| (19) |
 |
|
(11) |
EP 1 026 456 A1 |
| (12) |
EUROPEAN PATENT APPLICATION |
| (43) |
Date of publication: |
|
09.08.2000 Bulletin 2000/32 |
| (22) |
Date of filing: 03.02.1999 |
|
| (51) |
International Patent Classification (IPC)7: F24H 9/14 |
|
| (84) |
Designated Contracting States: |
|
AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
Designated Extension States: |
|
AL LT LV MK RO SI |
| (71) |
Applicant: IABER S.p.A. |
|
I-22053 Lecco
Como (IT) |
|
| (72) |
Inventor: |
|
- Pastorino, Giorgio
Malgrate, Lecco (IT)
|
| (74) |
Representative: Gandini, Claudio |
|
Via Durini 23 20122 Milano 20122 Milano (IT) |
|
| |
|
(57) The group features a price/performance ratio, a reference architecture with standardized
systems, reduction of the number of components thus avoiding code proliferation, simplified
assembly and testing procedures with consequent reduction of production times, modularity
for use with boilers of different architectures.
It allows to reduce field failures and to switch from an hydraulic to a motorized
system, using composite material components.
The users' advantage is represented by the evolution of the hydraulic group reducing
hot water waiting time.
|

|
General
[0001] The project originates from the need of a functional group featuring an aggressive
price/performance ratio, a reference architecture with system standardization, reduction
of the number of components to prevent codes proliferation, simplification of assembly
and testing procedures with consequent reduction of production time, modular design
for use on boilers with different architectures.
[0002] A product featuring performance and reliability improvements enabling to minimize
field failures and to switch from an hydraulic to a motorized system using components
made of composite material.
[0003] At user's level, the advantage provided by the evolution of the hydraulic group consists
in the reduction of the sanitary hot water waiting time.
Modified elements
[0004] The elements presenting a greater innovation as compared to the current model are
in bold type (reference European patent no. 0652408, enclosed)
- Inclusion of quick fastening systems with o-ring seals and fastening pin or clamping
screw.
- Inclusion of hoses with fastening pin at one of the two ends
- Previous by-pass valve (head + spring + sealing ring nut) replaced by a by-pass valve,
diameter 20, providing easier and more reliable disassembly
- Application of a limestone-proof system consisting of a check valve (reference our
European patent request no. 97830588.6 filed on November 11, 1997)
- the group has been conceived as modular in order to obtain with the same components
the following versions :
- heating only
- heating only with connection to remote boiler
- heating + sanitary water
- the hydraulic group inside the boiler has been standardized leaving to the template,
provided separately with different configurations, the function to match the various
types of plant loading system available in the different countries.
- Inclusion of one-level safety pressure switch for heating purposes to replace the
mechanical differential flow switch consisting of a diaphragm, a cap, a spring, a
spindle and a micro for the electric signal. The differential flow switch authorizes
gas ignition when the following two conditions under its control occur :
- The water pressure is sufficient
- The pump is running
The one-level pressure switch, connected to the electronic card, checks the water
pressure while circulation is kept under control by an intelligent probe. The one-level
pressure switch is a completely new component and its use allows to replace the differential
flow switch increasing reliability and making the control of water pressure easier.
- Inclusion of a 3-way electric actuator allowing to switch from a 3-way hydraulic system
with intermediate control lever (at rest when in heating position) to a direct electric
actuator of new design with built-in over stroke (at rest when in sanitary water position)
to reduce the user's waiting time for the hot sanitary water.
- Inclusion of a sanitary flow switch complete with filter, allowing to switch from
a diaphragm (venturi) priority system for sanitary water to a sanitary priority system
with a float + magnet flow switch controlled by a reed switch to reduce the user's
waiting time for hot sanitary water.
[0005] Enclosed please find :
- 3 color assembly views of the new hydraulic group
- diagram of the new hydraulic circuit
- exploded view of the new hydraulic group evidencing the sanitary flow switch, the
3-ways actuator and the new pressure switch
- drawing of the heating by-pass
- specifications and drawing of the electric actuator
- specifications and drawing of the heating pressure switch
- specifications and drawing of the sanitary pressure switch
The new design enables to reduce the number of components and of codes, to simplify
assembly and testing procedures with consequent reduction of production times, and
finally assures the possibility of use with boilers of different architectures.
Such system provides an evident reduction of the waiting time for the sanitary hot
water.
The hydraulic group features the following characteristics:
1. quick fastening system with o-ring seal and fastening pin or clamping screw
2. hoses with fastening pin at one of the two ends
3. use of a more reliable by-pass valve that can be easily dismounted
4. increased modularity of use
5. standardization of the hydraulic group inside the boiler, leaving to the template
the function to match the different loading systems
6. inclusion of a one-level safety pressure switch for heating
7. 3-way electric actuation group
8. sanitary flow switch complete with filter