Purpose of the invention
[0001] Purpose of the invention is to improve the performance of the tight chamber boiler,
passing the tests required by prEN483 standard for C5 configuration.
PrEN483.
[0002] Standard covering Type C (tight) boilers equipped with atmospheric burner, with rated
thermal power equal to or less than 70 Kw.
[0003] This standard specifies the requirements and test methods for the construction, safety,
performance, rational use of power, classification and marking of gas-fired boilers,
designed for central heating.
C5 configuration.
[0004] C5 configuration is defined by prEN 483 as a system where a type C (tight) boiler
is connected, through separate ducts, to two terminal units located in areas having
a different pressure. In practice, the following two conditions occur:
- air intake on a wall and exhaust on the opposite wall (see drwg no.1)
- wall air intake and roof exhaust.
[0005] PrEn 483 states that the exhaust of flue gases for a boiler installed according to
this configuration shall be submitted to a 2 mbar vacuum; under these conditions,
the machine shall light regularly and the flame shall remain steady.
Present situation
[0006] IABER boilers are not able to pass this test. Pressure and venturi tubes are mounted
inside the fan connector (see drwg. No. 2).
[0007] The pressure tube reads a static pressure while the venturi tube reads a vacuum,
changing with the change of the air speed passing through it.
[0008] These two components are connected to a pressure switch (see drwg no. 3a) measuring
any pressure change.
[0009] The pressure switch is an electromechanical device with a ON position at 100 +/-6
Pa and an OFF position at 72 +/-5 Pa.
[0010] Upon boiler's start-up, and for safety reasons, the software controlling the boiler
operation checks the pressure switch position. Consent to boiler's start-up is granted
only when the pressure switch is in the OFF position.
[0011] Under C5 configuration testing conditions, the 2 mbar vacuum applied to flue gases
exhaust generate an air flow causing a pressure change within the boiler, thus bringing
the pressure switch to the ON position. Therefore the software does not agree to the
boiler's start-up.
Description of the solution.
[0012] FIME fans type GR00680P, used for Basic boilers, incorporate the venturi tube (see
drwg. No. 4) and the hooked pressure tube (see drwg. No. 5) into the scroll.
[0013] The venturi tube reads a pressure, which is lower than the static pressure present
in the scroll and is proportional to the speed of flue gases at that point.
[0014] The choice of the pressure tube position (see drwg. No. 6) has been of the utmost
importance; actually measurements are read by a pressure switch detecting pressure
changes. The pressure switch reading shall be stable under normal operating conditions
and shall decrease in abnormal operating conditions, in order to assure that the boiler
is switched off.
The correct signal decrease depends upon the position of the venturi and hooked tubes
inside the fan's scroll. Therefore, the location of the two pressure detectors is
crucial and required long testing efforts.
[0015] The location of the venturi tube and of the hooked tube within the fan scroll, as
shown by drawing no. 6, enables to pass C5 tests (as per standard prEN 483/1998),
since pressure detectors are not affected by the air flow of the suction caused by
the natural draught of the stack, when the boiler is off.
[0016] This represents a remarkable advantage as compared to the tubes inside the flue gases
connection. Actually in this case, if a suction is imposed (as provided to pass C5
tests), the venturi tube, being at the center of the fluid vein, shall read a vacuum,
thus making it difficult to pass the test. On the contrary, if it is located inside
the fan scroll, the venturi tube is protected from the intake air flow thus allowing
to pass the test.
[0017] Therefore, the venturi shall not be very sensitive to the flows imposed by simulating
a suction when the boiler is off (test C5), but shall be highly sensitive to the speed
changes of the fluid vein when the fan is operating, thus enabling the boiler to automatically
shut-off, in case of either fan malfunctioning or incidental closure of the flue gases
exhaust tube.
[0018] Actually, tests carried out prove that emissions remain below 2000 ppm CO, corrected
before the boiler is put off by the action of the pressure switch and below 1000 ppm
CO, corrected at re-start as provided by standard prEN483/1998. In addition to the
above advantages, this solution allows a significant cost saving.
II.
Purpose of the invention.
[0019] Purpose of the invention is to improve the performance of the tight chamber boiler,
passing the tests required by prEN483 standard for C5 configuration.
PrEN483.
[0020] Standard covering Type C (tight) boilers equipped with atmospheric burner, with rated
thermal power equal to or less than 70 Kw.
[0021] This standard specifies the requirements and test methods for the construction, safety,
performance, rational use of power, classification and marking of gas-fired boiler,
designed for central heating.
C5 configuration.
[0022] C5 configuration is defined by prEN 483 as a system where a type C (tight) boiler
is connected, though separate ducts, to two terminal units located in areas having
a different pressure. In practice, the following two conditions occur:
- air intake on a wall and exhaust on another wall (not on the opposite one) at different
pressures (see drwg no.1)
- wall air intake and roof exhaust.
[0023] PrEn 483 states that the exhaust of flue gases for a boiler installed according to
this configuration shall be submitted to a 2 mbar vacuum; under these conditions,
the machine shall light regularly and the flame shall remain steady.
Present situation.
[0024] IABER boilers are not able to pass this test. Pressure and venturi tubes are mounted
inside the fan connector (see drwg. No. 2).
[0025] The pressure tube reads a vacuum, changing with the change of the air speed passing
through it.
[0026] These two components are connected to a pressure switch (see drwg no. 3) reading
any pressure change.
[0027] The pressure switch is an electromechanical device with a ON position at 100 +/-6
Pa and an OFF position at 72 +/-5 Pa.
[0028] Upon boiler's start-up, and for safety reasons, the software controlling the boiler
operation, checks the pressure switch position. Consent to boiler's start-up is granted
only when the pressure switch is in the OFF position.
[0029] Under C5 configuration testing conditions, the 2 mbar vacuum applied to flue gases
exhaust, generate an air flow causing a pressure change within the boiler, such as
to bring the pressure switch to the ON position. Therefore the software does not agree
to the boiler's start-up.
Description of the solution.
[0030] FIME fans type GR00680P, used for Basic boilers, incorporate the venturi tube into
the scroll (see drwgs. Nos. 4 and 5).
[0031] The venturi tube reads the pressure intake proportionally to the speed of flue gases,
at that point; the vacuum signal thus generated is then detected by the pressure switch.
Therefore, it "perceives" a pressure change (PD) generated by two pressure signals
coming from the venturi tube and from a static pressure tube (see drwg no. 3a).
[0032] In the previous solutions, the static pressure tube consisted of a straight tube
(see drwg. No. 2) taking the signal from flue gases exhaust. Now the static pressure
tube consists only of the positive tube of the pressure switch, reading the vacuum
existing in the boiler's air box (see drwg. No. 3 and solution for Basic Boiler).
[0033] The minimum PD to be assured during boiler's operation is 120 Pa, in the worst conditions
(i.e. tubes of the maximum width and operation at the maximum power).
[0034] Such PD could be generated by working both on the location of the venturi tube inside
the scroll and on the diameter of the venturi groove, which is presently 4.6+/-0,1
mm.
[0035] Thanks to these adjustments, the venturi generates a vacuum signal of approx. 150
Pa.
[0036] Under these conditions, the second pressure sensor of the pressure switch perceives
a vacuum of approx. 30 Pa.
[0037] The PD value detected by the pressure switch is therefore 120 Pa (150 Pa of the venturi
- 30 Pa of the direct intake = 120 Pa).
[0038] The advantages of this solution are mainly reflected on a higher stability of the
pressure signal.
[0039] The signal reaching the pressure switch shall be stable under the normal operating
conditions and shall decrease in abnormal operating conditions, in order to assure
that boiler goes off. The correct reduction of the signal is typical of the venturi
positive action.
[0040] Moreover, the venturi location inside the fan scroll, as shown by drawing no. 5,
enables to pass the C5 tests (as per standard prEN483/1998); actually in that position,
it is not affected by the air flow caused by the natural draught of the stack, when
the boiler is off.
[0041] This constitutes a remarkable advantage; actually , inside the fan scroll, the venturi
is located in a position protected from the flow thus allowing to pass the C5 test
(2 mbar vacuum suction).
[0042] Therefore, the venturi shall not be sensitive to the flows imposed by simulating
a suction , when the boiler is off (C5 test), but shall be highly sensitive to the
speed changes of the fluid vein when the fan is operating, thus enabling the boiler
to automatically shut-off, in case of either fan malfunctioning or incidental closure
of the flue gases exhaust.
[0043] Tests carried out at the IABER R & D laboratory prove that emissions remain below
2000 ppm CO, corrected before the boiler is put off by the action of the pressure
switch, and below 1000 ppm CO, corrected at re-start, as provided by standard prEN
483/1998.