|
(11) | EP 1 083 254 A3 |
(12) | EUROPEAN PATENT APPLICATION |
|
|
|
|
|||||||||||||||||||||||
(54) | Pull cord for blinds and method of making same |
(57) A method of manufacturing a control cord (27) for use in a covering for architectural
openings includes the steps of providing spools (10) of high tensile strength and
low abrasion characteristic yarns (12), tensioning the yarns (12) and winding the
yarns (12) under tension on bobbins (20), placing the bobbins (20) in a braiding apparatus
(26) and making an eight-carrier braid from the yarns (12) on the bobbins (20), and
passing the braided cord (27) through a treatment apparatus (30) where a urethane
coating is applied to the cord (27) and heat cured. |