[0001] The present invention relates to a scaffold anchor system for the maintenance, restoration,
restructuring of buildings.
It is well known that the difficulties arising from the anchorage of the provisional
stages to buildings to be subjected to maintenance and/or restructuring make such
works particularly heavy as far as both time and money is concerned.
The current methods for anchoring scaffolds to the building frame usually consist
in embedding irons into the wall, anchoring the scaffold to any overhangs of the building
frame, using big screws to be screwed into the frame jambs, etc.
[0002] The present invention aims at providing a device allowing a quick anchoring of scaffolds
and/or stages to a building by common anchor screw and/or chemical dowels that can
remain in their positions after the installation for a later use.
The device according to the invention is provided with a member whose length can be
adjusted according to the distance between the front of the building and the scaffold
to be anchored, such an adjustable member being able to be subjected to tensile stress
between a suitable anchor means connected to the scaffold and a dowel embedded into
the wall.
[0003] According to a particular feature of the present invention the above-mentioned adjustable
member is provided with quick-coupling-and-release means that simplifies and speeds
up both scaffold assembling and disassembling operations.
In order to efficiently anchor a scaffold to a building it is sufficient to install
a series of devices according to the invention in different points of the scaffold
at different heights so that a plurality of anchorings distributed all over the front
of the building is provided.
[0004] A better understanding of the invention will ensue from the following detailed description
with reference to the annexed drawings that show only by way of a not limiting example
a preferred embodiment of the invention.
In the drawings:
Fig. 1 is a top plan view of the device according to the invention installed between
a scaffold and the front of a building;
Fig. 2 is an elevation side view of the device of Fig. 1;
Figs. 3 and 4 are exploded plan and elevation views of the described device; and
Fig. 5 is an elevation side view of the device in non-operating conditions.
[0005] With reference to the figures, the device according to the invention includes essentially
an anchor screw or a chemical dowel 1 to be secured to the wall or front F of the
building, a clamping means 4 secured to scaffold P, and two rigid members 2, 3 capable
of co-operating with each other to perform the function of a tension rod between anchor
screw 1 embedded into the building and clamping means 4 secured to the scaffold. Particularly,
anchor screw 1 is provided with an inside longitudinal (female) thread 1A from its
outer end to the inside of the building. Such a female thread 1A is able to engage
a corresponding longitudinal male thread 2A arranged at one end of rigid member 2
which is provided with another but opposite handed thread 2B parallel to thread 2A.
Rigid member 3 is provided with a thread which is capable of engaging thread 2B of
rigid member 2, its free end having two projecting side flanges 6 able to engage clamping
means 4 secured to the scaffold.
In other words, the top plan view of rigid member 3 is that of a "T"-shaped bolt with
threaded shank and very short, squared flanges 6.
Clamping means 4 is essentially provided with a clamp formed of two half collars connected
by two bolts which are similar to those currently used for securing to one another
the tubular members forming the scaffolds.
[0006] This device can be very easily and quickly assembled. In fact, rigid member 3 is
first coupled to one of the half collars forming clamping member 4 and then both half
collars are clamped to the scaffold which is being raised. At this point, rigid member
2 is partially screwed to rigid member 3, as shown in fig. 5, whereupon free threaded
end 2A is screwed to anchor bolt 1 which has been previously embedded into the building.
The tension rod formed by the coupling of the components 1, 2, 3 and 4 can be adjusted
according to the distance between the tubular scaffold members and wall F by rotating
rigid member 2 so that a safe and stable anchoring of the scaffold to the wall can
be accomplished.
In order to facilitate the rotation of rigid member 2, its peripheral portion 5 is
provided with at least two diametrically opposed flat surfaces that are parallel to
the longitudinal axis of rigid member 2 itself so that an adjustable spanner can be
engaged and used. It is obvious that, as an alternative, the outer surface of rigid
member 2 may be provided with a polygonal section (having an even number of sides)
to which an adjustable spanner or the like can be engaged.
[0007] A first advantage over the known art is that the assembling and the disassembling
of the scaffold is made easier and faster owing to the simplicity by which the single
anchor elements are coupled and quickly released by screwing and unscrewing threads
and the fact that the T-shaped head of rigid member 3 can be released from the half
collar of clamping means 4 only by axially rotating the same by 90°.
A second advantage of the invention is that the anchoring device can be locked in
its position by a suitable nut screwed to the shank of rigid member 3 which is tightened
against the end of rigid member 2 after the adjustment.
A third advantage of the invention is given by the fact that the future assembling
of a scaffold requires less time and work because the anchor screws remain in their
seats embedded into the front wall and then are available for future use. In this
connection, it should be appreciated that the next scaffolds to be raised can be completely
or partially erected without impairing their stability and safety.
Still another advantage of the invention is given by the fact that as the next assembling
does not require any hole for the anchor screws (which have been already embedded
into the wall), the front of the building does not need any finishing after disassembling
the scaffolds.
[0008] The present invention has been described and illustrated according to a preferred
embodiment thereof, however, it should be understood that those skilled in the art
can make modifications and/or equivalent replacements without departing from the scope
of the present invention.
1. A device for quickly anchoring scaffolds, stages and provisional frames to buildings,
wherein it includes in combination an anchor screw or chemical dowel (1) which can
be embedded into the building frame, a clamping means (4) which can be secured to
the scaffold, and a rigid member (2, 3) having an adjustable length and being able
to be subjected to a tensile stress between said anchor screw (1) and said clamping
means (4) which is secured to scaffold (P) by quick-coupling/release means (6) so
as to perform the function of a tension rod between the building and scaffold (P)
which is thus anchored to the front (F) of the building.
2. The device for quickly anchoring scaffolds to buildings of claim 1, characterized
in that said rigid member with adjustable length has two rigid portions (2, 3) capable
of co-operating with each other to perform the function of a tension rod between anchor
screw (1) embedded into front (F) of the building and clamping means (4) secured to
scaffold (P).
3. The device for quickly anchoring scaffolds to buildings of the preceding claims, characterized
in that anchor means (1) is provided with an inside longitudinal female thread (1A)
from its outer end to the inside of the building, said thread (1A) being able to engage
a corresponding longitudinal male thread (2A) arranged at one end of rigid member
(2).
4. The device for quickly anchoring scaffolds to buildings of the preceding claims, characterized
in that rigid member (2) is provided with another but opposite handed thread (2B)
parallel to thread (2A).
5. The device for quickly anchoring scaffolds to buildings of the preceding claims, characterized
in that said rigid member (3) is provided with a thread which is capable of engaging
thread (2B) of rigid member (2), said quick-coupling/release means being formed of
two projecting side flanges (6) arranged at its free end and able to quickly engage
to or disengage from clamping means (4) secured to the scaffold.
6. The device for quickly anchoring scaffolds to buildings of the preceding claims, characterized
in that the top plan view of rigid member (3) is that of a "T"-shaped bolt with threaded
shank and very short, squared flanges (6).
7. The device for quickly anchoring scaffolds to buildings of the preceding claims, characterized
in that clamping means (4) is essentially provided with a clamp formed of two half
collars connected by two bolts which are similar to those currently used for securing
to one another the tubular members forming the scaffolds.
8. The device for quickly anchoring scaffolds to buildings of the preceding claims, characterized
in that tension rod (1, 2, 3 and 4) can be adjusted according to the distance between
the tubular scaffold members and the building wall by rotating rigid member (2) so
that a safe and stable anchoring of the scaffold to the wall can be accomplished.
9. The device for quickly anchoring scaffolds to buildings of the preceding claims, characterized
in that in order to facilitate the rotation of rigid member (2), its peripheral portion
(5) is provided with at least two diametrically opposed flat surfaces which are parallel
to the longitudinal axis of rigid member (2) itself so that an adjustable spanner
can be engaged and used.