[0001] The present invention relates to tools and methods for stabilizing wells, and more
particularly relates to tools and methods for enlarging and placing a cementitious
material in a well bore which passes through an unstable subterranean zone or formation
during drilling.
[0002] In the drilling of a well bore with a rotary drill bit, weight is applied to the
drill string (a string of connected drill pipe sections) while the drill bit is rotated.
A fluid, often referred to as drilling fluid or drilling mud, is circulated through
the drill string, through the drill bit and upwardly to the surface through the annulus
between the drill string and the walls of the well bore. The drilling fluid cools
the drill bit, removes cuttings from the well bore and maintains hydrostatic pressure
on pressurized subterranean formations.
[0003] During the drilling of a well bore, the well bore may penetrate and pass through
incompetent or otherwise unstable subterranean zones or formations such as unconsolidated
sands or shales. Such unstable zones or formations can have very high permeabilities
whereby severe drilling fluid losses occur into the zones or formations. Also, the
zones or formations can cave in, slough off or wash out due to the flow of drilling
fluid through the well bore which causes the well bore to enlarge. This, in turn,
can cause the drill string to become stuck as well as a variety of other severe problems.
The zones or formations can also be charged with a fluid, e.g., water or gas, which
flows into the well bore making drilling difficult.
[0004] In order to solve the problems caused by an unstable subterranean zone or formation,
the portion of the well bore passing through the zone or formation has heretofore
been enlarged and filled with cementitious material. After the cementitious material
has set, the well bore has been drilled through the cementitious material leaving
a cementitious sheath in the well bore for preventing fluid influx, fluid losses,
cave-ins, etc. While such techniques have been utilized successfully, they have heretofore
required the use of many different tools, the necessity of making many trips in and
out of the well bore, and a great deal of time and expense to complete.
[0005] Thus, there is a need for improved tools and methods for stabilizing unstable subterranean
zones or formations penetrated by a well bore which do not require the use of many
different tools, numerous drill string and/or work string trips, long delays and the
like.
[0006] The present invention provides improved well stabilization tools and methods which
meet the needs described above and obviate the shortcomings of the prior art.
[0007] The well stabilization tools and methods of the present invention can be used to
stabilize an unstable zone or formation encountered in the drilling of a well bore
without removing the drill string and drill bit from the well bore or only doing so
a minimum of times. That is, one improved well stabilization tool of this invention
can be connected in a drill string adjacent the drill bit before the well bore is
drilled. The drilling of the well bore can then proceed in the normal manner until
an unstable zone or formation is encountered. The well stabilization tool is then
activated and used to enlarge the portion of the well bore which passes through the
unstable zone or formation and to fill the enlarged well bore with a hardenable cementitious
material. Alternatively, in those instances where washout or other well bore enlargement
has already occurred, it may be unnecessary to enlarge the portion of the well bore
which passes through the unstable zone or formation prior to filling it with a hardenable
cementitious material. In such instances, the hardenable cementitious material is
placed in the same manner as described herein with respect to the enlarged portions.
After the cementitious material has hardened, the well bore is drilled through the
hardened material and normal drilling operations are resumed.
[0008] In one aspect of the invention, a well stabilization tool is basically comprised
of a tubular housing having a fluid flow passage extending therethrough adapted to
be connected in a drill string. The housing includes one or more outwardly extending
enlarged portions formed thereon whereby the outer surfaces of the enlarged portions
are positioned in close proximity to the walls of the well bore drilled with the drill
string and drill bit and having one or more lateral fluid jet forming ports extending
from the fluid flow passage through the enlarged portions of the housing to the exterior
thereof. A valve sleeve is releasably and slidably disposed within the fluid flow
passage of the housing which is movable between a first position whereby the fluid
jet forming ports are closed by the valve sleeve and fluid pumped through the drill
string is free to flow through the fluid flow passage of the housing by way of the
interior of the valve sleeve and a second position whereby the fluid jet forming ports
are opened.
[0009] The tool is activated by an activator plug which is flowed through the drill string
into the housing where it releasably engages and plugs the valve sleeve causing it
to move from the first position to the second position whereby fluid pumped through
the drill string is forced through the fluid jet forming ports of the tool. When the
activator plug is retrieved, the valve sleeve is pulled back to the first position
so that fluid again flows through the tool.
[0010] In an embodiment, said valve sleeve is prevented from moving past said second position
by an annular shoulder extending into said fluid flow passage of said housing.
[0011] In an embodiment, said valve sleeve is releasably retained in said first position
by a radially outwardly extending collet connected to said valve sleeve which engages
a groove in said housing.
[0012] In an embodiment, said valve sleeve is releasably engaged with said activator plug
by said collet which is forced inwardly by the surfaces of said housing fluid flow
passage into engagement with a groove in said activator plug when said valve sleeve
is moved from said first position to said second position by said activator plug.
[0013] In an embodiment, said enlarged portions of said tubular housing are comprised of
two or more outwardly extending ribs formed thereon.
[0014] In an embodiment, said one or more lateral fluid jet forming ports are positioned
radially in said housing.
[0015] In another aspect of the invention a method of using the above described tool basically
comprises the steps of placing the tool in a drill string near the drill bit, drilling
a well bore with the valve sleeve of the tool in the first position whereby fluid
flows through the tool and through the drill bit until the well bore has been drilled
through an unstable subterranean zone or formation. The tool is then activated, for
example, by means of the above mentioned activator plug and the valve sleeve is moved
to its second position whereby fluid flows through the jet forming ports of the tool.
When necessary, fluid is pumped through the drill string and through the tool at a
rate while moving the tool through the portion of the well bore in the unstable zone
or formation whereby the diameter of the well bore is enlarged by fluid jet erosion.
A hardenable cementitious material is then pumped through the drill string and through
the jet forming ports of the tool at a rate while moving the tool through the enlarged
portion of the well bore whereby the enlarged portion is filled with the cementitious
material. While the cementitious material is allowed to harden, the activator plug
is retrieved which moves the valve sleeve back to its first position after which the
well bore is drilled through the hardened material and normal drilling operations
are resumed.
[0016] In an embodiment, the hardenable cementitious material is selected from the group
consisting of hydraulic materials, resins, and polymers. Preferably, the hardenable
cementitious material is selected from the group consisting of Portland cement, high
alumina cement, slag, fly ash with lime, fly ash with free lime, condensed silica
fume with lime, gypsum cement, epoxy resins, furan resins, acrylamide polymer gels,
and mixtures thereof.
[0017] In an embodiment, said valve of said tool is a valve sleeve slidably disposed in
said fluid flow passage of said tool which is movable between said first and second
positions.
[0018] In an embodiment, said valve sleeve is moved from said first position to said second
position in accordance with step (c) by flowing an activator plug through the drill
string into said tool and into releasable engagement with said valve sleeve whereby
said activator plug and valve sleeve are moved by fluid pressure to said second position.
[0019] In an embodiment, said valve sleeve is moved back to said first position in accordance
with step (e) by retrieving said activator plug from said tool and drill string whereby
said valve sleeve is pulled from said second position to said first position prior
to when said activator plug disengages from said valve sleeve.
[0020] In an embodiment, said activator plug includes a fishing neck and is retrieved by
a fishing tool. The fishing tool may be suspended within the drill string by a wire
line, a slick line or a work string.
[0021] In an embodiment, said tool has one or more outwardly extending enlarged portions
comprised of two or more, preferably three or four, outwardly extending ribs formed
thereon.
[0022] In an embodiment, said tool includes three or more, preferably six or more, lateral
fluid jet forming ports.
[0023] In an embodiment, the method further comprises the step of pumping fluid through
said jet forming ports at a rate while moving said tool through the portion of the
well bore in the unstable zone or formation whereby the diameter of the well bore
is enlarged by fluid jet erosion.
[0024] In an embodiment, the method further comprises the step of moving the drill string
and drill bit to a position in the well bore above said enlarged portion of the well
bore filled with hardenable cementitious material after step (d) and prior to step
(e).
[0025] An alternate well stabilization tool of this invention for enlarging and placing
a cementitious material in an unstable subterranean zone or formation passed through
by a well bore requires only a minimum number of trips in and out of the well bore.
That is, after a well bore penetrates and passes through an unstable zone or formation,
the drill string is removed from the well bore, the drill bit is replaced with the
well stabilization tool and the tool and drill string are placed back in the well
bore. The tool is used to enlarge when necessary and to place a hardenable cementitious
material in the unstable zone or formation whereupon the drill string is removed from
the well bore and the well stabilization tool is replaced with the drill bit. After
the drill string and drill bit have been placed back in the well bore, the well bore
is drilled through the hardened cementitious material and normal drilling operations
are resumed.
[0026] Thus, in another aspect of the invention, a well stabilization tool is basically
comprised of a tubular housing having a longitudinal fluid flow passage extending
therethrough and having a plurality of lateral threaded openings extending from the
fluid flow passage to the exterior of the housing. The housing includes a seat for
receiving an activated plug and a plurality of tubular threaded arm members are threadedly
connected within the threaded openings in the housing. The threaded arm members have
fluid flow passages extending therethrough and have fluid jet forming ports communicating
with the passages at their exterior ends. The arm members are of lengths such that
the fluid jet forming ports at the exterior ends thereof are positioned in close proximity
to the walls of the well bore. A further feature of this tool is that the tool can
be made up using different sizes of arm members to conform the tool to varying well
bore sizes.
[0027] According to another aspect of the invention there is provided a method of stabilizing
an unstable subterranean zone or formation passed through by a well bore during the
drilling of the well bore with a drill bit connected to a drill string comprising:
(a) removing the drill string and drill bit from the well bore;
(b) connecting a well stabilization tool to the drill string in place of the drill
bit, said well stabilization tool comprising: a tubular housing having a longitudinal
fluid flow passage extending therethrough, having a threaded drill string connection
at the upper end thereof, having a plurality of lateral openings extending from said
fluid flow passage to the exterior of said housing and having an annular seat extending
into said flow passage below said lateral openings for receiving an activator plug,
and a plurality of tubular arm members connected within said openings in said housing
having fluid flow passages therethrough and having fluid jet forming ports communicated
with said fluid flow passages at the exterior ends thereof, said arm members being
of lengths such that said fluid jet forming ports at the exterior ends thereof are
positioned in close proximity to the walls of the well bore when said tool is connected
to the drill string and placed in the well bore;
(c) placing the drill string and well stabilization tool in the well bore with said
tool positioned within the portion of the well bore in the unstable zone or formation;
(d) flowing an activator plug with fluid pumped through the drill string into said
housing of said tool whereby said activator plug lands on said annular seat in said
housing and said fluid is caused to flow through said tubular arm members of said
tool and said fluid jet forming ports thereof;
(e) pumping a hardenable cementitious material through the drill string and through
said fluid jet forming ports at a rate while moving said tool through the enlarged
portion of the well bore in the unstable zone or formation whereby the enlarged portion
of the well bore is filled with said hardenable cementitious material;
(f) removing the drill string and well stabilization tool from the well bore while
said cementitious material is allowed to harden;
(g) reconnecting a drill bit to the drill string and placing the drill string and
drill bit in the well bore; and
(h) drilling the well bore through said hardened cementitious material.
[0028] In an embodiment, said tubular arm members are threadedly connected within said openings
of said housing of said tool and are present in a number less than the number of openings
in said housing , and said tool further comprises one or more plugs threadedly connected
within the openings which do not have arm members connected therein.
[0029] In an embodiment, said housing of said tool includes seven of said lateral openings
therein, four of said openings being equally spaced around the periphery of said housing
in a first position on said housing and three of said openings beings equally spaced
around the periphery of said housing in a second position on said housing. In one
embodiment, seven of said tubular arm members are threadedly connected in said openings.
In another embodiment, four of said tubular arm members are threadedly connected in
said four openings in said first position on said housing, and said tool further comprises
three plugs threadedly connected in said three openings in said second position. In
another embodiment, three of said tubular arm members are threadedly connected in
said three openings in said second position, and said tool further comprises four
plugs threadedly connected in said four openings in said first position. In another
embodiment, two of said tubular arm members are threadedly connected in two opposite
of said four openings in said first position on said housing, and said tool further
comprises two plugs threadedly connected in two opposite of said four openings in
said first position and three plugs threadedly connected in said three openings in
said second position.
[0030] The hardenable material may be as described above.
[0031] In an embodiment, prior to connecting said well stabilization tool to the drill string
in accordance with step (b), it is desirable to adjust the lengths of said tubular
arm members connected to said housing of said tool as necessary to position the fluid
jet forming ports at the exterior ends thereof in close proximity to the walls of
the well bore when said tool is placed therein.
[0032] In an embodiment, a drill string centralizer is connected in the drill string near
said well stabilizer tool connected to the drill string in accordance with step (b).
[0033] Reference is now made to the accompanying drawings, in which:
[0034] FIGURE 1 is a side partially sectional view of an embodiment of a well stabilization
tool according to the present invention.
[0035] FIGURE 2 is a side cross-sectional view of the tool of FIG. 1 after an activator
plug has engaged a valve sleeve in the tool.
[0036] FIGURE 3 is a side cross-sectional view of the tool of FIG. 1 after the activator
plug and valve sleeve have been moved downwardly in the tool by fluid pressure.
[0037] FIGURE 4 is a side cross-sectional view of the tool of FIG. 1 after a fishing tool
has engaged the fishing neck of the activator plug within the tool.
[0038] FIGURE 5 is a cross-sectional view of the tool of FIG. 1 after the activator plug
and valve sleeve have been moved upwardly within the tool as the activator plug is
being retrieved therefrom.
[0039] FIGURE 6 is a side cross-sectional view of the valve sleeve of the tool of FIG. 1.
[0040] FIGURE 7 is a top view of the valve sleeve of FIG. 6.
[0041] FIGURES 8 - 13 are sequential schematic illustrations of a well bore drilled through
an unstable zone or formation and the stabilization of the well bore using the tool
of FIG. 1 and the method of the present invention.
[0042] FIGURE 14 is a schematic illustration of an alternative embodiment of a well stabilization
tool according to the invention in a well bore which passes through an unstable zone
or formation.
[0043] FIGURE 15 is a side partially cross-sectional view of the tool illustrated in FIG.
14 having additional arm members connected thereto.
[0044] FIGURE 16 is a cross-sectional view taken along line 16-16 of FIG. 15.
[0045] FIGURE 17 is a cross-sectional view taken along line 17-17 of FIG. 15.
[0046] Referring now to the drawings and particularly FIGS. 1-6, an embodiment of the well
stabilization tool of the present invention is illustrated and generally designated
by the numeral 10. The tool 10 is comprised of a tubular housing 12 having a longitudinal
fluid flow passage 14 extending therethrough. The housing 12 includes a conventional
female threaded connection 16 at the upper end thereof for threaded connection to
a drill string 18. As is well understood by those skilled in the art, the drill string
18 is made up of a plurality of drill pipe sections threadedly connected end to end.
A complimentary male threaded connection 20 is provided at the lower end of the housing
12 for connecting the tool 10 to a drill pipe section, a drill collar or the drill
bit (not shown).
[0047] The housing 12 includes four outwardly extending enlarged rib portions 22 which are
positioned in close proximity to the walls of a well bore drilled with the drill string
18 and a drill bit (not shown) connected below the tool 10. As will be understood
by those skilled in the art, the housing 12 can include a single cylindrical enlarged
portion or two or more enlarged rib portions 22 as desired. The housing 12 further
includes a plurality of fluid jet forming passages or ports 24 formed therein extending
from the fluid flow passage 14 of the housing 12 through the enlarged rib portions
22 thereof to the exterior of the housing 12. Preferably, the lateral ports 24 are
arranged in two groups of three or four equally spaced ports 24 (two groups of four
ports 24 are illustrated in the drawings). Also, the ports 24 preferably intersect
enlarged counter bores 26 in the housing 12 adjacent the exterior thereof and include
fluid jet forming nozzles 28 threadedly connected therein. In an alternative embodiment
(not shown), the nozzles 28 may extend through the full length of the lateral ports
24 to the fluid passage 14 for preventing erosion of the housing 12 and to increase
the fluid jetting efficiency therefrom. As will be described further hereinbelow,
some of the ports 24 can include plugs instead of nozzles 28, and the sizes of the
flow passages through the nozzles 28 can be varied as required to produce the desired
number and velocities of the fluid jets issuing from the tool 10.
[0048] The tool 10 includes a valve sleeve 30 releasably and slidably disposed within the
fluid flow passage 14 of the housing 12. The valve sleeve 30 includes an elongated
cylindrical body portion 32 having a pair of longitudinally spaced grooves 34 formed
in the exterior surface thereof with conventional O-ring seals 36 disposed therein.
As shown in FIGS. 1, 2 and 5, the grooves 34 in the valve sleeve 30 are spaced a distance
apart whereby the O-ring seals bracket the lateral fluid jet forming ports 24 when
the valve sleeve is in its first position as shown in FIGS 1, 2 and 5.
[0049] As shown best in FIGS. 6 and 7, the upper end portion of the valve sleeve 30 includes
an internal activator plug receiving seat 38 and a collet 40 comprised of a plurality
of collet fingers 42 extending upwardly from the receiving seat 38. Each of the collet
fingers 42 of the collet 40 have collet heads 44 at the upper ends thereof. The collet
heads 44 protrude radially outwardly and the external surfaces of the collet fingers
42 below the heads 44 are recessed whereby the lower surfaces 43 of the collet heads
44 are inclined (as shown in FIG. 6). Alternatively, the collet heads 44 may include
additional collet fingers (not shown) extending upwardly therefrom, wherein the collet
fingers (not shown) are attached to one another at an end distant from the collet
heads 44. When the valve sleeve 30 is in its first position within the housing 12
as illustrated in FIGS. 1, 2 and 5, the collet heads 44 of the collet 40 extend within
a complimentary groove 46 in the housing 12 whereby the valve sleeve 30 is releasably
retained in the first position.
[0050] When it is desired to activate the tool 10, i.e., move the valve sleeve 30 to a second
position within the flow passage 14 of the housing 12 whereby the fluid jet forming
ports are opened, an activator plug 50 is flowed through the drill string 18 and housing
12 into releasable engagement with the valve sleeve 30 as illustrated in FIG. 2.
[0051] The activator plug 50 includes an elongated nose portion 52 which is of an external
size slightly smaller than the internal diameter of the valve sleeve 30. The nose
portion 52 includes an O-ring groove 54 with an O-ring 56 disposed therein for providing
a seal between the external surface of the nose portion 52 and the internal surface
of the valve sleeve 30. Immediately above the nose portion 52 of the activator plug
50 is an enlarged portion 58 which forms an annular shoulder or seat 60 on the activator
plug 50 complimentary to the annular seat 38 within the valve sleeve 30. An annular
groove 62 is formed in the enlarged portion 58 of the activator plug 50 which is positioned
to receive the collet heads 44 of the collet 40 as will be described hereinbelow.
Finally, the activator plug 50 includes a reduced diameter upwardly extending fishing
neck 64 connected to the enlarged portion 58.
[0052] When the activator plug 50 is flowed by drilling fluid pumped through the drill string
18 and housing 12 of the tool 10 into engagement with the valve sleeve 30 as illustrated
in FIG. 2, the seat 60 of the activator plug 50 lands on the seat 38 of the valve
sleeve 30 thereby plugging the interior of the valve sleeve 30 and moving it to a
second position as shown in FIG. 3. That is, the activator plug 50 seals the interior
of the valve sleeve 30 whereby fluid pressure produced by drilling fluid pumped through
the drill string and into the housing 12 forces the activator plug 50 and valve sleeve
30 to move downwardly in the passage 14 of the housing 12. As the activator plug 50
and valve sleeve 30 move downwardly, the collet heads 44 of the collet 40 are pulled
out of the annular groove 46 in the housing 12 whereby the valve sleeve 30 is released
from its first position. Simultaneously, the collet heads 44 are deformed into the
annular groove 62 in the enlarged portion 58 of the activator plug 50 as illustrated
in FIGS. 3 and 4 whereby the valve sleeve 30 is releasably engaged by the activator
plug 50.
[0053] As shown in FIG. 3, the downward movement of the activator plug 50 and valve sleeve
30 is terminated when the valve sleeve reaches its second position by an annular shoulder
66 extending into the fluid flow passage 14 of the housing 12. In the form illustrated
in the drawings, the annular shoulder 66 is formed by a snap ring 68 disposed within
a groove 70 in the housing 12. As will be understood, when the valve sleeve 30 is
in its second position shown in FIG. 3, fluid pumped through the drill string and
into the housing 12 of the tool 10 flows through the fluid jet forming ports 24 of
the housing 12.
[0054] When it is desired to move the valve sleeve 30 of the tool 10 back to its first position
and remove the activator plug 50 from the interior of the housing 12 of the tool 10
whereby normal well bore drilling can be resumed, a fishing tool 72 is lowered through
the drill string 18 by means of a wire line, a slick line or a working string into
the flow passage 14 of the housing 12 whereby the fishing neck 64 of the activator
plug 50 is engaged by the fishing tool 72 as shown in FIG. 4. Thereafter, the fishing
tool 72 and activator plug 50 are raised whereby they are moved upwardly within the
housing 12. As the activator plug is moved upwardly, the valve sleeve 30 is pulled
with it since the collet heads 44 of the collet 40 of the valve sleeve 30 extend into
the annular groove 62 of the activator plug 50 and are engaged thereby. When the activator
plug 50 and the valve sleeve 30 are pulled upwardly to the point where the valve sleeve
30 reaches its first position, the collet heads 44 of the valve sleeve 30 spring back
into the annular groove 46 in the housing 12 and out of the annular groove 62 in the
activator plug 50. This releases the activator plug 50 from the valve sleeve 30 whereby
the continued upward movement of the fishing tool 72 and activator plug 50 removes
the activator plug 50 from the tool 10. The fishing tool 72 and activator plug 50
are then lifted to the surface and removed from the drill string.
[0055] Referring now to FIGS. 8-13, various preferred steps involved in stabilizing an unstable
subterranean zone or formation passed through by a well bore during its drilling using
the well stabilization tool 10 are schematically illustrated. Referring specifically
to FIG. 8, a well bore 80 which has been drilled through an unstable subterranean
zone or formation 82 with a drill string 84 having the tool 10 and a drill bit 86
connected thereto is illustrated. As will be understood, the well stabilization tool
10 is plated in the drill string prior to the commencement of drilling with the valve
sleeve 30 in its first position whereby drilling fluid pumped into the drill string
84 during drilling flows through the flow passage 14 of the housing 12 of the tool
10 and through the interior of the valve sleeve 30, through the drill bit 86 and upwardly
through the annulus between the drill string 84 and well bore 80. When the well bore
80 has been drilled to a depth whereby it has passed through the unstable zone or
formation 82, the drilling of the well bore is stopped and the activator plug 50 is
placed into the drill string 84 at the surface. The activator plug 50 is caused to
flow by pumped drilling fluid through the drill string 84 and into the housing 12
of the tool 10 where it engages the valve sleeve 30 of the tool 10, moves it from
its first position to its second position and opens the lateral fluid jet forming
ports 24.
[0056] Referring now to FIG. 9, after the fluid jet forming ports 24 are opened, drilling
fluid is pumped through the drill string and through the fluid jet forming ports 24
of the tool 10 at a rate while moving the tool 10 through the portion of the well
bore 80 in the unstable zone or formation 82 whereby the diameter of the well bore
80 is enlarged by fluid jet erosion. That is, the drilling fluid jets issuing from
the ports 24 of the tool 10 impinge on the walls of the well bore 80 in the unstable
zone or formation 82 causing the well bore 80 to be eroded and enlarged as illustrated
in FIGS. 9 and 10.
[0057] Alternatively, if the unstable zone or formation is already sufficiently enlarged
due to washout etc., it may be unnecessary to pump drilling fluid through the ports
24 and to jet the well bore 80 for enlarging the zone or formation. Thus, jetting
the well bore 80 to enlarge a portion thereof may not be necessary when a sufficient
amount of hardenable cementitious material can be placed in the unstable zone or formation
to provide the desired well bore stabilization.
[0058] Referring now to FIG. 11, once the portion of the well bore 80 passing through the
unstable zone or formation 82 has been enlarged, a hardenable cementitious material
is pumped through the drill string 84 and through the jet forming ports 24 of the
tool 10 at a rate while moving the tool 10 through the enlarged portion of the well
bore 80 whereby the enlarged portion of the well bore is filled with a quantity 90
of cementitious material as shown in FIGS. 11 and 12. As shown in FIG. 12, when the
enlarged portion of the well bore 80 has been completely filled with the cementitious
material, the drill string 84, the tool 10 and drill bit 86 are moved to a position
in the well bore 80 above the enlarged portion containing the cementitious material
and the cementitious material is allowed to harden. While the cementitious material
is hardening, the activator plug 50 is removed from the tool 10 and drill string 84
which closes the ports 24 of the tool 10. Thereafter, the well bore 80 is redrilled
through the hardened cementitious material as shown in FIG. 13 and normal drilling
operations are resumed. The cement sheath 91 which remains in the unstable zone or
formation stabilizes the well bore passing therethrough and prevents such problems
as excessive, fluid influx, fluid loss, cave ins, wash outs, etc.
[0059] As will be understood by those skilled in the art, a variety of hardenable cementitious
materials can be utilized in accordance with this invention for stabilizing an unstable
subterranean zone or formation. For example, hydraulic cementitious materials which
form hard impermeable masses in the presence of water can be utilized such as Portland
cement, high alumina cement, slag and/or fly ash (ASTM Class F fly ash) and lime,
fly ash which includes free lime (ASTM Class C fly ash), condensed silica fume with
lime, gypsum cement (calcium sulfate hemihydrate) and mixtures of the foregoing materials.
Hardenable cementitious materials which are not hydraulic such as hardenable resins,
polymers and the like can also be used. Examples of such materials which are not hydraulic
include epoxy resins, furan resins and acrylamide polymer gels. The particular cementitious
material used depends upon a variety of factors relating to the particular unstable
zone or formation to be stabilized. Essentially, any pumpable cementitious material
that will harden after being placed in a subterranean zone at the temperature, pressure
and other conditions in the zone to provide stability thereto after the well bore
has been drilled through the material can be utilized.
[0060] Thus, the method of stabilizing an unstable subterranean zone or formation passed
through by a well bore during the drilling of the well bore with a drill bit connected
to a drill string using the tool 10 basically comprises the following steps:
(1) placing the well stabilization tool 10 in the drill string near the drill bit,
the tool having a longitudinal fluid flow passage therethrough, having one or more
lateral fluid jet forming ports therein and having an internal valve which can be
selectively moved between a first position whereby fluid pumped into the drill string
is flowed through the fluid flow passage of the tool and through the drill bit and
a second position whereby the fluid is flowed through the lateral fluid jet forming
ports of the tool;
(2) drilling the well bore with the valve of the well stabilization tool in its first
position until the well bore has been drilled through the unstable subterranean zone
or formation;
(3) moving the valve of the tool from its first position to its second position and
if necessary pumping fluid through the jet forming ports at a rate while moving the
tool through the portion of the well bore in the unstable zone or formation whereby
the diameter of the well bore is enlarged by fluid jet erosion;
(4) pumping a hardenable cementitious material through the drill string and through
the jet forming ports of the tool at a rate while moving the tool through the enlarged
portion of the well bore in the unstable zone or formation whereby the enlarged portion
of the well bore is filled with the cementitious material;
(5) moving the valve of the tool back to its first position while the cementitious
material is allowed to harden; and then
(6) drilling the well bore through the hardened cementitious material thereby forming
a hardened cementitious material sheath in the unstable zone or formation which stabilizes
the well bore.
[0061] Another well stabilization tool of this invention for enlarging and placing a hardenable
cementitious material in an unstable subterranean zone or formation passed through
by a well bore is illustrated in FIGS. 14-17 and is generally designated by the numeral
100. The well stabilization tool 100 does not include a valve and is adapted to be
connected to a drill string in place of the drill bit. That is, when a well bore has
been drilled through an unstable subterranean zone or formation utilizing a drill
bit connected to a drill string, the drill string and drill bit are removed from the
well bore and the drill bit is replaced with the tool 100. In addition, if the drill
string does not already include a drill string centralizer, such a centralizer is
placed in the drill string adjacent to or near the well stabilization tool 100. As
will be described further hereinbelow, the well stabilization tool 100 is utilized
to enlarge, unless such portion is already sufficiently enlarged, the portion of the
well bore passing through the unstable zone or formation and to fill the enlarged
portion of the well bore with a cementitious material. While the cementitious material
is setting, the drill string having the well stabilization tool connected thereto
is pulled from the well bore, the well stabilization tool and drill string centralizer
(if not left in the drill string) are removed from the drill string, the drill bit
is replaced on the drill string and the drill string and drill bit are placed in the
well bore. The drill string and drill bit are used to drill the well bore through
the set cementitious material leaving a cementitious sheath in the unstable zone or
formation which stabilizes the zone or formation. Thereafter, normal drilling operations
are resumed.
[0062] Referring now to FIG. 14, a well bore 102 drilled through an unstable zone or formation
104 is illustrated. The drill string has previously been removed from the well bore
and the drill bit replaced with a conventional drill string centralizer 106 and the
well stabilization tool 100. Drill string centralizers are well known to those skilled
in the art and function to maintain the drill string and tools connected thereto in
a central position within the well bore. For example, the drill string centralizer
illustrated in FIG. 14 is a typical bow spring type of centralizer which contact the
walls of the well bore and expands or compresses as required. The centralizer 106
can be a separate tool or an integral part of the well stabilization tool 100. The
drill string 108 including the centralizer 106 and tool 100 are placed in the well
bore 102 and lowered to the portion of the well bore 102 within the unstable zone
or formation 104. When the well bore 80 is not large enough to receive a sufficient
amount of hardenable cementitious material therein for stabilizing the unstable zone
or formation, the tool 100 is utilized to enlarge the portion of the well bore 102
within the zone or formation 104 as shown in FIG. 14. Subsequently, the tool 100 is
used to fill the enlarged portion with a cementitious material in the same manner
as described above in connection with the well stabilization tool 10. As mentioned
above, the centralizer 106 and the well stabilization tool 100 are removed from the
drill string 108 while the cementitious material sets, and the drill string and drill
bit are placed back in the well bore, used to drill the well bore through the set
cementitious material and to continue drilling the well bore below the unstable zone
or formation.
[0063] Referring now to FIGS. 15-17, the well stabilization tool 100 is illustrated in detail.
The tool 100 basically comprises a tubular housing 110 having a longitudinal fluid
flow passage 112 extending therethrough. A threaded connection 114 is provided at
the upper end of the housing 110 for connecting the tool 100 to the drill string,
and a plurality of lateral threaded openings 116 extending from the fluid flow passage
112 to the exterior of the housing 110 are formed in the housing 110. An annular seating
surface 118 is provided within the fluid flow passage 112 of the housing 110 below
the lateral threaded openings 116 therein for receiving an activator plug 120 (as
shown in FIG. 15). As will be understood, the activator plug 120, which can be in
the form of a ball, is flowed by drilling fluid to within the flow passage 112 of
the housing 110 of the tool 100 and lands on the seat 118. The activator plug 120
plugs the passage 112 whereby drilling fluid is forced to flow through the lateral
threaded openings 116 of the tool 100.
[0064] A plurality of tubular threaded arm members 122 are threadedly connected within the
threaded openings 116 in the housing 110. Each of the threaded arm members 122 includes
a flow passage 123 therethrough and a fluid jet forming port 124 formed in the end
thereof. Like the previously described well stabilization tool 10, the fluid jet forming
ports 124 of the tubular threaded arm members 122 can include nozzles 126 threadedly
connected thereto which can be varied in size to vary the velocities and other aspects
of the fluid jets formed.
[0065] Prior to using the well stabilization tool 100 for enlarging and placing a hardenable
cementitious material in a well bore passing through an unstable zone or formation,
tubular threaded arm members 122 are threadedly connected in the lateral threaded
openings 116 of the tool 10. The tubular threaded arm members 122 have lengths such
that the fluid jet forming ports 24 at the exterior ends of the threaded arm members
122 are positioned in close proximity to the walls of the well bore in which the tool
is to be used. To accomplish this, various lengths of tubular threaded arm members
122 can be made available for installation in the housing 110, or arm members 122
which are too long can be shortened by cutting portions therefrom at the interior
ends thereof.
[0066] As shown in FIG. 14, the tool 100 can include a number of tubular threaded arm members
122 less than the number of lateral threaded openings 116 in the housing 110. The
openings which do not have tubular threaded arm members 122 connected thereto can
be plugged by threaded plugs 130.
[0067] The well stabilization tool 100 preferably includes seven lateral threaded openings
116 therein with four of the openings 116 being equally spaced around the periphery
of the housing 110 at a first upper position on the housing 110 and three of the threaded
openings 116 being equally spaced around the periphery of the housing 110 at a second
lower position on the housing 110 as shown in FIGS. 15-17. The tool 100 can include
seven tubular threaded arm members 122 as illustrated in FIGS. 15-17, or less than
seven threaded arm members 122 can be utilized as mentioned above. Preferably, when
less than seven arm members 122 are utilized, they are either two, three or four in
number. When two or four threaded arm members 122 are used they are connected within
two opposite or all four of the four equally spaced threaded openings 116 in the upper
position on the housing 110 with two threaded openings in the upper position and/or
the threaded openings 116 in the lower position being plugged. When three threaded
arm members 122 are used they are threadedly connected within the three threaded openings
116 in the lower position on the housing 110 with the threaded openings 116 in the
upper position being plugged.
[0068] Thus, the method of stabilizing an unstable subterranean zone or formation passed
through by a well bore during the drilling of the well bore with a rotary drill bit
connected to a drill string utilizing the well stabilization tool 100 basically comprises
the following steps:
(1) removing the drill string and drill bit from the well bore;
(2) connecting a drill string centralizer and/or a well stabilization tool 100 to
the drill string in place of the drill bit, the well stabilization tool comprising,
a tubular housing having a longitudinal fluid flow passage extending therethrough,
having a threaded drill string connection at the upper end thereof, having a plurality
of lateral threaded openings extending from the fluid flow passage to the exterior
of the housing and having an annular seat extending into the flow passage below the
lateral threaded openings for receiving an activator plug, and
a plurality of tubular threaded arm members threadedly connected within the threaded
openings in the housing having fluid flow passages therethrough and having fluid jet
forming ports communicated with the fluid flow passages at the exterior ends thereof,
the arm members being of lengths such that the fluid jet forming ports at the exterior
ends thereof are positioned in close proximity to the walls of the well bore when
the tool is connected to the drill string and placed in the well bore;
(3) placing the drill string, centralizer and well stabilization tool in the well
bore with the tool positioned within the portion of the well bore in the unstable
zone or formation;
(4) flowing an activator plug with fluid pumped through the drill string into the
housing of the tool whereby the activator plug lands on the annular shoulder in the
housing and the fluid is caused to flow through the tubular arm members and the fluid
jet forming ports of the tool;
(5) if necessary, pumping fluid through the jet forming ports at a rate while moving
the tool through the portion of the well bore in the unstable zone or formation whereby
the diameter of that portion of the well bore is enlarged by fluid jet erosion;
(6) pumping a cementitious material through the drill string and through the fluid
jet forming ports at a rate while moving the tool through the enlarged portion of
the well bore in the unstable zone or formation whereby the enlarged portion of the
well bore is filled with the cementitious material;
(7) removing the drill string and well stabilization tool from the well bore while
the cementitious material is allowed to set;
(8) reconnecting a drill bit to the drill string and placing the drill string and
drill bit in the well bore; and
(9) drilling the well bore through the set cementitious material to thereby form a
cementitious sheath in the well bore which stabilizes the well bore passing through
the unstable zone or formation and resuming normal well bore drilling operations.
[0069] It will be appreciated that the invention may be modified within the scope of the
dependent claims.
1. A well stabilization tool (10) for enlarging and placing a hardenable cementitous
material in an unstable subterranean zone or formation (82) passed through by a well
bore (80) adapted to be connected in a drill string (84) having a drill bit (86) at
the end thereof, comprising: a tubular housing (12) having a longitudinal fluid flow
passage (14) extending therethrough, having one or more outwardly extending enlarged
portions (22) formed thereon whereby the outer surfaces of said enlarged portions
are positioned in close proximity to the walls of the well bore (80) drilled with
the drill string (84) and drill bit (86) and having one or more lateral fluid jet
forming ports (24) extending from said fluid flow passage (14) through said enlarged
portions (22) of said housing (12) to the exterior thereof; and a valve sleeve (30)
releasably and slidably disposed within said fluid flow passage (14) of said housing
(12) and being moveable between a first position whereby said fluid jet forming ports
(24) are closed by said valve sleeve (30) and fluid pumped through the drill string
is free to flow through said housing (12) by way of the interior of said valve sleeve
(30) and a second position whereby said fluid jet forming ports (24) are opened; said
valve sleeve (30) being movable from said first position to said second position when
releasably engaged and plugged by an activator plug (50) flowed through the drill
string (84) into said housing (12) thereby causing fluid pumped through the drill
string (84) to be forced through said fluid jet forming ports (24), and said valve
sleeve (30) being pulled back to said first position from said second position when
said activator plug (50) is retrieved from said housing (12).
2. A well stabilization tool according to claim 1, wherein: said valve sleeve is prevented
from moving past said second position by an annular shoulder (66) extending into said
fluid flow passage (14) of said housing (12); said valve sleeve (30) is releasably
retained in said first position by a radially outwardly extending collet (40) connected
to said valve sleeve (30) which engages a groove (46) in said housing (12); said enlarged
portions (22) of said tubular housing (12) are comprised of two or more outwardly
extending ribs (22) formed thereon; and/or the or each lateral fluid jet forming ports
(24) are positioned radially in said housing (12).
3. A well stabilization tool according to claim 2, wherein said valve sleeve (30) is
releasably engaged with said activator plug (50) by said collet (40) which is forced
inwardly by the surfaces of said housing fluid flow passage (14) into engagement with
a groove (62) in said activator plug (50) when said valve sleeve (30) is moved from
said first position to said second position by said activator plug (50).
4. A method of stabilizing an unstable subterranean zone or formation (82) passed through
by a well bore (80) during the drilling of the well bore with a drill bit (86) connected
to a drill string (84), said method comprising the steps of:
(a) placing a well stabilization tool (10) in the drill string (84) near the drill
bit (86), said tool (10) having a longitudinal fluid flow passage (14) therethrough,
having one or more lateral fluid jet forming ports (24) therein and having an internal
valve (30) which can be selectively moved between a first position whereby fluid pumped
into the drill string (84) is flowed through said fluid flow passage (14) of said
tool (10) and through the drill bit (86) and a second position whereby said fluid
is flowed through said lateral fluid jet forming ports (24) of said tool (10);
(b) drilling the well bore (80) with said valve (30) of said tool (10) in said first
position until the well bore (80) has been drilled through the unstable subterranean
zone or formation (82);
(c) moving said valve (30) of said tool (10) from said first position to said second
position;
(d) pumping a hardenable cementitous material through the drill string (84) and through
said jet forming ports (24) of said tool (10) at a rate while moving said tool (10)
through the enlarged portion of the well bore (80) in the unstable zone or formation
(82) whereby the enlarged portion of the well bore (80) is filled with said hardenable
cementitous material;
(e) moving said valve (30) of said tool (10) back to said first position while said
cementitious material is allowed to harden; and
(f) drilling the well bore (80) through said hardened cementitous material.
5. A method according to claim 4, wherein said valve (30) of said tool (10) is a valve
sleeve (30) slidably disposed in said fluid flow passage (14) of said tool (10) which
is movable between said first and second positions; and preferably said valve sleeve
(30) is moved from said first position to said second position in accordance with
step (c) by flowing an activator plug (50) through the drill string (84) into said
tool (10) and into releasable engagement with said valve sleeve (30) whereby said
activator plug (50) and valve sleeve (30) are moved by fluid pressure to said second
position; and preferably said valve sleeve (30) is moved back to said first position
in accordance with step (e) by retrieving said activator plug (50) from said tool
(10) and drill string (84) whereby said valve sleeve (30) is pulled from said second
position to said first position prior to when said activator plug (50) disengages
from said valve sleeve (30).
6. A method according to claim 4 or 5, wherein said activator plug (50) includes a fishing
neck (64) and is retrieved by a fishing tool (72), and preferably said fishing tool
(72) is suspended within the drill string (84) by a wire line, a slick line or a work
string.
7. A method according to any one of claims 4 to 6, wherein: said valve sleeve (30) of
said well stabilization tool (10) is prevented from moving past said second position
by an annular shoulder (66) extending into said fluid flow passage (14); said valve
sleeve (30) of said well stabilization tool (10) is releasably retained in said first
position by a radially outwardly extending collet (40) connected to said valve sleeve
(30) which engages a groove (46) in said tool (10); said tool (10) has one or more
outwardly extending enlarged portions (22) comprised of two or more, preferably three
or four, outwardly extending ribs (22) formed thereon; and/or said tool (10) includes
three or more, preferably six or more, lateral fluid jet forming ports (24).
8. A method according to claim 7, wherein said valve sleeve (30) of said well stabilization
tool (10) is releasably engaged with said activator plug (50) by said collet (40)
which is forced inwardly by the surfaces of said housing fluid flow passage (14) into
engagement with a groove (62) in said activator plug (50) when said valve sleeve (30)
is moved from said first position to said second position by said activator plug (50).
9. A method according to any one of claims 4 to 8, which further comprises the step of
moving the drill string (84) and drill bit (86) to a position in the well bore (80)
above said enlarged portion of the well bore (80) filled with hardenable cementitious
material after step (d) and prior to step (e).
10. A well stabilization tool (100) for enlarging and placing a hardenable cementitous
material in an unstable subterranean zone or formation passed through by a well bore
adapted to be connected to a drill string in place of the drill bit used to drill
the well bore, comprising: a tubular housing (110) having a longitudinal fluid flow
passage (112) extending therethrough, having a threaded drill string connection (114)
at the upper end thereof, having a plurality of lateral openings (116) extending from
said fluid flow passage (112) to the exterior of said housing (110) and having an
annular shoulder (118) extending into said flow passage (112) below said lateral openings
(116) for receiving an activating plug (120); and a plurality of tubular arm members
(122) connected within said lateral openings (116) in said housing (110) having fluid
flow passages (123) therethrough and having fluid jet forming ports (124) communicated
with said fluid flow passages (123) at the exterior ends thereof, said arm members
(122) being of lengths such that said fluid jet forming ports (124) at the exterior
ends thereof are positioned in close proximity to the walls of the well bore when
said tool (100) is connected to the drill string and placed in the well bore.
11. A well stabilization tool according to claim 10, which further comprises a well bore
centralizer connected in the drill string near said tool.
12. A well stabilization tool according to claim 10 or 11, wherein said tubular arm members
(122) are threadedly connected within said lateral openings (116) of said housing
(110) of said tool (100) and are present in a number less than the number of openings
(116) in said housing (110), and said tool (100) further comprises one or more plugs
(130) which are threadedly connected within the openings (116) that do not have arm
members (122) connected therein.
13. A well stabilization tool according to claim 10 or 11, wherein said housing (110)
of said tool (100) includes seven of said lateral openings (116) therein, four of
said openings (116) being equally spaced around the periphery of said housing (110)
in a first position on said housing (110) and three of said openings (116) being equally
spaced around the periphery of said housing (110) in a second position on said housing
(110), and preferably: seven of said tubular arm members (122) are threadedly connected
in said lateral openings (116); or four of said tubular arm members (122) are threadedly
connected in said four openings (116) in said first position on said housing (110),
and said tool (100) further comprises three plugs (130) threadedly connected in said
three openings (116) in said second position; or three of said tubular arm members
(122) are threadedly connected in said three openings (116) in said second position,
and said tool (100) further comprises four plugs (130) threadedly connected in said
four openings (116) in said first position.
14. A method of stabilizing an unstable subterranean zone or formation passed through
by a well bore during the drilling of the well bore with a drill bit connected to
a drill string comprising:
(a) removing the drill string and drill bit from the well bore;
(b) connecting a well stabilization tool (100) to the drill string in place of the
drill bit, said well stabilization tool (100) comprising: a tubular housing (110)
having a longitudinal fluid flow passage (112) extending therethrough, having a threaded
drill string connection (114) at the upper end thereof, having a plurality of lateral
openings (116) extending from said fluid flow passage (112) to the exterior of said
housing (110) and having an annular seat (118) extending into said flow passage (112)
below said lateral openings (116) for receiving an activator plug (120), and a plurality
of tubular arm members (124) connected within said openings (116) in said housing
(110) having fluid flow passages (123) therethrough and having fluid jet forming ports
(124) communicated with said fluid flow passages (123) at the exterior ends thereof,
said aim members (122) being of lengths such that said fluid jet forming ports (124)
at the exterior ends thereof are positioned in close proximity to the walls of the
well bore when said tool (100) is connected to the drill string and placed in the
well bore;
(c) placing the drill string and well stabilization tool (100) in the well bore with
said tool (100) positioned within the portion of the well bore in the unstable zone
or formation;
(d) flowing the activator plug (120) with fluid pumped through the drill string into
said housing (110) of said tool (100) whereby said activator plug (120) lands on said
annular seat (118) in said housing (110) and said fluid is caused to flow through
said tubular arm members (122) of said tool (100) and said fluid jet forming ports
(124) thereof;
(e) pumping a hardenable cementitious material through the drill string and through
said fluid jet forming ports (124) at a rate while moving said tool through the enlarged
portion of the well bore in the unstable zone or formation whereby the enlarged portion
of the well bore is filled with said hardenable cementitious material;
(f) removing the drill string and well stabilization tool (100) from the well bore
while said cementitious material is allowed to harden;
(g) reconnecting a drill bit to the drill string and placing the drill string and
drill bit in the well bore; and
(h) drilling the well bore through said hardened cementitious material.
15. A method according to claim 14, wherein said tubular arm members (122) are threadedly
connected within said openings (116) of said housing (110) of said tool (100) and
are present in a number less than the number of openings (116) in said housing (110),
and said tool (100) further comprises one or more plugs (130) threadedly connected
within the openings (116) which do not have arm members (122) connected therein.
16. A method according to claim 14, wherein said housing (110) of said tool (100) includes
seven of said lateral openings (116) therein, four of said openings (116) being equally
spaced around the periphery of said housing (110) in a first position on said housing
(110) and three of said openings (116) being equally spaced around the periphery of
said housing (110) in a second position on said housing (110), and preferably: seven
of said tubular arm members (122) are threadedly connected in said openings (116);
or four of said tubular arm members (122) are threadedly connected in said four openings
(116) in said first position on said housing (110), and said tool (100) further comprises
three plugs (130) threadedly connected in said three openings (116) in said second
position; or three of said tubular arm members (122) are threadedly connected in said
three openings (116) in said second position, and said tool (100) further comprises
four plugs (130) threadedly connected in said four openings (116) in said first position;
or two of said tubular arm members (122) are threadedly connected in two opposite
of said four openings (116) in said first position on said housing (110), and said
tool (100) further comprises two of said plugs (130) threadedly connected in two opposite
of said four openings (116) in said first position and three plugs (130) threadedly
connected in said three openings (116) in said second position.
17. A method according to any one of claims 14 to 16, which further comprises the step
of: prior to connecting said well stabilization tool (100) to the drill string in
accordance with step (b), adjusting the lengths of said tubular arm members (122)
connected to said housing (110) of said tool (100) as necessary to position the fluid
jet forming ports (124) at the exterior ends thereof in close proximity to the walls
of the well bore when said tool (100) is placed therein.
18. A method according to any one of claims 14 to 17, which further comprises the step
of connecting a drill string centralizer in the drill string near said well stabilizer
tool (100) connected to the drill string in accordance with step (b).
19. A method according to any one of claims 4 to 9 or 14 to 18, wherein the hardenable
cementitious material is one or more of a hydraulic material, a resin, or a polymer,
and is preferably one or more of Portland cement, high alumina cement, slag, fly ash
with lime, fly ash with free lime, condensed silica fume with lime, gypsum cement,
epoxy resins, furan resins, acrylamide polymer gels.
20. A method according to any one of claims 4 to 9 or 14 to 19, further comprising pumping
fluid through said jet forming ports (24) at a rate while moving said tool (10) through
the portion of the well bore (80) in the unstable zone or formation (82) whereby the
diameter of the well bore (80) is enlarged by fluid jet erosion.