[0001] The present invention relates to a method for building a wall or a part thereof in
the ground, a system for carrying out the method, and a wall building device for use
in the method and system.
[0002] Known tunnel wall building devices are e.g. described in the "Handbook of Mining
and Tunnel Machinery", Barbara Stack, 1982, published by John Wiley and Sons, pages
415-417. These known tunnel wall building devices comprise a cutting face at the front
of a cylindrical shield. The tunnel wall building device is pushed in the direction
of the advance of the shield by hydraulic cylinders acting between the rear side of
the shield and the constructed tunnel wall.
[0003] A first drawback of the use of such tunnel wall building devices is the criticality
of the control over the stabilization of the ground in front of the cutting face.
Too much excavation will cause local collapse of the ground, while too much push force
will cause undesirable settlements of the ground.
[0004] A second drawback is the required axial support of the tunnel wall building device
on the tunnel wall. In case of the use of prefabricated elements the axial support
force might be a governing load case.
[0005] In other methods the tunnel wall is made of extruded concrete. In this respect reference
is made here to EP-A-0 354 335 describing axially supporting a boring shield by the
extruded concrete tunnel wall through formwork elements used for forming the inner
side of the tunnel wall. The tunnel wall building method according to this publication
is discontinuous, taking away formwork elements where the concrete has hardened, and
adding the formwork elements, after cleaning thereof, directly behind the boring shield.
This method is expensive and time-consuming as a result of the use of the formwork
elements, which need to be handled behind the boring shield, and can only be removed
when the concrete they are supporting has hardened sufficiently, which may take considerable
time.
[0006] EP-A-0 483 445 describes a continuous tunnel wall building method, extruding concrete
to form a tunnel wall, and using a sliding formwork arrangement requiring additional
means to transfer the axial boring forces to the hardened part of the tunnel wall
and to facilitate continuity.
[0007] In all previous methods the management of the ground water level during the fabrication
of the tunnel wall may present serious problems.
[0008] The object of the present invention is to provide a method, system, and device for
building a wall or a part thereof in general, and a tunnel wall in particular which
avoid the risk of collapse or undesirable settlement of the ground in front of the
wall building area.
[0009] Another object of the present invention is to provide a wall building method, system,
and device which do not rely on the wall for providing an axial support for the wall
building activities.
[0010] Yet another object of the present invention is to provide a wall building method,
system, and device which can be continuous and do not use formwork elements.
[0011] A further object of the present invention is to provide a wall building method, system,
and device which are virtually unaffected by the ground water level.
[0012] To reach the above objects, in the method according to the invention a wall building
device having cross-sectional dimensions which are substantially equal to the dimensions
of at least a part of the cross-section of the wall is pulled through the ground,
at least a part of the wall being formed by injecting a hardenable material behind
the wall building device. In the process of making the wall, the wall is supported
on all sides by the ground surrounding the wall (and, in the case of a tunnel wall,
by the ground filling the tunnel wall). Consequently, the wall requires no direct
strength, and can e.g. be made from fibre concrete with a normal hardening time. The
excavation of the ground at one side of the wall can be done after the completion
of the tunnel wall, and the stability of the excavation presents no problem at all.
Different shapes of wall cross-sections are possible, but not limited to: (semi-)circular,
elliptical, rectangular, triangular, flat. Since the wall building device is advanced
by pulling, no reaction force is applied on the constructed wall. The advance of the
wall building device is therefore independent from the structural strength of the
wall at any given moment.
[0013] In a preferred embodiment of the wall building method according to the invention,
the following steps are performed: drilling one or more holes in the ground, on or
parallel to the projected path of the wall, each of the one or more holes being drilled
by means of a drill string; connecting one end of each drill string at the end of
the drilling operation to the wall building device; and pulling the wall building
device through the ground by retracting the one or more drill strings. Alternatively,
the wall building method may comprise the steps of: drilling one or more holes in
the ground, on or parallel to the projected path of the wall, each of the one or more
holes being drilled by means of a drill string; connecting one end of each drill string
at the end of the drilling operation to one end of a casing string; pulling each casing
string through the ground by retracting the drill string connected thereto; disconnecting
each casing string from the corresponding drill string; connecting one end of each
casing string to the wall building device; and pulling the wall building device through
the ground by retracting the one or more casing strings. Accordingly, depending on
the kind of wall to be built, in particular its cross-sectional area and its length,
one or more drill strings and or one or more casing strings are used to pull the wall
building device through the ground, using standard directional drilling techniques
to bring the drill and casing strings into the ground. The directional drilling techniques
are capable of very accurately following the projected path of the wall. The accuracy
of the paths of the casing strings can be further improved by using a single drill
string and by means of a connecting assembly connecting the ends of several casing
strings to one end of the drill string and transversely spaced therefrom, which drill
string is then pulled through the ground at the other end thereof.
[0014] In a preferred embodiment each casing string comprises an inner string and an outer
string enclosing the inner string, the inner string being adapted to transfer the
pulling force required by the wall building device, and the outer string being adapted
to provide low friction forces when moving the inner string relative to the outer
string. The outer string serves as a guide for the inner string when pulling the wall
building device through the ground by the inner string. The friction forces between
the inner string and the outer string can be still further reduced by supplying a
fluid to the space between the inner string and the outer string.
[0015] Preferably, the inner string of the casing string is made of steel providing the
strength needed, while the outer string is made of plastics, e.g. polyethylene providing
an excellent low cost and low friction separation wall between the inner string and
the ground.
[0016] When moving the wall building device through the ground, a hardenable material is
injected behind it to form the wall. The wall material preferably is supplied to the
wall building device through at least one of the one or more drill strings/casing
strings used for pulling the wall building device through the ground. Additionally,
at least one of the one or more drill strings/casing strings may contain at least
one line for supplying energy, at least one line for controlling and/or monitoring
the wall building device, at least one duct for supplying a drilling fluid to the
wall building device, and/or at least one duct for discharging ground removed by the
wall building device. Alternatively, or in addition thereto, the wall material and
the drilling fluid may be supplied to the wall building device through ducts extruded
in the wall. Such ducts can also be used for accommodating lines for supplying energy
to the wall building device, or for controlling and/or monitoring the wall building
device. Further, such ducts can be used for discharging ground removed by the wall
building device.
[0017] For an improved positioning accuracy of different wall parts relative to each other,
preferably the wall building device is adapted to build a wall or wall part provided
with wall guide means, the or a further wall building device being provided with means
for engaging the wall guide means. In this way the latter wall building device is
allowed to exactly follow the path of the wall or wall part already in place in the
ground. The wall guide means preferably comprise a guide slit, which may have an essentially
L-shaped cross-section. More generally, in a preferred embodiment at least one guide
member is provided in the ground, the wall building device being adapted to be guided
along the guide member through the ground.
[0018] When a wall building device is used in a multi-pass mode, i.e. for subsequently passing
through the ground along adjacent paths for building a wall from a plurality of separately
built wall sections, preferably the wall building device is adapted to be connected
to the leading end of a pulling string for pulling the pulling string into the ground
simultaneously with pulling the wall building device through the ground. The pullling
string is used for pulling the or a further wall building device through the ground
in a next passage. For this purpose, the wall building device preferably has an essentially
Z-shaped cross-section.
[0019] An essentially flat wall can be built in the ground by at least two wall building
devices which at at least one side thereof are adapted to be coupled to another, which
wall building devices further are adapted to be pulled through the ground in a forward
direction, and in a direction at an angle to the forward direction.
[0020] For improving the quality of the wall, the wall material preferably is injected between
one or more membranes defining one or more sides of the wall or wall part formed by
the wall building device. The membrane or membranes can be stored in the wall building
device in folded or rolled-up form, and unfolded or unrolled when injecting the wall
material.
[0021] The friction between the wall building device and the surrounding ground, and the
resistance the ground offers to the wall building device when pulling the wall building
device through the ground is preferably reduced by vibrating, lubrication, jetting
and/or removing the ground area adjacent to the front part of the wall building device.
[0022] The invention is explained in more detail in an exemplary way by reference to the
annexed drawings, in which:
Fig. 1 shows a vertical cross-section of a ground area in which a tunnel is to be
built, illustrating a first operation;
Fig. 2 shows on an enlarged scale a drill string used in the operation shown in Fig.
1;
Fig. 3 illustrates a next operation in the ground;
Fig. 4 shows on an enlarged scale a part of pulling means used in the operation illustrated
in Fig. 3;
Fig. 5 illustrates a next operation in the ground in the process of building a tunnel
wall;
Fig. 6 shows on an enlarged scale a side view of a tunnel wall building device shown
in Fig. 5;
Fig. 7 schematically shows a longitudinal cross-section of the tunnel wall building
device shown in Fig. 6;
Figs. 8 and 9 illustrate different methods of excavating a tunnel within the wall;
Fig. 10 shows a side view, partially in cross-section, of another embodiment of the
tunnel wall building device according to the invention;
Fig. 11 shows on an enlarged scale a cross-section of a detail X of the tunnel wall
building device of Fig. 10;
Fig. 12 shows a front view of the tunnel wall building device of Fig. 10;
Fig. 13 shows a perspective view of a wall building device according to the invention;
Fig. 14 shows on an enlarged scale a cross-section of the wall building device of
Fig. 13 taken along the line XIV-XIV;
Fig. 15 shows a perspective view of an assembly used for simultaneously pulling four
casing strings through the ground;
Fig. 16 shows a front view of the assembly of Fig. 15;
Fig. 17 shows a side view of the assembly of Fig. 15;
Fig. 18 shows a cross-section of a structure built in the ground using the method,
system and wall building device according to the invention;
Fig. 19 shows a cross-section of another structure built in the ground using the method,
system and wall building device according to the invention;
Fig. 20 shows a cross-section of a further structure built in the ground using the
method, system and wall building device according to the invention;
Figs. 20a-20d illustrate a method for building a structure similar to the one shown
in Fig. 20;
Fig. 21 shows a cross-section of still another structure built in the ground using
the method, system and wall building device according to the invention;
Fig. 22 illustrates in perspective view the process of building a composite wall made
from uniformly shaped wall sections;
Figs. 23a-23g in cross-sectional view show different stages in building composite
walls made from uniformly shaped wall parts;
Figs. 24a-24c in top view schematically illustrate a further process of building a
wall according to the invention; and
Figs. 25a and 25b in top view schematically illustrate a still further process of
building a wall according to the invention.
[0023] In the different Figures, the same reference symbols relate to the same parts or
parts having the same function. Arrows without reference numerals indicate normal
directions of movement.
[0024] As Figs. 1 and 2 illustrate, in the given example of a tunnel building method it
is assumed that a tunnel is to be built in the ground 2 under the ground surface 4
from a first construction pit 6 to a second construction pit 8. From the second construction
pit 8 a number of pilot holes 10 are drilled using conventional directional drilling
techniques, as described e.g. in "Tunnels & Tunnelling", published by Morgan-Grampian,
November 1996, in particular on page 15. A directional drilling unit 12 pushes a drill
string 14 through the ground from the second construction pit 8 to the first construction
pit 6. The pilot holes are drilled on or parallel to the projected path of the tunnel
wall.
[0025] As Figs. 3 and 4 illustrate, after having reached the first construction pit 6, the
front end of the drill string 14 is connected to the front part of a casing string
16, after which the casing string 16 is pulled through the ground along the path of
the pilot hole 10 by the directional drilling unit 12. As a result of this operation,
casing strings 16 are installed in the ground along the projected path of the tunnel
wall.
[0026] As Fig. 4 shows in more detail, the casing string 16 comprises a steel casing 18
enclosed in a plastic, preferably polyethylene (PE) tube 20. The casing string 16
is connected to a buoy 22 by a flexible coupling 24, which buoy 22 in turn is connected
to a reaming device 26 by a flexible coupling 28. When the projected tunnel wall has
a ring-shaped cross-section, preferably at least four casing strings 16 are installed
in the ground 2 spaced along the periphery of the cross-section.
[0027] As Figs. 5-7 illustrate, the back ends of the casing strings 16 are connected to
the front end of a tunnel wall building device 30, which has cross-sectional dimensions
which are substantially equal to the dimensions of at least a part of the cross-section
of the tunnel wall, and which is pulled through the ground 2 by pulling means 32 (not
shown in further detail) pulling simultaneously all casing strings 16.
[0028] The wall building device 30 comprises a body 34 with a conical-shaped front part
36, which is rounded at the front end thereof. Behind the front part 36, in the body
34 one or more vibration units 38 can be provided to reduce the friction between the
wall building device 30 and the ground, and to reduce the forces required to displace
the ground with the front part 36 while moving through the ground. Directly behind
the front part 36 a fluid 40, e.g. supplied through one of the casing strings 16,
may be injected to further reduce the friction between the wall building device 30
and the ground 2. The front part 36 is designed to minimize effects on the surrounding
ground area, to avoid plug forming in the wall building device 30, and to minimize
the required force for advancing the wall building device 30. Near the front end of
the front part 36 jetting 42 may be provided to improve the ground displacement, the
jetting fluid e.g. being supplied through one of the casing strings 16. Furthermore,
the front part 36 may be made in segments which are movable in the radial direction
to allow for small corrections of the path of the wall building device 30 moving through
the ground 2.
[0029] At the rear end of the wall building device 30, the tunnel wall 43 is extruded by
pumping the wall material 44 into the gap created by the wall building device 30.
The pressure of the wall material 44, which preferably is fibre concrete, ensures
the stability of the ground and prevents settlements thereof. The pressure also provides
a force in the direction of advance of the wall building device 30. The wall material
44 does not need to have direct strength, and only has to stabilize the gap created
by the wall building device 30 at the rear end thereof.
[0030] The wall material 44 is extruded between membranes 46 which can be stored in concertina
fashion in spaces provided therefore in the body 34 of the wall building device 30.
The membranes 46 are folded up in the body 34, and unfold when the wall building device
advances. The membranes 46 prevent leakage of the wall material into the ground, ensure
stabilization of the tunnel wall 43, provide (extra) water tightness, and provide
a quality assurance.
[0031] The use of one or more membranes in the method, system and wall building device according
to the invention is not essential; normally membranes can be omitted, and are used
only if special requirements, such as wall quality, water tightness, etc. are to be
met.
[0032] The wall material 44 is supplied to the wall building device 30 through one or more
of the casing strings 16, in particular through the steel casing 18 thereof. As will
be clear from Fig. 6, the tubes 20 of the casing string 16 are cut in front of the
wall building device in a manner not shown in further detail. The cut tube 20 is directed
to the inside of the tunnel wall 43, and can be removed during or after excavating
the ground inside the tunnel wall 43. The longitudinally cut tube can also be reused
to protect power supply or signal lines, or can serve other useful purposes when the
tunnel is completed. The body 34 of the wall building device 30 comprises channels
not shown in further detail guiding the wall material supplied through the casing
strings 16 to the rear end of the wall building device 30 between the membranes 46,
and may also comprise other channels not shown in further detail to guide fluid supplied
through the casing strings. 16 for lubrication and jetting.
[0033] As Figs. 8 and 9 illustrate, after the tunnel wall has been completed and has sufficient
strength, the ground inside the tunnel wall can be excavated using a dragline 50 (Fig.
8) or, when the level of the ground water 52 is high, conventional dredging equipment
54 (Fig. 9) can be used.
[0034] It will be clear that the wall building device 30 can also, under circumstances,
be pulled through the ground by the drill strings 14, which at the same time may serve
to supply the wall material 44 to the wall building device. Further it is possible
to construct the tunnel wall in separate elongated parts: a tunnel with a rectangular
cross-section may be constructed by subsequently building the top wall, the bottom
wall and the side walls, after which the ground inside the thus completed tunnel wall
is excavated. Yet another possibility is building a first tunnel wall and subsequently
building one or more additional tunnel walls enclosing the first tunnel wall, or inside
the first tunnel wall. The different tunnel walls may have different properties: one
being designed for watertightness, another being designed for strength.
[0035] Figs. 10, 11, and 12 show a tunnel wall building device 60 being pulled through the
ground by means of four pulling strings 62 not shown in further detail. The wall building
device 60 comprises eighty jetting and extruding units 64 arranged along the ring-shaped
front side of the wall building device 60.
[0036] As shown in Fig. 11, each jetting and extruding unit 64 comprises a body 66 having
four main ducts 68, 70, 72, and 74 formed therein. The ducts 68, 74 of different jetting
and extruding units 64 are in fluid communication with each other and may further
be in fluid communication with one or more ducts in a pulling string 62. At its front
part the jetting and extruding unit 64 comprises a grid 76 keeping stones and other
large objects out of a jetting chamber 78 situated behind the grid 76. In the jetting
chamber 78, a rotating jetting device is mounted comprising a fluid driven motor 80
driving a tube 82 which is provided with a jet opening 84. From the duct 70 a fluid,
such as water, is fed under pressure through a duct 86 to the fluid motor 80 making
the tube 82 rotate. Said fluid further is fed to the jet opening 84, thus creating
a rotating jet 88. From the duct 70 also fluid is fed through a duct 87 to the jetting
chamber 78, mixing there with the ground jetted by the jet 88. The ground/fluid mixture
is removed from the jetting chamber 78 through a duct 90 to the duct 68.
[0037] For a lubrication of the inner and outer sides of the tunnel wall building device
60, a lubricating fluid is fed from the duct 72 through the duct 72a and 72b out of
the body 66 of the jetting and extruding unit 64.
[0038] From the duct 74 a hardenable material is fed through a duct 92, after which the
hardenable material is extruded at the trailing end 96 of the jetting and extruding
unit 64 to form a tunnel wall. In the extruding chamber 94 a piston unit 98 is provided
which is movable in the directions indicated by double arrow 100. A chamber 102 is
filled with a fluid under pressure ensuring a constant pressure on the hardenable
material in the extruding chamber 94 despite of variations in the ground travelling
speed of the wall building device 60 or variations in the pressure of the hardenable
material in the ducts 74 and 92.
[0039] In an alternative embodiment, the tunnel wall building device according to Figs.
10, 11 and 12 comprises only one annular body 66 connected to eighty jetting chambers
78, each containing a tube 82 driven by a fluid driven motor 80. In the annular body
60, at regular angular intervals ducts 72a, 72b and 92 are provided. In this embodiment
the piston unit 98 has a generally annular shape, like the body 66.
[0040] Figs. 13 and 14 show a wall building device 110 having an essentially rectangular
cross-section, as seen at right angles to the direction of movement in the ground.
The wall building device 110 is pulled through the ground by means of two pulling
strings 112 not shown in further detail. At the leading side 114 of the wall building
device 110 a number of plates 116 are provided to prevent stones and other large objects
from entering into the jetting chambers 78 of a plurality of jetting and extruding
units 64 accommodated next to each other in the wall building device 110. At the trailing
side 118 of the wall building device 110 a wall 120 is formed having a substantial
rectangular cross-section. The jetting and extruding units 64 of the wall building
device 110 are similar to those of the tunnel wall building device 60 and a discussion
thereof is omitted here. Alternatively, the wall building device 110 may comprise
only one extruding chamber 94 in a substantially unitary body 66, connected to several
jetting chambers 78.
[0041] Figs. 15, 16, and 17 show a connecting assembly 130, being a frame made of triangular
plates 132 and rectangular plates 134 connecting the ends of casing strings 136 with
the end of a pull string, such as a drill string 138. At the point where the assembly
138 is connected to one of the casing strings 136, a drilling, reaming and/or jetting
head 140 is provided. With the assembly 130 it is possible to bring a number of casing
strings 136 in the ground exactly parallel to each other, which would be more difficult
if for each of the casing strings a separate drill string would be used. The assembly
130 may take various forms, depending on the number of casing strings 136 to be connected
and their position relative to each other.
[0042] Fig. 18 shows an open channel built in the ground 2 by subsequently or simultaneously
building walls 150, 152 and 154.
[0043] Fig. 19 shows another open channel built by subsequently or simultaneously building
a wall 156 and 158 in the ground 2.
[0044] Fig. 20 shows an open channel in the ground 2 built by forming a wall 160 with a
semi-circular cross-section in the ground 2.
[0045] As Fig. 20a in a cross-sectional view shows, in a first stage of building a wall
with a semi-circular or similar cross-section two elongated wall parts or guide beams
160a and 160b defining the path of the complete wall are provided in the ground 2
near the surface, e.g. by digging trenches in the ground and forming the guide beams
160a, 160b in situ, or by placing unit lengths of prefabricated guide beam parts in
the ground 2. The guide beams 160a, 160b are supported and fixed in the ground 2 by
piles 161 driven into the ground 2 in a manner known per se. It should be pointed
out here that under the same or other circumstances guide beams or wall parts such
as the ones shown in Fig. 20a for the same use can also be formed or placed on instead
of in the ground, in part or as a whole. Further, it is also not essential that the
guide beams or wall parts are fixed in or on the ground.
[0046] Then, as Fig. 20b in a cross-sectional view and Fig. 20c in a side view according
to arrow XXc in Fig. 20b show, a wall building device 160c having an essentially semi-circular
cross-section is pulled through the ground 2 by means of three pulling strings 160d
- at least one of which being a drill string or a casing string - in the indicated
direction. Alternatively, the wall building device 160c may be pulled through the
ground only by the lowest pulling string 160d, while the other two upper strings are
replaced by other means for moving the wall building device 160c by means of a pulling
or a pushing force, such as one or more lorries, jacks, etc. The wall building device
160c is guided along its path in the ground 2 in a manner not shown in further detail
by opposite ribs 160e being part of the guide beams 160a, 160b. The wall building
device 160c is fitted with thirty-four jetting and extruding units 64 the structure
and operation of which have already been explained in connection with Fig. 11. As
Fig. 20c, and Fig. 20d in a partial cross-section show, with the wall building device
160c a wall 161a is formed which is connected to, and fixed by the guide beams 160a,
160b, at least in the upward and lateral directions, and possibly also in the longitudinal
and downward directions in a manner not shown in further detail. During the building
process, the pulling strings 160d may be used for supplying wall material, drilling
fluid and energy to the wall building device 160c, for discharging ground removed
by the wall building device, and/or for accommodating lines for controlling and monitoring
the wall building device. Of course, at least part of these functions can also be
performed above ground, since the top side of the wall building device 160c is near
or above ground level. Further, it will be clear that a similar, appropriately reshaped
wall building device as the one shown in Figs. 20b and 20c can be used for building
the channels shown in Figs. 18 and 19 each with a wall in one piece, using guide beams
similar to the ones shown in Figs. 20a, 20b and 20d.
[0047] In the process of building the walls 150-160 and 161a of the channels according to
Figs. 18-20 and 20a, the walls 150-160 and 161a are built first, while the ground
between the walls 150-152 (Fig. 18), between the walls 156 and 158 (Fig. 19), and
at the concave side of the walls 160 and 161a (Figs. 20 and 20d, respectively) is
excavated afterwards.
[0048] Fig. 21 shows a wall 162 in the ground 2, the wall 162 having ducts 164 extruded
therein by appropriately designing the trailing portion of the extruding chamber of
the wall building device used for building the wall 162. The ducts 164 may be used
for supplying the wall material, drilling fluid and energy to the wall building device,
for discharging ground removed by the wall building device, and/or for accommodating
lines for controlling and monitoring the wall building device.
[0049] Fig. 22 shows a composite wall 170 in the ground 2 made from a plurality of interconnecting,
uniform, generally Z-shaped wall sections 172 having ducts 174 extruded therein. Each
wall section 172 is provided with a guide slit 176 having a generally L-shaped cross-section.
A wall building device 178 with a cross-sectional shape similar to the cross-sectional
shape of the wall sections 172 is used for building the wall sections 172 by the action
of eight jetting and extruding units 64 removing ground material and extruding wall
material at the appropriately shaped trailing side of the wall building device 178.
A pulling string 180 (which may be a drill string or a casing string), fixed centrally
to the wall building device 178 in a manner not shown in further detail, is used for
pulling the latter through the ground 2 in the direction indicated by the arrow. At
the same time, another pulling string 182 of which the leading end is fixed at the
side of the wall building device 178, is pulled into the ground. The trailing end
of the pulling string 182 is used for pulling the wall building device 178 through
the ground 2 in a next passage thereof for forming a next wall section 172. In said
next passage, the trailing end of the pulling string 182 is fixed centrally to the
wall building device, like the pulling string 180. It will be clear that by using
a pulling string for pulling both a wall building device and the leading end of at
least one other pulling string through and into the ground, considerable time and
cost savings can be achieved in a multi-pass process using the same wall building
device.
[0050] During a passage through the ground 2, the wall building device 178 is guided in
a desired position relative to a wall section 172 formed before by a generally L-shaped
foot (not shown) connected to the device 178 and sliding in the guide slit 176. Also
at other points the wall building device 178 is guided by an adjacent wall section
172, as appears clearly from Fig. 22. The guide slit and the foot may e.g. also be
T-shaped or J-shaped.
[0051] Fig. 23a shows a composite wall 190 in the ground 2 essentially made from a plurality
of interconnecting, uniform, generally Z-shaped wall sections 192, 192a. The wall
sections 192 have been built essentially in the way illustrated and explained according
to Fig. 22. The last wall section that has been built is wall section 192a. During
the building of wall section 192a, a leading end of a pulling string 194 has been
pulled into the ground 2 in a manner not shown in further detail by connecting the
pulling string 194 to the wall building device (not shown) used for building the wall
section 192a, similar to the use of the pulling string 182 in Fig. 22.
[0052] As Figs. 23a and 23b illustrate, next the pulling string 194 is used for pulling
a wall building device (not shown) connected to a leading end of a new pulling string
196 and the leading end of a further part 194a of the pulling string 194 through the
ground 2 for building wall sections 192b and 192c being separated from each other.
[0053] As Figs. 23b and 23c illustrate, next the pulling string 194a is used for pulling
a wall building device (not shown) connected to leading ends of new pulling strings
198 and 200 through the ground 2 for building a wall section 192d essentially at right
angles to the other wall sections 192, 192a, 192b and 192c. The wall building device
used in this step may the same as the wall building device used for building the last-mentioned
wall sections.
[0054] As Figs. 23c and 23d illustrate, next the pulling string 198 is used for pulling
a wall building device (not shown) connected to a leading end of a new pulling string
202 through the ground 2 for building a wall section 192e.
[0055] As Figs. 23d and 23e illustrate, next the pulling string 202 is used for pulling
a wall building device (not shown) connected to a leading end of a new pulling string
204 in a manner not shown in further detail through the ground 2 for building a wall
section 192f.
[0056] As Figs. 23e and 23f illustrate, next the pulling string 204 is used for pulling
a wall building device (not shown) connected to the leading end of a further part
204a of the pulling string 204 through the ground 2 for building wall sections 192g
and 192h being separated from each other.
[0057] As Figs. 23f and 23g illustrate, next the pulling string 204a is used for pulling
a wall building device (not shown) connected to leading ends of new pulling strings
206 and 208 through the ground 2 for building a wall section 192i essentially at right
angles to wall sections 192d-192h.
[0058] The wall building method illustrated in Figs. 23a-23g provides a grate flexibility
in building complex wall structures from basic, essentially uniform wall sections.
At any rate, basically only one type of wall building device is needed to build the
wall sections 192, 192a-192i by changing, whenever necessary, the extrusion profile
thereof, e.g. by putting into or taking out of operation different jetting and extruding
units 64 included in the wall building device.
[0059] Further, wall sections may take different shapes than the ones shown in Figs. 23a-23g,
possibly for establishing different angles than right angles between walls made up
of the wall sections.
[0060] Fig. 24a shows four construction pits 210, 212, 214 and 216. Similar to the method
described in connection with Figs. 1-4, two pulling strings 218, 220 (which may be
drill strings or casing strings or similar) have been placed in the ground 2 between
the construction pit 210 and the construction pit 212. The pulling strings 218 and
220 are used for pulling in the direction indicated by the arrows a wall building
device 222 along a path from the construction pit 210 to the construction pit 212.
The wall building device 222 at its leading side has five jetting or other excavating
devices 224 which are indicated only schematically. Further, the wall building device
222 is provided with a plurality of jetting and extruding units of which the jetting
parts 226 are located at the side of the wall building device 222 facing the construction
pits 214 and 216. During the passage of the wall building device 222 from the construction
pit 210 to the construction pit 212, only the jetting devices 224 are in operation;
the jetting and extruding units are inoperative.
[0061] As Fig. 24b illustrates, the trailing side of the wall building device 222 is connected
to a further wall building device 222a having a plurality of jetting and extruding
units of which the jetting parts 228 are located at the side of the wall building
device 222a facing the construction pits 214 and 216. The jetting and extruding units
of the wall building device 222a are inoperative during the passage of the wall building
device 222a from the construction pit 210 to the construction pit 212, whereas the
jetting devices 224 remain in operation. A further wall building device 222b (Fig.
24c) is connected to the wall building device 222a, and has essentially the same structure
as the wall building device 222a. To the wall building device 222b a further wall
building device 222c (Fig. 24c) is connected, having essentially the same structure
as the wall building devices 222a and 222b. The four wall building devices 222 and
222a-222c together bridge the distance between the construction pits 210 and 212.
[0062] As Fig. 24c illustrates, next the assembly of wall building devices 222 and 222a-222c
is pulled by pulling strings 230 and 232 (which may be drill strings or casing strings
or similar) in the indicated direction to the construction pits 214 and 216. The pulling
strings 230 and 232 have been pre-installed between the construction pits 212 and
214, and the construction pits 210 and 216, respectively, in a similar manner as described
with reference to Figs. 1-4. During the passage of the assembly of wall building devices
222 and 222a-222c through the ground 2, the jetting devices 224 are out of operation,
while the jetting and extruding units of the wall building devices 222 and 222a-222c
are in operation, building a wall 234 between the construction pits 212-216.
[0063] Figs. 25a and 25b show three construction pits 240, 242 and 244. Between the construction
pits 240 and 242 an assembly of wall building devices 222 and 222a-222d is installed
in a manner already explained with reference to Fig. 24b by means of pulling strings
246 and 248 (which may be drill strings or casing strings or similar). Next, by means
of a pulling string 250 one end of the assembly of wall building devices 222 and 222a-222d
is pulled to the construction pit 244, while the other end of the assembly remains
rotatingly connected to the construction pit 240, thus building a circle segment shaped
wall 252 by having the jetting and extruding units of the assembly of wall building
devices 222 and 222a-222d in operation, while the jetting devices 224 are inoperative.
1. Method for building a wall (43; 120; 150, 152, 154; 156, 158; 160; 160a, 160b; 161a;
162; 170, 172; 192, 192a-192i; 234; 252) or a part thereof in the ground (2), the
method comprising:
pulling a wall building device (30; 60; 110; 160c; 178; 222, 222a-222d) through the
ground, whereby the ground adjacent the wall is left substantially intact, the wall
building device having cross-sectional dimensions being substantially equal to the
dimensions of at least a part of the cross-section of the wall or wall part;
forming the wall or wall part by injecting a hardenable material (44) behind the wall
building device; and
removing and discharging the ground in the area adjacent the front part of the wall
building device.
2. Method according to claim 1, wherein the ground (2) is removed and discharged through
the wall building device (30; 60; 110; 160c; 178; 222, 222a-222d).
3. Method according to any of the preceding claims, wherein the wall building device
(30; 60; 110; 160c; 178; 222, 222a-222d) is pulled through the ground (2) by a drill
string (14) or a casing string (16) containing at least one duct, and wherein the
ground removed by the wall building device is discharged through the at least one
duct of the drill string or the casing string.
4. Method according to any of the preceding claims, wherein the wall or wall part contains
at least one duct (164; 174), and wherein the ground (2) removed by the wall building
device (30; 60; 110; 160c; 178; 222, 222a-222d) is discharged through the at least
one duct of the wall or wall part.
5. Method according to any of the preceding claims, wherein the ground (2) adjacent the
front part of the wall building device (30; 60; 110; 160c; 178; 222, 222a-222d) is
jetted.
6. Method according to claim 5, wherein the wall building device (30; 60; 110; 160c;
178; 222, 222a-222d) is pulled through the ground (2) by a drill string (14) or a
casing string (16) containing at least one duct, and wherein a jetting fluid is supplied
to the wall building device through the at least one duct of the drill string or the
casing string.
7. Method according to claim 5, wherein the wall (162) or wall part contains at least
one duct (164), and wherein a jetting fluid is supplied to the wall building device
(30; 60; 110; 160c; 178; 222, 222a-222d) through the at least one duct of the wall
or wall part.
8. Wall building device (30; 60; 110; 160c; 178; 222, 222a-222d) for building a wall
(43; 120; 150, 152, 154; 156, 158; 160; 160a, 160b; 161a; 162; 170, 172; 192, 192a-192i;
234; 252) or a part thereof in the ground (2), the wall building device being adapted
to be pulled through the ground, and having cross-sectional dimensions which are substantially
equal to the dimensions of at least a part of the cross-section of the wall or wall
part, the wall building device further comprising:
an injection device (74, 92, 94, 98) for injecting a hardenable material behind the
wall building device;
a ground removing device (70, 76, 78, 80, 82, 84, 86, 87, 88, 90) for removing and
discharging the ground in the area adjacent the front part of the wall building device
during pulling of the wall building device through the ground.
9. Device according to claim 8, wherein the ground (2) is removed and discharged through
the wall building device (30; 60; 110; 160c; 178; 222, 222a-222d).
10. Device according to claim 9, having a body (66) comprising ducts (68, 90) for discharging
the ground (2).
11. Device according to any of claims 8-10, wherein the ground removing device comprises
a plurality of jetting chambers (78).
12. Device according to claim 11, wherein each jetting chamber (78) comprises at least
one rotatably driven jet tube (82) extending substantially parallel to the direction
of movement of the wall building device (30; 60; 110; 160c; 178; 222, 222a-222d).
13. Device according to claim 11 or 12, having a body (34; 66) comprising channels (70,
87) for guiding a jetting fluid.