BACKGROUND OF THE INVENTION
1. Field of the Invention
[0001] The present invention relates to a remote monitoring system of a cooling apparatus,
which selects/reports a content of an abnormal operation condition of either an air
conditioner or a cooling apparatus (device) to a remote monitoring terminal unit for
performing a concentration monitoring operation.
2. Description of the Related Art
[0002] Fig. 13 is a schematic diagram for representing, for instance, the remote monitoring
system of the air conditioner disclosed in Japanese Laid-open Patent Application No.
4-106359 opened in 1992. In this drawing, reference numerals 1A to 1C indicate indoor
units; reference numbers 2A to 2C denote outdoor units; reference numeral 19 shows
a control signal line connected among the respective indoor units and the respective
outdoor units; reference numerals 17A to 17c indicate indoor control apparatus provided
with each of the indoor units; reference numerals 18A to 18C show outdoor control
apparatus provided with each of the outdoor units 2A to 2C; reference numeral 21 is
a local monitoring apparatus installed near the air conditioner; and reference numeral
20 indicates a detection signal line provided for monitoring a condition of the air
conditioner by the local monitoring apparatus 21. Also, reference numeral 22 shows
a signal line such as RS232C used to connect a modem 23 to the local monitoring apparatus
21; reference numeral 27 indicates a remote monitoring apparatus for monitoring conditions
in a remote manner; reference numeral 26 is a signal line such as RS232C used to connect
another modem 25 to the remote monitoring apparatus 27; and reference numeral 24 shows
a public line.
[0003] Now, a description is made of operations of this remote monitoring system. As indicated
in Fig. 12, the local monitoring apparatus 21 acquires from the signal line 19, various
abnormal signals flowing through the control signal line 19 connected between the
indoor unit 1 and the outdoor unit 2 together with an exhausting temperature of a
compressor corresponding to operation data. Then, the local monitoring apparatus 21
transmits the acquired data/signal via the modem 23, the public line 24, and the modem
25 to the remote monitoring apparatus 27. As a consequence, the operation data, the
abnormal signal, and the like are monitored by the remote monitoring apparatus 27
so as to remote-monitor the operation conditions of the air conditioner.
[0004] It should be noted that the abnormal signal of the indoor unit and the outdoor unit
of each air conditioner is reported by the local monitoring apparatus 21 to the remote
monitoring apparatus 27 every time the abnormal operation happens to occur.
[0005] As previously described, in the conventional remote monitoring system for the cooling
apparatus, the abnormal signals of the indoor units and the outdoor units of the air
conditioners are reported in combination with the data group indicative of the operation
conditions monitored via the transfer line every time the abnormal operations happen
to occur. Therefore, in particular, when continuous abnormal operation occurs, the
transfer amount of the line is increased, and thus the workload of processing the
information is increased. There is a problem that it is required to use the apparatus
having the large capacity.
[0006] Also, since no clear discrimination is made between the temporal abnormal operation
caused by changes in the natural environment conditions and the continuous abnormal
operation, there is another problem that even such an abnormal operation which need
not require repair services is transferred.
SUMMARY OF THE INVENTION
[0007] The present invention has been made to solve these problems, and therefore, has an
object to provide a remote monitoring system for a cooling apparatus, having a high
reliability in low cost, and capable of correctly grasping an actual abnormal operation
condition, while suppressing a report of troubleless abnormal operation frequently
occurred so as to reduce a signal transfer amount of a line.
[0008] In accordance with an aspect of the present invention, a remote monitoring system
of a cooling apparatus is comprised of: an operation monitoring apparatus connected
via a transfer line to each of an indoor unit and an outdoor unit of a cooling apparatus,
for reporting an operation condition of the indoor unit or the outdoor unit; and a
remote monitoring terminal unit connected via a transfer path such as a public line
to this operation monitoring apparatus, for monitoring the operation condition of
the indoor unit or the outdoor unit based upon the reporting result of the operation
monitoring apparatus; wherein: the operation monitoring apparatus includes: abnormal
operation detecting meals for detecting an abnormal operation content of the indoor
unit or the outdoor unit; and report judging means for comparing the abnormal operation
content detected by this abnormal operation detecting means with a past abnormal operation
content to judge whether or not the detected abnormal operation content is identical
to the past abnormal operation content; and when the detected abnormal operation content
is identical to the past abnormal operation content, the operation monitoring apparatus
does not report the detected abnormal operation content to the remote monitoring terminal
unit.
[0009] Also, according to another aspect of the present invention, a remote monitoring system
of a cooling apparatus is comprised of: an operation monitoring apparatus connected
via a transfer line to each of an indoor unit and an outdoor unit of a cooling apparatus,
for reporting an operation condition of the indoor unit or the outdoor unit; and a
remote monitoring terminal unit connected via a transfer path such as a public line
to this operation monitoring apparatus, for monitoring the operation condition of
the indoor unit or the outdoor unit based upon the reporting result of the operation
monitoring apparatus; wherein: the operation monitoring apparatus includes: abnormal
operation detecting means for detecting an abnormal operation content of the indoor
unit or the outdoor unit; and report judging means for comparing the abnormal operation
content detected by this abnormal operation detecting means with a past abnormal operation
content to judge whether or not the detected abnormal operation content is identical
to the past abnormal operation content as to the same unit; and when the detected
abnormal operation content is identical to the past abnormal operation content as
to the same unit, the operation monitoring apparatus does not report the detected
abnormal operation content to the remote monitoring terminal unit.
[0010] Also, the above-described operation monitoring apparatus further comprises: detecting
time judging means for judging as to whether or not the same abnormal operation occurrence
times reach a preset abnormal operation occurrence time based upon the judgment result
of the report judging means; and when the same abnormal operation occurrence times
reach the preset abnormal operation occurrence time, this abnormal operation content
is reported to the remote monitoring terminal unit.
[0011] Also, the above-described operation monitoring apparatus further comprises: a timer
for notifying a time instant; and when it is so judged that the abnormal operation
content is identical to the past abnormal operation content based on the time instant
notified from the timer and the judgment result of the report judging means, report
selecting means for judging as to whether or not the time when this same abnormal
content is again produced is present preset report prohibiting time; if the time when
this same abnormal content is again produced exceeds the preset report prohibiting
time, this same abnormal content is reported to the remote monitoring terminal unit.
[0012] Also, the above-described operation monitoring apparatus further comprises: a timer
for notifying a time instant; and clear judging means for judging as to whether or
not time lapse of the abnormal operation content exceeds preset clear time based on
the time instant notified from the timer; when the time lapse of the abnormal operation
content exceeds the preset clear time, this exceeded abnormal operation content is
deleted.
[0013] Also, according to another aspect of the present invention, a remote monitoring system
of a cooling apparatus is comprised of: an operation monitoring apparatus connected
via a transfer line to each of an indoor unit and an outdoor unit of a cooling apparatus,
for reporting an operation condition of the indoor unit or the outdoor unit; and a
remote monitoring terminal unit connected via a transfer path such as a public line
to this operation monitoring apparatus, for monitoring the operation condition of
the indoor unit or the outdoor unit based upon the reporting result of the operation
monitoring apparatus; wherein: the operation monitoring apparatus includes: a timer
for notifying a time instant; abnormal operation detecting means for detecting an
abnormal operation content of the indoor unit or the outdoor unit; report judging
means for comparing the abnormal operation content detected by this abnormal operation
detecting means with a past abnormal operation content to judge whether or not the
detected abnormal operation content is identical to the past abnormal operation content;
and when it is so judged that the abnormal operation content is identical to the past
abnormal operation content based on the time instant notified from the timer and the
judgment result of the report judging means, report selecting means for judging as
to whether or not the time when this same abnormal content is again produced is present
preset report prohibiting time; and clear judging means for judging as to whether
or not time lapse of the abnormal operation content exceeds preset clear time based
on the time instant notified from the timer; after the identical abnormal operation
content is reported, this abnormal operation content is deleted.
[0014] Also, the above-described operation monitoring apparatus is further comprised of
clear means for deleting the abnormal operation content, whereby the abnormal operation
content can be deleted.
[0015] Also, the above-described remote monitoring terminal unit is further comprised of
means for changing the preset report prohibit time of the report selecting means.
[0016] Also, the above-described remote monitoring terminal unit is further comprised of
means for changing the preset clear time of the clear judging means.
[0017] Also, a plurality of the remote monitoring terminal units are provided; and depending
on the abnormal condition of the operation conditions of the indoor unit and the outdoor
unit, the abnormal operation conditions are reported from the operation monitoring
apparatus to any one of the plural remote monitoring terminal units.
[0018] The above and other objects and features of the present invention will be more apparent
from the following description taken in conjunction with the accompanying drawings.
BRIEF DESCRIPTION OF THE DRAWINGS
[0019]
Fig. 1 is a block diagram for showing a system arrangement of the present invention;
Fig. 2 is a block diagram for indicating an arrangement of a monitoring apparatus;
Fig. 3 is a diagram for representing a flow operation after an abnormal operation
is detected until this abnormal operation is reported, according to the present invention;
Fig. 4 is a block diagram of a monitoring apparatus according to an embodiment 1 of
the present invention;
Fig. 5 is a diagram for representing a flow operation after an abnormal operation
is detected until this abnormal operation is reported in an embodiment 2 of the present
invention;
Fig. 6 is a block diagram of a monitoring apparatus according to an embodiment 3 of
the present invention;
Fig. 7 is a diagram for representing a flow operation after an abnormal operation
is detected until this abnormal operation is reported in the embodiment 3 of the present
invention;
Fig. 8 is a diagram for showing a flow operation for deleting a temporarily stored
abnormal operation content from storage means in the embodiments 3 and 4 of the present
invention;
Fig. 9 is a block diagram of a monitoring apparatus according to an embodiment 5 of
the present invention;
Fig. 10 is a diagram for representing a flow operation after an abnormal operation
is detected until this abnormal operation is reported in the embodiment 5 of the present
invention;
Fig. 11 is a block diagram of a monitoring apparatus according to an embodiment 6
of the present invention;
Fig. 12 is a diagram for showing an example of an arrangement of reporting destination
designating means in the embodiment 6 of the present invention; and
Fig. 13 is the structural diagram for representing the conventional remote monitoring
system.
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0020] Now, a description will be given in more details of preferred embodiments of the
present invention with reference to the accompanying drawings.
(Embodiment 1)
[0021] Fig. 1 is a block diagram for showing an arrangement of a remote monitoring system
according to embodiments 1 to 5 of the present invention. In this drawing, reference
numerals 1A to 1C show each of indoor units, and reference numerals 2A to 2C indicate
each of outdoor units. The operations of these indoor units and outdoor units are
controlled by transmitting/receiving data via transfer lines 8A to 8E. Reference numeral
3 shows a monitoring apparatus connected via a transfer line 9 to the above-described
air conditioners so as to establish communications with the respective air conditioners,
and capable of monitoring operation conditions of the air conditioners connected via
a modem 4 to a public line 5.
[0022] Reference numerals 7A to 7C indicate remote monitoring computers connected via the
public line 5 by way of the respective modems 6A to 6E to be communicated with an
operation monitoring apparatus 3. The remote monitoring computers correspond to remote
monitoring terminal units for displaying/editing the acquired information.
[0023] It should be noted that although 3 sets of the indoor units and the outdoor units
are employed, the present invention is not limited to these quantities. Also, the
total number of the remote monitoring terminal units is not limited to this embodiment.
[0024] Also, Fig. 2 is a block diagram for representing an internal arrangement of the monitoring
apparatus according to this embodiment 1. A remote monitoring controller corresponding
to the operation monitoring apparatus 3 for outputting operation conditions of the
indoor units and the outdoor units of the air conditioners shown in this drawing is
arranged by air conditioner communication means 12 for performing a data conversion
so as to be communicated with the air conditioner; public line communication means
13 for performing a data conversion in order to be communicated via the public line
with the remote monitoring terminal unit; clear means 14 for clearing an abnormal
operation content stored in a storage means (will be explained later); and also a
microcomputer 11 for controlling the monitoring apparatus.
[0025] Also, the microcomputer 11 is equipped with abnormal operation detecting means 11a
for detecting an abnormal operation of each of the air conditioners; report judging
means 11d for judging as to whether or not the detection result of this abnormal operation
detecting means is reported; reporting means 11b for reporting the judgment result
of this report judging means 11d to the remote monitoring terminal unit 7; and storage
means 11c for temporarily storing the content reported by this reporting means.
[0026] It should also be noted that the report judging means 11d reports the detection report
of the abnormal operation detecting means when judging that the abnormal operation
detection result is not equal to the same abnormal operation content of the same unit
based upon the storage result of the storage means 11c, whereas the report judging
means 11d does not report the detection report when judging that the abnormal operation
detection result is equal to the same abnormal operation content of the same unit.
[0027] Next, operations of the operation monitoring apparatus will be described with reference
to Fig. 1, Fig. 2, and Fig. 3. It should be understood that Fig. 3 is a diagram for
representing an example of a flow operation of the abnormal operation reporting process
executed in this embodiment 1.
[0028] First, when the operation monitoring apparatus 3 detects an abnormal operation condition
of each of the air conditioners under monitoring operation by the abnormal operation
detecting means 11a (step S1), the report judging means 11d retrieves the abnormal
operation content of this air conditioner from the storage results of the storage
means 11c based on this detection result (step S2).
[0029] Next, the report judging means 11d compares this retrieved result with the content
of the detection result to thereby judge as to whether or not this retrieved result
is equal to the same abnormal operation content of the same unit (step S3).
[0030] If the retrieved result is not equal to the same abnormal operation content of the
same unit, then this abnormal operation content is reported to the reporting means
11b and the storage means 11c. As a result, this abnormal operation content is transmitted
via the public line to the remote monitoring terminal unit 7, and also is stored in
the storage means 11c (steps S4 and S5).
[0031] Conversely, if the retrieved result is equal to the same abnormal operation content
of the same unit, then the report judging means 11d does not report (output) this
same abnormal operation content of the same unit to the reporting means 11b and the
storage means 11c. As a consequence, this same abnormal operation content is not reported
via the public line to the remote monitoring terminal unit 7, but also is not stored
in the storage means 11c (step S6).
[0032] It should be noted that after the process operations defined at the steps S5 and
S6 have been executed, this flow operation is returned to the first step S1.
[0033] As previously explained, since the same abnormal operation content of the same unit
which has been once reported is not reported to the remote monitoring terminal unit,
while the transfer amount of the transfer line can be reduced, the actual abnormal
operation can be correctly grasped and monitored. Accordingly, such a low-cost remote
monitoring system having high reliability for the cooling apparatus can be accomplished
which is suitable for a building accommodated with a plurality of air conditioners.
[0034] In the case that the abnormal operation condition is solved by a serviceman, if the
abnormal operation content stored in the storage means 11c can be cleared by the abnormal
operation content clear means 14, then when the same abnormal operation subsequently
happens to occur, the monitoring apparatus reports this same abnormal operation to
the remote monitoring terminal unit. As a consequence, it is also possible to accomplish
a high-reliable remote monitoring system with easy operation for the cooling apparatus,
which can check as to whether or not the repair is completed, and whether or not the
repair operation can give the good result.
(Embodiment 2)
[0035] Fig. 4 is a block diagram for representing an arrangement of an operation monitoring
apparatus according to an embodiment 2 of the present invention. In addition to the
arrangement shown in the embodiment 1, the operation monitoring apparatus of the drawing
is equipped with the reporting means 11b, the storage means 11c, and a timer 15 for
producing a time instant to report selecting means 11e and the like (will be explained
later). Also, the microcomputer 11 is equipped with, in addition to the arrangement
shown in the embodiment 1, data rewriting means 11f, and report selecting means 11e.
The data rewriting means 11f rewrites the data stored in the storage means every time
preselected time has passed. When the report judging means 11d judges that the same
abnormal operation of the same unit is present in the storage means, the report selecting
means 11e further investigates time elapsed from the previous reporting time instant
so as to judge as to whether or not preselected time has passed. Also, only when the
preselected time has passed, this report selecting means 11e issues the report.
[0036] It should be noted that in addition to the abnormal operation contents, the reporting
time instant produced from the timer 15 is stored into the storage means 11c according
to this embodiment.
[0037] Referring now to Fig. 5, operations of the operation monitoring apparatus according
to the embodiment 2 will be explained.
[0038] First, when the operation monitoring apparatus 3 detects an abnormal operation condition
of each of the air conditioners under monitoring operation by the abnormal operation
detecting means 11a (step S11), the report judging means 11d retrieves the abnormal
operation content of this air conditioner from the storage results of the storage
means 11c based on this detection result (step S12).
[0039] Next, the report judging means 11d compares this retrieved result with the content
of the detection result to thereby judge as to whether or not this retrieved result
is equal to the same abnormal operation content of the same unit (step S13).
[0040] If the retrieved result is not equal to the same abnormal operation content of the
same unit, then this abnormal operation content is reported to the reporting means
11b and the storage means 11c. As a result, this abnormal operation content is transmitted
via the report selecting means 11e and the public line to the remote monitoring terminal
unit 7, and also is stored in the storage means 11c (steps S14 and S15).
[0041] It should be noted that at this time, since the time instant is produced from the
timer 15 to be supplied to the reporting means 11b and the storage means 11c, the
reporting means 11b also reports such a time instant when the abnormal operation happens
to occur. Also, the storage means 11c stores therein the abnormal operation content
and this time instant when the abnormal operation happens to occur.
[0042] Conversely, if the retrieved result is equal to the same abnormal operation content
of the same unit, then the report judging means 11d does not report this abnormal
operation content to the reporting means 11b and the storage means 11c, but reports
this abnormal operation content to the report selecting means 11e (step S16).
[0043] In response to this report, the report selecting means 11e calculates a time difference
between the previous reporting time instant stored in the storage means 11c and the
present time instant produced from the timer 15, and then compares this calculation
result with preset report prohibit time "T1". When the time difference (recurrence
time) between the previous reporting time instant and the present time instant exceeds
the report prohibit setting time "T1", as a result of this comparison, the report
selecting means 11e reports both the present time instant and the abnormal operation
content to the reporting means 11b and the rewriting means 11f.
[0044] As a consequence, the reporting means 11b again sends the present time instant and
the same abnormal operation content to the remote monitoring terminal unit 7.
[0045] Also, since the rewriting means 11f rewrites the previous time instant of the storage
means 11c into the present time instant, the storage means 11c stores therein the
present time instant, and such a fact that the previous abnormal operation content
occurs at the present time instant (steps S17 and S18).
[0046] Also, if the time difference between the previous reporting time instant and the
present time instant does not exceed the report prohibit setting time T1, then both
the present time instant and the abnormal operation content are not reported to the
reporting means 11b and the rewriting means 11f. Accordingly, both the previous time
instant and the abnormal operation content are stored in the storage means 11c (step
S19).
[0047] After the process operations defined at the steps S18 and S19 are completed, the
flow operation is returned to the first step S1.
[0048] As previously explained, with respect to the abnormal operation once reported, this
abnormal operation is reported after the time difference (recurrence time) between
the previous reporting time instant and the previous time instant exceeds the report
prohibit setting time T1. As a consequence, such temporal abnormal operations caused
by changes in weather and environments (rain, wind, snow) are not reported to the
remote monitoring terminal unit. That is, for instance, in particular, the temperature
around the installation place of the outdoor units is increased due to some weather
and environmental conditions. Thus, the heat radiation performance of the radiator
plate of the outdoor unit is deteriorated, so that the operation of the outdoor unit
is stopped under abnormal condition. Thereafter, the deteriorated heat radiation performance
is improved due to changes in the succeeding weather and environmental conditions,
so that the automatic recovery operation can be performed. Also, if the manual recovery
operation can be performed, no abnormal operation is reported to the remote monitoring
terminal unit. On the other hand, the continuous abnormal operation is reported. As
a consequence, it is possible to provide a low-cost remote monitoring system having
high reliability for the cooling apparatus, which can correctly separate the temporal
abnormal operation from the continuous abnormal operation and can correctly monitor
this continuous abnormal operation, while reducing the total number of reporting the
abnormal operations.
[0049] When the report prohibit setting time T1 may be set depending upon the content of
the abnormal operation, this report prohibit setting time is variable depending upon
the use conditions of the air conditioner, and the contents of the abnormal operations.
Therefore, it is possible to obtain a more useful remote monitoring system for the
cooling apparatus.
[0050] Also, if the report prohibit setting time T1 may be arbitrarily set by way of the
remote monitoring terminal 7, then the use condition of the air conditioner and the
content of the abnormal operation can be varied even when the operator goes to the
installation place of the air conditioner. As a result, it is possible to provide
a more useful remote monitoring system for the cooling apparatus.
(Emobidment 3)
[0051] Fig. 6 is a block diagram for indicating an arrangement of a monitoring apparatus
according to an embodiment 3 of the present invention. Instead of the report selecting
means employed in the arrangement of the embodiment 2, a clear judging means is provided,
and furthermore, a clear means 11h is employed instead of the rewriting means 11f.
The clear judging means 11g judges as to whether or not the difference between the
previous reporting time instant stored in the storage means and the present reporting
time instant has elapsed preset clear time T2. The clear means 11h automatically clears
the content stored in the storage means 11c based on the judgment result of this clear
judging means 11g when the time difference between the previous reporting time instant
and the present reporting time instant exceeds the preset clear time T2.
[0052] Next, a description will now be made of operations of this embodiment 3 with reference
to Fig. 7 and Fig. 8.
[0053] First, when the operation monitoring apparatus 3 detects an abnormal operation condition
of each of the air conditioners under monitoring operation by the abnormal operation
detecting means 11a (step S21), the report judging means 11d retrieves the abnormal
operation content of this air conditioner from the storage results of the storage
means 11c based on this detection result (step S22).
[0054] Next, the report judging means 11d compares this retrieved result with the content
of the detection result to thereby judge as to whether or not this retrieved result
is equal to the same abnormal operation content of the same unit (step S23).
[0055] If the retrieved result is not equal to the same abnormal operation content of the
same unit, then this abnormal operation content is reported to the reporting means
11b and the storage means 11c. As a result, this abnormal operation content is transmitted
via the public line to the remote monitoring terminal unit 7, and also is stored in
the storage means 11c (steps S24 and S25).
[0056] It should be noted that at this time, since the time instant is produced from the
timer 15 to be supplied to the reporting means 11b and the storage means 11c, the
reporting means 11b also reports such a time instant when the abnormal operation happens
to occur. Also, the storage means 11c stores therein the abnormal operation content
and this time instant when the abnormal operation happens to occur.
[0057] Conversely, if the retrieved result is equal to the same abnormal operation content
of the same unit, then the report judging means 11d does not report this same abnormal
operation content of the same unit to the reporting means 11b and the storage means
11c (step S26).
[0058] It should be understood that the clear judging means 11g will check the time lapse
of the abnormal operation content stored in the storage means 11c and detected by
the detecting means based upon the time instant produced from the timer 15 every predetermined
time.
[0059] In other words, as represented in Fig. 8, with respect to each of the abnormal operation
contents of the respective air conditioners stored in the storage means 11c, the clear
judging means 11g calculates a time difference (time lapse) between this reporting
time instant and the time instant produced from the timer 15, and compares this calculation
result with the preset clear time T2. Based on this comparison result, when the time
difference exceeds the preset clear time T2, the clear judging means 11g reports the
time up content to the clear means 11h (steps S31 and S32).
[0060] In response to this report, the clear means 11h clears the abnormal operation content
thereof and the reporting time instant stored in the storage means 11c. That is to
say, the clear means 11h deletes the abnormal operation content exceeding the preset
clear time T2 from the storage means 11c, and the flow operation is returned to the
first step (step S33).
[0061] It should be understood that when the time lapse (time difference) from the reporting
time instant does not exceed the set clear time T2, since no time up content is reported
to the clear means 11h, both the abnormal operation content and the reporting time
instant are directly saved which have been stored in the storage means 11c and do
not exceed this set clear time T2.
[0062] As previously explained, when the time lapse after the reporting time instant exceeds
the set clear time T2 with respect to each of the abnormal operation contents of the
air conditioner, since this abnormal operation content is deleted, the waste content
is not stored. In particular, even when the temporal abnormal operation with the less
significant degree is changed into the abnormal operation with the significant degree,
it is possible to provide a highly reliable remote monitoring system for the cooling
apparatus, which can correctly grasp and monitor the abnormal operation.
[0063] Also, when the clear time T2 of the clear judging means 11g can be set, this clear
time is variable depending upon the use conditions of the air conditioner, and the
contents of the abnormal operations. Therefore, it is possible to obtain a more useful
remote monitoring system for the cooling apparatus.
[0064] Also, if the preset clear time T2 may be arbitrarily set by way of the remote monitoring
terminal 7, then this preset clear time T2 can be varied based on the use condition
of the air conditioner and the content of the abnormal operation even when the operator
goes to the installation place of the air conditioner. As a result, it is possible
to provide a more useful remote monitoring system for the cooling apparatus.
(Embodiment 4)
[0065] As previously described in the embodiment 3, in accordance with this embodiment 4,
instead of the report selecting means 11e employed in the embodiment 2, a clear judging
means 11g is employed. This clear judging means 11g judges as to whether or not the
time lapse after the abnormal operation stored in the storage means has been reported
passes through the preset clear time "T2". In addition to the arrangement of the embodiment
2, both the clear judging means 11g and the clear means 11h are merely added. However,
such a clear means 11h is not employed instead of the rewriting means. This clear
means 11h automatically clears the storage content of the storage means 11c when the
time lapse after the report exceeds the preset clear time T2 based on the judgment
result of this clear judging means 11g.
[0066] At this time, operations of this embodiment 4 are given as follows. That is, in such
a case that the report judging means 11d judges that the time lapse after the report
is located within judging time "T3" set longer than, or equal to the report prohibit
time T1 and shorter than, or equal to the clear time T2, and also the content of this
report is identical to the same content of the same unit, the report judging means
11d reports to the report selecting means 11e. The subsequent operation is identical
to the operation as explained with reference to the embodiment 2. Also, when the time
after the report exceeds the judging time T3, the report judging means 11d reports
to the clear judging means 11g. Thereafter, the subsequent operation is identical
to the operation as described with reference to the embodiment 3.
[0067] It should be understood that since the preceding operation has been explained in
the embodiment 2, no further explanation thereof is made in this specification.
[0068] As previously explained, when the report judging means judges that the time after
the report is located within the judging time T3, and also the content of this report
is the same content of the same unit, this report judging means reports to the report
selecting means. When the report judging means judges that the time after the report
exceeds the judging time T3, this report judging means reports to the clear judging
means. In particular, when the continuous abnormal operation with the significant
degree happens to occur, this continuous abnormal operation is firmly reported and
then deleted, so that the remote monitoring system with higher reliability can be
obtained.
[0069] It should be noted that when the clear time T2 is merely set longer than the report
prohibit time T1, a similar effect may be apparently achieved without providing the
judging time T2.
(Embodiment 5)
[0070] Fig. 9 schematically indicates an arrangement of an operation monitoring apparatus
according to an embodiment 5 corresponding to "3" of the present invention. The arrangement
of this embodiment 5 is made by adding to the arrangement of the embodiment 3, a detecting
time judging means 11i for judging as to whether or not a detecting time is reached
to a preset time "N". This preset time "N" is retrieved from the storage region of
the storage means 11c, while this storage means 11c temporarily stores the same abnormal
operation content of the same unit and the detecting time thereof.
[0071] Next, operations in this embodiment 5 will now be described with reference to Fig.
10. When the abnormal operation detecting means 11a detects an abnormal operation
condition of each of the air conditioners under monitoring operation (step S41), the
report judging means 11d retrieves the abnormal operation content of this air conditioner
from the storage results of the storage means 11c based on this detection result (step
S42).
[0072] Next, the report judging means 11d compares this retrieved result with the content
of the detection result to thereby judge as to whether or not this retrieved result
is equal to the same abnormal operation content of the same unit. If the retrieved
result content is equal to the same abnormal operation content, then the report judging
means 11d instructs a rewriting means (not shown) of the storage means to increment
this detecting time of the storage means, and further instructs the detecting time
judging means 11i to execute the judgment (step S43 and S44).
[0073] At this time, the report judging means 11d judges as to whether or not the detection
result content is equal to the same abnormal operation content of the same unit. If
not, then the report judging means 11d instructs the rewriting means to store the
abnormal operation content of this air conditioner, the detecting time "1", and also
the abnormal operation detecting time instant into the storage means 11c (step S45).
[0074] Next, in response to the instruction issued from the report judging means 11d, the
detecting time judging means 11i confirms the detecting time of this abnormal operation
content from the storage result of the storage means 11c. When the report judging
means 11d judges that this confirmed detecting time is reached to a preset time "N",
the report judging means 11d instructs the reporting means 11b to report this abnormal
operation content to the remote monitoring terminal unit 7 (steps S46, S47 and S48).
[0075] At this time, the detecting time judging means 11i instructs the clear means 11h
to delete this abnormal operation content from the storage means 11c (step S49).
[0076] It should be noted that when the detecting time of this abnormal operation is not
reached to the preset time "N", the detecting time judging means 11i does not report
(step S50).
[0077] As previously explained, after the occurrence times of the same abnormal operation
are reached to the preset times, the abnormal operation is reported to the remote
monitoring terminal unit. As a consequence, such a temporal abnormal operation with
a less significant degree is not reported, which suddenly and not periodically occurs
due to changes in weather conditions. However, only the continuous abnormal operation
content is reported. As a consequence, it is possible to provide a low-cost remote
monitoring system having high reliability for the cooling apparatus, which can correctly
separate the temporal abnormal operation from the continuous abnormal operation and
can correctly monitor this continuous abnormal operation, while reducing the total
number of reporting the abnormal operations.
[0078] Also, when the occurrence times of the same abnormal operation contents are reached
to the preset times, the detecting time judging means deletes the abnormal operation
content thereof from the storage means. As a result, since no useless content is stored,
it is possible to obtain such a low-cost remote monitoring system for the cooling
apparatus, in which the storage capacity of the storage means is reduced.
[0079] Also, as another example of this embodiment 5, when the detecting time judging means
judges that the occurrence time of the abnormal operation is reached to a preset detecting
time within preselected time (preset time T4) based upon the time instant produced
from the timer 15, the abnormal operation content thereof is reported to the remote
monitoring terminal unit 7. Since the detecting time judging means discriminates the
temporal abnormal operation from the continuous abnormal operation based on the detecting
times within the predetermined time, and then reports, it is possible to obtain such
a remote monitoring system with high reliability for the cooling apparatus, for correctly
judging and reporting the abnormal operation.
[0080] As another example of this embodiment 5, in such a case that the report judging means
11d judges based on the time instant produced from the timer 15 that the time lapse
after the first abnormal operation has been detected exceeds a preset time "T4", as
represented in Fig. 8, this report judging means 11d may instruct the clear means
11h to clear this abnormal operation content from the storage means 11c.
[0081] With this alternative example, when the same abnormal operation does not occur within
preselected time, this abnormal operation content is deleted from the storage means.
As a consequence, it is also possible to obtain such a low-cost remote monitoring
system for the cooling apparatus, while unnecessary abnormal operation contents are
not stored, and the storage capacity of the memory means is reduced.
[0082] Also, if the report prohibit setting time T1 may be arbitrarily set by way of the
remote monitoring terminal 7, then the use condition of the air conditioner and the
content of the abnormal operation can be varied even when the operator goes to the
installation place of the air conditioner. As a result, it is possible to provide
a more useful remote monitoring system for the cooling apparatus.
(Embodiment 6)
[0083] Fig. 11 is a diagram for showing an arrangement of an embodiment 6 according to the
present invention. A microcomputer 11 of this embodiment 6 is equipped with an abnormal
operation detecting means 11a for detecting an abnormal operation content of each
of the air conditioners, a reporting destination selection means 11j, and a reporting
means 11b for reporting to any one of the remote monitoring terminal units based upon
the selection result of this reporting destination selecting means 11j. The reporting
destination selecting means 11j compares the detection result of this abnormal operation
detecting means 11a with an abnormal operation of each of the air conditioners in
a reporting destination designation table, and selects any one of these remote monitoring
terminal units to be reported based on this comparison result. Also, the arrangement
other than a timer 15 instead of the clear means 11h employed in the embodiment 1
is the same as that of the embodiment 1.
[0084] Next, operations will now be described.
[0085] First, when an abnormal operation content of any of the air conditioners is detected
by the abnormal operation detecting means 11a, this abnormal operation content is
transmitted to the reporting destination designating means 11j.
[0086] Next, the reporting destination designating means 11j compares this transmitted abnormal
content of the air conditioner with, for instance, the abnormal operation contents
of the respective air conditioners contained in the reporting destination designation
table shown in Fig. 12. Based on this comparison result, the reporting destination
designating means 11j selects any one of these remote monitoring terminals, and then
transmits this selection result to the reporting means 11b.
[0087] Subsequently, the reporting means 11(b) transmits (reports) the abnormal operation
content of the air conditioner detected by the abnormal operation detecting means
11a to the remote monitoring terminal unit selected by the reporting destination designating
means 11j.
[0088] It should also be noted that as to the contents of the reporting destination designation
table, a plurality of reporting destinations may be designated, and otherwise, no
reporting destination may be designated, depending upon the importance/significant
degrees of the abnormal operation contents, or the occurrence time instants of the
abnormal operations. In other words, as to a certain abnormal operation, it is possible
to designate that no report is made.
[0089] As previously explained, since the abnormal operation content is reported from the
operation monitoring apparatus to any of the plural remote monitoring terminal units,
depending upon the abnormal operation contents of the operation conditions of the
indoor units and the outdoor units, this abnormal operation content is reported to
the remote monitoring terminal unit suitable for this abnormal operation content based
on the importance/significant degree of the abnormal operation content, or the occurrence
time instant of the abnormal operation. As a consequence, it is possible to obtain
a very useful remote monitoring system for the cooling apparatus, capable of providing
very quick services.
[0090] Also, when the timer 15 transmits the time instant to the reporting destination designating
means 11j, the reporting destination designating means 11j may detect the occurrence
time instant of the abnormal operation content sent from the abnormal operation detecting
means 11a. As a result, since it is also possible to select any of these remote monitoring
terminal units to be reported based on the occurrence time instant other than the
contents of the reporting destination designation table, a further useful remote monitoring
system for the cooling apparatus may be accomplished.
[0091] The above-explained embodiments 1 to 6 have described the abnormal operation contents
of the respective air conditioners, assuming that the respective air conditioners
of the building and the like are monitored. Alternatively, it is apparent to apply
the present invention to monitoring operations for air conditioners installed in offices
and homes, and also to monitoring operations for abnormal operations of cooling apparatus.
[0092] In the above-explained embodiments 1 to 6, the same abnormal operation of the same
unit has been employed as the report judging basis of the report judging means. If
an abnormal operation content is not repaired even in a plurality of air conditioners
installed in an office, a home, or a building, then this abnormal operation content
of this model is not changed. As a consequence, only the condition for judging whether
or not the detected abnormal operation content is equal to the same abnormal content
may be provided.
[0093] It should be understood that if the condition for judging whether or not the detected
abnormal operation content is equal to the same abnormal content is introduced, then
the once reported same abnormal operation content is not reported to the remote monitoring
terminal unit. Therefore, it is possible to provide a low-cost and high reliable remote
monitoring system for the cooling apparatus, while the transfer amount of the transfer
line can be reduced, and the actual abnormal operation can be correctly grasped and
monitored.
[0094] Since the present invention has been arranged as explained above, the present invention
can achieve the below-mentioned effects.
[0095] Since the same abnormal operation content which has been once reported is not reported
to the remote monitoring terminal unit, while the transfer amount of the transfer
line can be reduced, the actual abnormal operation can be correctly grasped and monitored.
Accordingly, such a low-cost remote monitoring system having high reliability for
the cooling apparatus can be accomplished.
[0096] As previously explained, since the same abnormal operation content of the same unit
which has been once reported is not reported to the remote monitoring terminal unit,
while the transfer amount of the transfer line can be reduced, the actual abnormal
operation can be correctly grasped and monitored. Accordingly, such a low-cost remote
monitoring system having high reliability for the cooling apparatus can be accomplished
which is suitable for a building accommodated with a plurality of air conditioners.
[0097] Also, after the occurrence times of the same abnormal operation are reached to the
preset times, the abnormal operation is reported to the remote monitoring terminal
unit. As a consequence, such a temporal abnormal operation with a less significant
degree is not reported, which suddenly and not periodically occurs due to changes
in weather conditions. However, only the continuous abnormal operation content is
reported. As a consequence, it is possible to provide a low-cost remote monitoring
system having high reliability for the cooling apparatus, which can correctly separate
the temporal abnormal operation from the continuous abnormal operation and can correctly
monitor this continuous abnormal operation, while reducing the total number of reporting
the abnormal operations.
[0098] Also, with respect to the abnormal operation once reported, this abnormal operation
is reported after the time difference (recurrence time) between the previous reporting
time instant and the previous time instant exceeds the report prohibit setting time
T1. As a consequence, such temporal abnormal operations caused by changes in weather
and environments (rain, wind, snow) are not reported to the remote monitoring terminal
unit. That is, for instance, in particular, the temperature around the installation
place of the outdoor units is increased due to some weather and environmental conditions.
Thus, the heat radiation performance of the radiator plate of the outdoor unit is
deteriorated, so that the operation of the outdoor unit is stopped under abnormal
condition. Thereafter, the deteriorated heat radiation performance is improved due
to changes in the succeeding weather and environmental conditions, so that the automatic
recovery operation can be performed. Also, if the manual recovery operation can be
performed, no abnormal operation is reported to the remote monitoring terminal unit.
On the other hand, the continuous abnormal operation is reported. As a consequence,
it is possible to provide a low-cost remote monitoring system having high reliability
for the cooling apparatus, which can correctly separate the temporal abnormal operation
from the continuous abnormal operation and can correctly monitor this continuous abnormal
operation, while reducing the total number of reporting the abnormal operations.
[0099] Also, when the time lapse after the reporting time instant exceeds the set clear
time T2 with respect to each of the abnormal operation contents of the air conditioner,
since this abnormal operation content is deleted, the waste content is not stored.
In particular, even when the temporal abnormal operation with the less significant
degree is changed into the abnormal operation with the significant degree, it is possible
to provide a highly reliable remote monitoring system for the cooling apparatus, which
can correctly grasp and monitor the abnormal operation.
[0100] Also, since the clear time T2 is set to be longer than the report prohibit time T1,
in particular, when the continuous abnormal operation with the significant degree
happens to occur, this continuous abnormal operation with the significant degree can
be surely reported, and thereafter can be deleted by such a high reliable remote monitoring
system.
[0101] Also, since the clear means for deleting the abnormal operation content is employed,
in particular, when the abnormal operation is cleared and the abnormal operation content
is deleted by the serviceman, even if the same abnormal operation subsequently happens
to occur, this same abnormal operation can be firmly reported. As a consequence, it
is also possible to accomplish a high-reliable remote monitoring system with easy
operation for the cooling apparatus, which can check as to whether or not the repair
is completed, and whether or not the repair operation can give the good result.
[0102] Also, since such a means is employed which may arbitrarily set the preset clear time
T2 by way of the remote monitoring terminal 7, then the use condition of the air conditioner
and the content of the abnormal operation can be varied even when the operator goes
to the installation place of the air conditioner. As a result, it is possible to provide
a more useful remote monitoring system for the cooling apparatus.
[0103] Also, when the clear time T2 of the clear judging means 11g can be set, this clear
time is variable depending upon the use conditions of the air conditioner, and the
contents of the abnormal operations. Therefore, it is possible to obtain a more useful
remote monitoring system for the cooling apparatus.
[0104] Also, since the abnormal operation content is reported from the operation monitoring
apparatus to any of the plural remote monitoring terminal units, depending upon the
abnormal operation contents of the operation conditions of the indoor units and the
outdoor units, this abnormal operation content is reported to the remote monitoring
terminal unit suitable for this abnormal operation content based on the importance/significant
degree of the abnormal operation content, or the occurrence time instant of the abnormal
operation. As a consequence, it is possible to obtain a very useful remote monitoring
system for the cooling apparatus, capable of providing very quick services.
[0105] The foregoing description of the preferred embodiments of the invention has been
presented for purposes of illustration and description. It is not intended to be exhaustive
or to limit the invention to the precise form disclosed, and modifications and variations
are possible in light of the above teachings or may be acquired from practice of the
invention. The embodiments were chosen and described in order to explain the principles
of the invention and its practical application to enable one skilled in the art to
utilize the invention in various embodiments and with various modifications as are
suited to the particular use contemplated. It is intended that the scope of the invention
be defined by the claims appended hereto, and their equivalents.