[0001] The present invention concerns a reinforced earth retaining wall. More specifically,
the invention concerns a containment work in earth that is mechanically stabilised
by including reinforcement elements inside the wall itself, that extend perpendicularly
to its vertical external surface. The earthwork is also equipped with a retaining
wall made up of panels, to which the said reinforcement elements are secured.
[0002] The technology for reinforcing earth by inserting reinforcements consisting of metal
or polymer bands arranged in horizontal layers inside the earthwork and anchored to
an external sloping retaining wall is well-known in the field of geo-technical engineering.
Various systems have been developed on the basis of this principle for creating retaining
structures such as supporting walls for road works, bridge abutments, stabilisation
works for slopes, dams, tunnels, embankments, quays, and in industrial and civil building
construction works.
[0003] The first applications, dating back to the early 1960s, started from the idea of
combining earthworks of various layers with metal reinforcement bands placed between
each earth layer and anchored to an external retaining wall. This gave a composite
structure, later called reinforced earth, that has great stability and durability
as well as considerable flexibility of application and simplicity of realisation.
[0004] These early applications are described, in particular, in
US patents No. 3421326 and
No. 3686873, in the name of Henri Vidal. In order to obtain reinforcements via which the external retaining wall of concrete
panels is anchored to the earth, these patents envisage largely linear elements made
up of flexible steel bands that are galvanised or coated with a layer of polymer material,
such as an epoxy resin, to protect them from corrosion. These bands must therefore
be cut into the required length before being transported to the construction site.
Then, they are anchored to the front retaining wall made up of prefabricated square
concrete panels or, better, panels having a more complex shape, such as to provide
a continuous cladding of complementary elements. The anchoring is obtained by connection
through bolts to the metal anchoring brackets jutting out at regular intervals from
the rear of each panel.
[0005] The realisation of a reinforced earth structure of the aforesaid type is carried
out in subsequent layers after levelling the ground on the worksite and laying a perfectly
horizontal foundation kerb that acts substantially as a guide for the later emplacement
of the panels. The panels are placed vertically in subsequent rows starting from the
first row on the foundation, while creating an embankment behind the panels with consecutive
layers of earth, preferably of a suitable composition and granulometry, by compacting
the earth with the suitable mechanical equipment. When the earth layers reach the
level of the rear anchorages for each row, then a row of metal bands is placed on
top of the compacted earth. The bands are laid horizontally and perpendicularly to
the retaining wall and are then fixed to the respective anchorages jutting out of
the panel. After laying a row of reinforcement bands, the next earth layer is then
laid as well as the next row of vertical panels. In this way a composite structure
is obtained where the longitudinal elements extending from the compacted earth interact
with the earth particles through friction and thus mechanically stabilise the earthwork.
Within certain limits, the longitudinal elements also act as anchorage ties.
[0006] To overcome the problems of corrosion connected with the use of metal reinforcements
embedded in the earth, reinforcements made of strips of polymer material of suitable
characteristics were later proposed for reinforced earth structures of the foregoing
type. These strips are composed of a tensile stress-resistant core of high strength
polyester fibres covered with a protective polyethylene sheath. The external protective
layer is necessary because of the poor resistance of polyester to degradation, while
polyethylene can guarantee suitable mechanical and physico-chemical protection.
[0007] One of these materials, known under the trade name Paraweb (originally manufactured
by ICI), is proposed, for example, in
US patent No. 4343571 (in the name of D. I. Price), where the reinforcement is characterised by consisting in a continuous strip of
flexible relatively unresilient material placed in zig-zag manner on the earth, between
the anchorage elements jutting out of the rear of the cladding panels and a fixed
bar anchored in the earth from the internal part of the earthwork. The continuity
of the reinforcement strip results in the possibility of tensioning it before placing
the next earth layer on top, thus making the structure particularly compact. With
respect to using many separate metal bands, the use of one continuous polymer strip
also has the advantage of exposing to chemical degradation very few ends that are
cut and not protected by the external layer.
[0008] In addition to the possibility of using a continuous zig-zag strip on a horizontal
earth layer, another embodiment disclosed in
US patent No. 4343571 envisages that each reinforcement strip be continuous in a vertical plane, remaining
unbroken alternatively on the back of the cladding panel and on the rear part of the
earthwork, as the earth fill goes up one layer. The pretensioning of the reinforcements
is carried out at each earth layer.
[0009] Compared to conventional systems, the aforesaid earth reinforcement structures have
the clear advantage of reducing the overall size of the whole retaining work to a
minimum, since they allow the realisation of a vertical retaining wall. Since the
dimensions at the base are smaller with respect to a traditional sloping retaining
wall, for example, the structure costs for are lower as far as the required land is
concerned. Moreover, the version using polymer bands enables a drastic reduction of
corrosion to the reinforcing elements, although a complete elimination of this problem
calls for specific solutions also in the systems for securing the reinforcement elements
to the cladding panels.
[0010] According to other technologies proposed by the prior art, instead of the prefabricated
reinforced concrete cladding panels, it is possible to use prefabricated concrete
blocks for the facing wall. These blocks are purposely designed to interlock with
each other and to connect to the reinforcement elements. Similar solutions are generally
proposed for achieving a cheaper transportation and an easier handling and laying
of these cladding elements, but they obviously negatively affect the construction
times and, above all, do not allow the construction of very high structures. In fact,
while reinforced earth retaining walls with external facing of concrete panels of
the size normally used can be as high as 20 m, those using concrete blocks for the
external facing can be not higher than 4-6 m because the overall stability of the
earthwork is considerably less.
[0011] Some well-known systems with external facing made of concrete blocks do not employ
the metal bands or polymer strips conventionally used for earth reinforcement with
panel facing elements, but instead use essentially horizontal layers of two-dimensional
reticular elements of polymer material, known as geogrids or geotextiles. These products
are commonly used in for many geotechnical applications other than the one discussed
here, such as, e.g., the realisation of reinforced slopes, both continuous slope and
stepped ones, as well as sloping green walls, where the concrete facing is absent.
[0012] The geogrids are normally made of a composite polymer material in which the highly
resistant internal element is of polyester while the external protection element may
be of PVC (such as the TeleGrid geotextiles) or polypropylene (e.g. the Merex geogrids),
or can be made entirely of HDPE (high density polyethylene, such as the Tensar geogrids).
The latter are rendered particularly resistant to tensile stress by a process of mono-axial
stretching of the element, that thus gives a monodirectional orientation to the polymer
chains.
[0013] The use of geogrids as reinforcement elements in earth structures with vertical retaining
walls of the type concerned here allows to internally reinforce the earth in a more
uniform way and with a more effective action than with the method employing anchorage
systems composed of strips or separate bands. This is because the presence of transverse
strips parallel to the retaining wall considerably improves the anchorage capacity
to the earth and increases the resistance of the reinforcement to slippage from the
earth itself. Moreover, this improved resistance is enhanced by the capacity of the
reticular elements to give rise to a "dynamic interlock" with the earth, since the
geogrid apertures allow the earth particles to be squeezed inside them during the
compaction operation, thus expanding the grid spaces of the polymer reinforcement.
When the grid spaces try to return to their initial configuration at the end of the
compaction process, the internal stresses generated encapsulate the earth granules
and reduce the horizontal thrust of the earth itself against the retaining wall.
[0014] Vertical retaining wall structures in which the external wall is composed of suitably
shaped concrete blocks, between which the ends of horizontal layers of reinforcement
elements - which may be geogrids - are laid during the emplacement phase, are described
in many patent documents, among which, for example, the
PCT patent application No. WO 99/32731 (in the name of S. R. Khamis). The latter document describes the use of various reinforcement systems, with the
proposed concrete block wall, and these systems can be combined or used as alternatives.
Among these systems, in particular, the document discloses separate flat layers of
geogrids or geotextile materials that extend horizontally inside the earth starting
from the rear face of the retaining wall.
[0015] In other prior art references, particularly in
US patent No. 4728227 (in the name of H. G. Wilson et al.), starting from the assumption that using many small-sized external cladding elements,
such as concrete blocks, has the aforesaid disadvantages, there is proposed to combine
the anchorage system composed of geogrids laid in separate layers with large prefabricated
facing panels, like the ones used for other civil engineering works, but equipped
with suitable systems for anchoring the polymer reinforcement layer to the rear of
the prefabricated panel.
[0016] In all the previously described cases, however, the geogrids or similar reinforcement
elements of a substantially two-dimensional type are anchored to the front retaining
wall (generally made of blocks) in separate horizontal layers with appropriately compacted
earth layers in between.
[0017] On the basis of this state of the art, an object of the present invention is to provide
a system of earth reinforcement based on the more reliable and flexible facing wall
composed of prefabricated panels wherein, however, these are associated with non-linear
but essentially two-dimensional reinforcement elements, such as geogrids, which afford
considerable advantages in terms of execution time and reduction of the reinforcement
material necessary to achieve a given resistance performance. In view of what has
been said as regards geogrids, it is evident that using these grids together with
the conventional-type prefabricated panels greatly reduces the time necessary to lay
each reinforcement layer between one layer of compacted earth and the next, and also
greatly facilitates this operation. In fact, the geotextile, which can be transported
to the worksite in the form of rolls, only needs to be uncoiled along the earth layer
(and, obviously, anchored to the connections provided on the rear of the panels) in
order to achieve a whole layer of reinforcement in just one operation. Moreover, in
view of the aforesaid improved performance of the geogrid structures in terms of the
anchorage capacity in the earth, it is obvious that the quantity of material needed
to achieve a certain resistance is lower than the one needed for anchorage materials
composed of bands or strips. Thus, the incidence of the reinforcement elements, both
in terms of quantity and in terms of costs, is lower than that of other systems, for
the same amount of retaining wall surface laid.
[0018] To this end, the present invention proposes to further improve the performance obtainable
with a reinforced earth structure realised with a retaining wall composed of prefabricated
reinforced concrete panels together with geogrid earth reinforcement elements, by
providing that at least some of the reinforcement layers of the structure are not
laid on a single level but are extended in one or more continuous loops from one level
of the structure to the one above. In this way, there is an added advantage in terms
of the time necessary to execute the work because, after the first geogrid layer and
its anchoring to the appropriate connections on the panel rear has been carried out,
the reinforcement roll remains intact and is taken to the layer above as the earth
layer rises to meet the next anchorage point. Thereafter, another reinforcement layer
is rolled out without needing to bring separate pre-cut pieces of reinforcement to
the site. In other words, the solution proposed allows using the same pre-cut roll
of reinforcement to lay two or more consecutive layers of internal reinforcement.
[0019] A further advantage of the solution proposed according to the present invention consists
of the fact that, if two consecutive layers of continuous reinforcement are anchored
to the back of two separate panels laid one above the other (instead of being anchored
to two connections, one above the other, on the same panel), then the reinforcement
itself will create a bond between the two panels, anchoring them also through the
tension induced in the grid by the compaction of the earth layers. This evidently
increases the bond between the panels of the retaining wall and the stability of the
whole structure.
[0020] Moreover, the continuity of the reinforcement geogrid or fabric from one level to
the one above can be realised also on the internal part of the earthwork, opposite
the external facing wall. In this case, the loop created by the reinforcement that
folds upwards from the internal part to then fold back to be laid on the next earth
layer has the capacity to create a considerable anchorage that is very resistant to
the slippage of each one of the reinforcement layers from the ground. The creation
of such a "foundation bulb" is especially useful in the upper levels of the reinforced
earth structure, where the weight of the earth bearing down on the reinforcements
is lower and these would otherwise tend to more easily slip out of the whole earthwork.
[0021] Therefore, the present invention specifically provides a reinforced earth structure
with a vertical retaining wall comprising:
■ a plurality of front facing panels laid vertically, arranged in rows one above the
other and presenting, at established heights, connection elements jutting out of the
rear face of each panel and aligned in one or more horizontal rows;
■ a plurality of reinforcement elements laid horizontally inside the earth at the
level of each row of the said connection elements provided on the rear of the said
front facing panels, and with an earth layer placed between each reinforcement layer
and the following one;
■ a plurality of anchorage means cooperating with the said connection elements in
order to anchor each of the said reinforcement elements to the said front facing panels,
characterised by the fact that the said reinforcement elements are layers of a two-dimensional
reinforcement and that at least some of the said reinforcement layers extend as a
loop from one earth level to the one above, going up vertically along the back of
the said front facing panels, between one horizontal row of the said anchorage means
and the next one, or along the rear part of the said reinforced earth structure, opposite
the front facing.
[0022] In particular, the said two-dimensional reinforcement layers (6, 8) may consist in
geogrids or geotextiles of polymer material, or may be composed of non-compact matting
or fabrics of possibly fibre-reinforced high modulus synthetic material. The geogrids
or geotextiles (6, 8) are preferably made of polyester fibres covered in polypropylene,
polyester fibres covered in PVC or are entirely made of high density polyethylene
(HDPE) and subjected to a monoaxial stretching process, according to the solutions
already in use in the prior art.
[0023] According to some specific embodiments of the structure of the invention, the front
facing panels are prefabricated reinforced concrete panels of a quadrilateral shape,
cross-shape or T-shape, combined so as to create a continuous cladding of complementary
elements. The panels do not require any particular interconnection systems because,
as already noted, a peculiar ity of the system lies in laying the reinforcement layers
in loops, positioned so as to create a bond between two panels placed one above the
other. Smaller panels are to be preferred in view of their easier handling. Moreover,
if required, the panel weight can be reduced by using lighter concrete mixtures that
include plastic aggregates or expanded clay instead of the conventional inert materials
used, or even fibre-reinforced mortar, in which fibres of a suitable resistance -
such as carbon fibres or aramide fibres are used instead of the steel reinforcement.
Alternatively, the panels can be made entirely of steel or of a suitable plastic material,
or even of wood.
[0024] As already noted, each of the said front facing panels is provided with connection
elements jutting out from the rear face thereof, and these elements are preferably
arranged in two horizontal rows. The connection elements can be steel rings, possibly
coated with a plastic material, or can be rings made of stainless steel, a composite
fibre or another highly resistant synthetic material. They are fixed to the rear of
the said front facing panels and are in a variable number for each of the two said
horizontal rows. The anchorage means cooperating with the said connection elements
preferably consist in a steel bar, possibly plastic coated, or a bar made of stainless
steel or a composite material highly resistant to bending stress, suitable to be inserted
in a horizontal row of the said connection elements, thereby securing the reinforcement
to the said connection elements. Preferably, the said bar is also pre-cut and of the
same length as the reinforcement width, and thus has the advantage of being easily
and rapidly laid with respect to using several separate anchorage devices for each
horizontal row of connection elements.
[0025] According to some specific embodiments of the present invention, at least two of
the said reinforcement layers are extended as a loop from one earth level to the one
above, rising vertically along the back of the facing panels, and are then be anchored
to two horizontal rows of connection elements provided on two vertically adjacent
panels. There is thus the already noted advantage of exploiting the reinforcement
to create a connection between two vertically adjacent panels of the front facing.
[0026] Advantageously, in the proposed structure at least two of the said reinforcement
layers, situated in the upper part of the structure, may extend as a loop from one
earth level to the one above, rising vertically along the rear of the said structure,
opposite the front facing. As already noted, this creates a very resistant anchorage
element on the inner part of the structure, which can resist any possible slippage
of the reinforcement.
[0027] Again, according to the present invention, it is preferable to use reinforcement
layers of the same width as that of the front facing panel, although it is possible
to use a reinforcement layer of a width corresponding to two or more panels placed
horizontally side by side.
[0028] To optimise the performance of the reinforced earth structure, reinforcement layers
of different strengths, decreasing from the bottom up, can be provided along the height
of the structure itself. In cases where the kinds of reinforcement used are not sufficiently
varied to optimise the resistance necessary at the various levels, then it is also
possible - after anchoring the reinforcement to the front facing panel as envisaged
- to fold the reinforcement layer on itself and to roll it out again inwards within
the earthwork in order to achieve a double reinforcement strength, on that specific
level, than the one envisaged for the material used.
[0029] The structure according to the present invention can also be used for creating opposed
retaining walls close to each other, as in the case of road ramps where the said plurality
of vertically laid front facing panels corresponds to a plurality of front facing
panels laid vertically on the opposite side, and the said reinforcement layers are
connected, via their respective connection elements and anchorage means, to both of
the said opposed retaining walls..
[0030] According to another aspect thereof, the present invention also concerns the construction
method used for creating the claimed reinforced earth structures. With specific reference
to the overall structure in its general lines, this method may be summarised as including
the following operations:
- a) creating a horizontal foundation kerb for aligning the first row of the said front
facing panels;
- b) laying the first row of the said panels vertically on the said foundation kerb;
- c) filling the earth inside the first row of panels up to the first row of connection
elements, and then compacting the earth using suitable mechanical equipment;
- d) laying a first reinforcement layer on the earth, starting from the rear of the
structure up to the said row of connection elements;
- e) inserting a row of - possibly appropriately cut - apertures of the said reinforcement
layer on the connection elements and immediately behind inserting one or more of the
said anchorage means in the said connection elements, thus anchoring the reinforcement
layer to the front facing panels;
- f) folding the reinforcement layer on itself and laying it backwards towards the rear
of the structure, or supporting the remaining part of the reinforcement layer at the
back of the facing panels;
- g) laying a second row of panels vertically on top of the said first row and filling
the earth inside the second row of panels until the earth level reaches the second
row of connection elements, compacting the earth with suitable mechanical equipment;
- h) if the reinforcement layer of the lower level has been folded on itself, laying
a second reinforcement layer proceeding as per the above points d) and e) for the
first layer, and then supporting the remaining part of the reinforcement layer at
the back of the panels;
- i) if the reinforcement layer of the lower level has been supported at the back of
the panels, proceeding as per point e) above for the first layer, and then laying
the reinforcement layer backwards towards the rear of the structure;
and carrying on with such operations until the required height of the earthwork is
reached.
[0031] In the case where the structure according to the present invention also includes
reinforcement loops provided by the rear part of the structure itself, these loops
being particularly useful, as pointed out before, at the higher levels of the retaining
wall, the aforesaid procedure will also include, after an operation of the kind envisaged
in i) above, the following operations,:
j) supporting the remaining part of the reinforcement layer (6, 8) from the rear part
of the said reinforced earth structure;
k) filling the earth inside the corresponding row of front facing panels (1-3) up
to the level of the next row of connection elements (5), compacting the earth with
appropriate mechanical equipment;
l) laying the said remaining part of the reinforcement layer (6, 8) on the earth by
starting from the rear part of the structure up to the said row of connection elements
(5).
[0032] Further construction and functional features of the reinforced earth structure according
to the present invention and the corresponding construction method, as well as the
advantages of the invention, will be more evident with reference to some specific
embodiments thereof, illustrated merely by way of example in the attached drawings,
where:
Figure 1 is a perspective view of an embodiment of the proposed structure, seen from
the rear, partially broken and symbolically devoid of the earth layers placed in between;
Figure 2 is a vertical sectional view of a similar structure as the one shown in figure
1, and is also symbolically devoid of the earth layers placed in between;
Figures 3 and 4 are two elevation views, respectively from the front and back of the
front facing panels, of a structure of the type shown in figures 1 and 2;
Figure 5 is a side view, from the back, of some of the front facing panels shown in
figures 3 and 4, resting on the foundation kerb and with the anchorage system visible;
Figure 6 is a partially broken vertical sectional view of a detail of the structure
of figure 1 or figure 2, showing the anchorage system composed of the fixed connection
element on the back of the panel and of the anchorage means that link to the connection
element to secure the reinforcement itself.
[0033] A reinforced earth structure according to the present invention, of which figure
1 only shows a perspective view from the back of a vertical column of front facing
panels (1, 2) laid one above the other, includes - in the forms illustrated in figures
1-5 -a front facing of prefabricated concrete panels (1, 2, 3) shaped so as to provide
a continuous cladding of complementary elements. In particular, in the case specifically
shown in figures 3-5, the front facing is mainly composed of T-shaped panels (1).
Rectangular panels (2), corresponding to the upper section of the T-shape are to be
added to these T-shaped panels (1) in order to uniformly complete the cladding, and
also cross-shaped panels (3), wherein the upper section of the T-shape is connected
to another rectangular element corresponding to a lower section of the T-shape. The
first row of panels (1, 2, 3) is laid on the foundation kerb (4) which, as already
pointed out, is perfectly horizontal and only serves to properly align the panels
(1, 2, 3).
[0034] Going back to figure 1, on the back of the panels (1, 2, 3) there are provided two
horizontal rows of connection elements (5) in the form of rings embedded in the concrete
casting of the panel itself. In the embodiment examined here, these connection elements
(5) are made of polymer-coated steel. When, as previously mentioned, the first earth
layer (not shown) has beeb put in place and compacted behind the first row of panels
(2) up to a level reaching the first row of connection elements (5), then the first
layer of reinforcement (6) - which in the form shown is a geogrid of polymer material-is
laid. This reinforcement layer (6) is made to interweave with the connection elements
(5), by means of a row of aligned apertures and, immediately after this, the polymer
coated steel bar (7), which acts as an anchorage means, is inserted in the connection
elements (5) and secures the reinforcement (6) to the front facing panels (1, 2, 3).
[0035] In the embodiment illustrated in figure 1, the first reinforcement layer (6) is not
folded on itself to be rolled out on the same level (this possibility is not shown
in the figures), but goes up vertically along the back of the panel (2) to reach the
earth level above. Once the required thickness of earth has been filled and compacted,
reaching the level of the second row of connection elements (5), then the previous
anchorage operation is repeated using the connection elements (5) and another steel
bar (7), and the reinforcement (6) is laid in a further layer going towards the rear
or internal part of the structure. In the version shown in figure 1, also the next
pair of reinforcement layers (6) are of the same type and are laid in the same manner,
while the pair of upper reinforcement layers (8) are made of a geogrid of a lower
strength.
[0036] In the embodiment schematically shown in figure 2, in which corresponding elements
are indicated with the same reference numbers as those used in the other figures (even
though the cross-sections of the anchorage bars (7) are so small that they are practically
non-visible), after the first two pairs of reinforcement layers (6) of the first type
are laid as in the previous case, the following reinforcement layers of a lower resistance
type (8) are four in all. Moreover, between the second and third of the said layers,
the reinforcement (8) remains unbroken by being folded as a loop and then taken up
to the next level from the rear end of the reinforced earth structure. In this way,
the reinforcement layer provides a high strength anchorage against the slippage of
the reinforcement layer (8) outside the earthwork.
[0037] As already noted above, the reinforced earth structure proposed according to the
present invention affords considerable advantages with respect to other known structures
of comparable performance, both in terms of speed and practicality of laying as well
as in terms of materials saving and/or mechanical reliability.
[0038] The present invention has been disclosed with particular reference to some specific
embodiments thereof, but it should be understood that modifications and changes may
be made by the persons skilled in the art without departing from the scope of the
invention as defined in the appended claims.
1. A reinforced earth structure with a vertical retaining wall comprising:
■ a plurality of front facing panels (1-3) laid vertically, arranged in rows one above
the other and presenting, at established heights, connection elements (5) jutting
out of the rear face of each panel (1-3) and aligned in one or more horizontal rows;
■ a plurality of reinforcement elements laid horizontally inside the earth at the
level of each row of the said connection elements (5) provided on the rear of the
said front facing panels (1-3), and with an earth layer placed between each reinforcement
layer and the following one;
■ a plurality of anchorage means (7) cooperating with the said connection elements
in order to anchor each of the said reinforcement elements to the said front facing
panels (1-3),
characterised by the fact that the said reinforcement elements are layers of a two-dimensional reinforcement
(6, 8) and that at least some of the said reinforcement layers (6, 8) extend as a
loop from one earth level to the one above, going up vertically along the back of
the said front facing panels (1-3), between one horizontal row of the said connection
elements (5) and the one above, or along the rear part of the said reinforced earth
structure, opposite the front facing.
2. A reinforced earth structure according to claim 1, wherein the said two-dimensional
reinforcement layers (6, 8) consist in geogrids or geotextiles of polymer material,
or are composed of non-compact matting or fabrics of possibly fibre-reinforced high
modulus synthetic material.
3. A reinforced earth structure according to claim 2, wherein the said geogrids or geotextiles
(6, 8) are made of polyester fibres covered in polypropylene, polyester fibres covered
in PVC or are entirely made of high density polyethylene (HDPE) and subjected to a
monoaxial stretching process.
4. A reinforced earth structure according to any one of claims 1-3, wherein the said
front facing panels (1-3) are prefabricated reinforced concrete panels of a quadrilateral
shape (2), cross-shape (3) or T-shape (1), combined so as to create a continuous cladding
of complementary elements.
5. A reinforced earth structure according to claim 4, wherein each one of the said front
facing panels (1-3) is provided with connection elements (5) jutting out from the
rear face thereof and arranged in two horizontal rows.
6. A reinforced earth structure according to claim 5, wherein the said connection elements
(5) are steel rings, possibly plastic coated, or are made of stainless steel, composite
fibre or another highly resistant synthetic material, fixed to the rear of the said
front facing panels (1-3) and in a variable number for each of the two said horizontal
rows.
7. A reinforced earth structure according to claim 6, wherein the said anchorage means
(7) cooperating with the said connection elements (5) consist in a steel bar, possibly
plastic coated, or made of stainless steel or a composite material highly resistant
to bending stress, suitable to be inserted in a horizontal row of the said connection
elements (5), thereby securing the said two-dimensional reinforcement layer (6, 8)
to the said connection elements (5).
8. A reinforced earth structure according to any one of claims 5-7, wherein at least
two of the said reinforcement layers (6, 8) extend as a loop from one earth level
to the one above, going up vertically along the back of the said front facing panels
(1-3), and are then anchored to two horizontal rows of the said connection elements
(5) provided on two vertically adjacent panels (1-3).
9. A reinforced earth structure according to any one of claims 5-8, wherein at least
two of the said reinforcement layers (8), situated in the upper part of the said structure,
extend as a loop from one earth level to the one above, going up vertically along
the rear part of the said reinforced earth structure, opposite the front facing.
10. A reinforced earth structure according to any one of the preceding claims, wherein
the said two-dimensional reinforcement layers (6, 8) are of the same width as that
of a retaining wall panel (1-3).
11. A reinforced earth structure according to any one of the preceding claims, wherein
along the height of the said structure two-dimensional reinforcement layers (6, 8)
of varying strength are provided, decreasing from the bottom up.
12. A reinforced earth structure according to claim 1, for the construction of opposed
retaining walls close to each other, wherein the said plurality of vertically laid
front facing panels (1-3) corresponds to a plurality of front facing panels (1-3)
laid vertically on the opposite side, and the said reinforcement layers (6, 8) are
connected, via their respective connection elements (5) and anchorage means (7), to
both of the said opposed retaining walls.
13. A process for the construction of a reinforced earth structure as described in claim
1, comprising the following operations:
a) creating a horizontal foundation kerb (4) for aligning the first row of the said
front facing panels (1, 2);
b) laying the first row of the said panels (1, 2) vertically on the said foundation
kerb (4);
c) filling the earth inside the first row of panels (1, 2) up to the first row of
connection elements (5), and then compacting the earth using suitable mechanical equipment;
d) laying a first reinforcement layer (6, 8) on the earth, starting from the rear
of the structure up to the said row of connection elements (5);
e) inserting a row of - possibly appropriately cut - apertures of the said reinforcement
layer (6, 8) on the connection elements (5) and immediately behind inserting one or
more of the said anchorage means (7) in the said connection elements (5), thus anchoring
the reinforcement layer (6, 8) to the front facing panels (1, 2);
f) folding the reinforcement layer (6, 8) on itself and laying it backwards towards
the rear of the structure, or supporting the remaining part of the reinforcement layer
(6, 8) at the back of the facing panels (1, 2);
g) laying a second row of panels (1, 3) vertically on top of the said first row and
filling the earth inside the second row of panels (1, 3) until the earth level reaches
the second row of connection elements (5), compacting the earth with suitable mechanical
equipment;
h) if the reinforcement layer (6, 8) of the lower level has been folded on itself,
laying a second reinforcement layer (6, 8) proceeding as per the above points d) and
e) for the first layer, and then supporting the remaining part of the reinforcement
layer (6, 8) at the back of the panels (1, 3);
i) if the reinforcement layer (6, 8) of the lower level has been supported at the
back of the panels (1-3), proceeding as per point e) above for the first layer, and
then laying the reinforcement layer (6, 8) backwards towards the rear of the structure;
and carrying on with such operations until the required height of the earthwork is
reached.
14. A process according to claim 13, also comprising, after an operation of the type as
per point i), the following operations:
j) supporting the remaining part of the reinforcement layer (6, 8) from the rear part
of the said reinforced earth structure;
k) filling the earth inside the corresponding row of front facing panels (1-3) up
to the level of the next row of connection elements (5), compacting the earth with
appropriate mechanical equipment;
l) laying the said remaining part of the reinforcement layer (6, 8) on the earth by
starting from the rear part of the structure up to the said row of connection elements
(5).
1. Verstärktes Erdbauwerk mit einer vertikalen Stützwand, umfassend:
• eine Vielzahl von vertikal aufgestellten, in Reihen übereinander angeordneten Frontplatten
(1-3), die in festgesetzten Höhen Verbindungselemente (5) aufweisen, die aus der Rückseite
jeder Platte (1-3) herausragen und in einer oder mehreren horizontalen Reihen angeordnet
sind;
• eine Vielzahl von Verstärkungselementen, die in der Höhe von jeder Reihe der Verbindungselemente
(5), die an der Rückseite der Frontplatten (1-3) vorgesehen sind, horizontal in der
Erde verlegt sind, und mit einer Erdschicht, die zwischen jeder Verstärkungslage und
der darauffolgenden Verstärkungslage platziert ist;
• eine Vielzahl von Verankerungsmitteln (7), die mit den Verbindungselementen zusammenwirken,
um jedes der Verstärkungselemente an den Frontplatten (1-3) zu verankern,
dadurch gekennzeichnet, dass die verstärkungselemente Lagen aus einer zweidimensionalen Verstärkung (6, 8) sind,
und dass mindestens einige der Verstärkungslagen (6, 8) sich als Schleife von einem
Erdniveau zu dem nächsten darüber liegenden Erdniveau erstrecken, indem sie entlang
der Rückseite der Frontplatten (1-3), zwischen einer horizontalen Reihe der Verbindungselemente
(5) und der darüber liegenden Reihe, oder entlang dem hinteren Teil des Aufbaus aus
bewehrter Erde, gegenüber der Frontverkleidung, vertikal nach oben gehen.
2. Verstärktes Erdbauwerk nach Anspruch 1, wobei die zweidimensionalen verstärkungslagen
(6, 8) aus Geogittern oder Geotextilien aus Polymermaterial bestehen oder sich aus
nicht kompakter Mattierung oder Textilwaren aus eventuell faserverstärktem Hochmodul-Synthetikmaterial
zusammensetzen.
3. Verstärktes Erdbauwerk nach Anspruch 2, wobei die Geogitter oder Geotextilien (6,
8) aus mit Polypropylen bedeckten Polyesterfasern, aus mit PVC bedeckten Polyesterfasern
oder vollständig aus Polyethylen hoher Dichte (PEHD) hergestellt sind und einer monoaxialen
Verstreckung unterworfen sind.
4. Verstärktes Erdbauwerk nach einem der Ansprüche 1 bis 3, wobei die Frontplatten (1-3)
viereckige (2), kreuzförmige (3) oder T-förmige (1) vorgefertigte armierte Betonplatten
sind, die derart kombiniert sind, dass eine durchgehende Verkleidung aus komplementären
Elementen entsteht.
5. Verstärktes Erdbauwerk nach Anspruch 4, wobei jede der Frontplatten (1-3) mit Verbindungselementen
(5) versehen ist, die an deren Rückseite herausragen und in zwei horizontalen Reihen
angeordnet sind.
6. Verstärktes Erdbauwerk nach Anspruch 5, wobei die Verbindungselemente (5) Stahlringe
sind, eventuell kunststoffbeschichtet, oder aus Edelstahl, Verbundfaser oder einem
anderen hochresistenten synthetischen Material gefertigt sind, und an der Rückseite
der Frontplatten (1-3) in einer variablen Anzahl für jede der zwei horizontalen Reihen
befestigt sind.
7. Verstärktes Erdbauwerk nach Anspruch 6, wobei die Befestigungsmittel (7), die mit
den Verbindungselementen (5) zusammenwirken, aus einem eventuell kunststoffbeschichteten
Stahlstab bestehen oder aus Edelstahl oder einem Verbundmaterial, das hochresistent
gegenüber Biegebeanspruchung ist, gefertigt sind, das bzw. der dazu geeignet ist,
in eine horizontale Reihe der Verbindungselemente (5) eingefügt zu werden und dadurch die zweidimensionale Verstärkungslage (6, 8) an den Verbindungselementen (5) fixiert.
8. Verstärktes Erdbauwerk nach einem der Ansprüche 5 bis 7, wobei mindestens zwei der
Verstärkungslagen (6, 8) sich als Schleife von einem Füllstand der Erde zu dem darüber
liegenden Füllstand erstrecken, indem sie entlang der Rückseite der Frontplatten (1-3)
vertikal nach oben gehen und anschließend an zwei horizontalen Reihen der Verbindungselemente
(5), die an zwei vertikal benachbarten Platten (1-3) vorgesehen sind, befestigt werden.
9. Verstärktes Erdbauwerk nach einem der Ansprüche 5 bis 8, wobei mindestens zwei der
Verstärkungslagen (8), die sich in dem oberen Teil des Aufbaus befinden, sich als
Schleife von einem Füllstand der Erde zu dem darüber liegenden Füllstand erstrecken,
indem sie entlang des hinteren Teils des Aufbaus aus bewehrter Erde, gegenüber der
Frontplatten, vertikal nach oben gehen.
10. Verstärktes Erdbauwerk nach einem der vorhergehenden Ansprüche, wobei die zweidimensionalen
Verstärkungslagen (6, 8) die selbe Breite haben wie eine Platte (1-3) der Stützwand.
11. Verstärktes Erdbauwerk nach einem der vorhergehenden Ansprüche, wobei entlang der
Höhe des Aufbaus zweidimensionale Verstärkungslagen (6, 8) von unterschiedlicher,
von unten nach oben abnehmender Stärke vorgesehen sind.
12. Verstärktes Erdbauwerk nach Anspruch 1 zum Bau von im kurzen Abstand gegenüberliegenden
Stützwänden, wobei die Vielzahl von vertikal aufgestellten Frontplatten (1-3) einer
Vielzahl von Frontplatten (1-3) entspricht, die auf der gegenüberliegenden Seite vertikal
aufgestellt sind, und die Verstärkungslagen (6, 8) mittels ihrer jeweiligen Verbindungselemente
(5) und Befestigungsmittel (7) mit beiden der gegenüberliegenden Stützwände verbunden
sind.
13. Verfahren zum Bau eines verstärkten Erdbauwerks gemäß Anspruch 1 beschrieben, umfassend
die folgenden Arbeitsschritte:
a) Erstellen einer horizontalen Randeinfassung des Fundaments (4) zum Ausrichten der
ersten Reihe der Frontplatten (1, 2);
b) vertikales Aufstellen der ersten Reihe der Platten (1, 2) auf der Randeinfassung
des Fundaments (4);
c) Einfüllen der Erde in die erste Reihe der Platten (1, 2) bis hoch zu der ersten
Reihe von Verbindungselementen (5) und anschließendes Verdichten der Erde mit geeigneten
mechanischen Geräten;
d) Auslegen einer ersten Verstärkungslage (6, 8) auf der Erde, beginnend von der Rückseite
des Aufbaus bis hoch zu der Reihe der Verbindungselemente (5);
e) Aufstecken einer Reihe von eventuell geeignet zugeschnittenen Öffnungen der Verstärkungslage
(6, 8) auf die Verbindungselemente (5) und unmittelbar dahinter Einfügen von einem
oder mehreren der Befestigungsmittel (7) in die Verbindungselemente (5) zum Befestigen
der Verstärkungslage (6, 8) an den Frontplatten (1, 2);
f) Falten der Verstärkungslage (6, 8) auf sich selbst und Legen der Verstärkungslage
nach hinten an die Rückseite des Aufbaus oder Lagern des verbleibenden Teils der Verstärkungslage
(6, 8) an der Rückseite der Frontplatten (1, 2);
g) vertikales Aufstellen einer zweiten Reihe von Platten (1, 3) auf das obere Ende
der ersten Reihe und Einfüllen der Erde in die zweite Reihe von Platten (1, 3), bis
der Füllstand der Erde die zweite Reihe der Verbindungselemente (5) erreicht, und
Verdichten der Erde mit geeigneten mechanischen Geräten;
h) wenn die Verstärkungslage (6, 8) auf dem unteren Füllstand auf sich selbst gefaltet
wurde, Auslegen einer zweiten Verstärkungslage (6, 8) gemäß der Vorgehensweise der
vorhergehenden Punkte d) und e) für die erste Lage und anschließend Lagern des verbleibenden
Teils der Verstärkungslage (6, 8) an der Rückseite der Frontplatten (1, 3);
i) wenn die Verstärkungslage (6, 8) auf dem unteren Füllstand an der Rückseite der
Platten (1-3) gestützt wurde, Fortfahren wie für den vorhergehenden Punkt e) für die
erste Lage und anschließend Legen der Verstärkungslage (6, 8) nach hinten gegen die
Rückseite des Aufbaus;
und Fortfahren mit diesen Arbeitsschritten, bis die erforderliche Höhe der Erdarbeit
erreicht ist.
14. Verfahren nach Anspruch 13, ferner umfassend, nach einem Arbeitsschritt vom Typ gemäß
Punkt i), die folgenden Arbeitsschritte:
j) Lagern des verbleibenden Teils der Verstärkungslage (6, 8) von dem hinteren Teil
des Aufbaus mit bewehrter Erde;
k) Einfüllen der Erde in die entsprechende Reihe von Frontplatten (1-3) bis zu der
Höhe der nächsten Reihe von Verbindungselementen (5) und Verdichten der Erde mit geeigneten
mechanischen Geräten;
I) Auslegen des verbleibenden Teils der Verstärkungslage (6, 8) auf der Erde, beginnend
von der Rückseite des Aufbaus bis zu der Reihe der Verbindungselemente (5).
1. Structure en terre renforcée par une paroi de retenue verticale comprenant :
- une pluralité de panneaux orientés vers l'avant (1-3) disposés verticalement, installés
en rangées l'un au dessus de l'autre et présentant, à des hauteurs établies, des éléments
de connexion (5) en surplomb de la face arrière de chaque panneau (1-3) et alignés
en une ou plusieurs rangées horizontales ;
- une pluralité d'éléments de renfort disposés horizontalement à l'intérieur de la
terre, au niveau de chaque rangée desdits éléments de connexion (5), ménagés à l'arrière
desdits panneaux orientés vers l'avant (1-3), et avec une couche de terre placée entre
chaque couche de renfort et la suivante ;
- une pluralité de moyens de fixation (7) coopérant avec lesdits éléments de connexion
afin de fixer chacun desdits éléments de renfort auxdits panneaux orientés vers l'avant
(1-3) ;
caractérisé par le fait que lesdits éléments de renfort sont des couches de renfort en deux dimensions (6, 8)
et qu'au moins certaines desdites couches de renfort (6, 8) s'étendent en boucle d'un
niveau de terre jusqu'à celui au dessus, en montant verticalement le long de la partie
arrière desdits panneaux orientés vers l'avant (1-3) entre une rangée horizontale
desdits éléments de connexion (5) et celle au dessus, ou le long dé la partie arrière
de ladite structure de terre renforcée, opposée à la façade avant.
2. Structure en terre renforcée selon la revendication 1, dans laquelle lesdites couches
de renfort en deux dimensions (6, 8) consistent en géotextiles maillés ou géotextiles
en matériau polymère, ou sont composées de nattes non compactes ou de tissus en matériau
synthétique à module d'élasticité élevée éventuellement renforcés en fibres.
3. Structure en terre renforcée selon la revendication 2, dans laquelle lesdits géotextiles
maillés ou géotextiles (6, 8) sont faits de fibres de polyester recouvertes de polypropylène,
de fibres de polyester recouvertes de PVC ou sont totalement faites de polyéthylène
haute densité (HDPE) et soumises à un processus d'étirement mono-axial.
4. Structure en terre renforcée selon l'une quelconque des revendications 1-3, dans laquelle
lesdits panneaux orientés vers l'avant (1-3) sont des panneaux de béton renforcé préfabriqués
de forme quadrilatérale (2), en forme de croix (3) ou en forme de T (1), combinés
de façon à créer un revêtement continu d'éléments complémentaires.
5. Structure en terre renforcée selon la revendication 4, dans laquelle chacun desdits
panneaux orientés vers l'avant (1-3) est doté d'éléments de connexion (5) en surplomb
de la face arrière de ceux-ci et disposés en deux rangées horizontales.
6. Structure en terre renforcée selon la revendication 5, dans laquelle lesdits éléments
de connexion (5) sont des anneaux en acier, si possible revêtus de plastique, ou sont
faits d'acier inoxydable, de fibre composite ou d'un autre matériau synthétique hautement
résistant, fixés à l'arrière desdits panneaux orientés vers l'avant (1-3) et en un
nombre variable pour chacune desdites deux rangées horizontales.
7. Structure en terre renforcée selon la revendication 6, dans laquelle lesdits moyens
de fixation (7) coopérant avec lesdits éléments de connexion (5) consistent en une
barre d'acier, si possible revêtue de plastique, ou faite d'acier inoxydable ou d'un
matériau composite hautement résistant à la contrainte de pliage, adapté pour être
inséré dans une rangée horizontale desdits éléments de connexion (5), en fixant ainsi
ladite couche de renfort en deux dimensions (6, 8) auxdits éléments de connexion (5)
.
8. Structure en terre renforcée selon l'une quelconque des revendications 5-7, dans laquelle
au moins deux desdites couches de renfort (6, 8) s'étendent en boucle depuis le niveau
de terre jusqu'à celui au dessus, en montant verticalement le long de l'arrière desdits
panneaux orientés vers l'avant (1-3) et sont ensuite fixées aux deux rangées horizontales
desdits éléments de connexion (5) ménagées sur deux panneaux verticalement adjacents
(1-3).
9. Structure en terre renforcée, selon l'une quelconque des revendications 5-8, dans
laquelle au moins deux desdites couches de renfort (8) situées dans la partie supérieure
de ladite structure, s'étendent en boucle depuis un niveau de terre jusqu'à celui
au dessus, en montant verticalement le long de la partie arrière de ladite structure
de terre renforcée, opposée à la façade avant.
10. Structure en terre renforcée, selon l'une quelconque des revendications précédentes,
dans laquelle lesdites couches de renfort à deux dimensions (6, 8) sont de la même
largeur que celle du panneau de la paroi de retenue (1-3).
11. Structure en terre renforcée selon l'une quelconque des revendications précédentes,
dans laquelle, sur toute la hauteur de ladite structure, des couches de renfort en
deux dimensions (6,8) de différentes résistances sont fournies, en diminuant de bas
en haut.
12. Structure en terre renforcée selon la revendication 1, pour la construction de parois
de retenue opposées, les unes près des autres, dans laquelle ladite pluralité de panneaux
de façade avant, disposés verticalement (1-3), correspond à une pluralité de panneaux
de façade avant (1-3) disposés verticalement sur le côté opposé, et lesdites couches
de renfort (6, 8) sont raccordées, via leurs éléments de connexion respectifs (5)
et des moyens de fixation (7), à deux desdites parois de retenue opposées.
13. Processus pour la construction d'une structure en terre renforcée, comme décrit dans
la revendication 1, comprenant les opérations suivantes :
a) créer une bordure de fondation horizontale (4) pour aligner la première rangée
desdits panneaux de façade avant (1, 2) ;
b) disposer la première rangée desdits panneaux (1, 2) verticalement sur ladite bordure
de fondation (4) ;
c) remplir la terre à l'intérieur de la première rangée de panneaux (1, 2) jusqu'à
la première rangée d'éléments de connexion (5) et ensuite compacter la terre en utilisant
un équipement mécanique adapté ;
d) disposer une première couche de renfort (6, 8) sur la terre, en partant de l'arrière
de la structure jusqu'à ladite rangée d'éléments de connexion (5) ;
e) insérer une rangée d'ouvertures - éventuellement convenablement coupées - de ladite
couche de renfort (6, 8) sur les éléments de connexion (5) et immédiatement derrière
en insérant un ou plusieurs desdits systèmes de fixation (7) dans lesdits éléments
de connexion (5), en fixant ainsi la couche de renfort (6, 8) aux panneaux orientés
vers l'avant (1, 2) ;
f) replier la couche de renfort (6, 8) sur elle-même et en la disposant en arrière,
vers l'arrière de la structure, ou en étayant la partie restante de la couche de renfort
(6, 8) à l'arrière des panneaux de façade (1, 2) ;
g) disposer une seconde rangée de panneaux (1,3) verticalement sur le haut de ladite
première rangée et remplir la terre à l'intérieur de la seconde rangée de panneaux
(1, 3) jusqu'à ce que le niveau de la terre atteigne la seconde rangée d'éléments
de connexion (5), en compactant la terre avec un équipement mécanique adapté ;
h) si la couche de renfort (6, 8) du niveau inférieur a été repliée sur elle-même,
disposer une seconde couche de renfort (6,8) en procédant en suivant les points d)
et e) ci-dessus pour la première couche, et ensuite étayer la partie restante de la
couche de renfort (6,8) à l'arrière des panneaux (1, 3) ;
i) si la couche de renfort (6, 8) du niveau inférieur a été étayée à l'arrière des
panneaux (1-3) en procédant conformément au point e) ci-dessus pour la première couche,
disposer la couche de renfort (6, 8) en arrière, vers l'arrière de la structure ;
et en réalisant ces opérations jusqu'à ce que la hauteur requise du terrassement soit
atteinte.
14. Processus selon la revendication 13, comprenant également, après une opération du
type indiquée au point i), les opérations suivantes :
j) supporter la partie restante de la couche de renfort (6, 8) depuis la partie arrière
de ladite structure de terre renforcée ;
k) remplir la terre à l'intérieur de la rangée correspondante des panneaux orientés
vers l'avant (1-3) jusqu'au niveau de la rangée suivante d'éléments de connexion (5),
en compactant la terre avec un équipement mécanique approprié ;
l) disposer ladite partie restante de la couche de renfort (6, 8) sur la terre en
partant de la partie arrière de la structure jusqu'à ladite rangée d'éléments de connexion
(5).