OBJECT OF THE INVENTION
[0001] The present invention relates to a buttressed top slab for building structures, which
by employing polystyrene or another material as light flooring blocks, embed said
structure in the concrete buttresses of the slab, thereby configuring a prefabricated
slab in a single body.
[0002] The object of this invention is to define the manufacturing process having a sliding
extruder or moulder with prestressed joists or alveolar slabs, so that when pouring
the concrete into the space left in the vault top slabs, which is normally double-T
shaped but may adopt a single -T configuration as well, a vibration ensures that the
concrete adheres the top slabs to the concrete buttresses, thus producing a slab with
sufficient resistance enabling to manipulate it and walk on it with complete safety.
[0003] The system means to replace conventional joists and top slabs with this prefabricated
slab in flat structures characteristic of household constructions currently used in
Spain and in warm weather countries. Classic joist and vault structures are currently
the most inexpensive structures in tropical or Mediterranean climates.
BACKGROUND OF THE INVENTION
[0004] Flat joist and top slab structures are those used most widely, due to their efficient
use of materials and labour in construction fabrication and assembly. In Nordic and
central European countries, where temperatures are low for most of the year, and rainfall
is frequent, construction work must be shortened as much as possible to prevent undue
labour expenses and reduce the risk of freezing in construction work pouring of concrete.
This means that in these Nordic countries prefabricated top slabs are used of the
half-slab type, both prestressed and reinforced, or prestressed alveolar slabs, with
an absence of classic joist and vault structures.
[0005] A further reason for employing prefabricated joist structures is worker safety, as
most labour accidents in construction work occur in the structure construction stage,
and specifically entail falling of workers due to the vault breaking; this results
in wealthier countries dictating standards in which safer systems are demanded, or
the floor must be planked entirely in order to prevent the vaults from breaking.
[0006] Currently in Spain new safety standards are requiring planks on all floor joists,
and therefore the use of joists is diminishing.
[0007] Use of prefabricated or alveolar slabs in home construction means that joists must
be thicker than slabs, so that false ceilings must be placed which increase the cost
of the building compared to the classic plaster whitewash.
[0008] Previous to this invention a patent was applied for the same slab with this configuration,
although in a static screed or mould, without a moulding machine.
[0009] Said invention application is numbered P-9801814 and was filed on 27 August 1998
by the author of the present patent in Spain. Afterwards Chapter I and II of the PCT
have been applied for, under registration number PCT/ES99/00273.
[0010] The main difference with said invention is the continuous fabrication method, which
allows it to be made with less labour and more quickly, in a track 100 to 200 metres
long and cut to the desired length with diamond disc.
[0011] Connection of the buttress to the support girders is solved by construction placing
of a steel connector in the alveolus which bears the slab buttress. Said alveolus
is continuous along the entire buttresses. The finished product is further improved
as regards end burrs and concrete slurry on the slab, etc.
DESCRIPTION OF THE INVENTION
[0012] The invention object of the present memory relates to a type of pre-stressed prefabricated
slab with the ensuing time reduction in the construction work as the forging need
not be assembled on site, and the absence of a lower planking, as well as providing
a solution for support of the prefabricated joists which allows leaving the bottom
part of the structure fully flat and ready to receive the inexpensive plaster directly.
[0013] The slab may be used with classic unidirectional flat joist floor structures (used
to support joists and girders of the forging) as well as for the support of load walls
made of brick, and its main advantage is manifested when combining TUL joists consisting
of a ferrule cage with a concrete screed. These joists allow to support the structure
of said flooring, thus avoiding the expensive construction.
[0014] Use of polystyrene top slabs and inferior covering of the concrete buttress with
polystyrene provides a great thermal insulation and extra impact sound insulation,
while traditional forging cannot provide this on its own.
[0015] The slab comprises a prefabrication of width between 0.6 and 2.4 m approximately,
with a typical width of 1.2 m as a result of transportation widths and the weight
which cranes can lift. The length of the slab can vary depending on the clearance
between joists and on the loads, but a typical value is a 19 cm buttresses plus 3
cm polystyrene coating the buttresses on the bottom, which when added to a further
4 cm concrete applied in construction give the 26 cm of traditional top slabs calculated
for clearances of 3 to 6 m and typical household loads of 660 kg/m2 of total load.
[0016] Each prefabricated slab incorporates two solid concrete or alveolar buttresses of
the same width as the slab which stiffen it and prevent planking or support in the
construction, so that they are self supporting, as with alveolar slabs. These buttresses
may have several shapes, with the most common one being those which have a double
-T shape in each buttress, although it may also have a single - T. The double T wings
may be rectangular, trapezoidal, triangular, round, etc.
[0017] The motive for the top T is that in order to be self supporting a compression head
is required for the top concrete wider than the single buttresses; in turn, this greater
width by means of the greater contact surface with the poured concrete allows to ensure
the transmission of loads through the slope between the two concretes; it also allows
the linkage of the lightening material between ribbings, which mainly consists of
expanded polystyrene slabs, although ceramic or concrete slabs may also be used. Lastly,
because of its greater width it provides greater safety to workers as when walking
they will be stepping on concrete areas, not only on the slabs.
[0018] The reason for the bottom T is that in the areas where the joist is working in negative
torque there is a wider compressed concrete head, thus saving negative steel as compared
to traditional narrow bottom buttress floor structures. The bottom wings of the buttresses
are further useful in locking the polystyrene or ceramic slabs, preventing them from
falling or slipping while the worker walks on them. As the concrete is extruded in
factory against them, the adherence between these parts and the buttress concrete
is ensured, unlike in traditional joist and slab structures in which the slabs are
loose and easily slip from the joists, until the construction concrete is poured.
[0019] Naturally, the steel employed to support the positive torques of the joist is incorporated
in the bottom part of the buttresses at the time of fabrication. Steel to withstand
negative torque is placed on the slab, and confined in place by the compression layer
concrete poured in construction. If a compression layer is not incorporated in the
construction negative steel may be housed in the open alveolus of the ends.
[0020] Steel to be placed on the prefabricate should be prestressed, with the ensuing saving
of steel for construction, as the greater elastic limit of these allows to reduce
its width considerably as compared to reinforced concrete.
[0021] Afterwards in construction, by placing a steel mesh above and pouring 4 or 5 cm more
of concrete on all the slabs, the floor joist itself is made. Thus all slabs will
operate transversely as well.
[0022] Construction of the slab with vaults in-factory entails a further advantage, in that
a mould is no longer required to shape the buttresses as the double T shape is achieved
with the shape drawn on the polystyrene vaults themselves (or ceramic or concrete),
without later removing the framework of the mould required.
[0023] Among other advantages of the new slabs is the possibility of reinforcing support
areas with cutting steel if calculations so recommend, or further increasing compression
heads, both lower and upper, also when required by the calculations. The increased
width and reinforcement due to having loads concentrated afterwards on the building
is also not a problem as narrower slabs are used to increase the buttresses. The different
width of the floor joist is immediately achieved by using thicker or narrower slabs
thus adapting to greater or smaller clearances.
[0024] The advantage of being self-bearing implies a reduced work in construction assembly,
as the classic planking of joists and slabs is not required.
[0025] Unlike alveolar slabs, cutting a slab is rather fast as it is only necessary to cut
the concrete buttress, and not the two top and bottom slabs of the alveolar slabs,
as well as their wider buttresses.
[0026] As regards the weight of the finished floor joist, it is lower than the joist and
slab floor joist if polystyrene slabs are used, which saves a few kilograms of steel
in the calculation. A ceramic slab and joist structure of edge 26 cm weighs 260 kg/m2,
while the new structure weighs around 200 kg/m2.
[0027] Weight of prefabricated slabs is on the order of 600 kg (for thickness 25 cm, width
1.2 m and length 5 m, typical for homes), which allows current 750 kg cranes to lift
these slabs easily. Transport is also much less than for alveolar slabs of the same
use, as well as joist and slabs.
[0028] Fabrication of angled support slabs can be immediately performed by cutting the required
angle on the pre-stress track with a diamond disc.
[0029] Plates may be provided with 1, 2, 3 or 4 buttresses, as desired by the designer or
the constructor. Buttresses may have several shapes, including rectangular, and thus
in order to ensure embedding of the slabs with this type of rectangular buttresses,
their walls shall be provided with saw teeth so that the concrete adheres more firmly.
On the bottom of the plate the dovetail slots made on the polystyrene slabs every
5 or 10 cm serve to lock the whitewash plaster.
[0030] The ends of the support buttresses may have a protruding reinforcement in order to
lock the cutting load on the support, according to standards. This connection reinforcement
shall be housed in the alveolus which houses the slab buttresses, and the concrete
poured in the alveolus ensures the overlapping of this reinforcement with the bottom
longitudinal reinforcement of the slab.
[0031] Reinforcement of negative torques may be distributed along steel bars of lesser diameter
and shared along the entire upper surface of the slabs, not necessarily on top of
the buttresses.
[0032] The possibility of cutting the polystyrene slab laterally allows in construction
to easily adapt to the widths of joists, if these are not multiples of 120 or 60 cm.
[0033] As we employ high resistance steel with high resistance concrete, and a considerable
thickness, we may place the buttress on the edge of the construction perimeter and
serve as an edge band in order to bear the building enclosure; thus saving the traditional
edge band.
[0034] The main advantage obtained by this novel system shall therefore be economical, as
if we evaluate all costs intervening in its fabrication and assembly we obtain the
same cost as for a traditional joist and slab structure, which hitherto is considered
the cheapest in the market. Despite employing polystyrene slabs, more expensive than
those of ceramic or concrete, this is offset by the slab not incorporating any more
concrete than a traditional structure, not requiring celosia, reducing the negative
torque reinforcement substantially as its compression head is smaller, for a typical
thickness of 26 cm it is 60 or 70 kg/cm2 lighter than a traditional reinforced joist
structure (if compared to a prestressed joist the weight reduction is greater) thereby
saving kilograms of steel in the entire structure, as planking is not required it
saves labour, as no special moulds are required investment in manufacturing installations
is small, if a prestressed or alveolar joist installation is already available, etc.
[0035] A further possibility would be use of extruded or moulded polystyrene slabs (with
buttresses) in order to employ less polystyrene and therefore reduce the cost of the
slabs.
[0036] The general fabrication process for the prestressed slab consists of placing the
1.2 m wide slabs on the track, with the buttresses already formed on the polystyrene.
[0037] The moulding machine is provided with two lateral and/or upper traction rollers,
which guide the slabs, align them and compress them somewhat against the already moulded
slab, achieving greater tightness as well as preventing unwanted floatability of the
slabs.
[0038] These lateral rollers also serve to prevent the slab from opening due to the concrete
pressure and vibrating when passing through the buttresses filler bins.
[0039] Rollers may be grooved for a greater grip on the polystyrene. Rollers may also be
replaced by endless belts, endless chains or clappers. In addition these guide systems
may be powered or not.
[0040] A forward filament guide comb will prevent the concrete from overtaking the machine,
for which the retainer comb or guillotine shall have the same shape as the buttress
(drawn on the polystyrene) and shall slide along the inside of the slabs.
[0041] Instead of a comb with the same shape as the buttress and with a clearance of 2 to
10 mm a sliding forward mould can be used, also known as a trumpet, with an approximately
rectangular shape and with a clearance with the polystyrene walls of 20 to 30 mm.
This forward mould shall be long (between 40 and 100 cm) in order to prevent the concrete
from leaving between the former and the slab wall towards the front of the machine.
Friction with walls and its permanent forward position with respect to the polystyrene
ensure reingestion of any concrete which advances.
[0042] A good tightness during filling may be ensured by skids in contact with the polystyrene
which slide on it, preventing the lateral exit of the concrete.
[0043] In order to configure the inner alveolus of the buttresses we use the same system
as for the alveolar slabs, but with a single alveolus. The walls of the slabs will
help keep the concrete from deforming, even if it is thin or has a taller than usual
Abrans cone.
[0044] The slope load between the concrete of the buttress and the compression layer can
be ensured by a top striation of the concrete at the end of the machine, leaving an
impression, longitudinal canals extruded by the machine itself or by an open alveolus
on the top. The alveolus may have zero width (solid buttress), when designing a metal
alveolus of the mould with near-zero thickness, but thick enough to ensure an inner
vibrating of the buttress.
[0045] When resting on prefabricated Tul or concrete screed (approximately 6 cm) with ferrule
cage girders, a 6 cm polystyrene layer shall be placed under the buttress, so that
in order to rest it is sufficient to cut the polystyrene, whether in shop or better
on the construction site, so that the polystyrene edge always touches the edge of
the girder screed, preventing gaps when applying the plaster.
[0046] Lastly, in order to elevate the slabs they maybe pinched on both sides of the top
buttresses wings, even if the slab polystyrene is slightly broken when the clip is
applied.
[0047] They may also be elevated by laterally pressing on the polystyrene, employing a hook
on the ends of the buttresses and housed in the alveolus, leaving steel hooks embedded
in the buttresses, etc.
[0048] On site stacking or resting on the framework or brick construction shall be performed
on short wooden or fibrocement plugs (depending on each case) which shall incrust
themselves in the lower polystyrene coating of the buttresses until touching the concrete
in the latter.
[0049] A solidification may also be performed, by cutting the bottom polystyrene coating
of the buttresses before moulding the concrete, marking and measuring the length at
which the slab will later be cut. In this way when the moulder is passed pouring concrete,
the concrete will descend to the bottom of the track and there will be concrete in
sight to rest the framework or load wall of the construction, in this way not spoiling
the polystyrene bottom coating of the buttresses.
DESCRIPTION OF THE DRAWINGS
[0050] These and further characteristics of the invention will be more clearly understood
in view of the accompanying drawings, where for purposes of illustration only the
following is shown:
Figure 1 shows a section view of the prefabricated slab for building floor structures
in a preferred fabrication. It also shows a cross section of a part of finished forging.
Figure 2 shows a sectional view of the slab with the alveolus open on the top.
Figure 3 shows a sectional view of the slab, with an alveolus and also upper longitudinal
grooves.
Figure 4 shows a perspective sectional view of the slab, without the double T shape
but with lateral grooves or saw teeth between the concrete buttress and the slab.
Figure 5 shows a perspective view of the emplacement of the slabs on the pre-stress
track.
Figure 6 shows a perspective view of a polystyrene slab showing the double T shape
of the buttresses cut out on the slab.
Figure 7 shows a perspective view of lateral rollers pressing on a slab.
Figure 8 shows a perspective view of top rollers pressing on the slabs against the
track. Also sown is a lateral guide skid.
Figure 9 shows a perspective view of the buttress filling bin, with its front retaining
door and its rear fitting mould. Also shown are loose upper sealing skids.
Figure 10 shows a perspective view of a portion of a finished slab with the top buttress
cut, the alveolus and a connector housed in it.
Figure 11 shows a perspective view of a slab guide train with lateral rollers, a retention
guillotine, fitting mould and rear grooves. Also shown is a section of the finished
slab.
Figure 12 shows a perspective view and a front view of a filling bin with a front
retention guillotine, and a further filling bin with a front retention pre-mould which
by friction prevents the concrete from sliding forward.
Figure 13 shows a sectional view of a Tul or concrete screed type joist and tow slabs
bearing on said joist.
Figure 14 shows a sectional view of a slab with one of its buttresses acting as an
edge band for a floor joist.
Figure 15 shows a perspective view of raising hooks for the slab.
PREFERRED EMBODIMENT OF THE INVENTION
[0051] A preferred embodiment is described with reference to the figures of a slab (1) comprising
two concrete buttresses (2) and a polystyrene or other material vault (3). Inside
said buttresses is housed reinforcement (4), required to withstand the positive torques
of the floor joist.
[0052] In order to make floor joist (5) on site the slabs shall be placed parallel to each
other, resting on the load girders of the structure, and the floor joist shall be
completed by placing reinforcement (6) meant to withstand negative torques and by
on-site addition of a steel mesh (7) and a thin concrete compression layer (8).
[0053] Slab buttresses (2) may have a double T shape with bottom wings (9) required to support
vaults (3) and to act as compressed heads when the floor joist is under negative torques.
At the top part of double T shaped buttresses (2), wings (10) will also allow to support
vaults (3), also forming a compression head to withstand positive torques of the slab
when placed on work, so that they are self bearing, and ensures transmission of loads
between buttress (2) and compression layer (8) of the work through rough surface (11)
relating the two concretes. Said rough surface (11) is made by scraping the surface
or by any other existing means, such as gravure.
[0054] Scraping (11) may be replaced by a deep open alveolus (12) or by top longitudinal
grooves (13), or by half a top-open shallow alveolus (14). A further alternative is
to make grooves (15) on the sides of vaults (3) inside the buttresses, in order to
ensure a good attachment between the concrete and the vault.
[0055] Double T wings (10) may have various shapes, ranging from triangular to trapezoidal,
rectangular or round.
[0056] In order to manufacture the part using an extruder or a sliding moulding machine
with a prestressed joist or alveolar slab, vaults (16) measuring between 1 and 6 m
shall be placed on the pre-stress track. Said vaults will bear a cut-out of the shape
(17) of the concrete buttresses.
[0057] In order to align, guide and tighten vaults (16) on the pre-stress track, lateral
rollers (18) which may be tractioning or not shall be used, pressing on the vault
and forcing it to align and compress against the concreted vaults. Whenever a roller
is referred to, an endless belt, a chain or a clapper may also be employed. The same
can be achieved using top rollers (19) and lateral skids (20).
[0058] The concrete is filled by pouring the contents of the moulding machine bin on the
buttress space drawn in the vault, using lateral skids (21) which prevent the concrete
from exiting between the filling bin (22) and the vault through the contact groove
(23).
[0059] The concrete is retained on the front of the machine by a retaining guillotine (24)
of the type used in these machines, with the shape of the buttress.
[0060] Lastly, the concrete is retained on the back using a fitting mould (25) with an inner
alveolus, normally used with this type of machine, which by friction and plugging
prevents the concrete from puffing at the machine output (26).
[0061] A better grip between the compression layer and the slab concrete buttress may be
obtained using a top striation (27) of the buttress.
[0062] As the cut is perfectly clean using a diamond disc, without the possibility of pre-stress
output reinforcement in front and behind the slab, a connector (29) can be housed
in alveolus (28) which by means of the concrete provided in the construction site
causes the overlap between the connector and slab steel.
[0063] Figure 11 shows a full fabrication line comprising a roller (18) guide and alignment
area, a retaining gate (24), a filling area with bin and inner alveolus (22), in addition
to lateral rollers to offer the concreting pressure (30), a fitting mould with alveolus
(25) and lastly a striation area (27). Thus the prefabricated slab (1) with an alveolar
(28) buttresses (3) is obtained.
[0064] Figure 12 shows separately the retention guillotine (24) which may be replaced by
a forward trumpet, pre-mould or friction plug (31), comprising a wide skid (32) which
bears on the vault, and a buttress (33) with a rectangular section, separated from
the polystyrene walls by 20 to 30 mm.
[0065] In this same figure is shown the filling bin for each buttress and the rear fitting
mould (25) with its metallic cylinder (34) which shapes the buttress alveolus.
[0066] The front view of said set aids in differentiating the two types of forward retainers,
the guillotine (24) and friction plug (31). Also remarked is the lateral sealing by
skid (23) on the vault.
[0067] In order to rest the concrete screed Tul type girder (35) with a ferrule cage (36),
it will suffice to have a bottom coating of polystyrene (37) of the same thickness
as screed (35), then cutting out excess polystyrene and resting concrete buttress
(2) directly on the girder screed. In order to not reduce the calculation width of
the girder due to interference with the polystyrene vaults and absorb possible errors,
girder screed (35) shall be made 5 or 10 cm wider on each side than obtained from
a calculation. By cutting off excess polystyrene on site, groove (38) left between
the bottom area of slab (2) and the edge of screed (35) is reduced practically to
nothing. Thus the plaster wash will not have to cover too large grooves.
[0068] Considering the substantial thickness existing, if the want the joist to have the
same thickness as the load girders (normally 26 cm) and as we are using prestressed
steel, we can replace the girder of the floor joist edge of work edge closure (39)
by a reinforced buttress (40) with cutting reinforcement if required.
[0069] Lastly, to raise and handle the prefabricate we may pinch the edges of each buttress
(41) with a gravity or hydraulic clamp (42) incrusted in vault (43), searching for
the lower area of the top wing of the double T of the concrete buttress. We may also
use a hook on the ends of the buttresses and insert it in the alveolus, press on the
polystyrene sides of the slab, hooks inserted in the fresh concrete, etc.
[0070] This description is not extended with the understanding that any expert in the field
will understand the scope of the invention and the advantages derived thereof.
[0071] Materials, shapes, size and arrangement of elements are subject to variation as long
as the essence of the invention is unaltered.
[0072] The terms used in this description are to be understood in a wide and non-limiting
sense.
1. Fabrication process for polystyrene vault and pre-stressed concrete floor joist top
slabs and top slabs obtained thereof; as a continuous production PROCESS: of single T, double T, tubular, inverted ribbed slab or alveolar slab joists; in
a long track of 100 to 200 m with pre-stressed steel, using a concrete moulding or
extruding machine, with length cut by a diamond disc machine; characterised in that on the fabrication track are placed the vaults of polystyrene or another similar
material with the buttresses etched in the vaults, so that they are all aligned on
the track; afterwards the pre-stress cables are placed inside the buttresses and stressed;
then a moulding type machine is placed above the vaults, resting on the track rails,
and the buttresses are continuously filled with concrete, with the machine leaving
one or several closed alveoli (28) of the alveolar slab type or tubular joist type,
or one or several open top alveoli; thus once the track is concreted the concrete
is allowed to set and later cut with a diamond disc to the desired length. On the
construction site, inside the alveoli and extending beyond the edges is placed a reinforcement
or connector which shall connect the buttresses to the support girder.
2. Fabrication process for polystyrene vault and pre-stressed concrete floor joist top
slabs and top slabs obtained thereof, performed with a moulding or extruding MACHINE of the type employed to manufacture prestressed joists or prestressed alveolar slabs,
comprising a screed with wheels on rails, a filling bin, a vibrating mould, a retention
guillotine and a rear fitting mould; characterised in that the machine is provided with lateral traction rollers (18) which guide, align and
compress the vaults without concrete against those already concreted, and bear the
concreting pressure so that the vaults do not open, or it may incorporate top traction
rollers (19) in order to also guide, compress and even prevent floatability of the
vaults.
3. Fabrication process for floor joist top slabs as in claim 2, characterised in that the lateral or top rollers may be replaced by endless belts which equally press on
the vaults, or by endless chains, or oscillating metal pushers which clap, known as
clappers, as they imitate a clapping motion.
4. Fabrication process for floor joist top slabs as in claims 2 and 3, characterised in that the machine may incorporate top skids (21) or lateral skids (20) which guide and
align polystyrene vaults (16).
5. Fabrication process for floor joist top slabs as in claims 2 to 4, characterised in that the concrete is poured using upper filling bins (22), with sides sealed with corresponding
vertical skids (21).
6. Fabrication process for floor joist top slabs as in claims 2 to 5, characterised in that the concrete may be retained in the forward are of the machine while the buttresses
are filled using a retaining guillotine (24) designed with the same shape as the buttress
outline but having a clearance of a few millimetres.
7. Fabrication process for floor joist top slabs as in claims 2 to 5, characterised in that the concrete may be retained in the forward area of the machine while the buttresses
are filled using a retaining pre-mould (31) comprising a wide upper skid (32) which
grazes the vault and a vertical rectangular core (33) similar in width to the buttress
but with a considerable clearance of a few centimetres. This mould shall be long enough
to retain by friction and reingest the buttress concrete which tries to advance.
8. Fabrication process for floor joist top slabs as in claims 2 to 7, characterised in that the concrete may be retained in the forward area of the machine by placing a rear
fitting mould (25) of a suitable length which by friction prevents the alveolus from
collapsing and/or the swelling of the upper surface of buttress (27) at the output
of the machine. Said fitting mould shall be provided with metallic cylinders (34)
which conform alveolus (28) inside the buttress, as well as the longitudinal grooves
(13) or large groove (14) according to the design.
9. Fabrication process for polystyrene vault and pre-stressed concrete floor joist top
slabs and top slabs obtained thereof of the prefabricated SLAB type comprising ceramic or polystyrene vaults and strong solid buttresses of reinforced
or prestressed concrete with a double or single T shape normally, and with the double
T wings having a rectangular, trapezoidal, triangular or round shape, concreted before
being placed on site, with the buttress edge equal to that of the vaults, as well
as with or without a polystyrene coating under the buttresses; characterised in that the slab obtained thus has its ends cut with a diamond disc, without reinforcement
extending beyond the concrete buttress ends, nor concrete strut or buttress extending
beyond the end; with the section solid or incorporating one or several closed alveoli
(28) or alveoli open on the top (12).
10. Fabrication process for floor joist top slabs as in claim 9, characterised in that connector (29) of the bottom part of the buttresses is housed in alveolus (28) or
(12) of the buttress and in its lower area, so that when the construction concrete
is poured it enters the alveolus or groove and overlaps the connector and the buttress.
11. Fabrication process for floor joist top slabs as in claims 9 and 10, characterised in that the upper face of the buttress may have a striation (27) made by the machine itself
on passing, or longitudinal grooves (13) made by the fitting mould.
12. Fabrication process for floor joist top slabs as in claims 9 and 10, characterised in that the buttress may be vertical rectangular in shape, with lateral saw teeth or grooves
(15) which place in contact the polystyrene and the concrete, with a top longitudinal
groove (14).
13. Fabrication process for floor joist top slabs as in claims 9 and 10, characterised in that in order to rest the slabs on prefabricated concrete screed girders (35) with a ferrule
cage (36), buttress (2) shall be given a bottom polystyrene coating (37) of the same
thickness as screed (35) of the girder, so that the polystyrene may be cut on site
as much as the slab rests on the girder, leaving a minimum groove (38).
14. Fabrication process for floor joist top slabs as in claims 9 and 10, characterised in that one of the slab buttresses may be used as an edge girder, which conveniently reinforced
shall bear the weight of enclosure (39) of the work. For this the lateral vault shall
be cut and the mason work shall be laid on outer buttress (40).
15. Fabrication process for floor joist top slabs as in claims 9 and 10, characterised in that the slabs are raised and handled using a gravity or hydraulic clamp (42) attached
beneath top wings (41) of the buttresses, for which polystyrene (43) is locally trimmed
by clamp (42).
16. Fabrication process for floor joist top slabs as in claims 9 and 10, characterised in that in order to prevent the internal polystyrene coating of the buttresses from being
squashed, fibrocement or wooden blocks either triangular or trapezoidal in shape may
be provided embedded in the polystyrene until they touch the concrete under the slab
buttress.
17. Fabrication process for floor joist top slabs as in claims 9 and 10, characterised in that in order to prevent the polystyrene from being squashed under the buttresses when
supporting weight, they may be filled in underneath by trimming the lower polystyrene
before concreting the slab, measuring and indicating the cut length of the slab previously.