[0001] The invention relates to the production of a foundation pile in the ground. In a
technique of this nature, the first step is to form a hole in the ground by means
of a pipe which is provided with an external screw thread and which is then filled
with a settable material, such as a mortar. After this material has set and the pipe
has been removed, the pile is ready for use.
[0002] The advantage of this technique is that no vibrations are generated when the pile
is put in place. This technique is preferred to pile-driving in particular in a sensitive
environment, for example in old town centres, in the vicinity of buildings containing
sensitive equipment and the like.
[0003] Furthermore, it is known from NL-A-9200855 to use both mortar and a prefabricated
pile element. In this case, the pile element is firstly placed in the pipe which has
been positioned in the ground. Then, the space which remains between the pile element
and the internal wall of the pipe has to be filled with grout. Then, the pipe is pulled
upwards, in order to form a hole into which the grout has to flow out. Meanwhile,
the pile element remains in the same position, specifically on the base component
which remains behind in the bottom of the hole and initially closes off the pipe.
[0004] There are various drawbacks associated with this known method. Firstly, placing grout
or concrete mortar in the somewhat limited space between pile element and pipe has
been found to cause problems. This space is so limited that it is impossible to ensure
that it is filled completely with the relatively pasty grout without taking additional
measures.
[0005] A further drawback is that when the pipe is pulled upwards, the grout flowing out
into the hole is not pressed against the wall of the hole to a sufficient extent,
and there is a considerable risk of groundwater-filled cavities in the grout. However,
a certain pressure is required with a view to obtaining the desired load-bearing capacity
for the pile.
[0006] However, when the pipe is pulled upwards, an upwardly directed force is exerted on
the grout, leading to the grout initially moving upwards with the pipe. This in fact
counteracts the desired effect of pressing the grout against the wall of the hole,
and cavities are created in the grout.
[0007] This has an adverse effect on the positive skin friction with respect to the load-bearing
layer of soil. Also, the grout does not bear correctly against the pile element. The
cavities in the grout means that the skin friction forces and the point force cannot
be utilized to their maximum extent, because the set body of grout is ruptured earlier
under load due to crack formation than would be the case if there were no cavities
and the grout were correctly joined to the pile element.
[0008] In the said known method, it is attempted to overcome this problem by exerting a
high pressure of 8 bar on the grout while the pipe is being pulled upwards, but owing
to the narrow space between the pile element and the pipe, together with the arching
action of the grout, it has been found that this high pressure has little effect,
since the pressure in the space decreases quickly in the downwards direction. In addition,
the pipe has to be rotated in such a manner that the screw thread can exert an additional
pressure on the grout.
[0009] A procedure of this nature is complicated. The high pressure to which the grout has
to be exposed requires the use of additional equipment. Moreover, it is necessary
to take measures to prevent the grout from disappearing at other locations, for example
in the weak layers which are able to bear less load.
[0010] Therefore, the object of the invention is to provide a different approach, in which
it is also possible to use a screw-in hollow pipe in combination with a pile element
and settable material. According to the invention, this is achieved by means of a
method for producing a foundation pile which can be subjected to compressive and/or
tensile loads in the ground, comprising the steps of:
- screwing into the ground a pipe which is closed off at the bottom by a base part and
has a screw thread on the circumference,
- introducing a quantity of mortar into the pipe,
- pulling the pipe upwards, leaving the base part behind, in such a manner that the
mortar collects in the hole formed when the pipe is pulled upwards,
- then lowering a prefabricated pile element, the transverse dimensions of which are
smaller than the corresponding internal dimensions of the pipe, into the mortar which
has collected in the hole, and down as far as the base part,
- removing the pipe.
[0011] The advantage of the method according to the invention is that the mortar can be
introduced into the pipe without problems, since the mortar is introduced before the
pile element is placed in the pipe. Consequently, a quantity of mortar can collect
in the bottom of the pipe without inclusions being formed in this mortar. Moreover,
the mortar can flow in freely when the pipe is pulled upwards and can completely fill
the hole formed in this way.
[0012] When the pipe is pulled upwards, no frictional forces which could impair the flow
and therefore inclusion-free filling of the hole are generated. Consequently, the
mortar bears correctly against the wall of the said hole, this being a necessary precondition
if the intended point resistance and positive skin friction are to be obtained in
the finished foundation pile.
[0013] When the pile element then penetrates into the mortar, these beneficial effects are
only intensified. The pile element drives the mortar downwards and sideways, thus
further improving the way in which it bears against the wall of the hole, and also
ensuring that it bears correctly against the pile element.
[0014] Preferably, in the method according to the invention, the prefabricated pile element
is positioned in the pipe in such a manner that the bottom end of the pile is situated
at the level of the mortar level.
[0015] The bottom surface of the pile element is always situated directly above the mortar
level. The advantage of this is that the mortar can move freely when flowing out into
the hole, without any bridging of the mortar. This is because the cross section of
the pipe is large enough to prevent this phenomenon.
[0016] In addition, the pipe may be filled with water above the mortar level, thus further
helping the mortar to flow out.
[0017] The method according to the invention may comprise the steps of lowering the pile
element as the mortar level falls while the pipe is being pulled upwards, and of forcing
the pile element into the mortar after the mortar has collected in the hole formed
when the pipe is pulled upwards.
[0018] To maintain the desired pressure in the mortar, the method according to the invention
may comprise the step of supplying additional water above the mortar level while the
mortar level is falling.
[0019] Finally, the method may comprise the step of rotating the pipe in such a manner that
the soil which has collected in the screw thread is pressed downwards when the pipe
is moved upwards after the pile has been forced into the mortar.
[0020] The invention will now be explained in more detail with reference to the method steps
shown in the figures.
[0021] As shown in Figure 1, an auger, which is denoted overall by 3 and comprises a hollow
pipe 4 with a screw thread 5 on its outer side, is screwed into the ground 1, in the
space 2. On the underside, the hollow pipe is closed off by the base component 6.
[0022] After auger 3 has reached the desired depth, the hollow pipe 4 is filled with a quantity
of mortar 7. Then, as illustrated in Figure 3, a prefabricated pile element 9 is placed
in the hollow pipe 4, the bottom end of this pile element being held just at the level
of the mortar level 8.
[0023] In the method step shown in Figure 4, the auger 3 is pulled upwards without being
rotated, thus forming a hole 10, the internal diameter of which corresponds to the
external diameter of the screw thread 5. This hole 10 is situated in the load-bearing
layer of soil material 11, and may also extend into the less strong layers 12.
[0024] When the auger 3 is pulled upwards, the base component 6 remains behind at the bottom
of the hole 10. The mortar 7 also collects in the hole 10 formed in this way. The
pile element is allowed to fall with the mortar level 8, but without allowing the
pile element 9 to penetrate into the mortar.
[0025] The desired pressure in the mortar 7 can be maintained by means of a column of water
13, which is situated above the mortar level 8. As a result, the pressure of the mortar
7 may be approximately equal to the earth pressure.
[0026] After the mortar 7 has flowed out into the hole 10 formed in this way, the pile element
9 can be moved downwards, in such a manner that it penetrates into the mortar 7. In
the process, some of the mortar rises into the auger 3: cf. the mortar 14. The prefabricated
element 9 ultimately reaches the base component 6.
[0027] Then, the auger 3 can be removed. To do this, the auger 3 is pulled upwards and is
rotated in such a manner that the soil which has collected inside the screw thread
5 is pressed downwards above the mortar 7. This quantity of soil is denoted in Figure
6 by reference numeral 15.
[0028] As shown in Figure 7, all the space around the pile element 9 is thus filled with
replaced earth. The finished foundation pile as illustrated in Figure 7 therefore
comprises, extending from the base component 6, a casing 16 which consists of set
mortar and is pressed firmly against the load-bearing layer of soil material 11, the
prefabricated pile element 9, the bottom of the hole 10 and the replaced soil 15 which
has been pressed onto it.
1. Method for producing a foundation pile which can be subjected to compressive and/or
tensile loads in the ground, comprising the steps of:
- screwing into the ground a pipe (4) which is closed off at the bottom by a base
part (6) and has a screw thread (5) on the circumference,
- introducing a quantity of mortar (7) into the pipe (4),
- pulling the pipe (4) upwards, leaving the base part (6) behind, in such a manner
that the mortar (7) collects in the hole (10) formed when the pipe is pulled upwards,
- then lowering a prefabricated pile element (9), the transverse dimensions of which
are smaller than the corresponding internal dimensions of the pipe (4), into the mortar
(7) which has collected in the hole (10), and down as far as the base part (6),
- removing the pipe.
2. Method according to Claim 1, comprising the step of positioning the prefabricated
pile element (9) in the pipe (4) in such a manner that the bottom end of the pile
(9) is situated level with the mortar level (8).
3. Method according to Claim 2, comprising the step of filling the pipe (4) with water
(13) above the mortar level (8).
4. Method according to Claim 2 or 3, comprising the step of lowering the pile (9) so
as to match the fall in the mortar level (8) while the pipe is being pulled upwards.
5. Method according to Claim 3 or 4, comprising the step of supplying additional water
(13) above the mortar level (8) while the mortar level (8) is falling.
6. Method according to one of the preceding claims, comprising the step of forcing the
pile (9) into the mortar (7) after the mortar (7) has collected in the hole (10) formed
when the pipe (4) is pulled upwards.
7. Method according to one of the preceding claims, comprising the step of rotating the
pipe (4) in such a manner that the soil (15) which has collected in the screw thread
(5) is pressed downwards when the pipe (4) is moved upwards after the pile element
(9) has been forced into the mortar (7).