[0001] This invention relates to a pipe or tubular handling assembly for use on a rig and
to a method of supplying drilling apparatus at well center. It also relates to a derrick
structure for handling and storing well tubulars on a rig floor
BACKGROUND OF THE INVENTION
[0002] In conventional rig design, well tubulars, such as drilling pipes, riser and casing
tubular are usually stored as single lengths of pipe (joints) laid out on racks at
the main floor or deck of the rig. Joints of well tubulars for use during a drilling
operations are lifted over a structure connecting the main rig floor with the drill
or rig floor, the so-called catwalk, and lowered into a opening, the mousehole, in
the drill floor next to the well center. To add the joint to the drill string, the
upper end of the drillsting, consisting of swivel and kelly, is disconnected from
the rest of the drill string. and moved over to the mousehole. The kelly is then stabbed
into the upper end of the joint ("box") and rotated so as to tighten the threaded
tool joint. The kelly and the joint of pipe are lifted and moved back over to well
center and stabbed into the upper end of the suspended drill string. Again, the threaded
connection is tightened by rotating the pipe joint and kelly.
[0003] After connecting the new joint to the drill sting, drilling can resume for the length
of the joint. Then the drilling has to stop to add another joint to the drill string
repeating the steps described above.
[0004] At certain intervals drilling stops. At this point, the drill string is tripped out
of the well. To trip out the kelly and swivel is removed from the top of the drill
string and placed into another opening in the drill floor, the rathole. Then, drill
pipe elevators are used to pull the drill string and break it into stands of pipes
or riser joints. During tripping not every single joint of tubular is broken out one
at a time.
Instead, the drill string is most often pulled three joints at a time. Joints of pipe
connected constitute what is called a stand. Stands can vary between two and four
joints. The stands are usually stored within vertical pipe rack in the mast or derrick
structure. The stands are reassembled in what is basically the reverse of the braking-out
operation.
[0005] Casing tubulars are assembled as the initial drill string.
However, there is usually no tripping operation for casing. Thus there is no storage
space within the derrick structure to store stands of casing.
[0006] Marine risers are run in very much the same manner as the casing string. Again as
riser joints are not subject to tripping and are usually retrieved only in emergencies
or when the rig is moved, there is no vertical storage provided for riser stands or
joints within the mast or derrick structure of a floating drilling platform.
[0007] In recent years many attempts were made to automate at least part of the pipe handling
using for example electronically controlled equipment to assemble and store pipe joints.
[0008] The above described activities occur along the path of well construction. This path
is often referred to as the critical path. All of the activities occurring in the
critical path contribute to "flat time", the time spent not drilling, or making hole.
Therefore, the present invention can be seen as seeking to reduce the amount of flat
time and so increase efficiency of well creation.
[0009] US-A-5,647,443 (Heerema Group Services B.V.) relates to a method and device for drilling
for oil or gas in an underwater bed by means of a drilling rig with a drilling derrick
disposed on a floating drilling platform or on an underwater bed. In this case, prior
to the placing of a casing string, the placing of a riser string or the drilling of
a hole, one or more parts of the aforesaid casing string, riser string or drill string
are pre-assembled on the drilling rig at one or more pre-assembly points which are
located at a position different from that of the drilling derrick.
[0010] According to one aspect of the present invention, there is provided a handling assembly
for use on a rig, comprising one well center and at least two handling stations for
receiving tubulars, and assembling them into stands, characterised in that the handling
assembly further comprises transfer means for transporting assembled stands to the
well center, wherein the handling stations are spaced apart from well center. Spaced
apart is defined as being outside the well center area and outside the reach of the
kelly.
[0011] The pre-assembly of stands of tubulars such as casings, drill pipe and risers before
the individual tubulars reach the drilling apparatus reduces the amount of operations
that occur at the critical path and reduces the flat time associated with drilling.
[0012] Preferably the handling stations are displaced either side of the drilling apparatus,
with a storage area for vertically oriented stands being provided between each handling
station and the drilling apparatus. This allows stands to be made up independently
of the rate of progress of drilling and stored ready for transfer to the well hole.
This allows stands of tubulars to be pre-assembled independently of the drilling operation
and ensures significant reduction in the flat time along the critical path as the
transfer means simply supplies a pre-assembled stand when required.
[0013] Preferably the drilling apparatus is located proximal to one edge of a rig deck with
the tubulars arrayed along racks over at least the central portion of the deck. A
conveyor system is provided to transport tubulars to the handling station, the conveyor
system comprising lifting means such as hoists or gantry cranes, and trolleys for
bearing tubulars to the handling station.
[0014] Where stands are made of lighter casings or drill pipe, the transfer means is a pipe
racking system. However stands of larger tubulars such as risers, the transfer means
comprises a hoist means and a pipe handling assembly, with the hoist bearing the weight
of the riser stand as it is transported to well center and the pipe racking system
travelling with the hoist to provide lateral guidance of the riser stand.
[0015] Preferably each handling station comprises a mousehole with a total of three mouseholes,
including that of the well center. Contrary to conventional mouseholes, at least one
of the mouseholes of the new handling assembly has a diameter sufficiently large to
accommodate the larger casing and/or riser diameter. The mouseholes are also deeper
than conventional mouseholes. The depths of the mouseholes exceed the length of at
least two pipe joints, or at least one casing, preferably three pipe joints or two
casings.
[0016] The ability of the handling assembly to assemble and transport double stands of risers
and triple stands of casing is of significant advantage in reducing the flat time.
The equipment required to transport these stands is necessarily of a specification
that will take the additional weight. Thus the additional equipment requirements of
the handling assembly are costly, but the overall reduction in flat time and speed
of increase of making hole or tripping out, means that greater cost efficiency is
achieved overall.
[0017] In accordance with another aspect of the invention, there is provided a method of
supplying drilling apparatus at well center with stands of tubulars, characterised
in that the method comprises the steps of:
1) Conveying tubulars to a first handling station and a second handling station, the
handling stations being placed on different sides of the well center;
2) Assembling tubulars into stands at the first handling station whilst simultaneously
drilling at well center;
3) Transferring the assembled stands to the drilling apparatus.
[0018] The method thus allows continuous assembly of stands during drilling and substantially
eliminates activities from well center that do not directly result in making hole.
In this way one handling station may be assembling stands, whilst the other handling
station either assembles stands simultaneously with drilling at well center or performs
alternative tasks related to drilling. Thus the method may include assembling tubulars
into stands at both the first and the second handling stations whilst simultaneously
drilling at well center.
[0019] Alternatively the method may include moving stands from one handling station to well
center, whilst the other handling station is assembling stands.
[0020] Preferably the method includes storing stands in a position between a handling station
and well center, so ensuring stands are always pre-assembled for use downhole. This
allows stands to be made up and stock piled in advance of their drilling need.
[0021] These and other features of the invention, preferred embodiments and variants thereof,
possible applications and advantages will become appreciated and understood by those
skilled in the art from the following detailed description and drawings.
DRAWINGS
[0022]
- FIG. 1
- shows a perspective view of a semi-submersible rig;
- FIG. 2
- shows a plan view of a deck of the rig showing a handling assembly in accordance with
the present invention;
- FIG. 3
- shows a side view of a conveyor and a pipe racking system used in the handling assembly;
and
- FIG. 4 to 7
- show a handling station and pipe handling machine of the assembly during operation.
MODE(S) FOR CARRYING OUT THE INVENTION
[0023] In FIG. 1, a semi-submersible rig 10 incorporating a handling assembly according
to the invention is shown. The rig 10 comprises a deck area 12 which is attached via
four columns 14, 15 to two pontoons 16. The four columns 14, 15 and pontoons 16 are
interconnected and braced by four cross bracing struts 20.
[0024] A derrick 22 is located to the rear, or aft, of the deck with a heli-pad 24 located
towards the front of the deck area 12.
[0025] A plan view of the handling assembly is shown in FIG. 2. Due to removal of the prime
movers to the pontoons, a large amount of deck space is available near the derrick
22. In plan view, the derrick is not visible, although a well center 30 and associated
drilling apparatus 32 are shown. The handling assembly comprises two handling stations
34, 35 spaced apart on opposite sides of well center 30, two conveyors 36, 38, two
pipe racking systems 40, 42 and two pipe handling machines 44, 46, and provides two
paths of travel for tubulars to reach the well center 30. A storage area is provided
between each handling station and the drilling apparatus. As the activities along
each of the two paths are the same, the activities and components of the handling
assembly will only be described with reference to one path, namely the path including
conveyor 36, handling station 34, and pipe handling machine 44. The pipe racking system
40, 42 is common to both paths.
[0026] Prior to running of the handling assembly, the tubulars, i.e. riser, drill pipe,
drill collar and casing, are stored on deck in racks positioned towards the center
of the deck. The riser is positioned at section 50, with different diameter casings
provided at sections 52. The casing diameter varies from 30 inches (0.76m) to 5½ inches
(0.14m). Drill pipe is shown at section 54, together with drill collar 56.
[0027] For the first travel path, the pipe racking system comprises two pipe rack handling
machines 40, 42, both of which are used to transport tubulars from their storage racks
60, 62 to the conveyor 36. As shown in FIG. 3, the two machines are of different configurations
to handle the different weights of different types of tubulars. The first rack handling
machine 40 is formed from an overhead pipe crane with laterally movable fingers
64, 66 which can be inserted into the ends of a riser
68. To lift a section of riser with this machine, the fingers
64, 66 are descended to the riser, extended laterally to insert into the central aperture
of the riser
68 and to hold it, the crane then lifts to remove the riser from its storage rack
60 and travels along rails
70 to reach a trolley on rails
74, whereupon the crane lowers the fingers
64, 66, and thus the riser, and retracts the fingers
64, 66, once the riser is deposited on the trolley.
[0028] For the lighter casing and drill pipe, a second pipe rack handling machine
42, such as a Pipe Mite™ is used. This machine
42 has a moveable arm
70 which grabs and lifts sections of drill pipe or casing shown in rack
62 and deposits them onto trolleys on the conveyor
36. The machine
42 is movable along rail
72 and use of this machine avoids the need for a second overhead crane.
[0029] The conveyor
36 transports the tubulars such as riser, casing and drill pipe, to the handling station
34, and comprises guide rails
74 bearing trolleys and a scissor raiser
76 at the end of the rails
74 closest to the handling station. The rails
74 follow a flat path along the deck area, with the scissor raiser
76 being provided to raise each trolley to the height of drilling platform height, as
typically the platform
80 bearing the derrick is raised above the deck portion bearing the rails
74.
[0030] The handling station
34 is provided with a hoist
82 for lifting tubulars from a conveyor trolley
84, a false mousehole
86 leading down into the column below, a double roughneck
90 and a turning table for the roughneck. The double roughneck
90 includes two pairs of tongs of different diameters so that it can join different
sizes of tubulars. However as an obvious alternative, two separate roughnecks with
different diameter tongs may be provided. In FIG. 2, the pipe handling machine
44 is shown at the handling station
86, although it moves between the handling station
86 and the well center
30 along rail
92, as later described. The pipe handling machine
44 has three angled extendible arms
94, 96 and
98 for improved weight lifting and safety characteristics.
[0031] The handling station
34 and pipe handling machine
44 assemble stands of tubulars i.e. two or more joined sections of tubular, from tubulars
supplied along the conveyor. Once stands are assembled, they are stored in storage
areas
100, 102 ready for supply to well center
30 when required. The storage areas
100, 102, 104, 106 are provided with two racks, a high rack for stands of riser and a low rack for stands
of casing and piping. The high rack has movable fingers which are extended to support
stands of risers, but yet withdraw to allow access to the lower rack when storage
of stands of casing and stands of drill pipe is required. Which stands are stored
at the storage areas
100, 102, 104, 106 will depend on the depth of well drilled, with early in drilling the storage areas
being occupied by stands of risers, at the middle of drilling by stands of different
diameter casings and towards the end of drilling with stands of drill pipe.
[0032] The use of the handling assembly to produce stands of risers, casings and drill pipe
will now be described with reference to the path of travel including conveyor
36, handling station
34, pipe racking system
40, 42, and pipe handling machine
44.
[0033] Firstly individual sections of tubulars such as risers, casings or drill pipe are
conveyed from storage areas
50, 52, 54 and
56 to trolleys on the guide rails
74 by use of the pipe racking machines
40, 42 as described above and as shown in FIG. 3. One or more tubulars are placed onto each
trolley and when the trolley has the required number of tubulars placed on it, it
travels along guide rails
74 and onto scissor raiser
76. The scissor raiser
76 then raises as shown in FIG. 4, and lifts the trolley
84 to the level of the drill platform
80 bearing the derrick and thus to the same level as the handling station
34.
[0034] At the handling station
34, the tubulars are assembled into stands, and these stands are transferred by means
of the pipe handling machine, and where appropriate in combination with a hoist on
the derrick, to storage areas
100, 102.
[0035] Once the trolley
84 is raised, the auxiliary hoist
82 is lowered and its latching mechanism grabs the tubular
110 as shown in FIG. 5. The hoist
82 is raised and the tubular
110 is lifted from horizontal to vertical, and suspended with sufficient working height
using an appropriate stop arrangement. The pipe handling machine
44 extends its lower arm
94 to grasp and support the suspended tubular
110 and the hoist
82 releases its grip on the tubular
110. The pipe handling machine
44 lifts up the tubular
110 and pivots about turntable
112 to place the tubular
110 into the mousehole and to lower it until it is clamped by the mousehole
86. This step is then repeated with another piece of tubular
114. As shown in FIG. 6, as the second tubular
114 is fed onto the top of the first tubular
110, the roughneck
90 travels along rails to reach the mousehole
86 and uses its tongs to connect the two pieces of tubular together. The roughneck
90 has two pairs of tongs of varying diameter to cope with different diameters of casing
or piping.
[0036] When assembling a stand of casing, this operation is repeated until three sections
of casing are assembled into a triple stand by the roughneck
90. When assembling drill pipe into a stand, the operation is repeated until either three
sections of drill pipe are assembled into a triple stand or until four sections of
drill pipe are joined together into a fourble stand by the roughneck
90. Where a riser is assembled into a stand, this is only a double stand consisting of
two sections of riser. When connecting the two risers together, manual connection
is required, as the roughneck
90 is not capable of making this connection.
[0037] Once a stand of piping or casing is assembled, the pipe handling machine
44 pivots and extends its three arms
94, 96, 98 to grasp the stand and to raise it from the mousehole
86. The arms
94, 96, 98 are then brought in towards the central axis of the handling machine
44 and it pivots about turntable
112 to then transport the stand along rails
92. The stand can either be delivered directly to well center
30 or typically will be placed in storage areas
100, 102 ready for use when required.
[0038] Where a stand of riser
116 is in the mousehole
86, the stand of riser
116 is lifted out of the mousehole
86 by a hoist
120 from a bridge crane up in the derrick as the pipe handling machine 44 cannot carry
the weight of a stand of riser. The lower part of the derrick hoist
120 can be seen in FIG. 7. Once the double riser stand
116 is removed from the mousehole
86, the hoist
120 and the pipe handling machine
44 move in tandem along the direction of rail
92, the pipe handling machine
44 acting to provide lateral guidance of the stand
116, although support of the weight of the stand is provided by the hoist
120. As before the stand can either be delivered directly to well center
30 or placed in storage areas
100, 102 ready for use.
[0039] Near well center
30, the drilling apparatus
32 required to make hole, comprising a travelling system, roughnecks and associated
turntable are shown. Drill pipe stands
120, 122 are provided either side of well center
30 with differently configured bottom hole assemblies
124, 126 (BHA) also provided. Blow out preventers (BOPS) are also stored nearby.
[0040] When new riser, piping or casing is required for insertion into the well hole
30, the pipe handling machine
44, or pipe handling machine
44 and derrick hoist
120 where stands of riser are being moved, picks up the stands from storage areas
100, 102 and moves along rail
92 until a position adjacent well center
30 is reached. The travelling system comprising a travelling block and power swivel
is then raised from the drill hole
30 and the stand of pipe placed in the well center
30 using a combination of drawworks, drilling line, crown sheaves and travelling block
assembly configured in a multi- part block and tackle arrangement.
[0041] The pipe handling machine
44 or hoist
120 is removed from well center
30 and the travelling system is then lowered to engage with the upper end of the stand
and the drilling operation is continued. The machine
44 and hoist
120 are able to retrieve or place stands in any of the storage areas near the derrick
independently of well operation as the pipe handling centerline is offset sufficiently
from the well centerline. When stands are retrieved from the well center, they are
returned to the setback areas by the pipe handling machine, or hoist as appropriate.
[0042] Stands of tubulars can be broken down and laid out of the derrick by reversing the
process described above.
[0043] The handling assembly substantially eliminates activities from the well construction
critical path that do not directly result in making hole, i.e. picking up or laying
down pipe, and generally integrates drilling processes, thus providing at least a
50%+ reduction in tubular handling time, by enabling pipe, casing, riser etc., to
be assembled in stands off the critical path. Logging toolstrings, core barrells etc
can also be stored as stands (fourbles, triples, or doubles) as required. This results
in a significant reduction in "flat time", the time spent not making hole. The reduction,
some 25%, is readily quantifiable, and is due to gains in mechanical efficiency resulting
from removing activities from the critical path altogether, or significantly reducing
their impact by increasing the number of parallel activities, as the configuration
of all machines in the assembly enables concurrent operations of any or all machines
in the assembly.
[0044] The handling assembly thus allows stands of tubulars, such as stands of risers, stands
of casing and stands of drill pipe, to be made by both handling stations whilst the
wellbore is being drilled, and for the stands to be directly transported to well center,
whilst one or both of the handling stations are making stands. Thus making of stands
can be simultaneous at both handling stations with drilling, or making of stands can
be simultaneous with drilling at one handling station if the other handling station
is required to perform other tasks during making hole.
[0045] On the rig, subsea and completion facilities include dedicated rectangular storage
areas adjacent the port and starboard sides of the substructure for locating tree
running, subsea equipment, and well testing equipment. Additionally the BOP and riser
are hung off moonpool beams and moved away from well center 30 which allows the BOP
to remain deployed, while open water work is performed over the well. This feature
also enables the BOP to remain deployed during short infield moves, saving the run/retrieval
time for the BOP.
[0046] The following example describes a typical deep water-drilling programme:
[0047] While surface hole is drilled, the conductor casing, and 26" (0.66m) BHA are made
up in either of the handling stations, ready to run.
[0048] Once the conductor is set, the 26" (0.66m) hole section is drilled using the pre-assembled
26 BHA, while racking back 20" (0.5m) casing, 17½" (0.44m) BHA's, and riser. Additionally
17½" (0.44m) hole section mud is prepared.
[0049] After setting 20" (0.5m) casing, the BOP is run using the double stands of riser
at rates in excess of 520 fph (158.5 mph). This means for example that in a water
depth of 7500 ft (2286m) the BOP can be run in approximately 14 hours compared with
up to 62 hours for a conventional rig. While the BOP is tested, and the section is
drilled, the 13 3/8" (0.34m) casing is picked up and racked in the derrick. The 36"
(0.91 m) and 26" (0.66m) BHAs are laid down and the 12¼" (0.31m) hole section mud
is prepared.
[0050] While the 12¼" (0.31m) hole section is drilled using the pre-tested BHA's, the 9
5/8" (0.24m) casing is picked up and racked in the derrick along with any logging
tools that may be required for the section. Also, the 8½" (0.21m) hole selection mud
is prepared. Additionally if a tree is to be run, it can be prepared in a dedicated
transport and storage area.
[0051] While the 8½" (0.21m) hole section is drilled , the 7" (0.18m) liner and test string
for completion are racked in the derrick. Additionally, if required a completion riser
may also be racked back. If the well is to be tested, either the permanently installed
or temporary test equipment is prepared. Once the liner is set, the well can either
be tested, or if it is to be completed, the completion run, the BOP recovered and
the tree run.
[0052] In a further embodiment of a handling assembly in accordance with the invention,
two pipe rack handling machines are provided, and instead of the earlier scissor raiser,
a ramp is provided in combination with rails. In this embodiment, one pipe rack handling
machine is the same as that shown by reference numeral 40 in FIG. 2.
The second pipe rack handling machine is similarly configured, but is adapted to handle
less heavy tubulars, such as lighter casing and drill pipe. Thus as for machine 40,
the second machine is an overhead crane with laterally movable fingers which hold
and lift sections of drill pipe or casing shown in rack 62 in the same manner as machine
40 as previously mentioned, lifts the riser.
[0053] As sections of tubular are lifted by the pipe handling machines, the cranes move
along rails to deposit the tubulars onto trolleys which are movable along rails.
The rails follow a flat path along the deck area, with the ramp being provided to
raise the trolleys to the height of the drilling platform.
[0054] Once the trolley is on the ramp and the front end of the trolley has reached the
top end of the ramp, the auxiliary hoist 82 is lowered and its latching mechanism
grabs the tubular largely as previously discussed in relation to FIGs. 4 to 7.
1. A handling assembly for use on a rig (10), comprising one well center (30) and at
least two handling stations (34, 35) for storing tubulars and assembling them into
stands, characterised in that the handling assembly further comprises transfer means (44, 120, 92) for transporting
assembled stands to the well center, wherein the handling stations are spaced apart
from well center.
2. A handling assembly according to claim 1, wherein the handling stations are displaced
either side of the well center, with a storage area (100, 102) for vertically oriented
stands being provided between each handling station and the drilling apparatus.
3. A handling assembly according to claim 1, having at least one mousehole (86) associated
with each of the handling stations and the well center.
4. A handling assembly according to claim 1, having at least one mousehole (86) associated
with at least one of the handling stations, wherein the diameter of the mousehole
is sufficient for the assembly of casing stands.
5. A handling assembly according to claim 1, having a racking system (40, 42) for drill
pipe stands, casing stands and riser stands.
6. A handling assembly according to claim 1, wherein a conveyor system (36) is provided
to transport tubulars to the handling station, the conveyor system comprising lifting
means (82) and trolleys (84) for bearing tubulars to the handling station.
7. A handling assembly according to claim 1, wherein the transfer means comprises a hoist
means (82) and a pipe handling assembly (44), with the hoist means bearing the weight
of a riser stand as it is transported to well center and the pipe racking system travelling
with the hoist means to provide lateral guidance of the riser stand.
8. A method of supplying drilling apparatus at well center with stands of tubulars through
a handling assembly according to claim 1,
characterised in that the method comprises the steps of:
1) Conveying tubulars to a first handling station (34, 35) and a second handling station
(34, 35), the handling stations being placed on different sides of the well center
(30);
2) Assembling tubulars into stands at the first handling station whilst simultaneously
drilling at well center;
3) Transferring the assembled stands to the drilling apparatus.
9. A method of supplying drilling apparatus according to claim 8, wherein the first handling
station assembles stands simultaneously with drilling at well center, whilst the second
handling station performs tasks related to drilling.
10. A method of supplying drilling apparatus according to claim 9, including moving stands
from one handling station to well center, whilst the other handling station is assembling
stands.
11. A method of supplying drilling apparatus according to claim 8, including assembling
tubulars into stands at both the first and the second handling stations whilst simultaneously
drilling at well center.
12. A method of supplying drilling apparatus according to claim 8, in which after assembly
of the tubulars into stands, the stands are stored in a position between a handling
station and well center.
1. Assemblage de manutention pour utilisation sur un appareil de forage (10), comprenant
un centre de puits (30) et au moins deux stations de manutention (34,35) pour l'entreposage
de tubes et leur montage sous la forme de tiges, caractérisé en ce que l'assemblage de manutention comprend de plus des moyens de transfert (44,120,92)
pour transporter les tiges assemblées vers le centre du puits, dans lequel les stations
de manutention sont disposées de part et d'autre du centre du puits.
2. Assemblage de manutention selon la revendication 1, dans lequel les stations de manutention
sont déplacées de chaque côté du centre du puits, avec une zone de stockage (100,102)
pour orienter verticalement les tiges étant fournies entre chaque station de manutention
et l'appareil de forage.
3. Assemblage de manutention selon la revendication 1, ayant au moins un trou de souris
(86) associé avec chacune des stations de manutention et le centre du puits.
4. Assemblage de manutention selon la revendication 1, ayant au moins un trou de souris
(86) associé avec au moins une des stations de manutention, dans lequel le diamètre
du trou de souris est suffisant pour le montage du cuvelage des tiges.
5. Assemblage de manutention selon la revendication 1, ayant un dispositif de gerbage
(40,42) pour les tiges de tubes de forage, le cuvelage de tiges et de colonnes de
tiges.
6. Assemblage de manutention selon la revendication 1, dans lequel un dispositif de convoyage
(36) est fourni pour transporter les tubes vers la station de manutention, le dispositif
de convoyage étant constitué de moyens de levage (82) et de chariots (84) pour porter
les tubes jusqu'à la station de manutention.
7. Assemblage de manutention selon la revendication 1, dans lequel les moyens de transfert
comprennent des moyens de levage (82) et un assemblage de manutention de tubes (44),
les moyens de levage portant le poids d'une colonne de tiges quand elle est transportée
vers le centre du puits et le dispositif de gerbage des tubes circulant avec les moyens
de levage pour fournir un guidage latéral de la colonne de tiges.
8. Procédé pour fournir un appareil de forage au centre d'un puits avec des tiges de
tubes à travers un assemblage de manutention selon la revendication 1,
caractérisé en ce que le procédé est constitué des étapes de :
1) Convoyage des tubes vers une première station de manutention (34,35) et une deuxième
station de manutention (34,35), les stations de manutention étant placées sur différents
côtés du centre du puits (30) ;
2) Assemblage des tubes en tiges à la première station de manutention tout en forant
simultanément au centre du puits ;
3) Transfert des tiges assemblées vers l'appareil de forage.
9. Procédé pour fournir un appareil de forage selon la revendication 8, dans lequel la
première station de manutention assemble les tiges simultanément avec le forage au
centre du puits, pendant que la deuxième station de manutention réalise les tâches
en rapport avec le forage.
10. Procédé pour fournir un appareil de forage selon la revendication 9, comprenant le
déplacement des tiges depuis l'une des stations de manutention vers le centre du puits,
pendant que l'autre station de manutention assemble les tiges.
11. Procédé pour fournir un appareil de forage selon la revendication 8, comprenant un
assemblage de tubes en tiges à la fois à la première et à la deuxième station d'assemblage
pendant le forage simultané au centre du puits.
12. Procédé pour fournir un appareil de forage selon la revendication 8, dans lequel après
l'assemblage des tubes en tiges, on stocke les tiges dans une position entre une station
d'assemblage et le centre du puits.
1. Handhabungsanordnung zur Verwendung auf einer Bohrinsel (10), umfassend ein Quellenzentrum
(30) und zumindest zwei Handhabungsstationen (34, 35) zur Lagerung von Rohren und
ihrer Anordnung in Ständern, dadurch gekennzeichnet, daß die Handhabungsanordnung weiterhin Übertragungseinrichtungen (44, 120, 92) zum Transport
der angeordneten Ständer zu dem Quellenzentrum umfaßt, wobei die Handhabungsstationen
von dem Quellenzentrum einen Abstand aufweisen.
2. Eine Handhabungsanordnung nach Anspruch 1, wobei die Handhabungsstationen auf beiden
Seiten des Quellenzentrums angeordnet sind, mit einem Lagerbereich (100, 102) für
vertikal ausgerichtete Ständer, die zwischen jeder Handhabungsstation und dem Bohrgerät
vorgesehen sind.
3. Eine Handhabungsanordnung nach Anspruch 1, die zumindest ein Mausloch (86) zugehörig
zu jeder Handhabungsstation und dem Quellenzentrum aufweist.
4. Eine Handhabungsanordnung nach Anspruch 1, die zumindest ein Mausloch (86) verknüpft
mit zumindest einem der Handhabungsstationen aufweist, wobei der Durchmesser des Mausloches
ausreichend für die Anordnung von Gehäuseständern ist.
5. Eine Handhabungsanordnung nach Anspruch 1, mit einem Regalsystem (40, 42) für Bohrrohrständer,
Gehäuseständer und Steigrohrständer.
6. Eine Handhabungsanordnung nach Anspruch 1, wobei ein Fördersystem (36) vorgesehen
ist, um Rohre zu der Handhabungsstation zu transportieren, wobei das Fördersystem
Hebeeinrichtungen (82) und Transportwagen (84) zum Tragen von Rohren zu der Handhabungsstation
aufweist.
7. Eine Handhabungsanordnung nach Anspruch 1, wobei die Übertragungseinrichtungen eine
Hebeeinrichtung (82) und eine Rohrhandhabungsanordnung (44) umfaßt, wobei die Hebeeinrichtung
das Gewicht eines Steigrohrständers trägt, während er zu dem Quellenzentrum transportiert
wird, und das Rohrlagersystem mit der Hebeeinrichtung wandert, um eine seitliche Führung
des Steigrohrständers zu liefern.
8. Ein Verfahren zur Lieferung eines Bohrgeräts am Quellenzentrum mit Ständern von Rohren
mittels einer Handhabungsanordnung nach Anspruch 1,
dadurch gekennzeichnet, daß das Verfahren folgende Schritte aufweist:
1) Fördern der Rohre zu einer ersten Handhabungsstation (34, 35) und einer zweiten
Handhabungsstation (34, 35), wobei die Handhabungsstationen an unterschiedlichen Seiten
des Quellenzentrums (30) angeordnet sind;
2) Anordnen von Rohren in Ständern an der ersten Handhabungsstation während gleichzeitigen
Bohrens am Quellenzentrum;
3) Übertragen der angeordneten Ständer zu dem Bohrgerät.
9. Ein Verfahren zur Lieferung eines Bohrgerätes gemäß Anspruch 8, wobei die erste Handhabungsstation
die Ständer gleichzeitig mit dem Bohren am Quellenzentrum anordnet, während die zweite
Handhabungsstation Aufgaben durchführt, die dem Bohren zugeordnet sind.
10. Ein Verfahren zur Lieferung eines Bohrgeräts nach Anspruch 9, einschließlich Bewegen
der Ständer von einer Handhabungsstation zu dem Quellenzentrum, während die andere
Handhabungsstation Ständer anordnet.
11. Ein Verfahren zur Lieferung eines Bohrgeräts nach Anspruch 8, einschließlich Anordnen
von Rohren in Ständer an sowohl der ersten wie auch der zweiten Handhabungsstation
während gleichzeitig am Quellenzentrum gebohrt wird.
12. Ein Verfahren zur Lieferung eines Bohrgerätes nach Anspruch 8, bei dem nach der Anordnung
der Rohre in Ständern die Ständer in einer Position zwischen einer Handhabungsstation
und einem Quellenzentrum gelagert werden.