[0001] The invention relates to a process for the continuous casting of molten steel to
form high-quality billets or blooms, utilizing a device of the type comprising a buffer
tank, an immersion pipe, a casting mould, and a line for feeding the molten metal
to the buffer tank, the immersion pipe being connected to the bottom of the buffer
tank and, during operation, extending as far as into the casting mould, the buffer
tank being designed so that it can be closed off in a gastight manner and being provided
in or in the vicinity of its top wall with a suction opening, and the feedline opening
into the buffer tank in the vicinity of its bottom, while the other end of the feedline
is connected to the bottom of a tundish, which bottom lies at a higher level than
that of the buffer tank, and means being present for injecting a flush gas into the
molten steel at the location of the feedline.
[0002] A device of the type mentioned in the preamble has already been described in Dutch
patent NL 1001976 for use in the casting of slabs. The aim of this device is to counteract
the formation of cracks and oxide inclusions, which are often relatively large inclusions,
by flushing with a flush gas. To achieve this, the injection of small volumes of,
for example, argon is sufficient, consideration being given, for example, to less
than 5 l (s.t.p.) per tonne of cast steel. Therefore, depending on the geometry of
the casting installation and the immersion pipe, the operating pressure must not be
too low. For this known application, the operating pressure will generally have to
be approx. 100 mbar or higher.
[0003] In the case of slab-casting machines, casting is often carried out using steel which
has been degassed in advance, the degassing being carried out, for example, with the
aid of a vacuum pan treatment. It is also known to remove, for example, hydrogen from
the cast slabs in annealing furnaces.
[0004] In the case of billet-casting machines, the use of vacuum pan installations and annealing
furnaces is not an attractive option owing to the smaller scale of the production
facilities. Therefore, there is a need for other possible ways of counteracting the
concentration of hydrogen in the liquid steel. In this context, it should be noted
that, for example when casting forged billets, it is particularly important to reduce
the concentration of hydrogen in the liquid steel in order to:
- counteract hydrogen embrittlement in forged steel. Particularly when the final dimensions
after forging are very close to the cast dimensions, scarcely any deformation takes
place in order to remove the hydrogen. The stresses in these components (which are
often critical from the point of view of safety aspects, for example in the automotive
industry) are such that hydrogen embrittlement (at the grain boundaries), may easily
lead to cracks and fracture without there being any possibility of measuring this
by ultrasound in the forged product (delayed cracking).
- counteract gas bubbles (pinholes). These gas bubbles are formed because solidified
steel is able to contain less gas than liquid steel.
[0005] The use of the device which is known from NL 1001976 in the manner described above
does not provide adequate results when casting billets and blooms if it is desired
to achieve very low hydrogen concentrations.
[0006] An advantage of very low hydrogen concentrations in, for example, steel which is
subject to considerable deformation consists in the fact that such concentrations
prevent the formation of hydrogen-filled cavities in the solidifying steel.
[0007] Therefore, the invention consists in the fact that, in the method of the type which
is known according to the preamble, argon is injected as the flush gas and that gas
is extracted from the buffer tank via the suction opening until an absolute gas pressure
of < 15 mbar is established in the top of the said buffer tank, and that argon is
injected in a volume of > 25 l (s.t.p.) per tonne of cast steel.
[0008] It should be noted that this gas pressure and this volume differ considerably from
the levels which are customary when casting slabs.
[0009] By injecting flush gas, such as argon, into the molten metal at the location of the
feedline, gas bubbles which have a relatively long residence time in the bath between
the injection location and the free surface of the metal in the tundish can form in
this feedline. As these gas bubbles rise upwards, the pressure on them will be reduced
and the gas bubbles will acquire a larger interface with the metal.
[0010] The bubbles of argon gas have two functions. Firstly, the gas bubbles form nuclei
for the formation of hydrogen bubbles, with the result that hydrogen is diffused out
of the molten metal more quickly, and secondly the argon gas absorbs hydrogen inside
the bubbles.
[0011] To achieve successful degassing, it is recommended to position the means for injecting
the flush gas at the location where the feedline is connected to the tundish. This
makes the residence time of the bubbles of argon gas as long as possible. According
to the invention, it is possible to achieve hydrogen concentrations which may be as
low as approx. 2 ppm if an absolute gas pressure in the buffer tank of < 15 mbar is
established and if argon is injected in a volume of > 25 l (s.t.p.) of cast steel.
[0012] Particularly good results can be obtained if the absolute gas pressure in the buffer
tank is < 10 mbar, and if more than 33 1 (s.t.p.) of argon is injected per tonne of
cast steel.
[0013] Finally, the residence time of the argon gas bubbles in the molten steel can be increased
still further, thus allowing further improved removal of hydrogen from the steel,
if the argon injected brings about a flow of the steel along the surface of the bath.
This can be achieved, for example, by causing the gas bubbles to rise upwards in the
buffer tank in the vicinity of a wall which is at a distance from the location where
the immersion pipe is connected to the bottom of the buffer tank.
[0014] The invention will now be explained with reference to a figure.
[0015] This figure diagrammatically depicts part of a device for the continuous casting
of steel. In order to allow the invention to be clearly understood, various components
are not to scale.
[0016] Reference numeral 1 indicates, on an enlarged scale, the inner wall of a casting
mould for casting steel billets. An immersion pipe 2 for supplying molten steel extends
to below the level 3 of the steel in the casting mould.
[0017] The casting mould is intensively cooled (not shown), with the result that a solidified
shell 4 is formed, the thickness of which increases in the downwards direction. On
leaving the casting mould, this solidified shell 4 has to be sufficiently strong to
be able to be withdrawn further using mechanical means without it rupturing. The means
for withdrawing the billet which is formed in this way are not shown, but are in the
form of a traditional set of rollers such as that which is depicted, by way of example,
in German Laid-Open Specification 2,017,469. In order to be able to carry out casting
at a relatively high speed, it is necessary to control the flow of the molten steel
without imposing an excessive casting impulse on the solidified shell, which is still
soft, since this could lead to this solidified shell being fractured. Preferably,
therefore, the immersion pipe is connected to a buffer tank 5, which is closed off
with the aid of a cover 6, and a vacuum can be created, via the suction opening 7,
above the molten steel which is situated in the buffer tank 5.
[0018] On the one hand, the presence of a buffer tank makes the flow of molten steel to
and through the immersion pipe 2 more regular, while furthermore, as a result of the
reduced gas pressure above the molten steel, the ferrostatic pressure in the immersion
pipe is reduced.
[0019] Molten steel is fed to the buffer tank 5 through the feedline 8, which is for its
part connected to a tundish 9. This tundish 9 is able to ensure that there is a constant
flow of steel to the buffer tank 5, even if the molten steel is supplied from the
steel factory in batches via steel ladles 10. Steel ladle 10 is for its part emptied
into tundish 9 via a casting pipe 11. With the aid of a stopper rod 12, the flow of
steel from the tundish 9 can be regulated in order to compensate for differences in
the level 13 of the steel in the tundish. The stopper rod 12 can also be used, if
desired, to shut off the flow from the tundish entirely. It is necessary to seek to
ensure that the level 14 in the buffer tank 5 remains as stationary as possible, so
that the casting conditions remain uniform. Argon gas is injected at location 15 and
forms bubbles 16 which are entrained to the buffer tank 5 by the stream of molten
steel running through the feedline 8. In the buffer tank 5, these bubbles form a screen
17 of bubbles which rises upwards, in the direction of arrow 18, towards the surface
of the bath. In so doing, the stream 17 of bubbles causes the steel to flow along
the surface of the bath in the direction of arrow 19.
[0020] Owing to the presence of the projection 20, the stream of bubbles is additionally
diverted in the upwards direction. This also prevents gas bubbles from being entrained
into the casting mould by the flow of liquid steel. A simple projection made of refractory
material and with a height of approximately 10 cm is sufficient to achieve this effect.
[0021] While they are moving through feedline 8 and via the screen 17 of bubbles, the bubbles
16 grow, initially by taking up hydrogen and then as a result of the ferrostatic pressure
on these rising bubbles being reduced. As a result, the surface area of the bubbles
is increased to such an extent that hydrogen can be absorbed very intensively into
the argon bubbles. Then, at the surface of the bath, the hydrogen which is released
is extracted via suction opening 7.
[0022] In a practical situation, steel was cast at a rate of 0.3 t/min. The temperature
of the cast steel was 1500°C. In the steel ladle 10, a hydrogen concentration of 6
ppm was detected. With a surface area of the steel melt in the tundish of approximately
1 m
2, an absolute pressure of 10 mbar was maintained above the steel surface 14. A hollow
stopper rod 12 was used, and a volume of argon gas of 10 l (s.t.p.)/min was injected
into the feedline 8 at the seal of the stopper rod. It was found that the argon bubbles
formed in the screen 17 of bubbles grew to a diameter of approximately 10 mm.
[0023] When measurements were carried out, it was found that the hydrogen content in the
cast steel had been reduced from 6 ppm to between 1 and 2 ppm.
[0024] Without injecting argon, but under conditions which were otherwise identical, measurements
showed that the cast steel had a hydrogen content of between 4 and 5 ppm.
[0025] It should be noted that the novel process also allows other components which are
naturally gaseous to be removed from the steel which is to be cast.
1. Process for the continuous casting of molten steel to form high-quality billets or
blooms, utilizing a device of the type comprising a buffer tank (5), an immersion
pipe (2), a casting mould (1), and a line (8) for feeding the molten metal to the
buffer tank (5), the immersion pipe (2) being connected to the bottom of the buffer
tank (5) and, during operation, extending as far as into the casting mould (1), the
buffer tank (5) being designed so that it can be closed off in a gastight manner and
being provided in or in the vicinity of its top wall (6) with a suction opening (7),
and the feedline (8) opening into the buffer tank (5) in the vicinity of its bottom,
while the other end of the feedline (8) is connected to the bottom of a tundish (9),
which bottom lies at a higher level than that of the buffer tank (5), and means (15)
being present for injecting a flush gas into the molten steel at the location of the
feedline (8), characterized in that argon is injected into the stream of liquid steel
as the flush gas, and in that gas is extracted from the buffer tank via the suction
opening (7) until an absolute gas pressure of < 15 mbar is established in the top
of the said buffer tank, and in that argon is injected in a volume of > 25 l (s.t.p.)
per tonne of cast steel.
2. Process according to Claim 1, characterized in that the absolute gas pressure in the
top of the buffer tank (5) is < 10 mbar, and in that more than 33 l (s.t.p.) of argon
is injected per tonne of cast steel.
3. Process according to one of Claims 1-2, characterized in that the argon injected brings
about a flow of the steel along the surface of the bath.