Description and Field of the Invention
[0001] This invention relates to surfing, specifically to "
SurfSliding", a new sport of skill which consists of controlled movements on a short "
LawnBoard" strapped to the feet of the surfer who glides downhill by gravity and kinetic energy
over a slope covered with artificial turf and lubricated by water.
[0002] The slopes, mostly in the form of large open pipes, are designed to allow the surfer
to predetermine his own line of movement. Also, different vehicles, such as modified
inner tubes, sleds or toboggans, can be used for a ride on SurfSlide ramps.
[0003] SurfSliding can offer a water based sport anywhere, regardless of mountains or oceans.
The controlled environment allows for SurfSliding to be enjoyed by day or night for
an extended season or all year round, depending on the climate.
Description of the Prior Art
[0004] Surfing on waves and skateboarding on land or ramps have been sporting attractions
to many people for quite some time. Snowboarding has recently become a very popular
winter sport in mountain areas. Wave pools and water slide parks are abundant in many
areas. Such sports attractions are usually confined to geographical locations, i.e.
surfing to areas with oceans or lakes, or snowboarding to areas with mountains, snow
and cold seasons.
[0005] To the inventor's knowledge, there is no prior art of SurfSliding. Water slides are
the closest known type of art. They are usually elongated tubes or troughs following
predetermined circuitous path downward from an elevated starting platform. A typical
apparatus of this type is described in U.S.Pat.No.4,194,733, which was issued to B.Whitehouse,
Jr. on March 25, 1980. A slide apparatus which has a generally parabolic upwardly
opening cross section is defined in U.S. Pat. No. 5,137,497 issued to David J. Dubeta
on August 11, 1992. One major difference is that waterslide tubes and troughs are
not designed to allow a user to stand erect. Additionally, they are not designed for
the user to be an active participant in the ride, only a passive user.
[0006] By contrast, the SurfSliding ramps are designed for active motion with a continued
pursuit and challenge for increasing the level of skill towards daring acrobatic movement
and trickery while standing erect.
General Description of the Invention
[0007] The present invention is
SurfSlide which is to provide for a new sport of skill during an extended season. The 'SurfSlide
Sport' contains the following elements:
Starting: The Takeoff!
[0008] To start a ride, the rider must commit to a given movement. To do so, he must lean
forward and into the slope to attain speed. Simultaneously, he must choose a path
on which to ride. This is called choosing or picking a line.
First Turn
[0009] The rider must lean his body weight to the desired side. This weight transition forces
the board's surface to focus on one rail and the center fin. This focused rail becomes
the inside rail (the opposing rail is considered the outside rail). Control and movement
is achieved by one's command of body position.
Subsequent Turns
[0010] A ride is composed of continuous balancing and weight shifting. A turn is the result
of weighting and un-weighting while the rider shifts the board position from rail
to rail. By using body torque, the rider's footwork controls the board's positioning
as it passes over a given surface. This active control of turns makes the ride.
Trickery
[0011] The power of gravity, the flow of water, and the skill of riders provide for many
exciting maneuvers. LawnBoards have foot straps allowing riders to make many such
maneuvers, including aerial acrobatics. The continuous advance of maneuvers will drive
the technology of the sport.
[0012] The invention facilitates this new sport of downhill surfing on a water lubricated
artificial surface suitable for water-oriented theme parks, additions to ski resorts,
or stand alone sporting facilities.
[0013] The new
apparatus is made from commercially available materials, components, and manufacturing processes.
The apparatus can be built as an above-ground structure, an in-ground structure, or
a combination of the two.
[0014] The
above-ground apparatus is a ramp system consisting of large open pipes constructed from high strength /
low weight materials cradled in a support structure. The interior surfaces of the
open pipes are lined with an artificial surface material similar to those used on
golf courses. A gutter system on both sides of the pipes along the rims provides a
thin sheet of water or other lubricant to continuously run down over the surface material.
[0015] In certain soil conditions,
in-ground slides offer advantages. The open pipe is scooped out from the soil, and the planking is
replaced by gunited concrete or sprayed fiber glass walls. The removed soil can be
used for landscaping around the SurfSlides. The water collection channel is inserted
at the bottom and covered with the same grating as in the above-ground structure.
The gutter system is built into a pre-cast concrete channel and hidden by a concrete
cover. The cover also serves as a safety walkway. It is easy to open for service and
adjustment of the gutter system.
[0016] The advantages of the in-ground slides are:
- Better fit of the SurfSlides into the landscape, aesthetically more appealing;
- Rounded turns instead of discrete angles;
- Great flexibility for varying dimensions and shape of open pipe cross sections;
- Reduced danger when surfers perform acrobatics above the 'gunwales';
- Elimination of weight constraints;
- Lower costs in favorable soil conditions.
[0017] The lubricant has several functions: 1) it reduces friction for the passing LawnBoard;
2) it acts as a coolant for the LawnBoard; 3) as the water is retained by the material
fibers, it acts as a shock absorber when the surfer falls; and 4) the water reduces
the risk of friction burns when the surfer falls and slides on the material. Thus,
the sheet of water plus the water retained in the fibers of the surface material provide
for an ample supply of water for the smooth gliding of the passing LawnBoard, resulting
in a hydroplaning experience like that of skim boarding.
[0018] At the bottom of the open pipes are gratings of adequate width to allow the water
to seep through a portion of perforated surface material and run into a collection
channel underneath. Depending on the water availability, the water may either run
off in a creek or be recycled by means of a pump/filter system. Each installation
requires a site-specific water supply and re-circulation solution using commercially
available components.
[0019] In summary, the invention has the following advantages and objectives
a) A new sport similar to surfing and snow boarding;
b) Varying slopes and curves for all skill levels, from beginners to experts;
c) Suitable for large numbers of surfers
d) Enables ski resorts to utilize large portions of their investment (access roads,
ski lifts, lodges, stores) in their off-seasons;
e) Can be installed as a stand-alone or as part of a theme park in areas where there
are no oceans, lakes, or mountains, thus bringing the surfing experience to new areas.
Description of Drawing Figures
[0020] In the drawings, closely related figures have the same number but different alphabetic
suffixes.
1. ELEMENTS OF THE SURFSLIDE SPORT
[0021]
Fig. 1a. shows the SurfSlide trails from beginner to expert slope, all adapted to
the natural terrain of a given hill side.
Fig. 1b. shows the stand-up version of a lawn board
Fig. 1c. shows a cross-sectional support, consisting of two identical side mounts
and a center mount.
2. THE SURFSLIDE APPARATUS
[0022] The support structure, usually made from steel or fiberglass, is so large that it
takes several levels of magnification to show its make-up.
Fig. 2a shows the horizontal projection of a 120 ft long SurfSlide structure containing
a 45° bend and three changes in slope.
Fig. 2b shows a side view of the SurfSlide with planking, support structure and slope
changes, adapting to the given terrain.
Fig. 2c shows details of a concrete footing.
Fig. 2d shows the top view of a planked SurfSlide with an S-curve
Fig. 2e shows light-weight hollow core pultrusions with a removable attachment and
artificial turf.
Fig. 2f shows a thermoplastic pultrusion connector for straight and angled connections
of pultrusions.
Fig. 2g shows an attachment of pultrusions to the support structure.
3. WATER SUPPLY & RECIRCULATION
[0023]
Fig. 3a shows pultrusion used as gutter.
Fig. 3b shows a thermoplastic water supply insert.
4. IN-GROUND SURFSLIDE
[0024]
Fig. 4a shows the cross section of an in-ground SurfSlide
Fig. 4b shows a section of the gutter system
LIST OF REFERENCE NUMERALS
[0025]
- 12
- Adhesive
- 14
- Artificial Turf
- 16
- Bend
- 18
- Board
- 20
- Center Section
- 22
- Chair Lifts
- 24
- Clamp
- 26
- Concave Fins
- 28
- Concrete Channel
- 30
- Concrete Footings
- 32
- Connection Fingers
- 34
- Connector for Pultrusions
- 36
- Control Valve
- 38
- Coping
- 40
- Cover (Concrete)
- 42
- Extension for Fast Turns
- 44
- Flexible Pipe
- 46
- Foot Straps
- 48
- Grating
- 50
- Gunite
- 52
- Gutter
- 54
- Gutter Feed Insert
- 56
- Gutter Feed Pipe
- 58
- Knock-through
- 60
- Lock Strip
- 62
- Original Contour
- 63
- Pipe Stub
- 64
- Planking (Pultrusions)
- 66
- Pultrusion Connector
- 68
- Railing
- 70
- Removable Attachment
- 72
- Rolled L-Profile, Steel
- 74
- Room for Utility Conduits
- 76
- Safety Walkway
- 78
- Seal
- 80
- Shim Adjustment
- 82
- Side Trellis
- 84
- Slope Decrease
- 86
- Slope Increase
- 88
- Soil / Gravel
- 90
- Steel Shoe
- 92
- Stiffening Steel Sheet
- 94
- Support Plate
- 96
- Surf Slide
- 98
- Surfer, 6 Foot tall, to scale
- 100
- T-Connector
- 102
- Tilt
- 104
- Trellis Support Structure
- 106
- Water Collection Channel
- 108
- Water Distribution Chamber
- 110
- Water Exit Slot
- 112
- Water Return Pipe
- 114
- Water Supply Main
Detailed Description of Drawing Figures
1. ELEMENTS OF THE SURFSLIDE SPORT
[0026] Figure 1a renders a complete SurfSlide park with SurfSlides (96) of different slopes for different
skill levels. The SurfSlides and the chair-lift installations (22) follow the natural
terrain to minimize the environmental impact. The use of planking imposes distinct
angles instead of curves.
[0027] Figure 1b shows a Surfin'Turf™ lawn board, a short light weight board (18) with concave fins
(26) for directional control and foot straps (46). The special form of this board
is protected by a recently granted design patent.
[0028] Figure 1c. A typical embodiment of the invention is the open pipe which is constructed of planking
(64), supported by a trellis support structure (104) which rests on concrete footings
(30). For reason of transport, the pipe support consists of a center section (20)
and two side sections (82) which are bolted together. The open pipe can be formed
from any material which lends itself to form large cylindrical sections such as sheet
metal, planking, or pre-formed fiberglass sections. In this example, the open pipes
are built from hollow core fiberglass pultrusions (64) which offer high strength at
low weight and are highly weather resistant; they are easy to transport, to handle
and to cut to size on site. Pultrusion planking (64) offers smooth surfaces suitable
for adhesive bonding to the rolled steel L-profiles (72) and for the removable attachment
of the artificial turf (14) with an adhesive or hook & loop tapes.
[0029] The cut-outs in the stiffening steel sheet (92) serve for stress relief. In the center
section (20) they provide room for utility conduits (74) such as the water collection
channel (106), the water supply main (114), the water return pipes (112) and others.
A fast action vertical extension (42) for the outside of turns can be added to the
trellis support structure(104). This extension allows for gravity defying maneuvers
as well as keeping the riders in the SurfSlide. In all places without such extension,
a protruding coping (38) is installed along the upper rim of the SurfSlide to ensure
that anyone surfing beyond the upper rim will fall back into the open pipe. Just below
the coping (respectively below the extension) is the gutter (52) located to dispense
the water or other lubricant. On the bottom, the water escapes through a grating (48)
into the water collection channel (106).
[0030] To allow for easy service of the artificial turf (14) and for rescue in the event
of an accident, a safety walkway (76) is provided on top of the trellis support structure
(104), secured by a railing (68).
[0031] The relation of a 6 foot tall Surfer (98) and a 30 foot diameter open pipe is sketched
to scale.
2. THE AERIAL SURFSLIDE
[0032] The Figures 2a, 2b, and 2d show projections of an above-ground SurfSlide.
[0033] Figure 2a shows the horizontal projection of a 120 foot long SurfSlide trellis support structure
(104) with a slope increase (86) and two slope decreases (84). The 45° bend (16) in
this example is composed of two 15° sections and two 7.5° extensions added to the
straight elements. The bottom structure from line A-B to line C-D lies all in one
plain which is tilted upward (102) around the axis X-X. Hence, Point C is located
higher than Point D and the lowest point inside the SurfSlide is not always in the
center. Provisions must be made to bring the water from the lowest point to the water
collection channel (106)(Fig.1c).
[0034] For simplicity, only the outer trusswork is shown. Dimensions vary, but a 6" square
tube may be used as a guideline for the outer beams.
[0035] Figure 2b shows a side view of the planked (64) SurfSlide system. The exterior of the open
pipe is supported by the trellis structure (104) and mounted on concrete footings
(30) with steel shoes (90) comparable to bridge constructions. The slope increases
(86) and decreases (84) are mitered between the abutting straight sections.
[0036] Figure 2c shows details of a concrete footing (30). The trellis structure (104) rests with
a steel shoe (90) on a support plate (94). The space between the two screws has to
be calculated to accommodate thermal expansions and contractions. To level out inaccuracies
of the footing or to compensate for settlement of the soil, the position of the support
plate can be corrected with one or more shim adjustments (80).
[0037] Figure 2d shows a vertical projection of a section with an S-curve. Since both, the pultrusions
(64) and the trellis support structures are manufactured in straight sections as shown
in Figures 2b and 2d, all the turns and changes in slope must be composed of discrete
angles. The angles for turns should be 15 degrees or less to assure a smooth ride.
Turns of more than 15 degrees shall be composed of smaller sections. Changes in slope
should generally be 5 degrees or less, except for expert runs where jumps are desired.
[0038] On both sides of the SurfSlide is, above the gutter line, a safety walkway (76) at
least 2 foot wide for service and emergency assistance. The walkway is secured with
a railing (68).
[0039] Figure 2e illustrates the means of attaching the artificial turf (14) to the inner surface
of the SurfSlide. Several commercial turf products are available, mostly manufactured
for golf courses, football fields and other sports facilities. The artificial turf
(14) shall be selected for good water retention of the fibers which may measure between
0.5" and 1.25" in length. The artificial turf (14)must withstand the full temperature
range of the region where it is installed, which often means a range from -25°F to
120°F. It must also be highly UV light resistant to avoid embrittlement and discoloration.
The attachment (70) to the planking (64) must be removable to rotate artificial turf
(14) sections or to replace worn areas. This can be accomplished with hook & loop
strips or with a suitable water resistant, removable adhesive.
[0040] Figure 2f illustrates a thermoplastic pultrusion connector (34). Its connecting fingers (32)
can be inserted into the hollow core pultrusions (64)(Fig.2e), be heated and bent
up to 15 degrees of composite angles. Upon cooling, it accepts the desired angle permanently.
[0041] Figure 2g shows a section of the trellis support structure shown in Fig. 1c(104). The two rolled
L-profiles (72) welded to the stiffening steel sheet (92) form the inner circle of
the open pipe and provide a flat surface suitable to glue the pultrusions (64). The
adhesive (12) must be suitable to compensate for small inaccuracies of the trellis
support structure and remain elastic to accommodate thermal expansions without breaking
the bond or the pultrusions.
[0042] The starting platform can be built from steel, wood, fiberglass, or any other suitable
material combination, including an earth mound with the beginning of the open pipe
cast in concrete. The end of the run will usually be a slight turn back up-hill to
let die out the residual speed of the surfer (not shown here).
3. WATER SUPPLY AND RECIRCULATION
[0043] Figure 3a shows a gutter detail. It is designed to allow the lubricant, usually water with
or without additives, to exit as a thin sheet and cover the inner surface of the open
pipe. The lubricating water is supplied from a reservoir or water tower located above
the SurfSlide and fed to the gutters through a supply main (114)(Fig. 1c). As shown,
the best material to use for the gutter is a hollow pultrusion (64) with sawed-in
slots (110). The gutters are arranged along the rim on both sides of the SurfSlide;
they allow a controlled flow of water to be released for hydroplaning.
[0044] Figure 3b is a Gutter Feed Insert (54) inserted with its fingers (32) into the gutter pultrusions
in regular intervals to assure a continuous sheet of water over the entire turf surface.
This thermoplastic insert is made very similar to the pultrusion connector shown in
Fig. 2f. It can also be inserted in straight or angled positions. The pipe stub (63)
is connected to the supply main shown in Fig. 1c(114).
[0045] Each supply pipe feeding an insert is equipped with a valve (not shown) for fine-tuning
the amount of water distributed. For gutter connections without water supply, a connector
as shown in Fig. 2f may be used.
[0046] Note: If lubricant re-circulation is required, commercial pump-filter units will be used,
not shown here.
4. THE IN-GROUND SURFSLIDE
[0047] Figure 4a shows an in-ground version of the SurfSlide. In this version, the trellis support
structure is replaced by the surrounding soil (88), and the planking is replaced by
a gunite cement or sprayed fiberglass wall (50). The gutter system (52), the water
collection channel (106) with the grating (48) above it, and the artificial turf (14)
are all arranged like in the aerial version.
[0048] In order to find the soil sufficiently compacted for gunniting, it is best to scoop
out the entire depth of the open pipe below the original contour (62) of the terrain.
The safety walkway (76) consists in this version of concrete slabs covering the gutter
system shown in Fig.4b.
[0049] Figure 4b shows a section of the gutter system housed in a pre-cast concrete channel (28) for
use with an in-ground SurfSlide structure. The water main (114) is connected to a
flexible pipe (44) with water exit slots (110). The pipe is held in place with two
lock strips (60) made in bright color from an elastic plastic or rubber. The lock
strips with the flexible pipe (44) in the middle make for a clean looking band which
runs along the top of the ramp and also serves as coping.
[0050] The water exits from the flexible pipe (44) through the water exit (110) slots into
water distribution chamber (108). From there, the water escapes through serrations
on the round surfaces of the lock strips which hug the flexible pipe and forms a uniform
sheet on the artificial turf (14). The amount of exiting water is controlled by the
control valve (36).
[0051] The feed connection from the water supply main (114) to the flexible pipe (44) goes
through a concrete knock-through (58) which separates the water distribution chamber
(108) from the utility channel which houses the water main (114) and other utility
conduits (not shown). Around this knock-through (58), the chamber (28) is enlarged
to accommodate the clamps (24) which attach the flexible pipes (44) to a T-connector
(100). To prevent back-flow into the utility channel (not shown), a seal (78) must
be installed.
[0052] The concrete gutter channel (28) rests on soil or gravel (88) which is level with
the upper end of the gunite (50). The channel and the gunite are connected with a
tongue-and-groove arrangement to ensure a clean looking rim of the in-ground open
pipe. The concrete cover (40) protects the gutter arrangement and serves as a safety
walkway at the same time.
Operation of the Invention
1) CONSTRUCTION: AERIAL STRUCTURE
The SurfSlide Structure
[0053] To facilitate manufacturing, transport, and assembly, the structure consists of standardized
straight and angled sections which are bolted together on-site.
[0054] A center section (20)(Fig.1c) is set on the lowest pair of prepared concrete footings
(30). The bottom beams are attached to the center section and rest on the second pair
of footings. The next center section (20)(Fig.1c) is put in place, bolted to the resting
beams. A diagonal brace completes the first bottom trellis (not shown). The bottom
trellises are built for the entire surf slide run and measured carefully to make sure
that all levels, angles and distances are correct.
[0055] The side sections (82)(Fig.1c) are bolted to both sides of the center sections (20)(Fig.1c)
and braced together with straight and diagonal beams to complete the side trellises
shown in Fig.2a.
[0056] To complete the structure, end caps for shoeing surfers into the slide and for safe
exit at the end must be built to fit the terrain. If extensions for fast turns are
used (42)(Fig.1c), sprinklers (not shown) may be installed on the safety walkway (76)(Fig.1c)
on the opposite side to shoot a jet of water onto the extension which is located above
the gutter (52)(Fig.1c). Also, a "traffic signal system" (not shown) may be installed
to avoid one surfer from plowing into another one who has fallen with his board.
[0057] The trellis support structure (104)(Fig.1c) must be calculated to support the highest
load expected. In mountainous areas in the North, this could be 3 feet of wet snow.
In the South, high side winds could be the primary concern. Also, the anchoring of
the footings must be designed to carry such loads.
Water Supply and Evacuation
[0058] Prior to planking, the water collection channel (106)(Fig.1c) is placed in the center
section (20)(Fig.1c) and connected to the water return pipe (112)(Fig.1c) in regular
intervals. Above the water collection channel (106)(Fig.1c), a grating (48)(Fig.1c)
is placed and lined up parallel to the trellis beams. Then, pultrusions or other planks
(64)(Fig.1c) are placed on both sides of the grating to plank the open pipe.
[0059] The highest positioned "plank" on either side is the gutter (52)(Fig.3a) which can
be a water carrying pultrusion or another water supply pipe with water exit slots
in order to lubricate the walls from top to bottom. The gutters (52)(Fig.1c) are connected
to the water supply main (114)(Fig.1c) at regular intervals. Other utility pipes are
put in place (74)(Fig.1c) and supported as needed with braces attached to the bottom
trellises.
[0060] Straight and angled gutter runs (52)(Fig.1c), made from pultrusions, are joined with
thermoplastic pultrusion connectors as shown if Fig.2f. In addition, about every 10
feet to 12 feet, a water supply insert, as shown in Fig.3b, is inserted into the gutters
and connected to the water supply main (114)(Fig.1c). The water supply insert is made
from the same thermoplastic material as the thermoplastic pultrusion connector in
Fig.2f and is inserted the same way. Each connection to the water supply main must
have a flow control valve (not shown) to fine tune the amount of water released. -
The water supply and, if necessary, the re-circulation system must be designed for
every installation.
Planking
[0061] For the above-ground SurfSlide, a trellis support structure (104)(Fig.1c) made from
steel with fiberglass pultrusions as planking material has been chosen for the following
reasons:
- the steel structure for the ease of pre-manufacture, transport and on-site assembly;
- the pultrusions for their high strength-to-weight ratio and climatic resilience, their
ease of transportation and of cutting them to length in their final position. Both
materials offer high strength at reasonable costs.
[0062] The pultrusions (64)(Fig.1c) are placed on both sides of the grating (48)(Fig.1c),
each pultrusion being oversized in length by 6" to 12" for the final cut. As the pultrusions
are put in place, they are glued to the rolled L-profiles (72)(Fig.2g). The adhesive
must withstand the entire temperature range of the geographic area where the SurfSlide
is installed; it must be resistant to water and dampness, and it must remain elastic
to accommodate differences in thermal expansion between the steel support structure
and the fiberglass pultrusion planking.
[0063] Lined-up pultrusions (64)(Fig.1c) are cut either straight or mitered for angled turns.
To mark the final cutting line, a construction laser can be used. Since even small
angular inaccuracies lead to substantial errors in the large dimensions of the SurfSlide,
the laser has to be positioned very accurately. The final cut can then be made with
a handheld powertool with an abrasive cutting wheel. Thereupon, the pultrusions (64)(Fig.1c)
roughly pre-cut for the next section, are laid in place (not glued) so their edges
hit the finished pultrusions of the previous section. The laser is then moved a few
inches to show a line parallel to the previous cut in order to cut the new pultrusions
under the same angle. - Again starting in the center next to the grating (48)(Fig.1c)
one thermoplastic pultrusion connector as shown in Fig.2f is inserted between each
pair of abutting pultrusions. If the connector is straining to accommodate the angle,
it can be warmed up to soften and adopt the angled form while cooling down. At this
point, the pultrusions of 'section 2' are also glued to the steel support.
The Turf
[0064] The artificial turf (14)(Fig.2e) is installed on the inner surface of the SurfSlide.
To facilitate replacement of worn sections, it is recommended to install the artificial
turf (14)(Fig.2e) in manageable sizes, referred to as "turf tiles", and to attach
them to the pultrusions with either a hook and loop tape as shown in Fig.2e or with
a water-resistant, removable adhesive. The requirements for such adhesive are that
the turf tiles solidly adhere to the pultrusions, irrespective of temperature and
water influence to assure that under no circumstances the edges lift off and a lawn
board gets caught underneath a turf tile; on the other hand, the adhesive must be
removable for replacement or rotation of turf tiles.
Design Constraints
[0065] The rigidity of the pultrusions imposes a rigid design and precision manufacturing
of the trellis support structure (104)(Fig.1c) and the concrete footings (30)(Fig.2c)
on which the structure rests. To balance out inaccuracies of the concrete footings
or to compensate for settlement in the soil, the concrete footings (30)(Fig.2c) provide
for shim adjustments (80)(Fig.2c).
[0066] Part of that rigid design is that, in Fig.2a, the bottom trellis A-B to C-D is in
the same plain which is tilted around the axis x-x by the tilt angle (102)(Fig.2a).
This has as a consequence that the point C is located higher than point D so that
the lowest point in the ramp is no longer in the center, requiring adjustments in
the water collection system.
2) CONSTRUCTION: IN-GROUND STRUCTURE
[0067] In sloped areas with soft, stable ground and without bedrock, the SurfSlide construction
can be simplified by scooping out the soil and shaping it into an open pipe, then
guniting the shell with "pool building" techniques (Fig.4a).
[0068] Prior to guniting, the water collection channel (106)(Fig.4a) made from pre-cast
concrete, is inserted in the bottom of the excavated open area. Similarly, the gutters
(52)(Fig.4a), water mains (114)(Fig.4b) and other utility conduits are housed in profiled
concrete channels (28)(Fig.4b) positioned on level soil or gravel (88)(Fig.2b) on
both sides of the open pipe.
[0069] The artificial turf (14) is attached as described above. Similarly, all other design
features are identical to the aerial structure. In fact, both versions can be combined
to take the best advantage of a given terrain.
3) CONCLUSIONS,RAMIFICATIONS AND SCOPE
[0070] The reader will see that the SurfSlide invention provides a new
SPORT OF SKILL which consists of controlled movements on a lawn board over an open pipe ramp system
covered with artificial turf. Such sport is usually not limited by geography, terrain
or climate.
[0071] While my above description contains many specifities, these should not be construed
as limitations on the scope of my invention but rather as an explanation of the preferred
embodiments. Many variations are possible such as aerial SurfSlides or in-ground SurfSlides.
Also, other types of vehicles such as inner tubes, sleds or tobbogans can be used
for a ride on the SurfSlide.
[0072] SurfSliding is a sport similar to surfing while executing movements similar to skateboarding
and snowboarding. SurfSliding can be experienced in various geographical locations
and is not confined to the topographical layout of the land. It differs from water
slide amusements in that the
patron participates actively in the ride. It inspires repeat visits to a facility so the patron can improve his/her skills
similar to skiing or snowboarding.
[0073] The configuration of this ramp system can reflect a wide variety of designs and layouts
for various skill levels of surfers. The arrangement of the ramps is only limited
by the imagination of the designer. Deponding on the terrain and the desired degree
of SurfSlide challenge, different cross-sectional designs may be used, ranging from
flat to circular to elliptical or parabolic, lifting or lowering the side walls.
[0074] All components of the SurfSlide ramp system and component parts are constructed from
commercially available materials. Each project engineer can make changes to use materials
available in his area. The open pipes of the invention can be made of straight, hollow
fiberglass pultrusions which are easy to transport over the road.
[0075] Since the open pipe size requirements depend on the customer specifications, the
support structure can become very large. If so, it should be designed for pre- manufacture
of sections which can be transported on regular trucks (no oversize permits and escorts)
and bolted together on-site on prepared concrete pilings.
[0076] The basic riding concepts required to SurfSlide are cross-overs from skateboarding,
skim-boarding, surfing and snowboarding which means that the basic movements are well
established but now applied in a novel manner. A combination of skill and balance
are used to perform maneuvers along a ski slope, an ocean swell, a city street, or
now, along a SurfSlide ramp. The primary mechanics of riding are as follows:
- Balance
- Constant body weight shifting is required to keep on top of and maintain control of
a board. In a fluid and dynamic medium, balance is crucial.
- Skill
- Persistent efforts to ride eventually become learned skills, whereby riders constantly
make maneuvers based on given situations. Skilled riders spontaneously change their
body dynamics to adapt to surface conditions.
- Body
- 1. Stance
Using bent knees, a rider puts one foot forward (steering control) and one foot back
(power and balance). The rider and board form an A-frame for stability and control.
2. Torque
To turn, a rider uses twisting movements of the body, ultimately controlling the board
with the feet. This footwork allows the rider to change directions, using a rail-to-rail
transition flow for board and path control.
- Grace
- Controlled movements allow for the aesthetic flow of turns. This graceful pattern
of riding is known as style. Each individual rider develops his or her own personal
style.
[0077] The fascination of young people with 'boarding' skills leads to competition and offers
a sense of accomplishment which attracts repetitive business for the surf slide operator.
[0078] Accordingly, the scope of the invention should be determined not by the illustrations
provided but by the attached claims and their legal equivalents.
1. A method for surfslide comprising the steps of:
(a) fixing an open pipe ramp system having a top and a bottom and an inner side and
outer side in relation to the ground;
(b) disposing a friction control surface on said inner side of said ramp system;
(c) lubricating said friction control surface of said inner side of said ramp system;
(d) providing for an upwardly opening cross section of said ramp system and downward
and forward slope from said top to said bottom; and
(e) entering means at said top of said ramp system whereby a user or a conveyance
carrying a user enters, travels on said ramp system downwardly over said friction
control surface, the users skills are employed to control direction, speed, and vertical
ability while traveling downwardly on said ramp system until the user exits said ramp
system at said bottom of said ramp system.
2. A surfslide apparatus comprising:
(a) a fixed open pipe ramp system having a top and a bottom and having an inner side
and outer side;
(b) a friction control surface disposed on said inner side of said ramp system;
(c) a lubrication means which flows over said friction control surface of said inner
side of said ramp system;
(d) said ramp system having an upwardly opening cross section and sloping downwardly
and forwardly from said top to said bottom; and
(e) said ramp system having an entrance at said top whereby a user or a conveyance
carrying a user enters, travels on said ramp system downwardly over said friction
control surface, the users skills are employed to control direction, speed, and vertical
ability while traveling downwardly on said ramp system until the user exits said ramp
system at said bottom of said ramp system.
3. An apparatus as claimed in Claim Two which further comprises a friction control surface
which retains the lubricating substance.
4. An apparatus as claimed in Claim Two which further comprises a lubricating means which
affects the friction between said friction control surface and a user or conveyance
carrying a user sliding over said friction control surface.
5. An apparatus as claimed in Claim Two which further comprises:
(a) a fluid inlet system to provide lubrication to the friction control surface arranged
along said ramp system; and
(b) a grid apparatus at the lowest point in the cross section of said ramp system
serving as a collection channel for said lubricating means.
6. An apparatus as claimed in Claim Two which further comprises a means for supporting
said ramp system.
7. An apparatus as claimed in Claim Two which further comprises a lubrication re-circulation
system.
8. An apparatus as claimed in Claim Two which further comprises an attachment means for
adhering the friction control surface to the inner side of the said ramp system.
9. An apparatus as claimed in Claim Two which further comprises mid ramp system having
a plurality of curves and slope increases and decreases as the ramp system is constructed
downwardly and forwardly from top to bottom.
10. An apparatus as claimed in Claim Two which further comprises a means for allowing
a user to travel downwardly through said ramp system either standing erect, sitting,
lying, or kneeling on a conveyance carrier.
11. A surfslide apparatus comprising:
(a) a fixed open pipe ramp system having a top and a bottom and having an inner side
and outer side;
(b) a friction control surface disposed on said inner side of said ramp system;
(c) a lubrication means which flows over said friction control surface of said inner
side of said ramp system;
(d) said ramp system having an upwardly opening cross section and sloping downwardly
and forwardly from said top to said bottom; and
(e) said ramp system having an entrance at said top whereby a user or a conveyance
carrying a user enters, travels on said ramp system downwardly over said friction
control surface, the users skills are employed to control direction, speed, and vertical
ability while traveling downwardly on said ramp system until the user exits said ramp
system at said bottom of said ramp system.
12. An apparatus as claimed in Claim Eleven which further comprises a plurality of open
pipe structures connected together to form said ramp system.
13. An apparatus as claimed in Claim Eleven which further comprises a ramp system having
a first upper wall disposed on the left of the longitudinal axis of said ramp system
and a second upper wall disposed on the right of the longitudinal axis of said ramp
system which allows for a user or conveyance carrying a user to stand or sit and travel
upwardly upon said first upper wall and downwardly again to the center of the ramp
system and then upwardly upon said second upper wall, causing a back and forth motion
as the user travels in a generally downwardly motion to the bottom of said ramp system.