[0001] This invention relates to a trenching machine for lowering a pipeline into the seabed
after pipeline installation.
[0002] A pipeline can be lowered into the seabed by removing the material of the seabed
from below the pipeline by breaking up the material and removing the material thereby
providing a trench under the pipeline. The pipeline can then sink into the trench.
[0003] Known trenching machines use jetting nozzles to break up the seabed with the jetting
power being supplied via a flexible hose from an operating platform such as a pipelay
barge. Such known trenching machines have the disadvantage of having a limited travelling
speed within the limits of the operating barge.
[0004] International patent application WO95/28529 discloses an apparatus which is attached
to a suction device on the surface of the water. This apparatus has two hinged legs
which are placeable over the pipeline. This apparatus has the disadvantage of being
horizontally unstable, does not provide fine steering capability in order to reduce
pipeline induced stresses, and has limited safety for deployment over a pipeline without
causing damage to the pipeline. This apparatus is only suitable for partial burial
of pipelines and could exercise unacceptable forces on the pipeline.
[0005] According to a first aspect of the present invention there is provided a trenching
machine for lowering a pipeline into the seabed after pipeline installation on the
seabed, the trenching machine comprising a trenching body and a connecting pipe wherein,
in use, the trenching machine is attached by the connecting pipe to a dredging vessel
which propels the trenching machine and wherein the connecting pipe provides suction
and jet power to the trenching body from the dredging vessel the trenching machine
also comprising a pair of skids to provide horizontal stability to the trenching machine.
[0006] The skids provide the advantage of increasing the clearance between the pipeline
and the trenching body due to the span crossing ability of the skids.
[0007] Preferably, a steering means for fine steering is provided at a coupling point of
the connecting pipe and the trenching body.
[0008] Preferably, at least part of the connecting pipe is sufficiently rigid to act as
a towing mechanism attached to the vessel for towing the trenching machine along the
seabed.
[0009] Preferably, the trenching body is in the form of a pair of legs which, in use, are
placeable either side of the pipeline. Preferably, the legs deliver jets of water
and suction power to the seabed material.
[0010] The legs may be attached to the trenching body such that the legs can be raised or
lowered independently along an axis perpendicular to the pipeline in order to allow
safe deployment over the pipeline.
[0011] Preferably, the legs can be raised and lowered hydraulically to adjust the trench
depth. The legs may be provided with forward and side facing jets and inward facing
ducts through which material is pumped out of the trench.
[0012] The skids may be adjustable in height to compensate for variations in the clearance
between the pipeline and the trenching body.
[0013] Preferably, the trenching body is attached to the connecting pipe via a universal
and rotating coupling which gives three axes of freedom namely, pitch, roll and yaw.
Rollers may be provided adjacent the pipeline to monitor pipeline contact forces.
[0014] The trenching machine may preferably include a surveillance system to allow operators
of the trenching machine to observe the machine. The trenching machine may also optimally
include an instrumentation system to monitor the trenching machine and the interaction
with the pipeline.
[0015] Preferably, the connecting pipe includes a suction pipe and a water jet pipe.
[0016] According to a second aspect of the present invention there is provided a trenching
system for providing a trench for a pipeline in a seabed, the trenching system comprising
a trenching body, a self-propelled dredging vessel and a connecting pipe, the connecting
pipe connecting the trenching body to the dredging vessel and providing suction and
jet power to the trenching body from the dredging vessel, wherein the vessel propels
the trenching body along the seabed, the trenching system also including a pair of
skids disposed on either side of the trenching body to provide horizontal stability
to the trenching body.
[0017] Preferably, the vessel is a trailer suction hopper dredger working on dynamic tracking.
[0018] According to a third aspect of the present invention there is provided a method of
providing a trench in a seabed for a pipeline comprising dragging a trenching body
along the seabed by a self-propelled vessel, wherein the trenching body is attached
to the vessel by a connecting pipe which supplies suction and jet power to the trenching
body, the trenching body being horizontally stabilised by the provision of a pair
of skids on either side of the trenching body.
[0019] Optimally, the trenching body is steered by a fine steering means provided at a coupling
point of the connecting pipe and the trenching body.
[0020] According to a fourth aspect of the present invention there is provided a trenching
machine for lowering a pipeline into the seabed after pipeline installation on the
seabed, the trenching machine comprising a trenching body and a connecting pipe wherein,
in use, the trenching machine is attached by the connecting pipe to a dredging vessel
which propels the trenching machine and wherein the connecting pipe provides suction
and jet power to the trenching body from the dredging vessel the trenching machine
also comprising a steering means provided at a coupling point between the connecting
pipe and the trenching body.
[0021] An embodiment of a trenching machine in accordance with the present invention is
now described with reference to the accompanying drawings in which:
Figure 1A is a side elevation of the trenching machine with the pipeline in a first
position;
Figure 1B is a side elevation of the trenching machine with the pipeline in a second
position;
Figure 2 is a top elevation of the trenching machine;
Figure 3A is a front elevation of the trenching machine with the pipeline in the first
position.
Figure 3B is a front elevation of the trenching machine with the pipeline in the second
position;
Figure 4 is a cross-section through A-A of Figure 1A; and
Figure 5 is a detail of Figure 4.
[0022] Referring to the drawings, a trenching machine 1 is positioned over a pipeline 2
on a seabed 5. The trenching machine 1 is attached via a coupling 10 and steering
mechanism to a connecting pipe 9. The trenching machine 1 is controlled and operated
from a vessel in the form of a trailer suction hopper dredger (not shown). The trenching
machine 1 uses the high jet and dredge pump power of the hopper dredger in order to
post lower the pipeline 2. In most cases this can be done in a single pass dependent
on the trench depth and soil encountered. The trenching machine 1 is primarily designed
for sand although the jet power of the hopper dredger enables it to be used with clay
and other materials.
[0023] The trenching machine 1 has a pair of parallel legs 4 which extend, in use, on either
side of the pipeline 2. The legs 4 each have inwardly projecting rollers 6 on their
mutually adjacent sides. A further roller 7 is disposed on the underside of the trenching
body 3.
[0024] The rollers 6, 7 are of steel construction with a hard rubber coating and plain bearings.
The rollers 6, 7 are mounted on roller cradles and are positioned so as to prevent
any other contact with the pipeline 2. The rollers 6, 7 are instrumented vertically
and laterally to monitor pipe contact forces.
[0025] The legs 4 are of steel fabricated construction with jet nozzles 24, 22 pointing
sidewards and in the direction of travel of the trenching machine 1. The side facing
jet nozzles 22 are positioned on each of the legs 4 such that the side facing jet
nozzles 22 are directed towards each other on either side of the pipeline 2 position.
The jet nozzles 22, 24 are nylon and replaceable to permit change to suit different
soil types. The jet nozzles 22, 24 are supplied with jet powered water from the vessel
via a jet water pipe 14. The jet water pipe 14 forms part of the connecting pipe 9.
[0026] The legs 4 also have a series of inward facing ducts 20 situated throughout the length
of the legs 4. The ducts 20 are connected to a suction pipe 12 acts as part of the
connecting pipe 9. The material from the trench is pumped out of the trench by suction
through the ducts 20 and through the suction pipe 12.
[0027] The legs 4 are attached via a hydraulic system to the trenching body 3. The legs
4 can be raised and lowered hydraulically and independently from each other to allow
safe deployment of the trencher above the pipeline 2 and to adjust the desired trench
depth. The legs 4 are raised and lowered by pivoting about an axis perpendicular to
the pipeline 2.
[0028] The hydraulic system is in the form of an electric motor driving a hydraulic pump
which provides oil to an oil filled valve tank.
[0029] The suction pipe 12 and the jet water pipe 14 are attached via a universal and rotatable
coupling 10 to the trenching machine 1 to give three axes of freedom for the trenching
machine 1 namely pitch, roll and yaw.
[0030] Fine steering means are provided at the coupling 10. The fine steering means is in
the form of a hydraulic module which does not rely on contact with the pipeline 2
and which alters the direction of the skids 8 by reference to the coupling 10.
[0031] The trenching machine 1 is a seabed referencing device which runs on skids 8. The
trenching body 3 has two skids 8 positioned on either sides of the legs 4. The trenching
machine 1 has roll freedom so that it can follow the shape of the seabed 5. In this
way, the horizontal position of the trenching machine 1 is unaffected by the connecting
pipe 9. The skids 8 are sufficiently large to give adequate support on soft soil.
The skids 8 are placed sufficiently in advance of the legs 4 in order to reduce the
risk of undermining by the excavation. The figures show the skids 8 in two different
height positions.
[0032] The trenching machine 1 is provided with a surveillance system which includes obstacle
avoidance sonar to look ahead and to the side of the trenching machine 1, profiling
sonar at the front and back of the trenching machine 1 for locating the pipeline 2
and monitoring the trench created. Cameras are also provided, one forward, one aft
and both on pan and tilt. Four lights are also mounted on the trenching machine 1
in optimum positions.
[0033] The trenching machine 1 includes an instrumentation system with load cells to measure
force, in cylinder transducers to measure position and a number of other transducers.
The parameters which the instrumentation system controls are pipe contact forces,
jet leg reaction, jet leg position, pipe height, suction pipe angle, pitch and roll,
speed of wheel running on pipe, moisture ingress to electronics pod, water depth,
suction and jet pressure.
[0034] The trenching machine 1 is fitted with a one atmosphere pressure vessel which acts
as a junction box for electrical harnesses and contains the data gathering unit. The
unit communicates via the connecting pipe 9 with the control cabin on the bridge of
the vessel. The unit also controls the hydraulic valves, instrumentation and surveillance.
An umbilical system linking the vessel to the junction box is attached to the suction
pipe 12 and is an armoured type.
[0035] Control equipment for the trenching machine 1 is installed on the bridge of the dredging
vessel.
[0036] All the power, umbilical and signal cables are glanded into a separate air conditioned
area of the vessel to keep the temperature of the components within their operational
limits. All high voltage equipment is shielded and the transformers are enclosed in
a frame for safety.
[0037] There are normally two operators - the operator, who controls and finely steers the
trencher hydraulic functions at the left hand side of a console, and the co-operator,
who controls ancillary functions on the right. The operators control the trenching
machine 1 via joysticks and membrane keypads.
[0038] A processor system is provided which is designed so that the operator can directly
change transducer calibration constants and alarm levels, and can chose the graphics
picture layout. The system also has flexibility. If, say, an extra transducer is added,
then the required changes to the software can be done quickly and easily using a programmer.
[0039] The processor system is initially programmed by a computer. During normal operations
the computer and processor system are linked. A data logging packager is provided
so the information can be obtained as hard copy from the printer and in addition the
data can be logged onto the computer hard disc.
[0040] At any time during the operations a "snapshot" of the control system can be taken
and printed out. This shows all variables at the time the snapshot was requested together
with scaling factors and alarm system settings.
[0041] A spare computer is also provided which can be used to monitor data in the processor
system running program. It is not possible to both data log and monitor the processor
system program from one computer at the same time, so the use of two computers allows
continuous data logging, even if processor system monitoring is required for reasons
such as fault diagnosis or changes to software.
[0042] Since the two computers are networked together, access to the "live" data, as well
as previously stored data, is possible for "on-line" trend analysis using a suitable
software package.
[0043] A chart recorder is used to provide a visual record of chosen variables. The chart
recorder generates an independent "real time" record.
[0044] A remote display unit is provided, and this is usually mounted on the bridge. The
remote display unit contains two black and white monitors and two RGB monitors. The
pilot screen, profiling sonar and two TV pictures can be displayed, using outputs
from video switches in a control area.
Operation of the Trenching Machine
[0045] The trenching machine 1 is designed to suit post trenching of varying diameters of
pipeline from 20'' to 46'' and trench depths from 0.0 to 3.0 m. Prior to deployment
from the dredger the trenching machine 1 will be adjusted to alter the length and
distance between the trenching machine's legs 4 in accordance with the given pipeline
2 diameter. Also the skids 8 will be set in order to achieve the clearance required
with the given trench depth in view of possible freespans of the pipeline 2 between
dunes on the seabed 5.
[0046] Depth of trenching is controlled by setting the angle of incidence of the legs 4
to the seabed 5 and the length of leg 4 which penetrates the seabed 5. The legs 4
are modular and can therefore be lengthened or shortened prior to deployment.
[0047] Deployment of the trenching machine 1 takes place with the vessel moving forwards
on dynamic tracking at around 0.3 to 3.0 knots.
[0048] The as laid pipeline coordinates (vertical and horizontal) will have been input to
the vessel's navigation and dredging computers prior to deployment. The deployment
position will be 200 to 300m ahead of the start of the trenching run. Once the dredging
hopper has attained and is maintaining the required track, the trenching machine 1
is lowered to 5m above the seabed 5.
[0049] At this point in the deployment, the electronic and visual sensor arrays installed
on the trenching machine 1 are used for additional reference information. The trenching
machine 1 is then positioned laterally over the pipeline 2 by manual joy stick operation
from the control position on the bridge of the vessel. Lateral position can be fine
tuned by the jet water nozzles 22 exerting sidewards thrust. When the operator is
satisfied as to the position of the trenching machine 1 above the pipeline 2 the trenching
machine 1 is lowered over the pipeline 2 and supported on its skids 8 on the seabed
5.
[0050] Once on the seabed 5 the trenching machine's 1 position is further adjusted by the
forward motion provided by the vessel via the suction pipe, and fine steering by a
hydraulic module fitted to the coupling 10. This steering module, which does not rely
on contact with the pipeline 2, alters the skid 8 direction by reference to the universal
coupling joint 10 between the trenching machine 1 and suction pipe 12.
[0051] The fine steering mechanism consists of an hydraulic cylinder which acts from the
connecting pipe 9 to the rotating part of the universal coupling 10. As such the trencher
body can rotate in the horizontal plane around the vertical axis of universal coupling
10, providing fine steering capacity around the theoretical pipeline alignment. The
fine steering is operated by joy-stick control from the control console on the vessel
bridge.
[0052] Based on the electronic and visual sensors displaying the position of the pipeline
2 in between the skids 8, one of the trenching legs 4 is hydraulically lowered into
the seabed 5, which is at the greatest distance from the pipeline 2. Whilst moving
forwards, the trenching machine 1 is further aligned and the other trenching leg 4
is lowered from the moment that the sensors display the position of the pipeline 2
in the center of the trenching machine 1.
[0053] On completion of deployment and position alignment to the pipeline 2, the trenching
operation can start. The trenching from here on is an automated process with a manual
overview and over-ride capability.
[0054] The complete operation is controlled by the dredging, trenching and navigation computers
which monitor and steer the dredger hopper and trenching machine 1.
[0055] The trenching machine 1 is designed to operate at forward speeds between 0.3 and
3 knots, the forward movement being provided by pulling loads via the vessel's suction
pipe 12. The jet nozzles 22, 24 mounted on the front and inside of the trenching machine's
legs 4 cause localised fluidisation of the soil thus reducing resistance to the legs
4 forward motion through the soil.
[0056] Generally, one trenching pass will be required to lower the pipeline 2 into sand
to a depth of 1.5 m. For greater depths, multipass operation could be required.
[0057] Trenching is achieved by the vessel's massive suction power ability to pump the soil
liquified by the jets 22, 24 out of the trench. On the inside faces of the trenching
machine's legs 4 suction ducts 20 are installed at some distance behind the jets 22,
24. The soil under the pipeline 2 is sucked out of the trench via these ducts 20,
and using the suction tube 12 and dredge pump, to which the trenching machine 1 is
attached, the trench material can be loaded into the vessel's hopper. The standard
procedure however will be to repump the soil down a second suction pipe of the vessel
to the seabed at approximately 30-40m parallel to the trench on the other side of
the vessel with the mouth of the second suction pipe 10m or more above the seabed
5.
[0058] In addition to the vessel track position information and the visual type sensor arrays
mounted on the trenching machine 1, warning signals from strain sensitive contact
rollers 6 on each of the trenching machine's legs 4 are monitored at the trenching
machine's control console on the vessel bridge. A continuous read out of the lateral
contact pressure of the rollers 6 on the pipeline 2 will be available for pipe stress
analysis purposes. The tracking system continuously checks the horizontal and vertical
position of the pipeline 2 in relation to the trenching machine's skids 8.
[0059] Similar vertical rollers 7 are also mounted on the trenching machine 1 to monitor
any vertical contact forces to the pipeline 2. In order to have sufficient span crossing
ability in case of post trenching being executed over sand dunes, a vertical clearance
of 2.5m is available between the pipeline 2 and the trenching machine's main body
3 with a given trench depth up to 1.5m.
[0060] During transit from one dune to another, the trenching machine's legs 4 will be left
in the seabed 5 at approximately 0.5m depth with the jets 22, 24 operating at reduced
volume but without pumping the seabed soil out of the trench. As such, the seabed
5 under the pipeline 2 will be fluidised over limited depth and cause a levelled seabed
5 for the pipeline 2 in areas of minor freespans which could have remained after pipelay.
[0061] Recovery of the trenching machine 1 is a straightforward and simple operation comparable
with the lifting of a draghead. On completion of the trenching run the trenching machine's
legs 4 are raised thus providing the maximum lateral clearance between the trenching
machine's skids 8 for the purpose of lifting. After completing visual checks of the
trenching machine 1 alignment to the pipeline 2, the suction pipe 12 hoist winches
will be engaged to lift the trenching machine 1 clear of the pipeline 2 and up onto
the vessel's deck.
[0062] The vessel can then, if necessary, deploy the trenching machine 1 for any subsequent
passes required.
[0063] The trenching machine 1 is provided with equipment, to continuously monitor and control
the trenching equipment as the pipeline 2 is lowered into the trench. The monitoring
and control includes the following aspects:
- Suitability of the trenching spread for the local soil conditions (soil bearing capacity
versus track pressure, etc.);
- Bumpers/ tubular protection structures, etc. to avoid any possible direct contact
during trenching between the trenching machine's steel components with the pipeline;
- A load recording device, with permanent print out and an audible alarm shall be installed
on the pulling suction pipe to enable pulling load monitoring;
- Permanent readout/ recording of the power consumption on pumps and jets.
[0064] Improvements and modifications can be made to the above without departing from the
scope of the present invention.
1. A trenching machine (1) for lowering a pipeline (2) into the seabed (5) after pipeline
(2) installation on the seabed (5) the trenching machine (1) comprising a trenching
body (3) and a connecting pipe (9) wherein, in use, the trenching machine (1) is attached
by the connecting pipe (9) to a dredging vessel which propels the trenching machine
(1) and wherein the connecting pipe (9) provides suction and jet power to the trenching
body (3) from the dredging vessel, the trenching machine (1) also comprises a pair
of skids (8) disposed on either side of the trenching body (3) to provide horizontal
stability to the trenching machine (1).
2. A trenching machine (1) as claimed in claim 1, wherein a steering mechanism for fine
steering is provided at a coupling (10) between the connecting pipe (9) and the trenching
body (3).
3. A trenching machine (1) as claimed in claim 1 or claim 2, wherein at least part of
the connecting pipe (9) is sufficiently rigid to act as a towing mechanism attached
to the vessel for towing the trenching machine (1) along the seabed (5).
4. A trenching machine (1) as claimed in claim 1, 2 or 3, wherein the trenching body
(3) is in the form of a pair of legs (4) which, in use, are placeable either side
of the pipeline (2).
5. A trenching machine (1) as claimed in claim 4, wherein the legs (4) deliver jets of
water and suction power to the seabed (5) material.
6. A trenching machine (1) as claimed in claim 4 or claim 5, wherein the legs (4) are
attached to the trenching body (3) such that the legs (4) can be raised or lowered
independently along an axis perpendicular to the pipeline in order to allow safe deployment
over the pipeline.
7. A trenching machine (1) as claimed in any claims 4 to 6, wherein the legs (4) can
be raised and lowered hydraulically to adjust the trench depth.
8. A trenching machine (1) as claimed in any of claims 4 to 7, wherein the legs (4) are
provided with forward and side facing jets (22, 24) and inward facing ducts (20) through
which material is pumped out of the trench.
9. A trenching machine (1) as claimed in any of the preceding claims, wherein the pair
of skids (8) are disposed (3) on either side of the pair of legs (4).
10. A trenching machine (1) as claimed in claim 9, wherein the skids (8) are adjustable
in height to compensate for variations in the clearance between the pipeline (2) and
the trenching body (3).
11. A trenching machine (1) as claimed in any of the preceding claims, wherein the trenching
body (3) is attached to the connecting pipe (9) via a universal and rotating coupling
(10) which give three axes of freedom namely, pitch, roll and yaw.
12. A trenching machine (1) as claimed in any of the preceding claims, wherein rollers
(6, 7) are provided adjacent the pipeline (2), in use, to monitor pipeline (2) contact
forces.
13. A trenching machine (1) as claimed in any of the preceding claims, wherein the trenching
machine (1) includes a surveillance system to allow operators of the trenching machine
(1) to observe the machine (1).
14. A trenching machine (1) as claimed in any of the preceding claims, wherein the trenching
machine (1) includes an instrumentation system to monitor the trenching machine (1)
and the interaction with the pipeline (2).
15. A trenching machine (1) as claimed in any of the preceding claims, wherein the connecting
pipe (9) includes a suction pipe (12) and a water jet pipe (14).
16. A trenching system for providing a trench for a pipeline (2) in a seabed (5), the
trenching system comprising a trenching body (3), a self-propelled dredging vessel
and a connecting pipe (9), the connecting pipe (9) connecting the trenching body (3)
to the dredging vessel and providing suction and jet power to the trenching body (3)
from the dredging vessel, wherein the dredging vessel propels the trenching body (3)
along the seabed (5), the trenching system also included a pair of skids (8) disposed
on either side of the trenching body (3) to provide horizontal stability to the trenching
body (3).
17. A trenching system as claimed in claim 16, wherein the vessel is a trailer suction
hopper dredger working on dynamic tracking.
18. A method of providing a trench in a seabed (5) for a pipeline (2) comprising dragging
a trenching body (3) along the seabed (5) by a self propelled vessel, wherein the
trenching body (3) is attached to the vessel by a connecting pipe (9) which supplies
suction and jet power to the trenching body (3), the trenching body (3) being horizontally
stabilised by the provision of skids (8) on either side of the trenching body (3).
19. A method as claimed in claim 18, wherein the trenching body (3) is steered by a fine
steering means provided at a coupling (10) point of the connecting pipe (9) and the
trenching body (3).
20. A trenching machine (1) for lowering a pipeline (2) into the seabed (5) after pipeline
(2) installation on the seabed (5) the trenching machine (1) comprising a trenching
body (3) and a connecting pipe (9) wherein, in use, the trenching machine (1) is attached
by the connecting pipe (9) to a dredging vessel which propels the trenching machine
(1) and wherein the connecting pipe (9) provides suction and jet power to the trenching
body (3) from the dredging vessel, the trenching machine (1) also comprises a steering
means provided at a coupling point (10) between the connecting pipe (9) and the trenching
body (3).