[0001] This invention relates to a span structure as well as a method for constructing such
a span structure, e.g. a bridge, consisting mainly of a supporting structure built
up from steel sections and a road surface connected therewith and composed of concrete
elements, said method including the steps of:
- arranging fluid activated pressure means comprising a pressure vessel at the location
of at least part of the joints between successive concrete elements,
- pressurizing the pressure means by filling with liquid under pressure to generate
in the concrete elements compression forces acting in the span direction and transmitted
by stops to the supporting structure,
- filling the joint around the pressurized pressure vessel with hardening and after
hardening substantially incompressible material,
- depressurizing the pressure means after hardening of said material around the pressure
vessel, and
- filling the space occupied by the pressure vessel with substantially incompressible
material, such as known from US-A-4,343,123.
[0002] Constructing a span structure of the above-mentioned general type is known from practice.
When the road surface is poured on the site on the supporting structure , shrinkage
cracks or other cracks may occur in the course of time owing to the hardening process,
resulting in damage to the road surface and symptoms of fatigue. These cracks advance
the date of maintenance work and/or shorten the life of the structure.
[0003] It is known that when using a concrete road surface as a monolithic whole because
the concrete parts are under pressure both in transverse and in the span direction,
the maintenance costs are substantially lower and the life of the span structure can
be prolonged. The compressive stress in the concrete surface in the span direction
is usually realized by means of a temporary support of the supporting steel structure
ensuring that the supporting structure is bend in the upward direction. Subsequently,
the surface is poured on the site in parts in a specific sequence or pre-fabricated
concrete elements are placed to form the road surface, after which the joints between
and the recesses in the concrete elements serving to connect them with the supporting
structure are filled with mortar. After hardening of the road surface or of the mortar
in the joints and recesses the temporary supporting structure is removed with the
result that the road surface and the joints transverse to the span direction are subjected
to pressure by its own weight in the span direction. The compressive stress in the
concrete elements transverse to the span direction can be applied in the known manner
on the site or in the factory by means of prestressed reinforcement.
[0004] The laborious erection of an auxiliary supporting structure and the subsequent removal
thereof can be left out by using the construction method known from US-A-4,343,123.
The compressive forces in the concrete elements are generated by placing hydraulic
pressure means of a specific type, so called flat jacks, in a joint between two concrete
elements, which are fixedly attached to the supporting construction to form consoles
for the hydraulic pressure means. Such a flat jack comprises two parallel pressure
plates connected at their perimeter by a channel part with a diameter wider than the
maximum distance between the pressure plates. The hydraulic pressure means are placed
on a beam of the supporting construction to create a bending moment in said beam.
This structure implies that an only locally compressive forces can be generated at
a specific part of the edges of the concrete elements bordering the joint and, thus,
limits the maximum force to be applied when compared with the above discussed bent-out
construction where the edges of two adjacent concrete elements contacting each other
over their entire surface. After pressurizing the concrete elements a part of the
joint is filled with so called babbit material. After hardening of said material the
flat jacks are depressurized and removed, the voids being formed by removing the flat
jacks being filled with another substantially incompressible material, such as concrete.
The strength of the concrete and the locally acting flat jacks limit the possible
compressive forces in the road surface. The combination of relatively low local compressive
forces in the road surface and attaching the road surface rigidly to the supporting
construction before pressurizing the flat jacks decreases the possibility to compensate
the creep of the concrete road surface and the favourable influence on the bending
moment in the construction.
[0005] The object of the invention is to provide a construction method and span structure
of the above type in which the road surface can be pressurized in the span direction
without requiring an auxiliary structure as a temporary support while retaining the
possibility to exert very high compressive forces in the concrete elements with relatively
simple and inexpensive means.
[0006] According to the invention this object is attained by
- providing stops, which take up the forces in the span direction, applied in the concrete
elements, at the ends of the span structure, said stops allowing a horizontal shift
of the concrete element between the stop and the pressure vessel with respect to the
supporting structure;
- providing pressure means comprising as pressure vessel (7) a metal tube flattened
with smooth flowing forms in cross-section, the long axis of the flattened metal tube,
seen in cross-section, being positioned substantially parallel to the main plane of
the joint (4) and said metal tube being located completely inside the joint (4),
- pressuring the whole road surface in the span direction to compensate from the beginning
shrinkage and creep effects such that the road surface functions as a monolithic whole;
- after pressurizing rigidly connecting the concrete elements to the supporting construction;
and
- filling under pressure the flattened metal tube with a hardening and after hardening
substantially incompressible mass.
[0007] By these features the concrete elements are pre-stressed in a uniform way between
the local pressure means and the local stops. After achieving this uniformly pre-stressed
condition said condition is maintained by filling the joints and connecting the concrete
elements between the pressure means and the stops to the supporting construction before
depressurising the pressure means. By using a flattened metal tube with flowing forms,
which can be relatively cheap made of a one piece tube by simply deforming the tube
between two pressing surfaces, said pressure means becomes an integral part of the
joint taking an active part in maintaining the compressive forces in the road surface
and in reinforcement of the joint against fatigue damage by being filled under pressure.
[0008] By arranging expandable pressure vessels preferably extending over substantially
the length of the joints between the concrete elements the whole road surface can
be pressurized in the span direction in such a manner that even after rigidly attaching
the road surface to the supporting construction the shrinkage and creep effects otherwise
occurring in the span direction are compensated from the beginning across the whole
span length as the road surface is equally pre-stressed over its whole length in a
sufficient manner, so that the road surface functions as a monolithic whole in a composite
construction. The compressive stress applied in the concrete elements in the span
direction produces a moment opposite to the weight load, as a result of the eccentric
action on the supporting steel structure, so that this supporting structure can be
made more slender.
[0009] The hardening mass can be brought directly into the pressure vessel on condition
that the hardening of that mass occurs more slowly than the hardening of the material
applied around the pressure vessel in the joint. However, according to a further embodiment
of the invention it is preferred that the flattened metal tube is filled under pressure
with a hardening mass after depressurizing the pressure means.
[0010] Depending of the span width of the bridge more than two concrete elements can be
present. Then, it is, according to a further embodiment of the invention, preferred,
that at least one concrete element is placed between the two concrete elements at
the ends of the span structure, which at least one concrete element is provided with
pressure means at its opposed ends and is locally firmly connected to the supporting
structure, allowing horizontal shift between said local connection and the pressure
vessels with respect to the supporting structure.
[0011] Further, the invention relates to a span structure, such as a bridge, consisting
mainly of a supporting structure built up from steel sections and a road surface supported
by the supporting construction and composed of at least one concrete element between
stops at the end of the road surface, joints being present between at least a concrete
element and a stop, pressure means comprising a pressure vessel arranged in a joint
and filled with a hardened mass being arranged at the location of at least part of
the joints, compression forces acting in the span direction and transmitted to the
supporting structure by the stops being present, as known from FR-A-2,218,434.
[0012] The pressure means in the span structure known from FR-A-2,218,434 consist of Freyssinet
jacks composed of two parallel rectangular plates connected at their perimeter by
a channel part with a diameter wider than the maximum distance between the pressure
plates. These jacks are placed between a single concrete element, shiftable to the
supporting construction and forming the road surface, and a console attached to a
beam of the steel section, i.e. only a local compressive force on a specific part
of the edge of the concrete element can be generated and thus limiting even more the
maximum compressive force in the span direction as discussed above with respect to
US-A-4,343,123. Moreover, the Freyssinet jacks are to be considered as lost elements
which increase the manufacturing costs, especially in view of the specific construction
of said jacks and necessitate to differently constructed, costly ends of the supporting
construction.
[0013] When, according to the present invention the road surface is composed of at least
two concrete elements rigidly attached to the supporting construction and defining
a joint there between and the pressure vessel is located in a joint between two concrete
elements and consists of a metal tube having two opposed, in cross-section by deforming
flattened surfaces acting as deformable pressure surfaces, the long axis of the flattened
metal tube, seen in cross-section, being substantially parallel to the main plane
of the joint, very high compressive forces in the span direction can be generated.
Although the pressure means, as in the known construction, are to be considered as
lost elements the costs are relatively low due to the simple and uncomplicated structure
of the flattened metal tube used as pressure vessel and their function as a replacement
for an otherwise needed reinforcement in the joint to meet the demands for fatigue
resistance. By placing the pressure means in a joint between two concrete elements
the whole length of the joint is available for pre-stressing the concrete elements
creating the possibility of uniformly dividing the pre-stress forces over the width
of the concrete elements. Attaching the concrete elements to the supporting construction
after pre-stressing maintains this uniformly pre-stressed condition.
[0014] The concrete element is provided with a first surface for forming a part of a road
surface and an opposed surface suited to be connected with a supporting steel structure
suitable for use in a span structure of the above type. Such a concrete element is
provided at the second surface with partly poured-in angle irons extending in the
span direction to form by the leg of the angle iron projecting from the concrete element
a supporting and shifting surface with respect to the supporting steel structure and
to connect the concrete element with the supporting steel structure. By this a solid
connection between the concrete element and the supporting structure is to be achieved.
[0015] Further such a concrete element, at at least one edge, comprises a longitudinal recess
of a shape corresponding to the flattened metal tube to optimise the pressure contact
between the pressure vessel and the concrete element.
[0016] An embodiment of the span structure according to the invention and of the concrete
element employed therein will be explained in more detail with reference to the accompanying
drawings in which:
Fig. 1 - diagrammetically shows a known span structure;
Fig. 2 - diagrammetically shows a span structure according to the invention;
Fig. 3 - shows the shape of the pressure vessel arranged between two adjacent concrete
elements;
Fig. 4 - shows the end of the span structure according to the invention;
Fig. 5 - shows the connection between concrete elements and supporting structure during
mounting of the span structure;
Fig. 6 - shows another embodiment of the connection between the concrete elements;
and
Fig. 7 - shows a joint between adjacent concrete elements in a ready span structure.
[0017] Fig. 1 shows the known span structure in a diagrammetic form in which a supporting
structure 1 made from steel rests on two supports 2 provided at the ends. The supporting
structure 1 will sag by its own weight to a greater or lesser degree, the neutral
line 5, depending on the embodiment of the supporting structure, being situated more
or less in the middle of the supporting structure 1. Applied to the supporting structure
is a concrete road surface consisting of concrete elements 3 and a joint 4 between
the concrete elements filled with mortar. The concrete elements 3 are connected with
the supporting structure 1 in some way or other. To contribute to the carrying power,
the concrete elements must take up pressure in the span direction, which only occurs
with increasing load in the vertical direction.
[0018] Fig. 2 shows the span structure according to the invention in diagrammatic form.
This structure differs from that of Fig. 1 by stops 6 provided at the ends of the
road surface, which can-take up the forces in the span direction, applied in the concrete
elements, and transmit them to the supporting structure 1. Arranged in the joint 4
is a pressure vessel 7 consisting of a flattened metal tube, deformable under internal
pressure to generate forces 8 in the span direction. When the pressure vessel 7 is
pressurized, the concrete elements 3 are connected with the supporting structure 1
by means of the diagrammatically shown clamp connections 15 allowing horizontal shift.
By applying the forces 8 transmitted to the stops 6 by means of the concrete elements
3, a moment opposite to the moment generated by its own weight acts on the supporting
structure with the result that the carrying power of the span structure is increased
or the same carrying power is obtained with a more slender supporting structure 1.
A change of stress has occurred in the supporting steel structure. The forces 8 generated
by the pressure vessel 7 apply a tensile stress in the span direction, while the moment
produced by those forces 8 because of the eccentric action applies a tensile stress
in the upper part of the supporting structure and a compressive stress in the lower
part. After providing a solid connection of the concrete elements 3 with the supporting
structure 1 by means of diagrammatically shown bolt connections 9, the neutral line
5 of Fig. 2 has shifted in upward direction when compared to Fig. 1.
[0019] Fig. 3 shows the shape of the pressure vessel 7 placed in the joint 4 between two
adjacent concrete elements 3. The pressure vessel 7 consists of a metal tube flattened
in cross-section, the long axis of which is parallel to the main plane of the joint
4. By applying in the pressure vessel 7 a pressure of, e.g., 400 bar, considerable
forces are generated in the concrete elements 4 which are transmitted via the stops
6 to the supporting structure 1. After the concrete elements 3 have thus been put
under compressive stress, the joint 4 is filled with mortar, after the bottom of the
joint has first been sealed by means of a rubber element 11. After the mortar in the
joint 4 has hardened, the pressure can be let off from the pressure vessel 7, after
which the pressure vessel 7 is filled under pressure with a hardening mass which,
after hardening, additionally keeps the concrete elements 3 under pressure.
[0020] Fig. 4 shows the end of the span structure. The supporting structure 1 can be provided
at the end with a strengthened flange 12. The concrete elements 3 are provided with
poured-in angle irons 13 of which the leg extending into the concrete element 3 is
preferably connected with the transverse reinforcement (perpendicular to the plane
of the drawing) of the concrete element 3. The leg of the poured-in angle iron 13
projecting from the concrete element is connected by means of a welded or bolt connection
10 with the strengthened flange 12 of the supporting structure 1 to form the stop
6 for transmitting the forces 8 in the span direction, generated in the concrete elements
3, to the supporting structure 1.
[0021] The steps of mounting the concrete elements 3 and connecting them with the supporting
structure 1 will be explained hereinbelow with reference to Fig. 5.
[0022] Fig. 5 shows a concrete element 3 provided at the bottom with poured-in angle irons
13 resting on the upper flange of the supporting structure 1. Arranged between adjacent
concrete elements 3 are pressure vessels 7 filled with a liquid capable of being put
under a high pressure of, e.g., 400 bar by means of appropriate means. In the middle
between the pressure vessels the concrete element 3 is firmly connected with the supporting
structure 1, preferably by means of a bolt connection 14. At the joints 4 the poured-in
angle irons 13 are connected with the suporting structure 1 by means of a plate 15
which is fixed in such a manner that shifting of the poured-in angle iron 13 with
respect to the supporting structure 1 is possible. By pressurizing the pressure vessel
7 the concrete to the left and the right of the pressure vessels will be put under
compressive stress so that the concrete elements are shortened. This compressive stress
is transmitted at the ends of the span structure to the supporting steel structure,
as a result of which mainly in the upper part thereof a tensile force is generated
so that this upper part is lengthened. In view of the described shortening of the
concrete 3 and the lengthening of the upper part of the supporting structure 1 the
angle irons 13 poured in the concrete shift with respect to the supporting structure
1 (except at the location of the solid fastening bolts 14), after which in the final
condition the angle irons 13 are connected with the supporting structure 1 by means
of bolts 9.
[0023] A connection between the concrete elements 3 and the supporting structure 1 may also
be effected in a manner different from the one shown in Fig. 5 and described above.
This other manner of connecting is shown in Fig. 6. Instead of angle irons 13 extending
throughout the length of the concrete element 3, there are only arranged short pieces
of angle iron, namely at both ends of the concrete element 3 at the plates 15 allowing
shifting and in the middle of the concrete element 3 at the connecting bolts 14. The
short angle irons 13 mainly have the function of supporting legs.
[0024] After fixing the concrete element 3 by connecting the middle angle-iron shaped portions
13 with the upper flange of the supporting structure 1, pressurizing the concrete
element by means of the pressure vessels 7, filling the joints 4 with mortar and hardening
them, the connection between concrete element 3 and supporting structure 1 is effected
by filling the groove 19, arranged on the upper flange of the supporting structure
1, with concrete mortar. The axial confinement between concrete element 3 and supporting
structure 1 is obtained by providing the concrete element 3 at the bottom with straps
16 at regular intervals, while dowels 17 projecting into the plane through the horizontal
legs of the straps 16 are welded to the upper flange of the supporting structure.
[0025] Fig. 7 shows a joint between adjacent concrete elements 3 in the final condition.
After the liquid in the pressure vessel 7 has been pressurized, the joint 4 is filled
with mortar. After hardening of the mortar the pressure in the pressure vessel 7 is
let off and the pressure vessel 7 is filled with a mass hardening under pressure for
additionally keeping the adjacent concrete elements 3 under compressive stress.
1. Method for constructing a span structure, such as a bridge, consisting mainly of a
supporting structure built up from steel sections and a road surface connected therewith
and composed of concrete elements, said method including the steps of:
- arranging fluid activated pressure means comprising a pressure vessel (7) at the
location of at least part of the joints (4) between successive concrete elements,
- pressurizing the pressure means by filling with liquid under pressure to generate
in the concrete elements (3) compression forces acting in the span direction and transmitted
by stops to the supporting structure,
- filling the joint (4) around the pressurized pressure vessel with hardening and
after hardening substantially incompressible material,
- depressurizing the pressure means after hardening of said material around the pressure
vessel, and
- filling the space occupied by the pressure vessel with substantially incompressible
material,
characterized by
- providing stops, which take up the forces in the span direction, applied in the
concrete elements, at the ends of the span structure, said stops allowing a horizontal
shift of the concrete element between the stop and the pressure vessel with respect
to the supporting structure;
- providing pressure means comprising as pressure vessel (7) a metal tube flattened
with smooth flowing forms in cross-section, the long axis of the flattened metal tube,
seen in cross-section, being positioned substantially parallel to the main plane of
the joint (4) and said metal tube being located completely inside the joint (4),
- pressuring the whole road surface in the span direction to compensate from the beginning
shrinkage and creep effects such that the road surface functions as a monolithic whole;
- after pressurizing rigidly connecting the concrete elements to the supporting construction;
and
- filling under pressure the flattened metal tube with a hardening and after hardening
substantially incompressible mass.
2. Method according to claim 1, characterized in that the flattened metal tube is filled under pressure with a hardening mass after depressurising
the pressure means.
3. Method according to claim 1 or 2, characterized in that at least one concrete element is placed between the two concrete elements at the
ends of the span structure, which at least one concrete element is provided with pressure
means at its opposed ends and is locally firmly connected to the supporting structure,
allowing horizontal shift between said local connection and the pressure vessels with
respect to the supporting structure.
4. A span structure, such as a bridge, consisting mainly of a supporting structure built
up from steel sections and a road surface supported by the supporting construction
and composed of at least one concrete element between stops at the end of the road
surface, joints being present between at least a concrete element and a stop, pressure
means (7) comprising a pressure vessel arranged in a joint and filled with a hardened
mass being arranged at the location of at least part of the joints (4), compression
forces acting in the span direction and transmitted to the supporting structure (1)
by the stops (6) being present, characterized in that the road surface is composed of at least two concrete elements rigidly attached to
the supporting construction and defining a joint (4) there between and the pressure
vessel (7) is located in a joint (4) between two concrete elements (3) and consists
of a metal tube having two opposed, in cross-section by deforming flattened surfaces
acting as deformable pressure surfaces, the long axis of the flattened metal tube,
seen in cross-section, being substantially parallel to the main plane of the joint
(4).
5. A span structure according to claim 3, characterized in that the long axis of the flattened metal tube, seen in cross-section, is approximately
1/3 to 2/3 of the thickness of the concrete elements (3) defining the joint (4).
1. Verfahren zum Konstruieren einer Spannstruktur, wie zum Beispiel einer Brücke, die
hauptsächlich aus einer aus Formstahl aufgebauten Stützstruktur und einer Straßenoberfläche
besteht, die damit verbunden ist und aus Betonelementen besteht, wobei das Verfahren
die folgenden Schritte aufweist:
- Anordnen eines einen Druckbehälter (7) umfassenden fluidaktivierten Druckmittels
am Ort mindestens eines Teils der Fugen (4) zwischen aufeinander folgenden Betonelementen,
- unter Druck Setzen des Druckmittels durch Befüllen mit unter Druck stehender Flüssigkeit
zum Erzeugen in den Betonelementen (3) von Druckkräften, die in der Spannrichtung
wirken und durch Widerlager an die Stützstruktur übertragen werden,
- Füllen der Fuge (4) um den unter Druck gesetzten Druckbehälter herum mit abbindendem
Material, das nach dem Abbinden im Wesentlichen nicht komprimierbar ist,
- Nehmen des Drucks vom Druckmittel nach dem Abbinden des Materials um den Druckbehälter
herum; und
- Füllen des durch den Druckbehälter eingenommenen Raums mit im Wesentlichen nicht
komprimierbarem Material,
gekennzeichnet durch
- Vorsehen von Widerlagern an den Enden der Spannstruktur, welche die in der Spannrichtung
wirkenden Kräfte aufnehmen, die an die Betonelemente angelegt werden, wobei die Widerlager
eine waagrechte Verschiebung des Betonelements zwischen dem Widerlager und dem Druckbehälter
bezüglich der Stützstruktur erlauben;
- Vorsehen eines Druckmittels, das als einen Druckbehälter (7) eine abgeflachte Metallröhre
mit weichen fließenden Formen im Querschnitt umfasst, wobei die Längsachse der abgeflachten
Metallröhre in Querschnittsansicht im Wesentlichen parallel zur Hauptebene der Fuge
(4) verläuft und die Metallröhre vollständig innerhalb der Fuge (4) angeordnet ist,
- unter Druck Setzen der gesamten Straßenoberfläche in der Spannrichtung zum Ausgleichen
des beginnenden Schrumpfens und von Kriecheffekten, so dass die Straßenoberfläche
als monolithisches Ganzes fungiert;
- nach dem unter Druck Setzen, steifes Verbinden der Betonelemente mit der Stützkonstruktion;
und
- Füllen der abgeflachten Metallröhre unter Druck mit einer abbindenden Masse, die
nach dem Abbinden im Wesentlichen nicht komprimierbar ist.
2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass die abgeflachte Metallröhre unter Druck mit einer abbindenden Masse befüllt wird,
nachdem der Druck vom Druckmittel genommen wurde.
3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass mindestens ein Betonelement zwischen die beiden Betonelemente an den Enden der Spannstruktur
platziert wird, wobei das mindestens eine Betonelement mit Druckmitteln an seinen
entgegengesetzten Enden ausgerüstet ist und lokal fest mit der Stützstruktur verbunden
ist, wodurch eine horizontale Verschiebung zwischen der lokalen Verbindung und den
Druckbehältern bezüglich der Stützstruktur ermöglicht wird.
4. Spannstruktur, wie zum Beispiel eine Brücke, bestehend hauptsächlich aus einer aus
Formstahl aufgebauten Stützstruktur und einer Straßenoberfläche, die von der Stützkonstruktion
gestützt wird und aus mindestens einem Betonelement zwischen Widerlagern an den Enden
der Straßenoberfläche besteht, wobei Fugen zwischen mindestens einem Betonelement
und einem Widerlager vorhanden sind, einem Druckmittel (7), das einen Druckbehälter
umfasst, der in einer Fuge angeordnet ist und mit einer abgebundenen Masse gefüllt
ist und am Ort mindestens eines Teils der Fugen (4) angeordnet ist, wobei Druckkräfte
in der Spannrichtung wirken und durch die vorhandenen Widerlager (6) auf die Stützstruktur
(1) übertragen werden, dadurch gekennzeichnet, dass die Straßenoberfläche aus mindestens zwei Betonelementen zusammen gesetzt ist, die
steif an der Stützkonstruktion befestigt sind und eine Fuge (4) zwischen ihnen definieren,
und der Druckbehälter (7) in einer Fuge (4) zwischen zwei Betonelementen (3) angeordnet
ist und aus einer Metallröhre besteht, die zwei sich gegenüber liegende, im Querschnitt
durch Verformung abgeflachte Oberflächen aufweist, die als verformbare Druckflächen
fungieren, wobei die Längsachse der abgeflachten Metallröhre in Querschnittsansicht
im Wesentlichen parallel zur Hauptebene der Fuge (4) ist.
5. Spannstruktur nach Anspruch 4, dadurch gekennzeichnet, dass die Längsachse der abgeflachten Metallröhre in Querschnittsansicht ungefähr 1/3 bis
2/3 der Dicke der Betonelemente (3) beträgt, welche die Fuge (4) definieren.
1. Procédé de construction d'une structure de travée, telle qu'un pont, constituée principalement
d'une structure de support réalisée à partir de tronçons en acier et d'une surface
de route reliée à ceux-ci et constituée d'éléments de béton, ledit procédé comportant
les étapes consistant à :
- agencer des moyens de pression activés par fluide comportant un réservoir de pression
(7) situé à l'emplacement d'au moins une partie des joints (4) existant entre des
éléments en béton successifs,
- la mise sous pression des moyens de pression par remplissage à l'aide d'un liquide
sous pression pour produire dans les éléments en béton (3) des forces de compression
agissant dans la direction de la travée et transmises par des butées à la structure
de support,
- remplir le joint (4), autour du réservoir de pression mis sous pression, avec un
matériau durcissant et sensiblement incompressible après durcissement,
- supprimer la pression des moyens de pression après durcissement dudit matériau autour
du réservoir de pression, et
- remplir l'espace occupé par le réservoir de pression avec un matériau sensiblement
incompressible,
caractérisé en ce qu'en plus
- on fournit des butées, qui subissent les forces dans la direction de la travée,
appliquées dans les éléments de béton, aux extrémités de la structure de travée, lesdites
butées permettant un déplacement horizontal de l'élément de béton entre la butée et
le réservoir de pression par rapport à la structure de support,
- on fournit des moyens de pression comportant en tant que réservoir de pression (7)
un tube métallique aplati ayant des formes à écoulement lisse en coupe transversale,
le grand axe du tube de métal aplati, vu en coupe, étant positionné sensiblement parallèlement
au plan principal du joint (4) et ledit tube métallique étant positionné entièrement
à l'intérieur du joint (4),
- on met sous pression la surface totale de la route dans la direction de la travée
pour compenser les effets de fluage et de rétreint commençant de telle sorte que la
surface de la route agit comme un monolithe entier,
- après mise sous pression on relie de manière rigide les éléments en béton avec la
construction de support, et
- on remplit sous pression le tube de métal aplati à l'aide d'une masse durcissante
et sensiblement incompressible après durcissement.
2. Procédé selon la revendication 1, caractérisé en ce que le tube de métal aplati est rempli sous pression à l'aide d'une masse durcissante
après suppression de la pression des moyens de pression.
3. Procédé selon la revendication 1 ou 2, caractérisé en ce qu'au moins un élément en béton est placé entre les deux éléments en béton situés aux
extrémités de la structure de travée, lequel au moins un élément en béton est muni
de moyens de pression à ses extrémités opposées et est localement relié de manière
ferme à la structure de support, permettant un déplacement horizontal entre ladite
liaison locale et les récipients de pression par rapport à la structure de support.
4. Structure de travée, telle qu'un pont, constituée principalement d'une structure de
support réalisée à partir de tronçons en acier et d'une surface de route supportée
par la construction de support et constituée d'au moins un élément en béton situé
entre les butées existant à l'extrémité de la surface de route, des joints étant présents
entre au moins un élément en béton et une butée, des moyens de pression (7) comportant
un réservoir de pression agencé dans un joint et rempli d'une masse durcie, agencé
à l'emplacement d'au moins une partie des joints (4), des forces de compression agissant
dans la direction de la travée et étant transmises à la structure de support (1) par
les butées (6) qui sont présentes, caractérisée en ce que la surface de la route est constituée d'au moins deux éléments en béton reliés de
manière rigide à la construction de support et définissant un joint (4) entre eux
et le récipient de pression (7) est situé dans un joint (4) entre deux éléments en
béton (3) et constitué d'un tube métallique ayant en coupe deux surfaces opposées
aplaties par déformation agissant en tant que surfaces de pression déformables, le
grand axe du tube métallique aplati, vu en coupe, étant sensiblement parallèle au
plan principal du joint (4).
5. Structure de travée selon la revendication 3, caractérisée en ce que le grand axe du tube métallique aplati, vu en coupe, est approximativement de 1/3
à 2/3 de l'épaisseur des éléments en béton (3) définissant le joint (4).