[0001] The present invention relates to methods and apparatus for completing wells in unconsolidated
subterranean zones, and more particularly, to improved methods and apparatus for completing
such wells whereby the migration of fines and sand with the fluids produced therefrom
is prevented.
[0002] Many reservoirs comprised of relatively young sediments are so poorly consolidated
that sand will be produced along with the reservoir fluids unless the rate is restricted
significantly. Sand production leads to numerous production problems, including erosion
of downhole tubulars; erosion of valves, fittings, and surface flow lines; the well
bore filling up with sand; collapsed casing because of the lack of formation support;
and clogging of surface processing equipment. Even if sand production can be tolerated,
disposal of the produced sand is a problem, particularly at offshore fields. Thus,
a means to eliminate sand production without greatly limiting production rates is
desirable. Sand production is controlled by using gravel pack completions, slotted
liner completions, or sand consolidation treatments, with gravel pack completions
being by far the most common approach.
[0003] In a gravel pack completion, sand or gravel that is larger than the average formation
sand grain size is placed between the formation and a screen 110 or slotted liner.
The gravel pack sand 106 (referred to as gravel, though it is actually sand in grain
size), should retain most of the formation sand, but let very fine particles pass
through it and be produced. The two most common types of gravel pack completions are
an inside-casing gravel pack 102 and an openhole or underreamed-casing gravel pack
122. Examples of each are illustrated in Figures 1A-1B. The underreamed-casing gravel
pack 122 provides better conductivity through the gravel 106, but is limited to single-zone
completions. A successful gravel pack completion must retain the formation sand and
offer the least possible resistance to flow through the gravel 106 itself.
[0004] For a successful gravel pack completion, gravel 106 must be adjacent to the formation
without having mixed with formation sand, and the annular space between the screen
and the casing or formation must be completely filled with gravel 106. Special equipment
and procedures have been developed over the years to accomplish good gravel placement.
[0005] Water or other low-viscosity fluids were first used as transporting fluids in gravel
pack operations. Because these fluids could not suspend the sand, low sand concentrations
and high velocities were needed. Now, viscosified fluids, most commonly, solutions
of hydroxyethylcellulose (HEC), are used so that high concentrations of sand can be
transported without settling. Just as with the fluids used in hydraulic fracturing,
it is desirable that these solutions degrade to low viscosity with little residue,
requiring the addition of breakers to the polymer solution.
[0006] In open-hole completions, the gravel-laden fluid can be pumped down 210 the tubing
casing 226 annulus, after which the carrier fluid passes through the screen 204 and
flows back up 220 the tubing. This is the reverse-circulation method 202 depicted
in Figure 2A. A primary disadvantage of this method is the possibility of rust, pipe
dope, or other debris being swept out of the annulus and mixed with the gravel, damaging
the pack permeability. More commonly, a crossover method 250 is used, in which the
gravel-laden fluid is pumped down 252 the tubing, crosses over 254 to the screen-open
hole annulus 260, flows into a wash pipe 230 inside the screen 204, leaving the gravel
in the annulus, and then flows up 270 the casing-tubing annulus to the surface as
shown in Figure 2B. Notice that the open-hole section is usually underreamed 280 through
the productive interval to increase well productivity.
[0007] For inside-casing gravel packing, washdown 300, reverse-circulation 302, and crossover
methods 304 are used as shown in Figures 3A-3C. In the washdown method 300, the gravel
308 is placed opposite the productive interval before the screen 306 is placed, and
then the screen 306 is washed down to its final position. The reverse-circulation
302 and crossover methods 304 are analogous to those used in open holes. A modern
crossover method, is shown in Figure 3D-3F. Gravel 350 is first placed below the perforated
354 interval by circulation through a section of screen called the telltale screen
352. When this has been covered, the pressure increases, signaling the beginning of
the squeeze stage. During squeezing, the carrier fluid leaks off to the formation,
placing gravel in the perforation 354 tunnels. After squeezing, the washpipe 356 is
raised, and the carrier fluid circulates through the production screen 358, filling
the annulus formed between the casing 362 and the production screen 358 with gravel
350. Gravel 350 is also placed in a section of blank pipe above the screen 358 to
provide a supply of gravel as the gravel 350 settles.
[0008] A problem that is often encountered in forming gravel packs, particularly gravel
packs in long and/or deviated unconsolidated producing intervals, is the formation
of sand bridges in the annulus. That is, non-uniform sand packing of the annulus between
the screen and the well bore often occurs as a result of the loss of carrier liquid
from the sand slurry into high permeability portions of the subterranean zone which
in turn causes the formation of sand bridges in the annulus before all the sand has
been placed. The sand bridges block further flow of the slurry through the annulus,
which leaves voids in the annulus. An example of a sand bridge 402 and the resulting
void 404 is illustrated in Figure 4A. When the well is placed on production, the flow
of produced fluids is concentrated through the voids 404 in the gravel pack which
soon causes the screen to be eroded and the migration of fines and sand with the produced
fluids to result.
[0009] In attempts to prevent the formation of sand bridges in gravel pack completions,
special screens having internal shunt tubes 406 have been developed and used. These
shunt screens have flow tubes (shunts) 406 welded along the length of the gravel-pack
screen 408 to bypass any bridges that may form in the annulus. If a bridge forms in
the annulus, the slurry bypasses it by flowing through the shunts 406 and exiting
through the nozzles as illustrated in Figure 4B. While such screens have achieved
varying degrees of success in avoiding sand bridges, they, along with the gravel packing
procedure are very costly and also reduce the diameter available for the production
base pipe. Thus, there are needs for improved methods and apparatus for completing
wells in unconsolidated subterranean zones whereby the migration of formation fines
and sand with produced fluids can be economically and permanently prevented while
allowing the efficient production of hydrocarbons from the unconsolidated producing
zone.
[0010] The present invention provides improved methods and apparatus for completing wells,
and optionally simultaneously fracture stimulating the wells, in unconsolidated subterranean
zones that meet the needs described above and overcome the deficiencies of the prior
art. The improved methods basically comprise the steps of placing a pre-packed screen
having an outer screen and an inner screen in an unconsolidated subterranean zone
whereby a first annulus is formed between the inner screen and the outer screen and
the annulus is packed with sand, placing a shroud in the unconsolidated subterranean
zone wherein a second annulus is formed between the shroud and the outer screen and
a third annulus is formed between the shroud and the well bore whereby the second
annulus provides an alternate path for the flow of particulate material and the third
annulus provides a primary path for the flow of particulate material, isolating the
annuli in the unconsolidated subterranean zone, and injecting particulate material
into the third annulus between the shroud and the well bore whereby the second annulus
between the shroud and the outer screen forms an alternate path for the flow of the
particulate material such that the particulate material is uniformly packed in the
second and third annuli and the migration of formation fines and sand with fluids
produced into the well bore from the zone is prevented. The permeable pack of particulate
material formed prevents the migration of formation fines and sand with fluids produced
into the well bore from the unconsolidated subterranean zone.
[0011] As mentioned, the unconsolidated subterranean formation can be fractured prior to
or during the injection of the particulate material into the unconsolidated producing
zone, and the particulate material can be deposited in the fractures as well as in
the annuli between the inner and outer screen, between the outer screen and the shroud,
and between the shroud and the well bore.
[0012] The apparatus of this invention are basically comprised of a shroud having perforations
therethrough; a first screen cylindrically disposed within the shroud whereby a first
annulus is formed between the shroud and the screen wherein the first annulus provides
an alternate path for the flow of particulate material, and a second screen cylindrically
disposed within the first screen whereby a second annulus is formed between the first
screen and the second screen. For small diameter well bores, only a first screen is
used.
[0013] According to another aspect of the invention there is provided a method of completing
an unconsolidated subterranean zone penetrated by a well bore comprising the steps
of:
(a) placing in said zone a pre-packed screen having an outer screen and an inner screen
whereby a first annulus is formed between said inner screen and said outer screen
said first annulus is pre-packed with sand;
(b) placing in said zone a shroud wherein a second annulus is formed between said
shroud and said outer screen and a third annulus is formed between said shroud and
said well bore whereby said second annulus provides an alternate path for the flow
of particulate material and said third annulus provides a primary path for the flow
of particulate material;
(c) isolating said annuli in said zone; and
(d) injecting particulate material into said third annulus between said shroud and
said well bore whereby said second annulus between said shroud and said outer screen
forms an alternate path for the flow of said particulate material such that said particulate
material is uniformly packed in said second and third annuli and the migration of
formation fines and sand with fluids produced into said well bore from said zone is
prevented.
[0014] In an embodiment, the particulate material is sand; the subterranean zone may be
open-hole. The well bore in said subterranean zone may have casing cemented therein
with perforations formed through the casing and cement.
[0015] In an embodiment, the annuli are isolated in accordance with step (b) by setting
a packer in said well bore.
[0016] In an embodiment, the method further comprises the step of creating at least one
fracture in said subterranean zone prior to carrying out step (d).
[0017] In an embodiment, the method further comprises the step of creating at least one
fracture in said subterranean zone while carrying out step (d).
[0018] In an embodiment, the method which further comprises the step of depositing particulate
material in said fracture.
[0019] According to another aspect of the invention there is provided a method of completing
an unconsolidated subterranean zone penetrated by a well bore comprising the steps
of:
(a) placing in said zone a shroud and a screen disposed therein whereby a first annulus
is formed between said screen and said shroud and a second annulus is formed between
said shroud and said well bore;
(b) isolating said annuli in said zone;
(c) injecting particulate material into said second annulus between said shroud and
said well bore whereby said first annulus provides an alternate path for the flow
of particulate material whereby particulate material is uniformly packed in said first
and second annuli and the migration of formation fines and sand with fluids produced
into said well bore from said zone is prevented.
[0020] In an embodiment, the annuli are isolated in accordance with step (b) by setting
a packer in said well bore.
[0021] In an embodiment, the method further comprises the step of creating at least one
fracture in said subterranean zone prior to carrying out step (c).
[0022] In an embodiment, the method further comprises the step of creating at least one
fracture in said subterranean zone while carrying out step (c).
[0023] In an embodiment, the method further comprises the step of depositing particulate
material in said fracture.
[0024] According to another aspect of the invention there is provided an apparatus for completing
an unconsolidated subterranean zone penetrated by a well bore comprising: a shroud
having perforations therethrough; and a first screen cylindrically disposed within
said shroud whereby a first annulus is formed between said shroud and said screen
wherein said first annulus provides an alternate path for the flow of particulate
material.
[0025] In an embodiment, the first screen comprises a sintered metal layer.
[0026] In an embodiment, the perforations are substantially 7/16 inches (11.1 mm) in diameter.
[0027] In an embodiment, the first screen comprise a wire wrap.
[0028] In an embodiment, the perforations are arranged in rows with individual perforations
spaced two inches (50.8 mm) apart and with perforations on adjacent rows set off by
one inch (25.4 mm).
[0029] In an embodiment, the apparatus further comprises a second screen cylindrically disposed
within said first screen whereby a second annulus is formed between said first screen
and said second screen.
[0030] In an embodiment, the second annulus is filled with particulate matter.
[0031] In an embodiment, the second screen comprises smaller openings than does said first
screen.
[0032] In an embodiment, the second screen comprise a wire wrap.
[0033] In an embodiment, the first screen comprises a first wire wrap, the second screen
comprises a second wire wrap, and the diameter of wire for said first wire wrap is
larger than the diameter of wire for said second wire wrap.
[0034] The improved methods and apparatus of this invention avoid the formation of sand
bridges in the annulus between the shroud and the well bore thereby producing a very
effective sand screen for preventing the migration of fines and sand with produced
fluids. Furthermore, the screen is more durable and less sensitive to washing out
during the gravel placement during FracPack (fracturing and gravel packing a formation
in one step) and gravel pack operations than are prior art screens. Additionally,
the present invention maximizes the base pipe diameter by minimizing the space required
for the sand screen.
[0035] It is, therefore, a general object of the present invention to provide improved methods
of completing wells in unconsolidated subterranean zones having more durable screens
that are relatively insensitive to washing out during gravel placement during FracPac
and gravel pack operations.
[0036] Reference is now made to the accompanying drawings, in which:
Figures 1A-1B (Prior Art) illustrate examples of gravel pack completions for an inside-casing
gravel pack and for an openhole or underreamed-casing gravel pack;
Figures 2A-2B (Prior Art) illustrate methods of pumping the carrier fluid through
the tubing casing;
Figures 3A-3C (Prior Art) illustrate washdown, reverse-circulation, and crossover
methods for inside-casing gravel packing;
Figure 3D-3F (Prior Art) illustrates a modern crossover method for inside-casing gravel
packing;
Figure 4A (Prior Art) illustrates a sand bridge inside a well bore;
Figure 4B (Prior Art) illustrates a sand screen having a shunt valve to provide an
alternate path to pack sand in the annulus;
Figures 5-7 illustrates a vertical well bore having casing cemented therein extending
into an unconsolidated subterranean zone with dual screen and shroud according to
an embodiment of the present invention;
Figure 8 illustrates a perforation pattern for the shroud;
Figures 9 and 10 illustrate a horizontal open-hole well bore with dual screen and
shroud according to an embodiment of the present invention;
Figures 11A and 11 B depict a quarter section cutout view showing more detail of a
preferred screen and shroud assembly suitable for use as the screen and shroud assembly
shown in Figures 5-7 and 9-10;
Figure 12 shows a sectional cutout view of a preferred pre-packed dual screen assembly
1200 suitable for use as dual screen 521 and 935 is illustrated;
Figure 13 shows a base pipe with perforations disposed within a single all metal premium
screen disposed within a shroud;
Figure 14 shows an alternative embodiment of a single screen assembly wherein the
single all metal premium screen is a pleated screen.
[0037] The present invention provides improved methods of completing, and optionally simultaneously
fracture stimulating, an unconsolidated subterranean zone penetrated by a well bore.
The methods can be performed in either vertical or horizontal well bores which are
open-hole or have casing cemented therein. The term "vertical well bore" is used herein
to mean the portion of a well bore in an unconsolidated subterranean producing zone
to be completed which is substantially vertical or deviated from vertical in an amount
up to about 80°. The term "horizontal well bore" is used herein to mean the portion
of a well bore in an unconsolidated subterranean producing zone to be completed which
is substantially horizontal or at an angle from vertical in the range of from about
80° to about 90°.
[0038] Referring now to the drawings and particularly to Figures 5-7, a vertical well bore
510 having casing 514 cemented therein is illustrated extending into an unconsolidated
subterranean zone 512. Casing 514 is bonded within well bore 510 by a cement sheath
516. A plurality of spaced perforations 518 produced in well bore 510 utilizing conventional
perforating gun apparatus extend through casing 514 and cement sheath 516 into unconsolidated
producing zone 512.
[0039] In accordance with the methods of the present invention, a shroud 520 having a pre-packed
dual-screen 521 installed therein whereby an annulus 522 is formed between dual screen
521 and shroud 520 is placed in well bore 510. Shroud 520 and dual screen 521 have
lengths such that they substantially span the length of the producing interval in
well bore 510. Shroud 520 is of a diameter such that when it is disposed within well
bore 510, an annulus 523 is formed between it and casing 514. Holes 524 in shroud
520 can be circular as illustrated in the drawings, or they can be rectangular or
other shapes.
[0040] For example, if well bore 510 has an outer diameter casing of seven inches, then,
in one embodiment, hole 524 size is 7/16 inches (11.1 mm) in diameter. Eighteen rows
of holes 524 are centered at 1.22 inches (31 mm) apart along the circumference of
shroud 520. Each row has six holes for each foot (0.305 m) of length (two inch spacing
[51 mm]). The rows are arranged down the side of shroud 520. Adjacent rows of holes
524 are off set by one inch (25.4 mm) so that for every two rows, there will be a
hole 524 every inch (25.4 mm) along shroud 520 as illustrated by the pattern 800 in
Figure 8. This corresponds to 108 holes 524 per foot (0.305 m) of shroud 520, which
comes out to an area of 16.24 square inches (106 cm
2) of holes 524 per linear foot (0.305 m) of shroud 520. If the perforations are at
22 shots per linear foot (0.305 m) of casing (spf) with 0.9 inch (22.9 mm) perforations,
the open area is 13.99 square inches (90 cm
2). Therefore, the flow are through shroud 520 will exceed the flow area through perforations
518. Thus, the flow restrictions introduced with shroud 520 are minimized. These dimensions
and layout are given merely as examples of a shroud. However, other dimensions and
layouts will be obvious to one skilled in the art.
[0041] As shown in Figures 5-7, shroud 520 and pre-packed dual screen 521 are connected
to a cross-over 525 which is in turn connected to a production string 528. A production
packer 526 is attached to cross-over 525. Cross-over 525 and production packer 526
are conventional gravel pack forming tools and are well known to those skilled in
the art. Cross-over 525 is a sub-assembly which allows fluids to follow a first flow
pattern whereby particulate material suspended in a slurry can be packed in the annuli
522 and 523 between dual screen 521 and shroud 520 and between shroud 520 and well
bore 510. That is, as shown by the arrows in Figure 6, the particulate material suspension
flows from inside production string 528 to annuli 523 and 522 between dual screen
521 and shroud 520 by way of two or more ports 529 in cross-over 525. Simultaneously,
fluid is allowed to flow from inside dual screen 521 upwardly through cross-over 525
to the other side of packer 526 outside of production string 528 by way of one or
more ports 531 in cross-over 525. By pipe movement or other procedure, flow through
cross-over 525 can be selectively changed to a second flow pattern (shown in Figure
7) whereby fluid from inside dual screen 521 flows directly into production string
528 and ports 531 are shut off. The production packer 526 is set by pipe movement
or other procedure whereby annulus 523 is sealed.
[0042] After shroud 520 and dual screen 521 are placed in well bore 510, annulus 523 between
shroud 520 and casing 514 is isolated by setting packer 526 in casing 514 as shown
in Figure 5. Thereafter, as shown in Figure 6, a slurry of particulate material 527
is injected into annulus 522 between dual screen 521 and shroud 520 by way of ports
529 in cross-over 525 and into annulus 523 between casing 514 and shroud 520. The
particulate material flows into perforations 518 and fills the interior of casing
514 below packer 526 except for the interior of dual screen 521. That is, as shown
in Figure 6, a carrier liquid slurry of particulate material 527 is pumped from the
surface through production string 528 and through cross-over 525 in to annulus 522
between dual screen 521 and shroud 520. From annulus 522, the slurry flows through
holes 524 and through the open end of shroud 520 into annulus 523 and into perforations
518. The carrier liquid in the slurry leaks off through perforations 518 into unconsolidated
zone 512 and through dual screen 521 from where it flows through cross-over 525 and
into casing 514 above packer 526 by way of ports 531. This causes particulate material
527 to be uniformly packed in perforations 518, in annulus 523 between shroud 520
and casing 514 and within annulus 522 between dual screen 521 and the interior of
shroud 520.
[0043] After the particulate material 527 has been packed into well bore 510 as described
above, the well is returned to production as shown in Figure 7. The pack of particulate
material 527 formed filters out and prevents the migration of formation fines and
sand with fluids produced into well bore 510 from the unconsolidated subterranean
zone 512.
[0044] Referring now to Figures 9 and 10, a horizontal open-hole well bore 930 is illustrated.
Well bore 930 extends into an unconsolidated subterranean zone 932 from a cased and
cemented well bore 933 which extends to the surface. As described above in connection
with well bore 510, a shroud 934, having a dual screen 935 disposed therein whereby
an annulus 941 is formed between shroud 934 and screen 935, is placed in well bore
930. Shroud 934 and dual screen 935 are connected to a cross-over 942 which is in
turn connected to a production string 940. A production packer 936 is connected to
cross-over 942 which is set within casing 937 in well bore 933.
[0045] In carrying out the methods of the present invention for completing unconsolidated
subterranean zone 932 penetrated by well bore 930, shroud 934 with dual screen 935
therein is placed in well bore 930 as shown in Figure 9. Annulus 939 between shroud
934 and well bore 930 is isolated by setting packer 936. Thereafter, a slurry of particulate
material is injected into annulus 941 between dual screen 935 and shroud 934 and by
way of holes 938 into the annulus 939 between shroud 934 and well bore 930. Because
the particulate material slurry is free to flow through holes 938, the particulate
material is uniformly packed into annulus 939 between well bore 930 and shroud 934
and into annulus 941 between dual screen 935 and shroud 934. The pack of particulate
material 940 formed filters out and prevents the migration of formation fines and
sand with fluids produced into well bore 930 from subterranean zone 932.
[0046] Turning now to Figures 11A and 11B, a quarter section cut-out view showing more detail
of some aspects of a preferred screen and shroud assembly suitable for use as the
screen and shroud assembly shown in Figures 5-7 and 9-10 is illustrated. (Note, not
all features illustrated in Figures 5-7 and 9-10 are shown herein.) The well bore
1110 has a well casing 1112 that prevents the formations around the well bore 1110
from collapsing the well bore 1110. Well bore perforations 1114 allow fluid from the
formations to flow into the well bore 1110. Inside the well bore 1110 is located a
gravel pack packer 1116. Gravel pack packer 1116 is connected to a pre-packed screen
1122 by a swivel sub 1160. Swivel sub 1160 prevents torque from being transmitted
through screen 1122 to sump seals 1130 below. A three-way adapter 1120 connects an
outer shroud 1124 to gravel pack packer 1116. A base pipe (not shown) is cylindrically
disposed within screen 1122 that is cylindrically disposed within outer shroud 1124.
Screen 1122 is attached directly to a sump packer 1126. Outer shroud 1124 simply hangs
around screen 1122 from three-way adapter 1120. Optionally, shroud 1124 can be attached
to sump seals 1130 to create a pressure tight fit if necessary for a particular application.
Three-way adapter 1120 contains ports 1165 to provide the alternate flow path for
gravel packing as high above screen 1122 as possible without the interference of shroud
1124. The size of ports 1165 is limited to encourage flow to the outside of shroud
1124 first.
[0047] Preferably, outer shroud 1124 is constructed from a very soft, easily milled, composite
material. This allows for screen 1122 to be larger for a given casing size. If the
need arose to fish screen assembly 1100, shroud 1124 can be milled out during the
washing of screen 1122. In this embodiment, three-way adapter 1120 is constructed
out of soft steel to assist in the milling.
[0048] Sump packer 1126 and sump seals 1130 isolate perforations 1114 in well bore 1110
for the unconsolidated subterranean zone of interest from the subterranean zones below
and serve as a foundation to accumulate sand for the gravel pack. The pre-packed screen
seals 1128 prevent fluid loss from the zone of interest into the subterranean zones
below.
[0049] Pre-packed screen 1122 prevents sand and other unwanted particulate matter from being
produced along with the desired fluids. Pre-packed screen 1122 essentially consists
of an outer screen (not shown) and an inner screen (not shown) separated by an annulus
(not shown) that is pre-packed with gravel (not shown). More detail about the pre-packed
screen 1122 is provided below. Outer shroud 1124 and the outer screen define an annulus
1132. Outer shroud 1124 and well bore 1110 define an annulus 1150. Annulus 1132 provides
an alternate path for the flow of gravel pack material during gravel packing. This
alternate flow path prevents uneven packing of and the formation of sand bridges in
the well bore 1110 by allowing the gravel pack material to bypass the pile-up. Thus
gravel pack material is uniformly packed.
[0050] Turning now to Figure 12, a sectional cut-out view of a preferred pre-packed dual
screen assembly 1200 suitable for use as dual screen 521 and 935 and pre-pack screen
1122 is illustrated. Pre-packed dual screen assembly 1200 has an inner base pipe 1201
having perforations 1202 therein for receiving the flow of produced hydrocarbons for
production to the surface. An inner screen 1204 covers inner base pipe 1201. Inner
screen 1204 consists of a wire wrap that wraps base pipe 1201 with wire wherein a
gap is formed between inner screen 1204 and base pipe 1201 by the presence of raised
bars 1205 that are fixed to the side of base pipe 1201 between perforations 1202.
An outer screen 1206 covers inner screen 1204 with a thin layer of gravel 1207 filling
the annulus between inner screen 1204 and outer screen 1206, thus preventing voids.
Inner screen 1204 allows produced hydrocarbons to flow through pre-pack gravel 1207,
then move longitudinally unimpeded around base pipe 1201 to its nearest perforation
1202. Gravel used for pre-pack gravel 1207 may or may not be resin-coated and is very
thin compared to gravel used with regular pre-pack screens. Preferably, inner screen
1204 is a microscreen with smaller diameter filter openings than outer screen 1206.
Outer screen 1206 is preferably a regular outer screen jacket as conventionally used
with prepacks, such screen jackets being well known to one of ordinary skill in the
art.
[0051] In an alternative embodiment, dual screen 521 and 935 is replaced by a single screen.
This embodiment is preferred in smaller diameter screen assemblies. Figure 13 shows
a base pipe 1305 having perforations 1307 disposed within a single all metal premium
screen 1310 disposed within a shroud 1315. Preferably, the screen 1310 diameter is
approximately 1/2 inch larger than the outside diameter of base pipe 1305. Thus, allowing
for a larger diameter base pipe 1305 than is allowed for with pre-packed screens.
[0052] An alternative example of a single all metal premium screen assembly is depicted
in Figure 14. In this example, single screen 1310 is replaced with a pleated screen
1410. Pleated screen 1410 has more than twice the filtering surface area of traditional
screens, thus, greatly increasing its contaminant capacity. This results in reduced
plugging tendencies and greater flow throughput.
[0053] Preferably, single screen 1310 or pleated screen 1410 is a sintered metal, that is,
it is constructed from multiple layers of woven, stainless steel wire mesh sintered
together into a rugged, porous material. By sintering the layers, each wire is metallurgically
bonded to the adjacent wires and layers of the screen, thus maximizing the strength
and durability. This yields self-supporting filter media which do not deform, even
under extreme pressures. The various wire mesh layers are selected to achieve accurate
particle size control while maximizing flow rates. This may vary depending on the
type of fines found in the unconsolidated zone. The appropriate size mesh layers to
use for a particular application will be obvious to one of ordinary skill in the art.
[0054] The particulate material utilized in accordance with the present invention is preferably
graded sand which is sized based on a knowledge of the size of the formation fines
and sand in the unconsolidated subterranean zone to prevent the formation fines and
sand from passing through the gravel pack, i.e., the formed permeable sand pack 527
and 940. The graded sand generally has a particle size in the range of from about
10 to about 70 mesh, U.S. Sieve Series. Preferred sand particle size distribution
ranges are one or more of 10-20 mesh, 20-40 mesh, 40-60 mesh or 50-70 mesh, depending
on the particle size and distribution of the formation fines and sand to be screened
out by the graded sand.
[0055] The particulate material carrier liquid utilized, which can also be used to fracture
the unconsolidated subterranean zone if desired, can be any of the various viscous
carrier liquids or fracturing fluids utilized heretofore including gelled water, oil
base liquids, foams or emulsions. The foams utilized have generally been comprised
of water based liquids containing one or more foaming agents foamed with a gas such
as nitrogen. The emulsions have been formed with two or more immiscible liquids. A
particularly useful emulsion is comprised of a water-based liquid and a liquified
normally gaseous fluid such as carbon dioxide. Upon pressure release, the liquified
gaseous fluid vaporizes and rapidly flows out of the formation.
[0056] The most common carrier liquid/fracturing fluid utilized heretofore which is also
preferred for use in accordance with this invention is comprised of an aqueous liquid
such as fresh water or salt water combined with a gelling agent for increasing the
viscosity of the liquid. The increased viscosity reduces fluid loss and allows the
carrier liquid to transport significant concentrations of particulate material into
the subterranean zone to be completed.
[0057] A variety of gelling agents have been utilized including hydratable polymers which
contain one or more functional groups such as hydroxyl, cis-hydoxyl, carboxyl, sulfate,
sulfonate, amino or amide. Particularly useful such polymers are polysaccharides and
derivatives thereof which contain one or more of the monosaccharides units galactose,
mannose, glucoside, glucose, xylose, arabinose, fructose, glucuronic acid or pyranosyl
sulfate. Various natural hydratable polymers contain the foregoing functional groups
and units including guar gum and derivatives thereof, cellulose and derivatives thereof,
and the like. Hydratable synthetic polymers and co-polymers which contain the above
mentioned functional groups can also be utilized including polyacrylate, polymethylacrylate,
polycrylamide, and the like.
[0058] Particularly preferred hydratable polymers, which yield high viscosities upon hydration
at relatively low concentrations, are guar gum and guar derivatives such as hydroxypropylguar
and carboxymethylguar and cellulose derivatives such as hydroxyethylcellulose, carboxymethylcellulose
and the like.
[0059] The viscosities of aqueous polymer solutions of the types described above can be
increased by combining cross-linking agents with the polymer solutions. Examples of
cross-linking agents which can be utilized are multivalent metal salts or compounds
which are capable of releasing such metal ions in an aqueous solution.
[0060] The above described gelled or gelled and cross-linked carrier liquids/fracturing
fluids can also include gel breakers such as those of the enzyme type, the oxidizing
type or the acid buffer type which are well known to those skilled in the art. The
gel breakers cause the viscous carrier liquids/fracturing fluids to revert to thin
fluids that can be produced back to the surface after they have been utilized.
[0061] The creation of one or more fractures in the unconsolidated subterranean zone to
be completed in order to stimulate the production of hydrocarbons therefrom is well
known to those skilled in the art. The hydraulic fracturing process generally involves
pumping a viscous liquid containing suspended particulate material into the formation
or zone at a rate and pressure whereby fractures are created therein. The continued
pumping of the fracturing fluid extends the fractures in the zone and carries the
particulate material into the fractures. Upon the reduction of the flow of the fracturing
fluid and the reduction of pressure exerted on the zone, the particulate material
is deposited in the fractures and the fractures are prevented from closing by the
presence of the particulate material therein.
[0062] As mentioned, the subterranean zone to be completed can be fractured prior to or
during the injection of the particulate material into the zone, i.e., the pumping
of the carrier liquid containing the particulate material through the slotted liner
into the zone. Upon the creation of one or more fractures, the particulate material
can be pumped into the fractures as well as into the perforations and into the annuli
between the sand screen and shroud and between the shroud and the well bore.
[0063] The methods and apparatus of this invention are particularly suitable and beneficial
in forming gravel packs in long-interval horizontal well bores without the formation
of sand bridges. Because elaborate and expensive sand screens including shunts and
the like are not required and the pack sand does not require consolidation by a hardenable
resin composition, the methods of this invention are very economical as compared to
prior art methods.
[0064] The description of the present invention has been presented for purposes of illustration
and description, but is not intended to be exhaustive or limited to the invention
in the form disclosed. Many modifications and variations will be apparent to those
of ordinary skill in the art. The embodiment was chosen and described in order to
best explain the principles of the invention and the practical applications to enable
others of ordinary skill in the art to understand the invention for various embodiments
with various modifications as are suited to the particular use contemplated. It will
be appreciated that modifications may be made.
1. A method of completing an unconsolidated subterranean zone penetrated by a well bore
comprising the steps of:
(a) placing in said zone a pre-packed screen having an outer screen and an inner screen
whereby a first annulus is formed between said inner screen and said outer screen
said first annulus is pre-packed with sand;
(b) placing in said zone a shroud wherein a second annulus is formed between said
shroud and said outer screen and a third annulus is formed between said shroud and
said well bore whereby said second annulus provides an alternate path for the flow
of particulate material and said third annulus provides a primary path for the flow
of particulate material;
(c) isolating said annuli in said zone; and
(d) injecting particulate material into said third annulus between said shroud and
said well bore whereby said second annulus between said shroud and said outer screen
forms an alternate path for the flow of said particulate material such that said particulate
material is uniformly packed in said second and third annuli and the migration of
formation fines and sand with fluids produced into said well bore from said zone is
prevented.
2. A method according to claim 1, which further comprises the step of creating at least
one fracture in said subterranean zone prior to carrying out step (d).
3. A method of completing an unconsolidated subterranean zone penetrated by a well bore
comprising the steps of:
(a) placing in said zone a shroud and a screen disposed therein whereby a first annulus
is formed between said screen and said shroud and a second annulus is formed between
said shroud and said well bore;
(b) isolating said annuli in said zone;
(c) injecting particulate material into said second annulus between said shroud and
said well bore whereby said first annulus provides an alternate path for the flow
of particulate material whereby particulate material is uniformly packed in said first
and second annuli and the migration of formation fines and sand with fluids produced
into said well bore from said zone is prevented.
4. A method according to claim 3, which further comprises the step of creating at least
one fracture in said subterranean zone prior to carrying out step (c).
5. A method according to claim 1, 2, 3 or 4, wherein said particulate material is sand.
6. A method according to any preceding claim, wherein said well bore in said subterranean
zone is open-hole.
7. A method according to any preceding claim, wherein said well bore in said subterranean
zone has casing cemented therein with perforations formed through the casing and cement.
8. An apparatus for completing an unconsolidated subterranean zone penetrated by a well
bore comprising: a shroud having perforations therethrough; and a first screen cylindrically
disposed within said shroud whereby a first annulus is formed between said shroud
and said screen wherein said first annulus provides an alternate path for the flow
of particulate material.
9. Apparatus according to claim 8, wherein said first screen comprises a sintered metal
layer.
10. Apparatus according to claim 8 or 9, further comprising a second screen cylindrically
disposed within said first screen whereby a second annulus is formed between said
first screen and said second screen.