[0001] The present invention relates to a production method of a cylinder block of an internal
combustion engine. More particularly, the present invention relates to a cylinder
block having a cylinder bore surface constructed from metal matrix composite (MMC).
[0002] As illustrated in FIG. 11, a conventional production method for MMC cylinder block
includes the steps of: setting a preheated preform (or formed member) 102 having a
tapered inside surface and a straight outside surface parallel to an axis of the preform
onto a bore core 101 having a tapered outside surface; arranging the bore core such
that it is mounted in a cavity 104 defined by a mold 103; injecting molten metal 105
from an injection cylinder 106; and pressing the injected molten metal by a plunger
107, whereby the molten metal is infiltrated (or impregnated) into the preform 102
from the outside surface of the preform 102 only so that the preform changes to an
MMC. After solidified, the cylinder block cast product is taken out of the mold 103
and the bore core 101, and then the MMC cylinder bore surface is machined to a specified
diameter to form a straight cylindrical cylinder bore.
[0003] However, the conventional production method for MMC cylinder block has the following
problems:
[0004] First, in the conventional production method as illustrated in FIG. 12, there is
a clearance 108 between the bore core 101 and the preform 102. The clearance is caused,
for example, by a difference between the taper angle of the bore core 101 and the
taper angle of the preform 102 and a difference between the temperature of the bore
core (for example, 100 - 200 °C) ad the temperature of the preform (for example, 500
- 900 °C). In a state where the clearance 108 exists, when the molten aluminum is
pressed and is infiltrated into the preform 102 as illustrated in FIG. 13A, cracks
such as crack 109 often develop in the preform 102 as illustrated in FIG. 13B. More
particularly, when circumferential stress in the preform that is caused by a radial
compression force acting on the outside surface of the preform exceeds an allowable
shear stress, a shear fracture 109 develops along a direction inclined by 45 degrees
from the direction of the compression force. Buckling occurs along the fracture surface
and causes a local portion of high density of reinforcement fibers. When a piston-ring
slidably contacts that high density portion during actual engine operation, abrasive
wear of the piston-ring increases.
[0005] Second, the preform 102 is usually manufactured by dipping an air permeable cylindrical
former into a slurry containing reinforcement fibers and particles and aspirating
the slurry water from an interior of the former thereby forming a layer of the reinforcement
fibers and particles on the outside surface of the former. Then, the former and the
layer of the reinforcement fibers and particles are taken out of the slurry and the
layer of the reinforcement fibers and particles is dried to form a preform 102 constructed
from the reinforcement fibers and particles. In the preform 102, the reinforcement
fibers extend in directions perpendicular to a radial direction of the preform to
form a laminar wall. As a result, the separation resistant strength of one layer from
another layer of the laminar wall of the preform is relatively low. As a result, the
crack 109 tends to change the propagation direction to the circumferential direction
of the preform due to the shear stress thereby resulting in a circumferential crack
110 (FIG. 14). When the molten aluminum flows into the crack 110 and solidifies, and
when the crack portion is exposed to the outside during machining, it causes a portion
111 that has no reinforcement fibers. Such portion 111 will cause excessive abrasive
wear and seizure of the piston-ring during actual operation of the engine.
[0006] Third, since the preform 102 is in plane contact with the bore core 101 when it is
set to the mold, the temperature of the preform 102 rapidly decreases. As a result,
the molten aluminum does not tend to infiltrate smoothly into the preform and the
pressure of the molten aluminum rises before the entire portion of the preform is
infiltrated with the molten aluminum, whereby the non-infiltrated portion of the preform
is compressed (or crushed). For smoothly removing the preform from the former, the
inside surface of the preform is tapered (more than 1 degree). Therefore, as illustrated
in FIG. 16, the lower the preform is in the axial direction, the larger the deformation
of the preform is due to compression. When the inside surface of such a deformed preform
is machined, an aluminum portion that has no reinforcement fibers tends to be exposed
to the outside. The exposed portion will cause an excessive abrasive wear and seizure
of a piston-ring during actual operation of the engine.
[0007] An object of the present invention is to provide a production method for a cylinder
block of an internal combustion engine having a cylinder bore surface constructed
from metal matrix composite (MMC) that can solve at least one of the above-described
three problems: the occurrence of a shear crack, a circumferential propagation of
the shear crack, and compression of a portion of the preform.
[0008] The above-described object is achieved by the following present invention:
[0009] A production method for MMC cylinder block of an internal combustion engine according
to the present invention includes the steps of: setting a generally cylindrical preform
having an inside surface and an outside surface in a cavity defined by a mold and
a bore core having an outside surface to form a clearance where molten metal is lead
between the inside surface of the preform and the outside surface of the bore core;
and supplying molten metal into the cavity so that the molten metal is infiltrated
into the preform from both the inside surface and the outside surface of the preform
whereby the preform changes to a metal matrix composite.
[0010] The preform is supported by an upper mold and a lower mold, or is supported by the
bore core at the protrusions formed in the bore core.
[0011] In the above-described cylinder block, since the pressure of the molten aluminum
is imposed on both the inside surface and the outside surface of the preform, the
pressure imposed on the preform is balanced. As a result, cracks due to shear forces
will not develop in the preform and circumferential propagation of such shear cracks
will not occur. Further, since the molten aluminum infiltrates the preform from both
the inside surface and the outside surface of the preform, the entire portion of the
preform is easily infiltrated with the molten aluminum, and there will be no compression
of the non-infiltrated portion of the preform. Furthermore, since the infiltration
speed is high, the preheating temperature of the preform is allowed to be lower than
that of the conventional process.
[0012] Since the preform line-contacts the protrusions of the bore core or the upper and
lower molds, the decrease in temperature of the preform is suppressed.
[0013] The above and other objects, features, and advantages of the present invention will
become more apparent and will be more readily appreciated from the following detailed
description of the preferred embodiments of the present invention in conjunction with
the accompanying drawings, in which:
FIG. 1A is a cross-sectional view of a mold and a preform at a first step (a step
for setting the preform) of a production method for a cylinder block, applicable to
any embodiment of the present invention;
FIG. 1B is a cross-sectional view of the mold and the preform at a second step (a
step for pouring molten metal) of the production method for a cylinder block, applicable
to any embodiment of the present invention;
FIG. 1C is a cross-sectional view of the mold and the MMC layer at a third step (a
step for removing a cast product from the mold and the bore core) of the production
method for a cylinder block, applicable to any embodiment of the present invention;
FIG. 1D is a cross-sectional view of the mold and the MMC layer at a fourth step (a
step for machining a cylinder bore surface of the cast product) of the production
method for a cylinder block, applicable to any embodiment of the present invention;
FIG. 2 is a graph of molten metal pressure versus time, applicable to any embodiment
of the present invention;
FIG. 3 is a cross-sectional view of an apparatus for conducting a method according
to a first embodiment of the present invention;
FIG. 4 is a plan view of the apparatus of FIG. 3 viewed in direction P;
FIG. 5 is a cross-sectional view of an apparatus for conducting a method according
to a second embodiment of the present invention;
FIG. 6 is an oblique view of a bore core for conducting a method according to a third
embodiment of the present invention;
FIG. 7 is a cross-sectional view of an apparatus for conducting a method according
to a fourth embodiment of the present invention;
FIG. 8 is a cross-sectional view of a portion of an apparatus for conducting a method
according to a fifth embodiment of the present invention;
FIG. 9 is a cross-sectional view of a bore core having protrusions for conducting
a method according to a sixth embodiment of the present invention;
FIG. 10 is a partial, cross-sectional view of the bore core and the protrusion of
FIG. 9;
FIG. 11 is a cross-sectional view of an apparatus for conducting a conventional production
method for a cylinder block;
FIG. 12 is a cross-sectional view of a bore core and a preform for conducting the
conventional method;
FIG. 13A is a cross-sectional view of a portion of the preform on which a compression
force is imposed;
FIG. 13B is a cross-sectional view of the portion of the preform where a crack due
to a shear force is caused;
FIG. 14 is a cross-sectional view of a portion of a preform where a circumferential
crack is caused;
FIG. 15 is an oblique view of a portion of the preform where a circumferential crack
is caused and is exposed to outside when machined; and
FIG. 16 is a cross-sectional view of a portion of a cast cylinder block illustrating
a compression of the preform.
[0014] FIGS. 1A - 1D and FIG. 2 illustrate a production method for a cylinder block of an
internal combustion engine applicable to any embodiment of the present invention;
FIGS. 3 - 4 illustrate a method according to a first embodiment of the present invention;
FIG. 5 illustrates a method according to a second embodiment of the present invention;
FIG. 6 illustrates a method according to a third embodiment of the present invention;
FIG. 7 illustrates a fourth embodiment of the present invention; FIG. 8 illustrates
a fifth embodiment of the present invention; FIGS. 9 and 10 illustrate a sixth embodiment
of the present invention. Portions common or similar to all of the embodiments of
the present invention are denoted with the same reference numerals throughout all
of the embodiments of the present invention.
[0015] First, portions common or similar to all of the embodiments of the present invention
will be explained with reference to FIGS. 1A - 1D and FIG. 2.
[0016] A production method for a cylinder block of an internal combustion engine according
to the present invention includes a first step and a second step.
[0017] At the first step, as illustrated in FIG. 1A, a generally cylindrical, preheated,
preform 2 having an inside surface 2a and an outside surface 2b is set in a cavity
4 defined by a mold 3 which includes a bore core 1 having an outside surface 1a so
that a clearance 8 where molten metal is lead is formed between the inside surface
2a of the preform 2 and the outside surface 1a of the bore core 1. In order that molten
metal can smoothly flow in the clearance 8, it is preferable that the clearance 8
has a thickness equal to or greater than 0.5 mm. The clearance 8 is formed throughout
an entire circumference of the inside surface of the preform 2, except portions where
protrusions contact the bore core 1 in a case where the preform is supported by the
bore core.
[0018] At the second step, as illustrated in FIG. 1B, molten metal 5 (molten aluminum) is
supplied into the cavity 4 so that the molten metal 5 is infiltrated into the preform
2 from both the inside surface 2a and the outside surface 2b of the preform 2 whereby
the preform 2 changes to a metal matrix composite (MMC).
[0019] As illustrated in FIGS. 1C and 1D, the production method for a cylinder block according
to the present invention may include a third step and a fourth step.
[0020] At the third step, as illustrated in FIG. 1C, a cylinder block cast product 9 is
taken out of the mold 3 and the bore core 1 after the molten metal has solidified.
[0021] At the fourth step, as illustrated in FIG. 1D, a cylinder bore surface of metal matrix
composite of each cylinder bore of the cylinder block cast product 9 is machined to
a specified diameter.
[0022] In FIGS. 1A - 1D, the molten metal is injected into the cavity 4 by an injection
cylinder 6 having a plunger tip 7. Though the bore core 1 and the preform 2 are arranged
laterally in the molding apparatus, the bore core 1 and the preform 2 may be arranged
vertically. The molten metal is, for example, molten aluminum, though the molten metal
is not limited to molten aluminum.
[0023] The preheating temperature of the preform 2 may be lower than that of the conventional
one. More particularly, while the preheating temperature of the conventional method
was about 700 °C when the preform was taken out of the preheating furnace or was set
to the mold, the preheating temperature of the preform 2 according to the present
invention is equal to or higher than 300 °C and lower than 700 °C. Though the temperature
of the bore core 1 is lower than the temperature of the preform and is, for example,
100 - 200 °C, since a decrease in the temperature of the preform 2 is delayed due
to the clearance 8 between the preform 2 and the bore core 1, the temperature of the
preform 2 can be relatively low.
[0024] FIG. 2 illustrates a relationship between a change in the pressure of the molten
metal and beginning and completion of the infiltration of the molten metal into the
preform during the second step. During a certain period of time A when the molten
metal is being supplied into the cavity, the pressure of the molten metal in the cavity
almost does not increase. At the time B when the molten metal has just filled the
cavity, the pressure of the molten metal in the cavity begins to increase suddenly.
At the time C when the pressurizing has been completed, the pressure of the molten
metal in the cavity is about 750 - 850 kg/cm
2 (73.5 - 83.3 MPa). At an early stage of the pressure increasing period of time from
the point B, infiltration of the molten metal into the preform 2 will be completed.
In the case where the pressure of the molten metal is imposed on the preform from
a radially outside surface of the preform, like in the conventional method, a crack
due to a shear force will occur at about 3 kg/cm
2 (0.294 MPa). In contrast, in the present invention, since the pressures acting on
the outside surface and the inside surface balance or almost balance with each other,
a crack due to a shear force does not happen throughout the pressure increasing period
from point B to point C in FIG. 2.
[0025] Effects of the above-described portion common or similar to all of the embodiments
of the present invention will be explained.
[0026] Since the clearance 8 between the preform 2 and the bore core 1 is formed throughout
the entire circumference of the preform 2, the pressure of the molten metal is imposed
on both the inside surface 2a and the outside surface 2b of the preform 2. Since the
pressures acting on the inside and outside surfaces of the preform 2 balance with
each other, no crack due to a shear force is caused to occur unlike the conventional
case where a shear crack 109 shown in FIG. 13B is caused along a plane inclined by
45 degrees from the circumferential direction of the preform.
[0027] Further, a circumferential crack 110 shown in FIG. 14 that initiates at an end of
the propagating shear crack will not be caused to occur because the shear crack itself
does not occur and because the preform 2 is pressed from both the inside and outside
surfaces of the preform and therefore no separating force acting between the layers
of the reinforcement fibers will result.
[0028] Furthermore, unlike the conventional case, a radially inner portion of the preform
is unlikely to be crushed. The reason is as follows:
[0029] Generally, if the preform has enough strength to endure a pressure equal to or greater
than the pressure at the time when infiltration of the molten metal into the preform
has just been completed, crushing of the preform will not occur. However, in the case
of the conventional method, since the pressure at the time when infiltration of the
molten metal into the preform has just been completed is high, it is difficult to
prevent crushing of the preform. More particularly, when the molten metal is infiltrating
the preform, the temperature of the tip portion of the molten metal will be decreased
so that the viscosity of the tip portion of the molten metal will be increased. A
portion close to the bore core, of the preheated preform is cooled by the bore core
and the decrease in temperature of the molten metal at that portion of the preform
close to the bore core is large. The molten metal will solidify at that portion of
the preform so that a large pressure of the molten metal will act on the radially
inner portion of the preform.
[0030] In contrast, with the method according to the present invention, due to the clearance
8 provided between the bore core 1 and the inside surface of the preform 2, the following
effects are caused:
(1) Because the preform 2 does not contact the bore core 1 or a contact surface of
the preform 2 with the bore core 1 is minimized, the temperature of the preheated
preform 2 is unlikely to decrease easily;
(2) Because the molten metal infiltrates into the preform 2 from both of the inside
and outside surfaces of the preform 2, the distance by which the molten metal has
to infiltrate into the preform before crushing of the preform begins is allowed to
be a half of that of the conventional case.
(3) Because the molten metal infiltrates into the preform from not only the outside
surface but also the inside surface of the preform, the surface area through which
the molten metal infiltrates into the preform is increased. As a result, the molten
metal can easily infiltrate into the preform and a distance by which the molten metal
infiltrates into the preform can be large.
[0031] Because of these reasons, compression of the preform is unlikely to occur.
[0032] Portions unique to each embodiment of the present invention will now be explained.
[0033] With the first embodiment of the present invention, as illustrated in FIGS. 3 and
4, at the first step, the preform 2 is supported by and squeezed between a fixed mold
3a and a movable mold 3b of the mold 3. The preform 2 does not contact the bore core
1, and the clearance 8 is formed throughout the entire circumference of the preform
2. The fixed mold 3a includes a cylinder block journal forming portion 3c having opposite
surfaces. In order to introduce the molten metal 5 (see FIGS. 1A and 1B) into the
clearance 8, an opening 3d for introducing a portion of the molten metal 5 to the
clearance 8 inside of the preform 2 is formed between an upper end of each of the
opposite surfaces of the cylinder block journal forming portion 3c and a lower end
of the inside surface of the preform 2. The bore core 1 is supported by the movable
mold 3b and is moved together with the movable mold 3b.
[0034] An effect of the first embodiment of the present invention is as follows:
[0035] With the conventional method where a preform 2 is supported by a bore core 1, there
are various problems. More particularly, if a foreign substance is attached to the
bore core 1, the preform 2 may not be able to be set onto the bore core 1. If the
molten metal cannot enter the clearance formed between the bore core 1 and the preform
2, the preform 2 may be destroyed. If the clearance is too small, the preform may
be destroyed during setting. In contrast, in the present invention, because the preform
2 is supported by the movable mold 3b and the fixed mold 3a, the above-described problems
are solved.
[0036] With the second embodiment of the present invention, as illustrated in FIG. 5, the
bore core 1 has at least one protrusion 11 which protrudes radially outwardly from
the outside surface 1a of the bore core 1 and which is integral with the bore core
1. At the first step, the preform 2 is supported by the bore core 1 at the protrusion
11. The preform 2 and the protrusion 11 line-contact or point-contact with each other.
The clearance 8 is interrupted at the protrusion 11. The shape of the protrusion 11
is selected not to prevent the molten metal from filling the clearance 8.
[0037] With an effect of the second embodiment of the present invention, since the preform
2 is supported by the bore core 1 via the protrusion 11, it is easy to control the
thickness of the clearance 8. As a result, the thickness of the clearance 8 can be
controlled to about 0.5 mm which is a minimum thickness to ensure smooth filling of
the molten metal, whereby the amount of machining of the cylinder bore after casting
is minimized.
[0038] With the third embodiment of the present invention, as illustrated in FIG. 6, the
bore core 1 has a plurality of protrusions which protrude from the outside surface
1a (FIG. 3) of the bore core and which are integral with the bore core 1. The protrusions
extend in an axial (longitudinal) direction of the bore core 1. At the first step,
the preform 2 is supported by the bore core 1 via the protrusions 11. Preferably,
the number of the protrusions is equal to or more than three. The preform and the
protrusions 11 line-contact with each other.
[0039] With an effect of the third embodiment of the present invention, since the protrusions
extend in the axial direction of the bore core 1, the protrusions do not prevent the
molten metal from flowing in the clearance 8 in the axial direction of the bore core
1. However, each clearance portion between the protrusions has to communicate with
the opening (3d in FIG. 4) for introducing the molten metal to the clearance.
[0040] With the fourth embodiment of the present invention, as illustrated in FIG. 7, the
bore core 1 has at least one protrusion 11 protruding radially outwardly from the
outside surface 1a of the bore core. The protrusion 11 extends in an axial (longitudinal)
direction of the bore core 1.
[0041] A portion of the bore core facing a cylinder block portion between adjacent cylinder
bores (a portion of the bore core facing a cylinder block portion located on a line
connecting centers of adjacent cylinder bores) is necessarily provided with the at
least one protrusion 11.
[0042] The at least one protrusion 11 is omitted from the outboard portion of each of outboard
two bore cores of multi-bore cores arranged in a longitudinal direction of a cylinder
block. At the first step, the preform 2 is supported by the bore core 1 at the at
least one protrusion 11. The preform 2 and the at least one protrusion 11 line-contact
with each other. There is a clearance 8 except at the at least one protrusion.
[0043] With an effect of the fourth embodiment of the present invention, when the molten
metal passes through a portion of the cavity between adjacent cylinder bores, the
molten metal is throttled and imposes a greater pressure on the preform 2 at the throttle
portion than other portions. However, since the preform 2 is necessarily supported
by the protrusion 11, fracture of the preform 2 is prevented.
[0044] In the case where the bore core 1 is provided with the protrusion 11, aluminum adheres
to the tip of the protrusion 11 and, as a result, it becomes difficult to set a preform
member 2 to the protrusion at the next molding cycle. Since adhesion of aluminum resulting
in seizure of the mold product with the protrusions occurs due to shrinkage at solidification
of the cast material, it tends to occur at the longitudinal opposite ends of the cylinder
block. However, in the present invention, since the protrusions 11 at the outboard
portions at the outboard bore cores are omitted, adhesion and solidification of aluminum
to the protrusions is unlikely to occur.
[0045] With the fifth embodiment of the present invention, as illustrated in FIG. 8, the
bore core 1 has a plurality of protrusions 11 protruding radially outwardly from the
outside surface 1a of the protrusion 1. The protrusions extend in the axial (longitudinal)
direction of the bore core 1. One 11' of the protrusions 11 is also provided at an
outboard portion of each of outboard two bore cores of multi-bore cores arranged in
a longitudinal direction of a cylinder block. The outboard protrusion 11' has a height
that is lower than heights of two protrusions adjacent to the outboard protrusion
11' and that protrudes outboard from a line connecting tips of the two protrusions
adjacent to the outboard protrusion 11'. At the first step, the preform 2 is supported
by the bore core 1 at the protrusions 11. There is a clearance 8 except at the protrusions
11.
[0046] With an effect of the fifth embodiment of the present invention, the two outboard
protrusions 11' are not used for supporting the preform 2. The protrusions 11 adjacent
to the outboard protrusion 11' are used for supporting the preform 2. The outboard
protrusion 11' is a dummy protrusion to which molten aluminum is caused to adhere
thereby preventing much aluminum from adhering to the protrusions adjacent to the
outboard protrusion 11' and preventing an excessive shrinkage force from acting on
the protrusions 11 adjacent to the outboard protrusion 11'. Even if aluminum adheres
to the outboard protrusion 11', since the outboard protrusion 11' is low in height,
it is easy to remove the cast product from the protrusion 11' and no problem will
arise during-setting a preform to the core bore at the next cycle.
[0047] With the sixth embodiment of the present invention, as illustrated in FIGS. 9 and
10, the protrusion (protruding member) 11 is formed separately from the bore core
1 and is mounted to the bore core 1 so as to be movable in a radial direction of the
bore core 1. A tapered member 12 is provided between the protrusion 11 and a groove
formed in the bore core 1 so as to be slidable relative to the bore core 1 and the
protrusion 11. By moving the tapered member 12 in the axial direction of the bore
core 1, the protrusion 11 is moved in the radial direction of the bore core 1 so that
the protruding height of the protrusion 11 from the outside surface 1a of the bore
core 1 is adjusted.
[0048] With an effect of the sixth embodiment of the present invention, during setting the
preform 2 to the bore core 1 and during supplying the molten metal to the cavity,
the protrusion 11 is adjusted to take a most protruding position. While removing the
cast product from the mold and bore core 1, the protrusion 11 is adjusted to take
a most receding position, whereby the removing resistance is small and the cast product
can be smoothly removed.
[0049] According to the present invention, the following technical advantages are obtained:
[0050] First, since the clearance 8 is formed between the preform 2 and the core bore 1,
the pressures at the inside surface and the outside surface of the preform 2 balance
with each other. As a result, a crack due to a shear force is unlikely to be caused
in the preform 2, and a circumferential crack initiating a tip of the shear crack
will not happen. Further, the molten metal can infiltrate into the preform from the
inside and outside surfaces of the preform 2, compression of a portion of the preform
in the thickness direction of the preform is unlikely to occur. Furthermore, due to
the clearance 8, the temperature decrease of the preform 2 is suppressed and, as a
result, the preheating temperature of the preform 2 is allowed to be low compared
with the conventional method.
[0051] Second, in the case where the preform is supported by the upper mold and the lower
mold, the preform 2 does not contact the bore core 1. As a result, the preform 2 does
not need to be tapered, and the preform 2 is allowed to be formed as thin as possible.
[0052] Third, in the case where the preform 2 is supported by the bore core 1 at the protrusion
11, the thickness of the clearance 8 can be controlled substantially exactly to a
specified thickness.
[0053] Fourth, in the case where the protrusion 11 extends axially in the bore core 1, the
protrusion 11 does not prevent the molten metal from flowing into the clearance 8.
[0054] Fifth, in the case where the protrusion 11 is necessarily provided at a portion of
the bore core 1 facing a portion of the cylinder block between adjacent cylinder bores,
when a relatively large pressure of the molten metal flowing the portion between the
cylinder bores acts on the preform 2, the preform can endure the pressure.
[0055] Sixth, in the case where the protrusion 11 is not provided at the outboard portion
of the outboard bore core 1, even if the cylinder block material (cast product) causes
a shrinkage in the longitudinal direction of the cylinder block, sticking at the tip
of the outboard protrusion does not occur.
[0056] Seventh, in the case where the outboard protrusion is formed to have a low height,
sticking at the tips of the protrusions adjacent to the outboard protrusion is prevented,
and sticking at the tip of the outboard protrusion itself is prevented.
[0057] Last, in the case where the protrusion is formed separately from the bore core 1
and is mounted to the bore core 1 so as to be movable in the radial direction relative
to the bore core 1, by receding the protrusion during removing the cast product from
the bore core 1 and the mold, sticking at the tip of the protrusion can be effectively
prevented.
[0058] A production method for a cylinder block of an internal combustion engine includes
a first step and a second step. At the first step, a preform (2) having an inside
surface (2a) and an outside surface (2b) is set to a bore core (1) so that a clearance
(8) is formed between the inside surface (2a) of the preform and an outside surface
(1a) of the bore core (1). At the second step, a molten metal (5) is supplied into
a cavity (4) so that the molten metal (5) infiltrates into the preform (2) from both
the inside surface (2a) and the outside surface (2b) of the preform (2) thereby changing
to a metal matrix composite, which constitutes an inside surface of a cast cylinder
block.
1. A production method for a cylinder block of an internal combustion engine comprising:
setting a generally cylindrical preform (2) having an inside surface (2a) and an outside
surface (2b) in a cavity (4) defined by a mold (3) which includes a bore core (1)
having an outside surface (1a) so that a clearance (8) where molten metal (5) is lead
is formed between said inside surface (2a) of said preform (2) and said outside surface
(1a) of said bore core (1); and
supplying molten metal (5) into said cavity (4) so that said molten metal (5) infiltrates
said preform (2) from both said inside surface (2a) and said outside surface (2b)
of said preform (2) whereby said preform (2) changes to a metal matrix composite.
2. A method according to claim 1 further comprising:
taking a cylinder block cast product (9) out from said mold (3) and said bore core
(1) after said molten metal (5) has solidified; and
machining a cylinder bore surface of metal matrix composite of each cylinder bore
(1) of said cylinder block cast product (9) to a specified diameter.
3. A method according to claim 1, wherein during said setting, said preform (2) is preheated
to a temperature equal to or higher than 300 °C and lower than 700 °C.
4. A method according to claim 1, wherein during said setting, said clearance (8) has
a thickness equal to or greater than 0.5 mm.
5. A method according to claim 1, wherein said mold (3) includes a fixed mold (3a) and
a movable mold (3b) and wherein during said setting, said preform (2) is supported
between said fixed mold (3a) and said movable mold (3b).
6. A method according to claim 5, wherein said clearance (8) is formed throughout an
entire circumference of said preform (2).
7. A method according to claim 5, wherein said fixed mold (3a) includes a cylinder block
journal forming portion (3c) having opposite surfaces, and wherein an opening (3d)
for introducing a portion of said molten metal (5) to said clearance (8) inside of
said preform (2) is formed between an upper end of each of said opposite surfaces
of said cylinder block journal forming portion (3c) and a lower end of said inside
surface of said preform (2).
8. A method according to claim 1, wherein said bore core (1) has at least one protrusion
(11) protruding outwardly from said outside surface (1a) of said bore core (1) in
a radial direction of said bore core (1), and wherein said preform (2) is supported
by said bore core (1) at said at least one protrusion (11).
9. A method according to claim 8, wherein said clearance (8) is formed along a circumference
of said preform (2) except at said least one protrusion (11).
10. A method according to claim 8, wherein said at least one protrusion (11) is a plurality
of protrusions (11) that are spaced from each other in a circumferential direction
of said bore core (1), each protrusion (11) extending in an axial direction of said
bore core (1).
11. A method according to claim 10, wherein a total number of said plurality of said protrusions
(11) per cylinder bore is equal to or more than three.
12. A method according to claim 8, wherein a portion of said bore core (1) facing a cylinder
block portion between adjacent cylinder bores (1) is necessarily provided with said
at least one protrusion (11).
13. A method according to claim 8, wherein said at least one protrusion (11) is omitted
from an outboard portion of each of outboard two bore cores of multi-bore cores arranged
in a longitudinal direction of a cylinder block.
14. A method according to claim 8, wherein said at least one protrusion (11) is at least
two protrusions (11) in which one protrusion (11') is disposed at an outboard portion
of each of two outboard bore cores of multi-bore cores arranged in a longitudinal
direction of a cylinder block and wherein said outboard protrusion (11') has a height
that is lower than heights of two protrusions adjacent to said outboard protrusion
(11') and that protrudes outboard from a line connecting tips of said two protrusions
adjacent to said outboard protrusion (11').
15. A method according to claim 8, wherein said at least one protrusion (11) is formed
separately from said bore core (1) and wherein said at least one protrusion (11) is
supported movably in a radial direction of said bore core (1) so that a protrusion
height of said at least one protrusion (11) from said outside surface (1a) of said
bore core (1) is changeable.