BACKGROUND OF THE INVENTION:
[0001] One method for developing and producing hydrocarbons from deep water oil fields,
is to provide a fixed platform. Such fixed platforms may have drilling equipment as
well as hydrocarbon processing equipment (e.g. to separate stones, sand, etc. from
hydrocarbons, separate gas from oil, and burn or reinject gas). However, in deep waters
such fixed platforms are enormously expensive, with costs sometimes exceeding one
billion dollars.
[0002] A lower cost approach for developing and producing from deep undersea oil fields,
involves the use of a TLP (tension leg platform). A large platform floats at the sea
surface and is anchored by a group of tendons that extend vertically to the seafloor.
The tendons are under high tension, produced by the large buoyant platform, which
results in very little drift of the platform. As wells are drilled and fluid-carrying
risers are connected between the seafloor well and the platform, such risers must
be placed in tension to prevent them from repeatedly scraping against one another
or a tendon. Present platforms are massive, with presently installed TLP's having
a net displacement of between 20,000 tons and 300,000 tons (40,000 kips to 600,000
kips, where kips stands for thousands of pounds, or 18,000 MT to 540,000 MT where
MT stands for metric tons), with the tendons producing perhaps one-quarter of the
platform displacement (e.g. 5,000 to 75,000 tons, or 4500 to 68000 MT). The net weight
of the platform out of the water may be at least 65% to 80% of the rest of the displacement.
Such large TLP's carry substantially the same type of equipment as a fixed platform,
including hydrocarbon processing equipment and permanent quarters for a crew to service
the various equipment. Such TLP systems may include perhaps twenty wells, and perhaps
twenty corresponding fluid-carrying risers which must be tensioned.
[0003] The tension for fluid-carrying hydrocarbon-producing risers may be perhaps 100 tons
(91 MT) each, which is much less than 1% of prior total platform displacement (at
least 20,000 tons = 18,000 MT). A complement of 20 risers results in an additional
downward force of perhaps 2,000 tons (1800 MT) on the platform of the TLP system,
which is no more than 10% of the platform displacement. Such relatively small riser-caused
load on a prior platform may be ignored, or may be taken by an initial slightly increased
tendon load. Thus, when the risers are added, perhaps one at a time or in groups of
a few, there is not much effect on the system, and the system need not be compensated
as risers are added. However, such systems are still expensive (even though less than
a fixed platform), and a system which was of much less cost than existing TLP systems,
would be of considerable value.
[0004] US 4,913,238 shows a floating/tensioned production system for use in deep-water drilling
and production operations generally combining a relatively small tension leg platform
with a semi-submersible platform. The semi-submersible platform is provided with a
working deck supported above the water surface so that an air gap exists between the
working deck and the water surface. The tension leg platform provides a heave-restrained
production deck for near surface wellhead equipment. The production deck is supported
above the drill site but beneath the water surface by buoyancy members and held in
place by one or more letters.
SUMMARY OF THE INVENTION
[0005] In accordance with the present invention, a TLP (tension leg platform) system and
method for operating such system are provided, according to claims 1 and 7. The platform
may have a relatively small displacement such as 6,000 tons (5500 MT), and be anchored
with correspondingly lightweight tendons which apply a load such as 1,200 tons (1100
MT). As a result, the load applied by a full complement (e.g. 20) of risers is significant,
as it may amount to perhaps 2,000 tons (1800 MT), which is more than 20% and usually
more than 30% of the total platform displacement. Each riser may apply a load such
as 100 tons (91 MT), which is more than 1% of the total platform displacement. Applicant
compensates for the load applied by each additional riser, by initially establishing
the platform with flooded buoyancy chambers, and by adding buoyancy when each riser
is attached, to compensate for the riser-added load. The platform may carry a drill/workover
rig that can be moved to different locations. Buoyancy can be added to where the rig
is moved and reduced from where the rig was moved, to avoid over and under tensioning
of tendons and risers.
[0006] The novel features of the invention are set forth with particularity in the appended
claims. The invention will be best understood from the following description when
read in conjunction with the accompanying drawings.
BRIEF DESCRIPTION OF THE DRAWINGS
[0007]
FIG. 1 is an isometric view of a TLP (tension leg platform) of the present invention,
showing one of the risers being installed, and also showing a maintenance boat.
FIG. 2 is an isometric view of the platform of the system of FIG. 1.
FIG. 3 is a partial section side view of the system of FIG. 1, showing how the buoyancy
of the platform is changed.
FIG. 4 is an enlarged view of a portion of FIG. 3, showing a hydrocarbon production
tree thereof.
FIG. 5 is a sectional view of a tendon and of a riser of the system of FIG. 1.
FIG. 6 is a side elevation view of an oil production complex which includes the system
of FIG. 1.
DESCRIPTION OF THE PREFERRED EMBODIMENT
[0008] FIG. 1 illustrates a TLP (tension leg platform) system 10 which includes a platform
12 that floats at the sea surface 14 and which is anchored largely by groups of tendons
16. The tendons extend substantially vertically from each of four comers 21 - 24 of
the platform down to the seafloor 26. The tendons are connected to a template 30 that
is anchored to the seafloor. The particular system includes twelve tendons arranged
in groups of three at each of the corners of the platform and of the template. The
template has wellhead couplings 32 arranged at the sides of the square template 30,
to which risers such as 34 are connected. The system is initially setup as shown in
FIG. 1, with only the tendons 16 extending down to the seafloor. Wells 31 may be drilled
in the seafloor through the wellhead couplings 32, and risers such as riser 34 are
then installed, which have lower ends 36 connected to the seafloor at the template
30, and upper ends 38 coupled to the platform. Both the platform and template are
of substantially rectangular shape as seen in a plan view.
[0009] As shown in FIG. 3, the upper end 38 of the riser 34 extends through an aperture
40 in the lower portion 42 of the platform, through the water line or sea surface
14, and to an upper part 44 of the platform which lies above the sea surface. A hydrocarbon
production tree 50 is mounted on the upper portion 44 of the platform to lie above
the sea surface. As shown in applicant's FIG. 4, the tree 50 has various valves such
as 52, 54 and pipe couplings, where well effluent can be removed for processing, and
through which gas might be reinjected, control signals (in the form of fluid pulses)
can be delivered to downhole equipment to operate a valve thereat, etc.
[0010] It is important that the risers 34 and tendons 16 be kept under a substantial tension,
so they cannot whip about and strike one another. Tension in the risers is established
by a rig 150 (FIG. 1). After a riser is tensioned, a stopper 56 (FIG. 4) thereafter
maintains the tension. The tendons are tensioned by deballasting the TLP (by pumping
air into water-filled chambers) when the TLP system is initially installed.
[0011] Applicant constructs the platform 12 (FIG. 1) so it is of relatively light weight
and correspondingly small displacement, with the particular platform shown being designed
for a working displacement of 6,000 tons (12,000 kips or thousands of pounds, or 5500
metric tons = 5500 MT). The term "working displacement" means the weight of water
that is displaced by the platform in use. Applicant uses tendons 16 which are of relative
low tension capacity, with their preferred tension under quiescent conditions being
about 150 tons (140 MT) each. The result is that the total quiescent downward force
of the twelve tendons is about 1,800 tons (1600 MT). The riser tension is considerable
as compared to platform displacement and tendon total tension, in that total riser
tension (of twenty risers) is more than 20% of platform displacement, and more than
20% of total tendon tensions, so the tension in each riser is at least 1% of platform
displacement and total tendon tension.
[0012] With each riser 34 being designed for a quiescent tension of 100 tons (91 MT), the
total tension applied by all twenty risers would be about 2,000 tons (1800 MT), which
is a very significant portion (about one-third) of the total downward force of 6,000
tons (5500 MT) on the platform 12. The total downward force of 6,000 tons on the platform
may include a total weight of the platform in air, of 2,200 tons, plus 1,800 tons
in tendon tension, plus 2,000 tons of riser tension (when all 20 risers are installed).
Thus, the downward force that would be applied by all risers (of 2000 tons) is at
least about equal to the downward force (of 1800 tons) applied by all of the tendons.
The platform may have a width, length, and height, that are each about 30 meters,
and is designed for installation in a deep sea (usually a plurality of hundreds of
meters) that may have a depth on the order of 1,000 meters. Under severe storm conditions,
the tendon tension may more than double to 300 tons or more per tendon.
[0013] Although the system shown in FIG. 1 can produce from up to twenty wells, it is common
to drill and install only one or a few wells at a time, and to operate the system
for an extended period before additional wells are added (if ever, depending on production
rates achieved and other matters). As mentioned above, the additional downward load
on the platform 12, that is added when each riser is installed, is substantial (over
1% of total platform displacement). If a group of risers are added, which each apply
a load of 100 tons on the platform, this will result in a corresponding decrease in
loading of the tendons and existing risers. When starting with no risers, the addition
of a riser would result in undertensioning (e.g. from 150 tons to 142 tons for one
riser and to 100 tons for 6 risers) of the tendons so the tendons may repeatedly go
slack and cause riser failure in a storm. It would be possible to retension the tendons
whenever a group of risers were installed, but retensioning is time consuming and
costly. Also, whenever a new group of risers were added, the old risers as well as
all tendons would have to be retensioned, which would be very time consuming. It is
noted that if one or a few risers were attached to only one of the four sides 81 -
84 (FIG. 2) of a platform, more tension would have to be added to the tendons on the
same side of the platform as the risers. The wide variation in downward load on the
platform, between a situation where only one or a few risers were connected as compared
to a situation where all twenty risers were connected, also would result in some change
in depth of submersion of the platform.
[0014] Because of the light weight of the tendons, it is not practical to initially overtension
them, so that when risers were added the tendon tensions would drop close to the ideal.
That is because overtensioned tendons might fail. For example, in order for the twelve
tendons to return to a quiescent tension of a total of 1,440 tons (1300 MT), or 120
tons (110 MT) each (only 20% below the ideal of 150 tons) after all twenty risers
were installed, the tendons would have to be initially set at a tension of 287 tons
each (a total of about 3,440 tons which is 91% over the ideal) and would be overtensioned
in event of a storm. In a small prior art platform of 20,000 tons displacement, with
an ideal tendon tension of 10,000 tons, the tendons could be initially tensioned at
11,000 tons (10% over ideal). When twenty risers (2,000 tons total tension) were added,
the net tendon tension would fall to only 9,000 tons (10% below ideal). 90% of ideal
tension does not substantially affect performance.
[0015] In accordance with an aspect of the invention, applicant changes the buoyancy of
the platform 12 whenever a group of risers are added. As shown in FIG. 3, the TLP
is provided with multiple buoyancy chambers such as 90, 92, and 94, which may be initially
flooded with water, so that an imaginary water line 96 on the platform lies at sea
level 14 when all tendons are attached and properly tensioned, but no riser has been
installed. When a group of risers (which includes one or more risers) is installed
and tensioned, and the platform tends to move down in the water (and the tendon tension
tends to decrease) applicant adds buoyancy to the platform. (It is noted that the
buoyancy can be added before or even during riser tensioning.) An air pump 100 pumps
air (or other gas such as nitrogen) through a valve and pipe 102 to one of the compartments
or buoyancy chambers 94. The compressed air at 103 in the chamber, causes water 104
in the chamber to be expelled through a vertical pipe 106 into the sea. Thus, all
chamber connections are above water level, even for chambers that lie completely underwater,
which assures that a chamber will not be flooded if a valve malfunctions. The water
level in the chamber is recorded by a calibrated pressure gauge 108. Air is pumped
until the weight of expelled water approximately equals the tension load (e.g. 100
tons = 91 MT) added to the platform by the properly tensioned riser. As a result of
the buoyancy adjustment, the level of platform submersion will remain constant and
the tension in the tendons will remain constant. Thus, no retensioning of the tendons
is required and the platform remains at a constant desired level of submersion which
will keep the trees 50 above water (for easy servicing) while maintaining only a moderate
profile for low wave response.
[0016] The pump 100 is preferably brought to the platform on a relatively small boat by
a crew that is not quartered on the platform (although a temporary emergency shelter
can be provided). The boat also can bring the rig to the platform. By avoiding permanent
quarters (beds, cooking and entertainment facilities, etc.), the platform can be made
relatively small and cheap.
[0017] Since one or a few risers may be added to only one side of the platform, applicant
prefers to add buoyancy to only that side of the platform to maintain a more constant
tendon tension. Accordingly, applicant may add buoyancy to a pair of chambers 94,
110 which lie at opposite ends of the same side 82 of the platform. The platform includes
numerous chamber spaced about the axis 109 of the platform, including a plurality
of completely underwater chambers stacked one on another. This facilitates compensation
for riser tension that avoids tilt of the platform.
[0018] FIG. 2 shows that the particular platform 12 has six apertures such as 40A - 40F
at each side such as 82. A maximum of five is used, with the sixth used if one of
the others cannot be used. The platform has three apertures such as 116A - 116C at
each comer such as 22, where tendons will lie.
[0019] FIG. 5 is a sectional view of one tendon 16 and of one riser 34. A common tendon
size has an outside diameter D of about 33 cm (13 inches) while a common riser size
has an outside diameter of about 26 cm (9⅝ inch). One or several fluid-carrying pipes
such as 112, 114 may lie within the riser 34 to actually carry fluid. The rest of
the inside of the riser normally contains air or nitrogen, as does the inside of the
tendon 16, to provide buoyancy that counteracts the weight of the steel. Although
prior risers might be of the same diameter as riser 34, prior tendons used in TLP
systems were typically of greater diameter than risers 16 and/or more of them were
used.
[0020] In FIG. 3, the riser 34 bends about the bottom of the tree for up to 0.8° of platform
deviation from its quiescent position. Between 0.8° and 5° of deviation, an upper
crossload bearing 111 presses against the walls of aperture 40, and riser bending
occurs immediately below bearing 111. Between 5° and maximum deviation (perhaps 8°
in a severe storm), riser bending occurs at a lower crossload bearing 113. The tendons
each bend about a joint 115 that is also at the bottom of the platform, so the tendons
and risers remain parallel for large platform drift.
[0021] The tendon 16 of FIG. 5 of diameter D of 13 inches (33cm) has a cross-sectional area
of steel of 17.3 inches
2 (112cm
2), while the riser 34 of 9⅝ inch (24.4cm) diameter has a cross-sectional area of steel
of 11.45 inches
2 (74cm
2). It is desirable to maintain the steel in each tendon and riser at the same unit
tension stress level, of about 19,200 psi (132 MPa). For a sea depth of 1,000 meters,
such equal stress (per unit cross-sectional area) results in an elongation of 2.2
feet (0.67 meter) for each. Applicant prefers to maintain the strain (elongation)
and therefore the stress per unit area, of the tendons and risers within 20% of each
other, and more preferably within about 10% of each other in the quiescent position
of the platform, so the strain is about equal under severe storm conditions and the
mooring load is shared by tendons and risers.
[0022] As shown in FIG. 2, the platform 12 includes four vertically extending comer columns
116, 117, 118 and 119 lying at the corners of an imaginary rectangle (which is preferably
substantially a square). Four horizontal beams 121, 122, 123 and 124 each connect
the lower ends 125 of a different pair of columns. Each of the columns and beams 116-119
and 121-124 has an average width W of a plurality of feet (e.g. 7 meters), with the
particular columns and beams shown having an average width of over one meter, and
all form at least one chamber which can hold water or air to change the ballast condition
of the platform. A beam structure 126 comprising multiple steel beams (none forms
a hollow water-filled chamber), connects the upper ends 127 of the columns. Each column
such as column 116 shown in FIG. 3 has a plurality of vertically spaced chambers with
a horizontal separating wall 128. The separating wall is part of the column structure.
The use of a plurality of vertically-spaced columns avoids large platform tilt if
one of the chambers develops a leak.
[0023] FIG. 6 shows an oil production complex 130 which includes the system 10 of FIG. 1.
Oil passing up through the risers 34 and into the trees on the platform 12, is gathered
and passed through pipes lying within a conduit 132 that extends to a large vessel
134. The large vessel 134 may be a tanker with large oil-storing capacity, and which
also has hydrocarbon processing equipment 136, permanent (nonemergency crew quarters
where personnel stay for many days under normal operating conditions), offloading
equipment for transferring oil to other tankers, life boats, etc. If the platform
has any hydrocarbon processing equipment, it is minimal in that the mass of processing
equipment on the vessel is at last 5 times as great. The vessel supports a turret
140 that can remain stationary (not rotate much, but only drift) while the vessel
weathervanes around it, and the vessel is moored by catenary anchor chains 142. The
anchor chains allow the vessel to drift only a moderate amount such as 300 meters.
The platform 12 lies in water having a depth of 1,000 meters and the space between
the vessel 134 and platform is at least 500 meters. It is noted that the fluid conduit
132 includes two sections, With a buoy 144 connecting them.
[0024] Systems for anchoring large vessels such as 134 while allowing them to drift, are
of only moderate cost. Applicant's TLP system 10 is of relatively small size, so it
is also of moderate cost. Servicing of the platform 12 is done by relatively small
boats 146 carried by crew members stationed on the vessel 134. Such crew members may
carry air pumps and various equipment for maintaining parts of the system 10, and
also serve to operate a tender assisted workover rig 150 which can carry out well
completion, workover and redrilling. The rig 150 can be shifted around the TLP on
skids, which is well known to the industry. Fig. 2 shows the drilling rig shifted
away from the center (axis 109 in Fig. 3) of the platform to lie over one of the apertures
(40A-40F). For some systems, it is possible to remove the rig when a storm approaches.
By minimizing equipment on the fixed platform 12, where the cost for the platform
and anchoring equipment is relatively high, and placing such equipment on the weathervaning
vessel 134 where the cost of supporting such equipment is relatively small (especially
because it is already large enough to store oil), applicant minimizes the cost of
the entire complex 130. Of course, in some installations, the conduit 134 can extend
to shore and the crew is quartered on shore.
[0025] The rig 150 has considerable weight (e.g. 400 tons = 360 MT, which is at least 5%
of tendon and riser tension). As a result, when the rig is moved from a first location
on the platform to a primarily horizontally spaced second location, such movement
could overtension tendons and risers whose upper ends lie near the first location
and undertension tendons and risers at the second location. Applicant compensates
for the change in center of gravity (and center of buoyancy) caused by such movement
by reducing buoyancy at the previous rig location (by admitting water into buoyancy
chambers near the previous rig location) and/or by adding buoyancy at the new rig
location (by removing water from buoyancy chambers near the new rig location). This
is because tension elements (tendons and any already-installed risers) are spaced
about the platform axis 152, and such compensation minimizes changes in tension of
such tension elements due to such rig movement.
[0026] Thus, applicant provides a relatively low costTLP system. This is accomplished by
using a relatively small platform and relatively light duty tendons that hold it in
place, together with moderately large risers (requiring moderately large tension)
which may be connected singly or in small groups, with the system designed to operate
for indefinite periods and even in storms, between riser additions. The platform is
provided with buoyancy adjusting means in the form of chambers which are initially
flooded but which can be partially or completely filled with gas instead of water
to increase platform buoyancy. Such ability to increase platform buoyancy in steps,
allows applicant to easily adjust for the additional tension produced by the addition
of each riser. This allows for the use of a relatively light weight platform and relatively
light weight tendons, which greatly reduces the cost of the system. The light weight
platform preferably has only minimal equipment, including a tree for each riser, possibly
a mount for holding a derrick, and minimal couplings and piping.
1. A tension leg platform system which includes a platform (12) that floats at the sea
surface and that has a vertical axis (109), a plurality of tendons (16) extending
down from said platform to the seafloor (26) and anchored thereto, and a drilling
rig (150) that lies on said platform said platform having means (50, 56) for attaching
up to a predetermined maximum number of risers, and including a plurality of risers
(34) each extending down from said platform to the seafloor and anchored thereto,
with said tendons and risers each being held under tension which produces downward
forces on said platform that are countered by displacement of said platform,
characterized in that:
said drilling rig has a weight of at least 5% of the tension of said tendons and risers
and can be shifted horizontally about said platform;
said platform has a small enough buoyancy and said tendons have enough tension, that
the combined downward force that would be applied by said tendons and said predetermined
number of risers to said platform is at least 20% of the working displacement of said
platform; and
said platform has a plurality of adjustable buoyancy chambers (90, 92, 94) spaced
about said vertical axis and apparatus (100, 106) for controlling the buoyancy of
said chambers to maintain approximately constant tendon tension in all of said tendons
when said drilling rig is shifted.
2. The system described in claim 1 wherein:
said platform has a horizontal width and a horizontal length, said drilling rig is
horizontally moveable away from a position over said axis, and said buoyancy chambers
are adjustable for said movement of said rig to avoid changes in tendon tension.
3. The system described in claim 1 including:
said platform includes four vertical comer columns (116, 117, 118, 119) having upper
(127) and lower (125) end portions, a structure (126) that connects said upper end
portions together with said drilling rig moveably mounted on said structure, and four
horizontal beams (121, 122, 123, 124) connecting together said lower end portions
of said columns, with each of said columns and each of said beams having at least
a portion of one of said buoyancy chambers.
4. The system described in claim 3 wherein:
a plurality of said beams has a least one aperture (40, 40A-40F), with said drilling
rig being shiftable to move it over any one of said apertures.
5. The system described in claim 3 wherein:
said columns and said beams each have at least portions of adjustable-buoyancy chambers
(90, 92, 94), whose buoyancy can be adjusted to compensate for changes in the tensions
of said tendons resulting from shifting of said drilling rig.
6. A method for operating a tension leg platform (10) that has an axis (109), a drilling
rig (150) that is horizontally shiftable on said platform, a plurality of adjustable
buoyancy chambers spaced about said axis, and a plurality of tendons and at least
one riser all extending vertically from said platform to the sea bed and anchored
to the sea bed, comprising:
shifting said drilling rig horizontally on said platform, and adjusting the buoyancy
of said chambers to maintain a substantially constant tension in said tendons and
said at least one riser.
7. The method described in claim 6, wherein:
said platform has a plurality of apertures (40A-40F) horizontally space from said
axis, said drilling rig is moveable to lie over a selected one of said apertures,
and said step of adjusting includes adding water to at least one of said buoyancy
chambers to reduce its buoyancy and blowing out water to add buoyancy to another of
said buoyancy chambers.
1. Trossenverspanntes Bohrplattformsystem, das eine Plattform (12), die auf der Meeresoberfläche
schwimmt und eine vertikale Achse (109) aufweist, eine Vielzahl von Vorspanngliedern
(16), die sich von der Plattform zum Meeresboden (26) hinunter erstrecken und dort
verankert sind, sowie einen Bohrturm (150) umfasst, der auf der Plattform liegt, wobei
die Plattform Mittel (50, 56) aufweist, um bis zu einer maximalen Anzahl von Steigleitungen
(34) zu befestigen, und eine Vielzahl von Steigleitungen (34) beinhaltet, die sich
jeweils von der Plattform zum Meeresboden hinunter erstrecken und dort verankert sind,
wobei die Vorspannglieder und die Steigleitungen jeweils unter Spannung gehalten werden,
wodurch abwärts gerichtete Kräfte auf die Plattform erzeugt werden, denen durch eine
Verlagerung der Plattform entgegenwirkt wird,
dadurch gekennzeichnet, dass
der Bohrturm ein Gewicht aufweist, das zumindest 5 % der Spannung der Vorspannglieder
und der Steigleitungen ausmacht, und horizontal um die Plattform verschoben werden
kann,
der Auftrieb der Plattform klein genug ist und die Vorspannglieder ausreichend Spannung
aufweisen, damit die kombinierte abwärts gerichtete Kraft, die von den Vorspanngliedern
und der vorbestimmten Anzahl von Steigleitungen auf die Plattform ausgeübt wird, zumindest
20 % der Arbeitsverlagerung der Plattform ausmacht; und
die Plattform eine Vielzahl einstellbarer Auftriebskammern (90, 92, 94) aufweist,
die um die vertikale Achse und die Vorrichtung (100, 106) beabstandet sind, um den
Auftrieb der Kammern so zu steuern, dass eine annähernd konstante Vorspannglied-Spannung
in allen Vorspanngliedern beibehalten wird, wenn der Bohrturm verschoben wird.
2. System nach Anspruch 1, worin:
die Plattform eine horizontale Breite und eine horizontale Länge aufweist, wobei der
Bohrturm horizontal von einer Position über der Achse weg bewegt werden kann und die
Auftriebskammern für die Bewegung des Turms eingestellt werden können, um Veränderungen
der Vorspannglied-Spannung zu vermeiden.
3. System nach Anspruch 1, worin:
die Plattform vier vertikale Ecksäulen (116, 117, 118, 119) mit oberen (127) und unteren
(125) Endabschnitten, eine Struktur (126), die die oberen Endabschnitte miteinander
verbindet, wobei der Bohrturm beweglich auf der Struktur montiert ist, sowie vier
horizontale Träger (121, 122, 123, 124) umfasst, die die unteren Endabschnitte der
Säulen miteinander verbinden, wobei jede der Säulen und jeder der Träger zumindest
einen Abschnitt einer der Auftriebskammern aufweisen.
4. System nach Anspruch 3, worin:
eine Vielzahl der Träger zumindest eine Öffnung (40, 40A-40F) aufweist, wobei der
Bohrturm so verschiebbar ist, dass er sich über eine beliebige der Öffnungen bewegt.
5. System nach Anspruch 3, worin:
die Säulen und die Träger jeweils zumindest Abschnitte von Kammern (90, 92, 94) mit
einstellbarem Auftrieb aufweisen, deren Auftrieb eingestellt werden kann, um Veränderungen
der Spannungen der Vorspannglieder zu kompensieren, die aus der Verschiebung des Bohrturms
resultieren.
6. Verfahren zum Betreiben einer trossenverspannten Bohrplattform (10), die eine Achse
(109), einen Bohrturm (150), der horizontal auf der Plattform verschoben werden kann,
eine Vielzahl einstellbarer Auftriebskammern, die um die Achse beabstandet sind, sowie
eine Vielzahl von Vorspanngliedern und zumindest eine Steigleitung aufweist, die sich
alle vertikal von der Plattform zum Meeresboden erstrecken und im Meeresboden verankert
sind, umfassend:
das horizontale Verschieben des Bohrturms auf der Plattform und das Einstellen des
Auftriebs der Kammern, um eine im Wesentlichen konstante Spannung in den Vorspanngliedern
und der zumindest einen Steigleitung beizubehalten.
7. Verfahren nach Anspruch 6, worin:
die Plattform eine Vielzahl von Öffnungen (40A-40F) aufweist, die horizontal von der
Achse beabstandet sind, wobei der Bohrturm so bewegt werden kann, dass er über einer
ausgewählten der Öffnungen liegt, und der Schritt des Einstellens das Einfüllen von
Wasser in zumindest eine der Auftriebskammern, um ihren Auftrieb zu verringern, sowie
das Ausblasen von Wasser umfasst, um den Auftrieb einer anderen der Auftriebskammern
zu erhöhen.
1. Système d'une plate-forme à jambes de tension qui comporte une plate-forme (12) qui
flotte sur la surface de la mer et qui présente un axe vertical (109), plusieurs éléments
de précontrainte (16) s'étendant de ladite plate-forme au fond de la mer (26) et ancrés
dans celui-ci, et une installation de forage (150) qui repose sur ladite plate-forme,
ladite plate-forme comportant des moyens (50,56) pour la fixation à un nombre maximal
prédéterminé de colonnes montantes, et comportant plusieurs colonnes montantes (34)
chacune s'étendant de ladite plate-forme au fond de la mer et étant ancrée à celui-ci,
lesdits éléments de précontrainte et colonnes montantes étant chacun maintenu sous
tension, ce qui produit des forces descendantes sur ladite plate-forme qui sont contrées
par le déplacement de ladite plate-forme,
caractérisé en ce que:
ladite installation de forage a un poids d'au moins 5% de la tension desdits éléments
de précontrainte et colonnes montantes et peut être déplacée horizontalement autour
de ladite plate-forme;
ladite plate-forme a une flottabilité suffisamment petite, et lesdits éléments de
précontrainte ont suffisamment de tension pour que la force descendante combinée qui
serait appliquée par lesdits éléments de précontrainte et ledit nombre prédéterminé
de colonnes montantes à ladite plate-forme représente au moins 20% du déplacement
de travail de ladite plate-forme; et
ladite plate-forme comporte plusieurs chambres de flottabilité ajustable (90,92,94)
espacées autour dudit axe vertical et l'appareil (100,106) pour commander la flottabilité
desdites chambres afin de maintenir une tension approximativement constante dans tous
les éléments de précontrainte précités lorsque ladite installation de forage est déplacée.
2. Système selon la revendication 1, où ladite plate-forme présente une largeur horizontale
et une longueur horizontale, ladite installation de forage est déplaçable horizontalement
au loin d'une position sur ledit axe, et lesdites chambres de flottabilité sont ajustables
en vue dudit déplacement de ladite installation de forage pour éviter des changements
de tension dans les éléments de précontrainte.
3. Système selon la revendication 1, incluant:
ladite plate-forme comporte quatre colonnes de coin verticales (116,117,118,119) présentant
des portions d'extrémité supérieures (127) et inférieures (125), une structure (126)
qui relie lesdites portions d'extrémité supérieures ensemble avec ladite ladite installation
de forage montée d'une manière mobile sur ladite structure, et quatre poutres horizontales
(121,122,123,124) reliant ensemble lesdites portions d'extrémité inférieures desdites
colonnes, chacune desdites colonnes et chacune desdites poutres présentant au moins
une portion d'une desdites chambres de flottabilité.
4. Système selon la revendication 3, dans lequel:
une pluralité desdites poutres présente au moins une ouverture (40,40A-40F), ladite
installation de forage étant déplaçable pour l'amener sur l'une quelconque desdites
ouvertures.
5. Système selon la revendication 3, dans lequel lesdites colonnes et lesdites poutres
ont chacune au moins des portions des chambres à flottabilité ajustable (90, 92, 94),
dont la flottabilité peut être ajustée pour compenser des changements dans les tensions
desdits éléments de précontrainte résultant du déplacement de ladite installation
de forage.
6. Procédé pour faire fonctionner une plate-forme à jambes de tension (10) qui possède
un axe (109), une installation de forage (150) qui est déplaçable horizontalement
sur ladite plate-forme, plusieurs chambres à flottabilité ajustable espacées autour
dudit axe, et plusieurs éléments de précontrainte et au moins une colonne montante,
tous s'étendant verticalement de ladite plate-forme au fond de la mer et étant ancrés
dans le fond de la mer, comprenant:
le déplacement de ladite installation de forage horizontalement sur ladite plate-forme,
et le réglage de la flottabilité desdites chambres afin de maintenir une tension sensiblement
constante dans lesdits éléments de précontrainte et ladite au moins une colonne montante.
7. Procédé selon la revendication 6, dans lequel:
ladite plate-forme présente plusieurs ouvertures (40A-40F) espacées horizontalement
dudit axe, ladite installation de forage est déplaçable pour reposer sur une ouverture
sélectionnée parmi lesdites ouvertures, et ladite étape de réglage comprend l'addition
d'eau à au moins une desdites chambres à flottabilité pour réduire sa flottabilité
et pour expulser de l'eau pour ajouter de la flottabilité à une autre desdites chambres
à flottabilité.