[0001] It is known to drill a tunnel wherein the tunnel drill device is advanced through
virgin soil. This technique has several drawbacks. Supply and withdrawal of material
and equipment for drilling the tunnel and installing the tunnel tube etc., such as
prefabricated tunnel wall elements and drilling fluids, all takes place from one side
of the tunnel drilling device. In this way the already limited space in the drilled
tunnel is mainly covered by appliances, equipment and materials, and manouvring is
therefor inconvenient. The limited available free space also puts limits to the dimension
of the articles that are used in the tunnel, such as the prefabricated tunnel wall
elements. Also the safety of the personell in the tunnel is insufficiently assured.
Furthermore, this way of drilling a tunnel is relatively slow. Apart from that much
effort is required to follow sufficiently accurate the desired course of the tunnel.
The costs of investment in equipment are relatively high. The tunnel drilling device
pushes against the tunnel wall elements to advance, such that said wall elements should
be dimensioned for the forces acting during tunnel drilling.
[0002] The object of the invention is a tunnel drilling technique with which one or more
of the disadvantages of the known tunnel drilling technique is eliminated.
[0003] According to the invention it is therefor suggested to initially drill one or more
at least substantially parallel guide- or pilot drillings, subsequently followed by
the tunnel drilling device. Particularly, effort is used such that the one or more
pilot drillings come out of the soil at the side of the tunnel drilling device facing
the direction of its advancement through the soil, before the tunnel drilling device
starts following said pilot drillings. Particularly in this way it is made possible
to supply through the pilot drillings to the tunnel drilling device material and/or
equipment for drilling the tunnel.
[0004] "Tunnel drilling" here means each technique (such as also reaming) for making a hole
in the underground wherein the tunnel front advances beneath the surface. The tunnel
to be drilled is particularly designed for making an underground traffic tunnel, such
as for car or train traffic. Therefor, its diameter measures preferably 3m as a minimum.
In particular the invention is applied in sandy soil or some other relatively easily
processable underground, such as clay, peat, gravel or mixtures of these soil types,
wherein these undergrounds are also called "soil" or "earth". During installation
and/or also thereafter, at least a length part of the tunnel installed according to
the invention is at least partly, e.g. over at least 25% or at least 50% of its height,
or over completely its height, beneath the local ground water level. The tunnel drilling
device is preferably designed in accordance with the dimension of the tunnel tube
to be installed therewith. Preferably this device has an underground rotatably fixed
base frame following the advancement of the drilling front and equiped with driving
means to rotatably drive one or more underground drilling members which are rotatable
relative to said base frame and also follow the advance,ent of the drilling front,
such as drilling bits or fluid jet nozzles. Said drilling members preferably push
against the rotatably fixed base frame.
[0005] The pilot drillings have a diameter substantially smaller than that of the tunnel
tube, and can be made by any convenient technique, such as jet grouting or with a
mechanical drilling head. The walls of the pilot drilling can be equiped with a lining
such as a prefabricated tube, the front end of which is preferably moved along with
the drilling front of the pilot drilling.
[0006] With the technique of tunnel drilling the tunnel wall lining is each time added at
the drilling front, such the the tunnel wall lining already applied can remain in
place during the complete procedure. This tunnel wall lining has at least one of the
following functions: Carrying the loads from the surrounding soil; providing a neat
finish of the view side of the tunnel; containing one or more provisions, such as
cables to illuminate the tunnel and/or traffic control or else.
[0007] At least since the tunnel wall lining is each time added at the drilling front, this
technique of underground installation of a tube differs from other techniques wherein
the wall lining is each time added at the side (the back side) opposite the advancing
underground front, such that the already applied wall lining moves along with the
advancing front. Furthermore this technique differs from other techniques due to the
underground drive system for the drilling members moving along with the drilling front.
With other drilling techniques the drive system of the drilling members is located
at the start of the underground tube, and a longitudinally adaptable rotating drive
rod extends therefrom to the drilling members.
[0008] The invention is now further illustrated by way of some embodiments that are not
intended to limit the scope of the invention.
[0009] First refering to fig. 1 and 2. Fig. 1 shows a sectional side view of a tunnel trajectory
during installation, wherein the method according to the invention is applied. Fig.
2 shows the surrounding of the tunnel drilling device more in detail in sectional
side view. A tunnel tube 2 is illustrated below the ground surface 1, debouching above
the ground at one longitudinal end while at the opposite end (the drilling front)
a tunnel drilling device 3 is present. A number of pilot drillings 4 extend from the
drilling front, the longitudinal end of which opposite the drilling front also debouching
outside the soil. The drilling front 5 advances in the direction of the pilot drillings
(arrow A). Through one or more of the pilot drillings 4 the fluids, such as liquid
and/or mortar, required for the correct action of the tunnel drilling device, are
supplied to and withdrawn from the drilling front. Through one or more of the pilot
drillings a pulling member 6 extends to the drilling front 5 and is connected to the
tunnel drilling device 3 to apply a pulling force on the latter in the direction of
the arrow A to supply at least a part of the propulsion force required to advance
the drilling front 5. Thus, the device 3 at least has to push less hard against the
tunnel wall lining 7 during advancement. The device 3 each time advances stepwise
and then between it and the stationary tunnel wall lining a ring gap 8 develops which
subsequently is at least partly filled from the existing tunnel wall lining with supplied
tunnel wall lining, whereafter the device 3 advances over one stroke again. The device
3 comprises a shell body 10 overlapping the tunnel wall lining 9 and connecting thereto
in an at least substantially liquid tight manner such that no matter (such as ground
water) can enter from the drilling front 5 the tunnel tube 2 exending below the ground
water level 11.
[0010] The tunnel tube is preferably installed according to a hollow extending curved path
relative to the eart surface, as illustrated. The tunnel tube can extend below an
obstacle, such as a building, surface water body, forest, lawn, or such, such that
the tunnel tube extends from the one to the opposite side of the obstacle.
[0011] The pilot drillings 4 extend with a mutual distance and are connected to the front
of the device 3 with a mutual distance. The locations where the pilot drillings are
connected to the device 3, and the number of pilot drillings 4 applied can be selected
according to desire. While in the embodiments the tunnel tube 2 accurately follows
the path of the pilot drillings along their complete length, it is also possible that
the tunnel tube 2 follows said path along only a part length, to e.g. subsequently
follow the path of another set of pilot drillings. The tunnel drilling device preferably
surrounds at least one of the pilot drillings.
[0012] Preferably the pilot drillings are made in the one direction and the tunnel tube
in the opposite direction. In case of passing an obstacle, the pilot drillings are
drilled from the one side to the opposite side of the obstacle. The tunnel tube is
then drilled from the opposite side to the one side of the obstacle. The advantage
of this manner of working is that the auxiliary equipment used to make the pilot drillings,
such as driving power and fluid sources, can be applied for the tunnel drilling device
without the need to displace them.
[0013] Fig. 3 shows some profile shapes of the tunnel tube which can be made according to
the present invention. Apart of that, a traditional at least substantial circular
profiel shape and also possibly a rectangular profile shape (fig. 4) can be made.
[0014] Fig. 5 shows schematically a front view of the device 3, wherein the working areas
12 of the drilling members are shown. By application of a plurality of relatively
small drilling members each having a circular working area 12, a tunnel tube differing
from the circular shape can be made. Each drilling member can be a drilling head with
bits know as such, spinning around a central spinning axis extending under right angles
to the drawing surface of fig. 5. In stead of bits, the drilling head can have e.g.
fluid jet nozzles ejecting a fluid jet eroding the surrounding soil material. Preferably,
adjacent drilling members spin oppositely.
[0015] Fig. 6 shows a sectional side view and fig. 4 shows the corresponding view of fig.
6 in the direction of the arrow VII of an alternative embodiment of the tunnel drilling
device 3 for making a tunnel tube with rectangular profile. The drilling members,
the working areas 12 of which are shown, can now spin around an axis 13 extending
making an angle with the longitudinal direction of the tunnel tube. As with fig. 5,
the working areas 12 are within a soil knife 14 having a slanted cutting edge extending
downwardly to the back as view from aside. This soil knive can be eliminated. It is
also feasible, to use the soil knive without additional drilling members or with different
drilling members.
[0016] Fig. 8 and 7 show the profile of the tunnel tube 2. In fig. 8 a wheeled carriage
15 is located in the tunnel tube 2. A prefabricated tunnel wall lining segment 16
of steel sheet is supported by the carriage. The segment 16 preferably makes a closed
section. It is supplied to the tunnel tube 2 in collapsed mode, preferably by pivots
along one or more pivoting lines. The segment 16 can advance through the tunnel tube
from its begin an towards the drilling front to extend the tunnel tube wall lining
over a distance that at least substantially equals the distance over which the device
3 is advanced since the last time the tunnel tube wall lining is extended. At the
location of destination the segment can be unfolded into its final shape, corresponding
to the tunnel tube profile (fig. 7). By lining the tunnel wall with metal, preferably
sheet type, an air tight, fire proof tunnel tube of relatively low weight is provided.
1. Method of making a tunnel tube with the aid of a tunnel drilling device, particularly
for car or train traffic, with a diameter of preferably 3m to a minimum, particularly
at least partly below the local ground water level in sandy soil or another relatively
easy processable underground, such as clay, peat, gravel or mixtures of these soil
types, by initially making one or more at least substantially parallel guide or pilot
drillings which are subsequently followed by the tunnel drilling device.
2. Method according to claim 1, wherein through said pilot drillings material and/or
equipment for drilling the tunnel, such as liquid or mortar, are supplied to and/or
withdrawn from the tunnel drilling device.
3. Method according to claim 1 or 2, wherein the pilot drillings are carried out in the
one direction and the tunnel tube is made in the opposite direction and preferably
provision is made that the one or more pilot drillings arrive above the ground at
the side of the tunnel drilling device facing the direction of its advancement through
the ground, before the tunnel drilling device starts to follow said pilot drillings.
4. Method according to any of claims 1-3, wherein the walls of a pilot drilling are provided
with a lining such as a prefabricated tube, the front end of which is preferably moved
with the drilling front of the pilot drilling.
5. Method according to any of claims 1-4, wherein the tunnel drilling device has an underground
rotatably fixed base frame following the advancement of the drilling front and having
driving means for rotatably driving one or more underground drilling members which
are rotatable relative to said base frame and also follow the advancement of the drilling
front, such as drilling bits or fluid jet nozzles, preferably pushing against the
rotatably fixed base frame.
6. Method according to any of claims 1-5, wherein a pulling member (6) extends through
at least one of the pilot drillings and is connected to the tunnel drilling device
(3) to exert a pulling force on it.
7. Method according to any of claims 1-6, wherein a shell body (10) is overlapping the
tunnel wall lining (9) connecting at least substantially fluid tight thereto such
that no matter can penetrate the tunnel tube (2).
8. Method according to any of claims 1-7, wherein the tunnel tube is installed according
to a hollow extending curved path relative to the eart surface and preferably extends
below an obstacle, such as a building, surface water body, forest, lawn, or such.
9. Method according to any of claims 1-8, wherein a prefabricated tunnel wall lining
segment (16) of preferably steel sheet and preferably providing a closed section is
supplied to the drilling front in collapsed mode, preferably by pivoting along one
or more pivoting lines, and is subsequently unfolded into its final shape, adapted
to the tunnel tube profile.
10. Method according to any of claims 1-9, wherein the tunnel drilling device (3) has
a plurality of relatively small drilling members, each covering a working area (12)
around an own axis.