. The pins 29 project to either side of the carrier, as appears from Fig.
3. In the embodiment shown eight pins 29 are arranged one over the other on each vertical
post 24. As the spools 5 are placed on the pins 29 (see Fig. 2), a total number of
sixteen yarn spools 5 may be placed on each post. Alternatively, it is possible to
use a different number of pins 29. In the embodiment shown the pins 23 extend perpendicularly
to the vertical posts 24. Alternatively, it is possible to arrange the pins 29 with
an upwardly slanting orientation.
[0034] The plant shown in the figure will function in the following manner.
[0035] When the yarn spools 5 in the feeding station of the yarn rack 3 are substantially
empty, the loom 2 is stopped. Then the yarn ends are cut, so that loose yarns ends
are hanging from each of the pipes supplying the loom 2 with yarn from the feeding
station 6. When all yarns have been cut, the switch point 13 is set so that a first
rail length 10 in the feeding station 6 is connected with one of the corresponding
second rail lengths 11 in the storage station 7. Then the row of carriers 4 with empty
yarn spools 5 is transferred onto said corresponding second rail length 11. Then the
switch point 13 is shifted so that one of the other two of the second rail lengths
11 in the storage station 7 is connected with the corresponding first rail length
10 in the feeding station 6. The operator repeats this for de four first rail lengths
belonging to the loom 2. Then the yarn ends of the full yarn spools 5 are spliced
with the yarn ends of the loom. Then the loom may be restarted.
[0036] As every first rail length 10 is connected with three second rail lengths 11, the
risk of conducting a wrong row 14 of carriers 4 into the feeding station 6 is avoided.
In order to ensure correct transfer of the carriers 4 between the feeding station
6 and the storage station 7, the second rail lengths 11 may be provided with colour
codes.
[0037] When the loom has been restarted, the operator may transfer the carriers 4 via the
central rail length 12 to the emptying station 18 where yarn spools 15 with any remaining
yarn are removed from the carriers 4. Then the carriers are transferred to the filling
station 17 where new yarn spools are placed in the carriers. When this has been done,
the carriers may again be transferred via the central rail length 12 into the storage
station 7 of the yarn rack 3 on a correct second rail length 11.
[0038] As the operator can transfer the carriers on the central rail length 12 arranged
in a position behind the feeding station 6, and as the replacement of the yarn spools
5 takes place in the separate emptying/filling stations 18, 17, no wind transfers
or wind gusts will occur in the feeding station 6 of the yarn rack such as in the
traditional double racks with two pins for each yarn end. This is important since
even relatively small wind transfers will be able to make yarns being unwound from
the yarn spools 5 become entangled, which may mean that the loom 2 has to be stopped
or that the product formed is useless.
1. A plant for supplying yarn to a loom and comprising a yarn rack, which is placed next
to the loom and which comprises a number of juxtaposed, replaceable carriers that
are suspended by means of carrier rolls in a ceiling rail arrangement and on which
yarn spools are suspended, characterised in that the yarn rack comprises a feeding station having a number of juxtaposed rails,
each of which is able to carry one or more carriers, said feeding station being placed
in immediate vicinity of the loom, as well as an adjacent storage station, which is
connected with the feeding station via the rail arrangement and which comprises at
least two related rails for each rail in the feeding station.
2. A plant according to claim 1, characterised in that the ceiling rail arrangement connects the yarn rack with a filling station,
in which full yarn spools are placed in the carriers.
3. A plant according to claim 1 or 2, characterised in that the ceiling rail arrangement connects the yarn rack with an emptying station,
in which spools with or without remaining yarns are removed from the carriers.
4. A plant according to any one of the preceding claims, characterised in that at least the rail arrangement in the feeding station comprises a floor rail
located under the ceiling rail and co-operating with guiding rolls at the carrier
bottom.
5. A plant according to claim 4, characterised in that the floor rail at the entrance of a station is funnel-shaped.
6. A plant according to any one of the preceding claims, characterised in that each carrier comprises an upper carrier profile, that said carrier rolls
are mounted on the upper carrier profile for rotation around substantially horizontal
axes within C-shaped downward open ceiling rails, that each carrier profile is connected
with 4 to 8 vertical posts which are connected at their bottoms with a lower support
profile and each of which is provided with an outwardly to either side oriented row
of pins arranged one over the other, on which pins the spools are placed.
7. A plant according to any one of the preceding claims, characterised in that the distance between the juxtaposed carriers in the feeding station is between
700 and 900 mm, preferably approximately 800 mm.
8. A method for supplying yarn to a loom from a yarn rack, which comprises a number of
juxtaposed, replaceable carriers that are suspended by means of carrier rolls in a
ceiling rail arrangement and on which yarn spools are placed, characterised in that the yarns are unwound from the spools while each carrier is located on a
rail of its own in a feeding station in immediate vicinity of the loom, that when
the yarn spools have been emptied, the carriers are transferred via the ceiling rail
arrangement from the rail in the feeding station to a first related rail in a storage
station, that a carrier with full yarn spools is transferred from a second related
rail in the storage station onto said related rail in the feeding station for subsequent
supply to the loom.
9. A method according to claim 8, characterised in that the emptied carriers are transferred via the ceiling rail arrangement into
an emptying station in which the spools are removed, and that the carriers are subsequently
transferred into a filling station in which yarn spools are placed in the carriers,
and that the carriers are subsequently transferred into the storage station ready
for subsequent transfer into the feeding station.
10. A method according to claim 8 or 9, characterised in that the transfer of the carriers between different stations is supervised and
controlled by a computer unit.