[0001] The present patent has for object a mobile mixer to be used in train for cold recycling
asphalt concrete roadways.
[0002] The innovation finds particular even if not exclusive application in a mobile train
to operate in situ in the road paving/repaving by also using recyclable material obtained
by road scarification of the pre-existing road paving (art commonly known as "stabilisation").
[0003] State of the art for in situ repaving: In prior art self-propelled systems for road
repaving operating in situ are known, to see: IT-UD97A000143 / EP-A-9811183.1 (Marini);
IT-4753489.A.89 /EP-A-0378973 (Todini); EP-A-0324491 (Wirtgen).
[0004] The in situ road (directly road), repaving known art provides the mixing and preparation
of the components on the road itself after having carried out the milling (scarification)
of the road paving for a certain depth (some centimetres), by means of a first front
milling self-propelled machine, known as scarifier machine, which provides for milling
the material upstream by a milling machine discharging it downstream on another towed
machine, with eventual addition of new grit (for example by a grit spreader operating
in front of the train), for the correction of the granulometric curves, and addition
of binding materials with mixing action before the laying on road.
[0005] This second machine realises the so-called "Wood Train".
[0006] The "Wood Train "is substantially made up of:
- an inert materials spreader (grit spreader);
- a scarifier machine (road paving milling machine);
- a heap shaper-meter to form a continuous and constant in section grit line;
- a machine for the grit line picking up or loader machine;
- a machine for receiving and weighing the material from the first one and for a rotating
drum continuous mixing associated with a spreader of binding material on the mixer,
associated with a tank for the binding material, endowed with conveying means for
making the necessary binder material flow within the mixer, through said spreader,
and associated with means for spreading the material on the road.
[0007] By the " Wood Train " method the work is started from the scarifier machine which
scarifies (mills) the road paving for a certain depth transforming the road pavement
in granular form (broken asphalt) , discharging it in a downstream line (grit line
or broken asphalt continuous cumulus or continuous heap) where the heap shaper-meter
adjusts it.
[0008] Wanting granulometric curve correction, the corrective grit is spread by a grit spreader
upstream of the scarifying machine, directly on the road pavement to be scarified,
so that an even mixing virgin material or rejuvenant material with scarfied (milled
material), by means of the same action of the milling cutters is obtained.
[0009] The train of machines which substantially concern the mixing, therefore downstream
of the scarifier machine, which generally operates separately, subsequently provides
in the front-end, a self-propelled loader that conveys the broken material previously
prepared in grit heap-line to a towed mixer machine which substantially concerns this
invention, through a proportioning hopper, from which through a suitable ponderal
dosage, it is discharged into the mixer.
[0010] The towed mixing machine, mixes the materials introducing the hot or cold bituminous
binder into a mixer, by a pump connected to the aggregates feeding system in order
to add the binder necessary for the mixing by picking it up from a suitable binder
material tank integrated with the train (asphalt recycling travelplant with cold planer).
[0011] The mixer or mixing machine or blending machine, is made up of a container having
a double rotor with blades.
[0012] In prior art, one or more direct flame burners for the binder (bitumen) eventual
heating are provided, and the mixed material is discharged while still hot, that is
with the mixed bitumen not yet solidified, in the form of a heap line (grit line),
from the rear mouth of the mixer,
[0013] The following machine in the train provides for spreading the material on the road
by spreader.
[0014] At the end of the train a self-propelled finishing road straightening machine and
vibrating-roller and/or gummed rollers is provided.
[0015] About the mixing unit, additional water tank to the binder tank may be provided for
cement mixture.
[0016] Of course the same train can perform stabilisations with cement or with other binders
(generally cold) such as for example bituminous mixtures in solution with solvents
or in emulsion with water.
[0017] In IT-83469 A/88 Marini, it is proposed a solution of a train that concerns a plant
to mix and produce in continuous conglomerates of different composition, in which
it is provided:
- a mixing base unit, combined with:
- a demontable unit for the addition of solid binder in powder form, interchangeable
with
- a demontable alternative unit for the addition of liquid or semi-liquid binder,
- or vice versa.
[0018] In this way preparing stabilised conglomerates with both cement and bitumen, by simply
changing the binders feeding units from the whole mixing structure, is possible with
the same mixing unit.
[0019] In said solution advantageously the mixing unit includes a mixer group or unit (equipped/able
with a water or volumetrically proportioned bituminous binders spraying device), of
the "Trough" type with a pair of horizontal or lightly tilted shafts, longitudinally
placed parallel to one another endowed with oppositely rotating mixing blades.
[0020] In this way it is possible to strongly compact the mixing unit size and it is possible
to easily arrange the binder addition unit above the mixer device.
[0021] It is also provided the addition of an intermediate machine between the collecting
machine and the mixer/blending machine which provides for a perfect cleaning of the
road bed before the binder material spraying and mixed material laying is carried
out by the mixing machine, but this addition of an intermediate cleaning-machine,
besides lengthening the train, makes the transfer of the material collected by the
collecting machine to the following mixing machine difficult.
[0022] With the IT-UD97A000143 / EP-A-9811183.1 (Marini); a road paving cold recycle train
is provided, the train being for the collection in continuous of bulk material in
a grit line along the feather-edge restoration runway, of the type frontally involving
two arms with means for picking -up the bulk material in front of their path and means
for the conveying on a downstream blending machine, which includes between the wheels
or front tracks and wheels or rear tracks, suction means (SA) for sucking all that
granulated material and dust which the front pick-up means have failed to collect
from the underlying paving is provided.
[0023] Also the solutions IT-4753489.A.89 /EP-A-0378973 (Todini); EP-A-0324491 (Wirtgen),
where in both solutions it is provided:
- scarifier means to collect the material to be mixed from the road and to discharge
it into a heaping hopper which comprises weighing means;
- means to clean the road from the material left by using suction as in the former solution;
- means to transfer the collected material to sieving means;
- means for grinding the material discarded from the sieving for the recycle and
- at least one tank to mix the material in mixing means and
- means for spreading the mixed material on the road to form a paving new layer.
[0024] These latter solutions, and in particular even if the first one is more advantageous,
have the drawback of using an art of mixing with bituminous emulsion, which involves
autonomy problems (emulsion, on an average: 60% bitumen and 40% water).
[0025] While the cold solutions, previously mentioned, are complex, difficult and hardly
reliable in consideration of the fact that:
- the use of sole cement is provided for sole ground layers;
- the use of cold bituminous emulsion did not allow to reach a suitable performance
particularly due to technical mixing complexities and difficulties and also with spreading
modified emulsions and problems of fast and effective use of the new paving.
[0026] Purpose of the present innovation is to realise a new train particularly suitable
to the cold working and laying of the material, without the drawbacks, complexity,
problems, of the prior cold arts and of the as much complex hot laying arts.
[0027] The problem is solved as claimed by means of a vehicle to mix in continuous aggregating
material with binder material, to be associated in a road repaving train substantially
operating with cold laying, of the type comprising bitumen as a binder base, wherein
it si further provided in combination:
- means to heat said binder material in fluid form at 150/200°C, preferably at about
170°C, before the spraying in said mixing means;
- means to convey hot and fluid bitumen in a controlled way, pressure and flow rate,
with additives, through a static turbo-mixer to respective sprayers above said mixer,
associated with:
- means to inject water, in a controlled way, to said binder material immediately before
the spraying, upstream of said sprayers, under such a pressure to prevent the vaporisation
of said added water, in order that at the exit from said spraying means a bitumen
foam is formed, caused by the expansion by evaporation of the particles of water that
is sprayed in the cold aggregate material being mixed thus mixing and binding with
it.
[0028] In this way the advantage of a cold operating by starting from the base material
that substantially remains the bitumen, which assures the better binding is obtained.
[0029] Advantageously also the addition to the mixer of fluid cement mortar substantially
including at least water and cement, the whole being mixed in said mixer is provided.
[0030] In this way a paving material with high sticking quality, resistance to wear, breakage
and detachment from the road bed is obtained.
[0031] Advantageously the mixer to form a cold recycle self-propelled train for the road
paving rehash, of the type involving:
- a feeding-proportioning front hopper with weighing belt, to collect the material to
be recycled from a front vehicle;
- at least a tank of additives and a tank of water to be added to the material to be
recycled;
- at least one silo or tank of mixture cement to be added to the material to be recycled,
with a respective cement proportioning unit or device;
- a water-cement blending group;
- a mixer group including:
- a mixer to mix said material to be recycled coming from said hopper with said additives,
water and cement;
- a multiple ramp for spraying foam bitumen, additives, water and cement mortar;
- a belt for discharging in a line the mixed material along the road;
- a control electric board
- an electric generator.
[0032] In which it is provided that said mixing means and said binder material spreading
means provide:
- means to heat and/or to maintain said binder material in fluid form at 150/200°C,
preferably at about 170°C;
- means to convey under pressure in a controlled way said bituminous binder material
to respective sprayers associated with:
- means to add additive substances;
- means to inject water, in a controlled way, to said binder material immediately before
the spraying, upstream of said sprayers, under such a pressure to prevent the expansion
by vaporisation of said added water;
- in order that at the exit from said spraying means the expansion by evaporation of
the water particles occurs forming a bituminous material foam that is sprayed in the
material being mixed thus mixing and binding with it.
- and means for the addition to said cement mortar mixer substantially made up of a
previous liquid mixture of water and cement.
[0033] A towing vehicle provides to feed the fluid bitumen to said mixer in said spraying
ramp.
[0034] In this way a maximum performance and functionality of the train self-propelled plant
is obtained, and in particular a cold road paving stratification of maximum reliability
and with all the qualitative features of the hot bituminous mixture may be carried
out, but using a cold instead of an hot working and without the need of using a bituminous
emulsion which proved to be little practical, as the very reduced volume of the water
used in the bitumen foaming, after the spraying, forces its rapid evaporation, obliging
the bitumen to coat and to stick strongly to the respective granules during mixing.
[0035] The addition of cement binder favours a fastest absorption in the mixture of the
waste water after the new layer rolling, making the new paving more rapidly practicable.
[0036] Advantageously the additive materials to the bitumen are amines in the 1/3% percentage,
which favour the realisation of the mixture.
[0037] The amount of bitumen is advantageously provided in about 2-4%, advantageously in
about 3% of the material to be recycled (aggregates).
[0038] The amount of water for the bitumen foaming, advantageously ranges within a 2 to
5 % value.
Description
[0039] These and other advantages will appear from the following detailed description of
preferred solutions of embodiments with the aid of the enclosed drawings whose details
are not to be considered limiting but only illustrative.
Figure 1 shows a sideways schematic view in elevation of the mixing vehicle, according
to this innovation.
Figure 2 shows a schematic view of the mixing apparatus with the mixer schematised
in cross section.
Figure 3 shows an enlarged schematic view of the foamed material spraying system,
in this specific case showing two of the series of spraying nozzles that extend above
the mixer.
Figures 4,5 show schematic views in front longitudinal elevation and from the top,
of the mixer, above which the binder material spraying ramp insists.
[0040] Referring to the figures it can be noticed that the mixing vehicle according to this
invention includes:
- a front feeding-proportioning hopper with weighing continuous belt (1), to collect
the material to be recycled or aggregate, from a preceding vehicle;
- at least one tank of additives (2) and a water tank (3) to be added to the material
to be recycled;
- a silo of mixture cement (4) to be added to the material to be recycled, with a respective
cement proportioning unit (5);
- a water-cement blending unit (6);
- a mixer blending unit (7) including:
- a mixer (P1) to mix said material to be recycled or aggregates, coming from said hopper
(1) with cement+water (3-P6-P8; 3 - P6-P9);
- a multiple ramp for bitumen spraying (P2) with by-pass control, liter-counter (P3)
and static mixer (P4), toward compressed air pressure nozzles (P10) to obtain a bitumen
foamed with pressurised water before the spraying (3-P7) in said spraying nozzles
(P12) for the formation of foamed bitumen that will be mixed with the material being
mixed in said mixer, being said additives (2-P5) added to the fluid bitumen and mixed
with it by static mixer or turbo-mixer (P4), while the cement mortar is separately
added (M-E);
- a belt for the discharge in a line (9) of the mixed material along the road;
- a control electric board (11) associated with a computer for controlling the dosages
(PLC=Programmable Logic Computer) operating in function of the bitumen temperature
(P13), of the aggregates weighing (P14), of the bitumen dosage set (P15), of the additives
dosage set (P16), of the water and cement dosage set in form of fluid cement mortar
(P 17) and of the water dosage set (P18);
- an electric generator (10) for the functioning of all the vehicle apparatuses.
[0041] Substantially said mixing means and said binder material delivering means provide:
- means to heat said binder material in fluid form at 150/200°C, preferably at about
170°C, before of spraying (U2) in said mixing means (P1);
- means to convey by pressure and in a controlled way by a litre-counter (P3) said
bituminous binder material (B-P2) with additives (AD-P5) through a static turbo-mixer
with opposite vanes (P4), to respective sprayers (P1) associated to:
- means to inject water, in a controlled way (P7-U2), to said binder material immediately
before the spraying, upstream of said sprayers (U3), with such a pressure to prevent
the expansion of said added water;
- in order that at the exit from said spraying means (U3) the expansion by evaporation
of the water particles is obtained forming a bituminous material foam that is sprayed
into the material being mixed thus mixing and binding with it (P1).
[0042] As said, means for the transport of the bitumen (B) in the fluid state and its feeding
in the train from a towing vehicle to said mixer in said spraying ramp (P12) are provided.
[0043] In this way a plant maximum performance and functionality is obtained.
[0044] More in particular a continuous mixer (P1) with double axis (Ax) with co-penetrating
blades or crossing blades (PO) and discharge at one end (S) is used while on the top
the spraying ramp extends (P12) with a plurality of sprayers comprising an additived
bitumen duct (B+AD), that gets through an interchangeable gauger (U1) to flow in a
turbulence pre-chamber where the water is injected under pressure (H2O), which is
tightly mixed with the bitumen and additive (B+AD) and exits from the spraying nozzles
with rapid expansion of the water particles that immediately evaporate foaming the
material, which falling above the mixer (P1) is mixed with the aggregate together
with the liquid cement mortar (M).
[0045] Each proportioning pump (P5, P2, P7, P8, P9) is controlled by a flow rate checking
system (PLC=Programmable Logic Computer) by a variable motor (M) and by a tacho-dynamo
(tachymetric dynamo or tachymeter-dynamo, P6).
[0046] A by-pass (BP) in the bitumen feeding for the recirculation in case of delivery stop
to the mixer is provided.
[0047] The computer-controlled system determines and controls all the parameters for a regular
continuous working.
[0048] More particularly the mixing vehicle is endowed with the following devices or units:
- in the front said aggregate feeding-proportioning hopper, with underlying continuous
weighing belt (1n) connected to said aggregates control means (P14-PLC=Programmable
Logic Computer), that carries the material, backwards, in a controlled amount for
discharging it above said mixer (7) underlying said water tank (3), said additive
materials tank being provided adjacent to this latter (2-AD) and above said mixer
(7) and under said water tank (3) and additives tank (2), said spraying ramp being
installed (8-P12);
- downstream of these, from beneath the discharge (S) of said mixer (P1), said discharge
continuous conveyer belt (9) which tilts upwards and protrudes backwards from the
vehicle, for the rearward mixed discharge material starts;
- above said discharge continuous conveyer belt (9) and immediately after and above
said mixer group (P1, 8-7) the cement silo (4) from which the cement is taken by a
conveyer system (55) up to the rear cement dosage unit (5) which discharges the cement
in the blending unit with water (6) for the formation of a mortar that is sent by
means of a volumetric/proportioning pump to the mixer (E) is installed;
- said electric generator that controls all the vehicle devices is placed above said
discharge continuous belt (9) and behind this and always above said discharge continuous
belt, also said control board into an electric box accessible from outside (11), which
also includes the processor means (computer) for the control of all the system working
or working process (PLC=Programmable Logic Computer) is placed.
1. An in-situ mixer vehicle to mix continuous aggregating material with binding material,
to be associated in a road repaving train substantially operating with cold laying
process, of the type comprising bitumen as binder base, and having a mixing means
unit, characterised in that it is provided:
- means to heat said binding material in fluid form at 150/200°C, before of the pressure
spraying (U2), in said mixing means (P1);
- means to convey hot and fluid bitumen (B, P2) in a controlled way (P3) with additives
(AD) through a static turbo-mixer blender with opposite vanes (P4), to respective
sprayers (P1) associated with:
- means to inject water, in a controlled way (U2), to said binding material immediately
before the spraying, upstream of said sprayers (U3), under such a pressure to prevent
the expansion of said added water, in order that at the exit from said spraying means
(U3) the expansion by evaporation of the water particles forming a foam of bituminous
material which is sprayed into the in-mixing aggregating material, thus mixing and
binding with it (P1) is obtained.
2. An in-situ mixer vehicle according to claim 1., characterised in that the temperature
of the supply of said binding material in fluid form is about 170°.
3. An in-situ mixer vehicle according to claim 1., characterised in that it comprises:
- a feeding/proportioning front hopper with weighing continuous belt (1) connected
to said aggregates control means (P14-PLC=Programmable Logic Computer), to collect
the material to be recycled or aggregate, from a previous vehicle;
- at least one additives tank (2) and a water tank (3) to be added to the material
to be recycled or aggregate;
- a silo of mixture cement (4) to be added to the material to be recycled or aggregate,
with a respective cement dosage unit (5);
- a water-cement blending unit (6);
- a feeding and dosage group of the cement mortar to the mixer (E,P1-7)
- a mixer unit (7) including:
- a mixer device (P1) to mix said material to be recycled or aggregates, coming from
said hopper (1) with cement+water (3-P6-P8; 3-P6-P9);
- a multiple ramp for bitumen spraying (B-P2) with by-pass control, litre-counter
(P3) and static mixer (P4), toward compressed air pressure controlled nozzles (P10)
to obtain a foamed bitumen by injecting pressurised water before of the spraying (3-P7)
in said spraying nozzles (P12) for the formation of foamed bitumen that is mixed with
the material being mixed in said mixer (P1), being said additives (2-P5) added to
the fluid bitumen and mixed with it by static turbo-mixer (P4), while said water and
cement in form of fluid cement mortar, is separately added (M-E);
- a belt for discharging in a line (9) the mixed material along the road;
- a control electric board (11) associated with a computer for controlling the quantity
of the materials to add (PLC=Programmable Logic Computer), operating in function of
said bitumen temperature (P13), of said aggregates weighing (P14), of the bitumen
dosage set (P15), of the additives dosage set (P16), of said cement mortar dosage
set (P17) and of the water dosage set (P 18);
- an electric generator (10) for the operation of all the vehicle apparatuses.
4. An in-situ mixer vehicle according to previous claim, characterised in that it comprises:
- in the front said aggregate feeding-proportioning hopper, with underlying continuous
weighing belt (1n) connected to said aggregates control means (P14-PLC=Programmable
Logic Computer), that carries the material, backwards, in a controlled amount for
discharging it above said mixer (7) underlying said water tank (3), said additive
materials tank being provided adjacent to this latter (2-AD) and above said mixer
(7) and under said water tank (3) and additives tank (2), said spraying ramp being
installed (8-P12);
- downstream of these, from beneath the discharge (S) of said mixer (P1), said discharge
continuous conveyer belt (9) which tilts upwards and protrudes backwards from the
vehicle, for the rearward mixed discharge material starts;
- above said discharge continuous conveyer belt (9) and immediately after and above
said mixer group (P1, 8-7) said cement silo (4) from which the cement is taken by
a respective conveyer (55) towards said rear cement dosage unit (5) which discharges
the cement in the blending group with water for the formation of a mortar that is
sent by means of a volumetric/proportioning pump to the mixer (E) is installed;
- said electric generator that controls all the vehicle devices being placed above
said discharge continuous belt (9) and
- behind this and always above said discharge continuous belt, also said control board
into an electric box accessible from outside (11), which also includes the processor
control means for the control of all the system working (PLC=Programmable Logic Computer)
being placed.