[0001] The present invention relates to method for, during construction of a floor or roof
structure in a building, building-in a gully, consisting of a gully member with a
cup-shaped inlet portion, a tubular outlet portion and a substantially in a radial
direction protruding flange on top of the inlet portion, and of an extension ring
member with a tubular portion protruding down into the inlet portion of the gully
member and a flange protruding substantially in a radial direction from the upper
end of the tubular portion protruding upwards from said inlet portion, into the floor
or roof structure with at least the flange of the extension ring substantially horizontal
and flush with the top surface of the floor or roof structure. The invention also
relates to devices for carrying through said methods.
[0002] During construction of floor or roof structures in buildings, preferably molding
of floor structures into which gullies, preferably floor gullies with extension ring
members shall be built, preferably molded, the extension ring member is mounted already
before construction of the floor or roof structures has begun, in the desired horizontal
position flush with the future top surface of the floor or roof structure. There is
a great risk that the gully with its extension ring member during construction of
the floor or roof structure thereby is displaced from its desired position, whereby
the function thereof might deteriorate and worse, leaks occur at the gully and the
connections thereto. No correction after finishing the construction of the floor or
roof structure is possible without extensive and time-consuming measures to that end.
[0003] The object of the present invention is to provide methods and devices which primarily
permit adjustment of the position of the extension ring member during a later step
in the construction of the floor or roof structure until said construction has progressed
so far that the risk for displacement of the extension ring member from the desired
position during the subsequent further construction of the floor or roof structure
has been minimized, and which further permit fixation of the extension ring member
in the desired position until the construction of the floor or roof structure is concluded.
[0004] The object is arrived at according to the invention by means of the methods with
the characterizing measures of claims 1 and 5 respectively, and by means of the devices
with the characterizing features of claims 13 and 22 respectively.
[0005] The above and other characterizing features and measures according to the invention
as well as the advantages associated therewith, will be further described below with
reference to the accompanying drawings, in which
fig. 1 is an exploaded perspective view of a floor gully with a device according to
the invention;
fig. 2 is a longitudinal section through the floor gully of fig. 1 in assembled condition
with an extension ring member in a first position relative to a floor gully member;
and
fig. 3 is a longitudinal section similar to fig. 2 but with the extension ring member
in a second position relative to the floor gully member.
[0006] The gully illustrated in the drawings is accordingly a floor gully, consisting of
a floor gully member 1 and an extension ring member 2. The floor gully, the various
members thereof and the various components therein, can be made entirely or partly
of metal, e.g. cast iron, stainless steel etc., or of a suitable plastic material,
unless otherwise specified.
[0007] The floor gully member 1 includes, in the illustrated embodiment, a cup-shaped inlet
portion 3, a tubular laterally directed outlet portion 4 which can be connected to
a discharge pipe (not shown) and, through a transition 5, a substantially in radial
direction protruding flange 6 on top of the inlet portion 3.
[0008] The extension ring member 2 includes a tubular portion 7 protruding down into the
inlet portion 3 of the floor gully member 1 and, through a transition 8, a flange
9 protruding substantially in a radial direction from the upper end 7a of the tubular
portion 7 protruding upwards from said inlet portion 3. The transition 8 between the
tubular portion 7 of the extension ring member 2 and the flange 9 thereof, is provided
with a step 10 for a clamping ring 11 which is attached to the extension ring member
2 preferably by means of screws 12 which are screwed into screw attachments 13 in
said step 10. On the transition 8 between the step 10 and the tubular portion 7 there
is further provided, in a suitable manner, a support 14 for a waterseal tongue 15
which together with a cup 17 which in the illustrated embodiment is snapped onto (snap-on-portions
16) the waterseal tongue 15 and rests on the bottom of the cup-shaped inlet portion
3, define the waterseal of the floor gully. Except for the pipe piece 18 protruding
down into the cup 17, the waterseal tongue 15 consists of a flange 20 which on top
of the pipe piece 18 protrudes, through a transition 19, in a substantially radial
direction and which with its edge portion 21 rests on the support 14. The edge portion
21 and the support 14 have been designed to fit closely together. However, for optimum
sealing a sealing ring 22 is provided on the underside of the flange 20 at the edge
portion 21, clamped between a ring support 23 which is attached to the underside of
the flange and a shank 24 on the support 14 for the waterseal tongue 15. This shank
24 extends substantially perpendicular to the shank 25 on the support 14 through which
said support is located on the transition portion 8a between the step 10 and the tubular
portion 7 of the extension ring member 2.
[0009] In order to obtain sealing also between the floor gully member 1 and the extension
ring member 2, a packing or gasket 26 is provided between said members.
[0010] The floor gully member 1 with extension ring member 2 described above is located,
during mounting thereof, in a suitable position on a location adapted for the floor
gully in an arrangement of a suitable type (not shown) for constructing a floor structure.
The floor gully is thereby provided with or will be provided with before the construction,
i.e. preferably before casting is initiated, a protecting device in the form of a
protective cover 27 which from above covers the tubular portion 7 and flange 9 of
the extension ring member 2 and thereby, also the cup-shaped inlet portion 3 of the
floor gully member 1, such that material from the construction, preferably cast compound,
is prevented from falling down into the interior of the floor gully and get stuck
therein.
[0011] The protective cover 27 is thereby at the outer periphery thereof, provided with
an edge piece 28 which grasps around the outer edge portions 6a, 9a of said flanges
6, 9. The edge piece 28 is defined by an outer edge portion of the protective cover
27 which is bent downwards, alternatively downwards and back towards the center of
the protective cover substantially in parallel with and at a distance from the main
portion 29 of the protective cover, i.e. bent about 180°. The edge piece 28 is preferably
snapped onto the outer edge portions 6a, 9a of the flanges 6, 9, whereby the protective
cover 27 is held in intended position. The edge piece or outer edge portion 28 defines
in the alternative embodiment (not shown) at least one surrounding, inwardly open
recess for the outer edge portions 6a, 9a of the flanges 6, 9, and achieves thus,
a further improved attachment of the protective cover 27 to said flanges.
[0012] Alternatively, the floor gully member 1 may initially be mounted on the intended
location without the extension ring member 2. The protecting device in the form of
the protective cover is in this alternative embodiment provided on the floor gully
member 1 and the protective cover is at the outer periphery thereof provided with
an edge piece which grasps around the outer edge portion 6a of the flange 6 of the
floor gully member 1. As described above, the edge piece may be defined by an outer
edge portion of the protective cover which is bent downwards substantially perpendicular
to the main portion of the protective cover or is alternatively defined by an outer
edge portion which is bent downwards and back towards the center of the protective
cover substantially in parallel with and at a distance from the main portion of said
protective cover in order to define at least one surrounding, inwardly open recess
for the outer edge portion 6a of the flange 6.
[0013] The construction of the floor structure starts with a first construction or build-up
step which is continued until the floor structure has been built up to (the cast compound
reaches) a level just beneath the flange 6 of the floor gully member 1, whereby said
floor gully member 1 is immovably fixed in the material for the floor structure. During
this first construction or build-up step, the extension ring member 2, when present
from the beginning, is held temporarily fixed to the floor gully member 1 in a first
position in which the flanges 9 and 6 respectively, of said members extend substantially
in parallel adjacent each other. This is accomplished by a first fixing means.
[0014] This fixing means may be a first fixing means which preferably is designed to grasp
around at least parts of outer edge portions 6a, 9a of the flanges 6 and 9 respectively,
of the floor gully member 1 and the extension ring member 2 and hold the flanges in
said position substantially in parallel with each other. The first fixing means may
to this end have any suitable shape, e.g. consist of one or more clamps of varying
circular section extension. In the embodiment shown however, the first fixing means
is defined by said protective cover 27 which protects the interior of the floor gully
from material from the construction of the floor structure, i.e. preferably cast compound
such as concrete, and which due to its design provides for good fixation of the extension
ring member 2 to the floor gully member 1.
[0015] After having completed the first construction or build-up step, the protective cover
27 is removed from the flanges 6 and 9 respectively, of the floor gully member 1 and
the extension ring member 2. If the protective cover is not designed to grasp around
both flanges 6, 9 of said members 1, 2, but e.g. only grasps around the flange 9 of
the extension ring member 2, the protective cover may remain seated thereon until
the construction of the floor structure is entirely completed. The risk however, that
material from said construction shall fall down into the interior of the floor gully
after completion of the first build-up step is small. At the abovementioned alternative
method where the extension ring member 2 initially is missing, the protective cover
must be removed. If there are first fixing means of another type than said protective
cover, these might eventually also have to be removed.
[0016] When the protective cover has been removed, the extension ring member 2, when initially
not present, is located in the floor gully member 1. With the extension ring member
2 in position in the floor gully member 1, the extension ring member 2 is adjusted
as required relative to the floor gully member 1. Adjustment is needed if the floor
gully in any way has been dislodged from the preferably substantially horizontal position
in which it was placed before the construction of the floor structure started and/or
if the future floor surface will lie on another level than that where the flange 9
of the extension ring member 2 is found after the first build-up step. Adjustment
is then carried through to a second position in which the flange 9 of the extension
ring member 2 extends substantially horizontally and flush with the future floor surface.
[0017] After the adjustment, a second construction or build-up step is carried through;
here preferably also casting with concrete as cast compound or filling with putty
compound or filler. During this second construction or build-up step, the extension
ring member 2 is held temporarily fixed to the floor gully member 1 in said horizontal
position until, through said second build-up step, the extension ring member 2 is
finally fixed in the horizontal position with the flange 9 thereof flush with the
floor surface or top surface of the floor structure. The second build-up step is carried
through with the help of a fixing means of a suitable type.
[0018] If the extension ring member 2 from the beginning has been located in the floor gully
member 1, this fixing means may, as in the illustrated embodiment, be a second fixing
means which is a complement to the first fixing means. Alternatively, this fixing
means may be the same fixing means which during said first build-up step held the
extension ring member temporarily fixed to the floor gully member in said first position
with the flanges 6, 9 of said members running substantially in parallel adjacent each
other.
[0019] In a suitable embodiment this second fixing means or alternatively, said one and
same fixing means, is designed to resiliently or elastically yielding engage, from
the outside, the tubular portion 7 of the extension ring member 2. It will hereby
be possible during adjustment of the extension ring member 2 relative to the floor
gully member 1 before the second build-up step is initiated, to turn and rotate the
extension ring member 2 as required and tilt it relative to the floor gully member
1 if necessary, while simultaneously the fixing means engages the extension ring member
2 with such force that it effectively retains the extension ring member in any new
set position. Hereby, the fixing means preferably consists of an annular gasket or
elastic material, e.g. plastic or rubber, preferably the abovementioned gasket 26
for sealing between the floor gully member 1 and the extension ring member 2. For
rendering it possible for the gasket 26 to safely fulfil its fixing as well as sealing
function eventually during said first build-up step, during said adjustment as required
and during the subsequent second build-up step and thereby not itself get out of position,
said gasket 26 is provided on a step 30 in the transition 5 between the cup-shaped
inlet portion 3 of the floor gully member 1 and its flange 6. For optimum fixing and
sealing function the gasket 26 preferably has a radially inwards directed sealing
lip 26a which resiliently engages the outside of the tubular portion 7 of the extension
ring member 2, and a radially outwardly directed sealing lip 26b which resiliently
engages a step surface 30a substantially opposite to the tubular portion 7 of the
extension ring member 2. In order to further ensure that the gasket 26 remains in
desired position for optimum fixing and sealing function, a preferably annular gasket
support 31 is provided, which in the illustrated embodiment is attached to a transition
surface 5a between the step 30 (step surface 30a) and the flange 6 on the floor gully
member 1 and designed such that it protrudes radially inwards towards the extension
ring member 2 and engages the gasket 26 from above. The gasket support 31 may be designed
in other ways. Instead of covering the entire gasket 26 from above, the gasket support
may alternatively consist of e.g. three or four tongue-like support portions (not
shown) with the same cross-sectional shape as the gasket support 31 and with the same
location.
[0020] After having completed the construction of the floor structure, the protective cover
27 is removed if this has not been done previously. A floor mat or sealing mat (not
shown) is laid on top of the floor structure and is inserted into the floor gully
and clamped under the clamping ring 11 therein in a conventional manner. Instead of
the protective cover, a removable grating is then placed on top of the clamping ring
11 or, if e.g. a clinker floor shall be laid on top of the sealing mat, a transition
ring 32 with a removable grating 33.
[0021] It is obvious to a skilled person that the present invention can be modified and
amended within the scope of the subsequent claims without departing from the idea
and purpose of the invention. Thus, the gully and its various members and the components
thereto may, as defined, be designed and arranged in many different ways, and the
material they can be made of may also vary. The gully may e.g. be another gully than
a floor gully (e.g. a roof gully) and also of another type than side-dumping (e.g.
bottom dumping). The floor structure may instead be a roof structure.
1. Method for, during construction of a floor or roof structure in a building, building-in
a gully, consisting of a gully member (1) with a cup-shaped inlet portion (3), a tubular
outlet portion (4) and a substantially in a radial direction protruding flange (6)
on top of the inlet portion, and of an extension ring member (2) with a tubular portion
(7) protruding down into the inlet portion of the gully member and a flange (9) protruding
substantially in a radial direction from the upper end (7a) of the tubular portion
protruding upwards from said inlet portion, into the floor or roof structure with
at least the flange of the extension ring substantially horizontal and flush with
the top surface of the floor or roof structure,
characterized in
that the gully member (1) without extension ring member (2) is placed at a location intended
therefor in an arrangement for constructing or building-up the floor or roof structure,
that a first construction or build-up step is carried through, during which the floor
or roof structure is built up for secure attachment of the gully member (1) therein,
that the extension ring member (2) after conclusion of the first build-up step is placed
in the gully member (1) and adjusted as required relative to said gully member to
a position in which the flange (9) of the extension ring member (2) extends substantially
horizontally and flush with the future top surface of the floor or roof structure,
and
that a second construction or build-up step is carried through, during which the extension
ring member (2) is temporarily fixed to the gully member (1) in said horizontal position
until the extension ring member (2) through said second build-up step is finally fixed
in this position with the flange (9) thereof flush with the top surface of the floor
or roof structure.
2. Method according to claim 1, characterized in that after the first build-up step but prior to placing the extension ring member (2)
in the gully member (1), a protecting device is released from the flange (6) of the
gully member (1) and removed from the floor gully (1), said protecting device preventing
material for build-up of the floor or roof structure from falling down into the interior
of the gully member (1) during said first build-up step.
3. Method according to claim 1 or 2, characterized in that the extension ring member (2) is adjusted relative to the gully member (1) against
the fixation force from said fixing means.
4. Method according to claim 3, characterized in that the extension ring member (2) is held temporarily fixed to the gully member (1) in
said horizontal position by the fixation force from a fixing means (26).
5. Method for, during construction of a floor or roof structure in a building, building-in
a gully, consisting of a gully member (1) with a cup-shaped inlet portion (3), a tubular
outlet portion (4) and a substantially in a radial direction protruding flange (6)
on top of the inlet portion, and of an extension ring member (2) with a tubular portion
(7) protruding down into the inlet portion of the gully member and a flange (9) protruding
substantially in a radial direction from the upper end (7a) of the tubular portion
protruding upwards from said inlet portion, into the floor or roof structure with
at least the flange of the extension ring substantially horizontal and flush with
the top surface of the floor or roof structure,
characterized in
that the gully member (1), with extension ring member (2) is placed at a location intended
therefor in an arrangement for constructing or building-up the floor or roof structure,
that a first construction or build-up step is carried through, during which the floor
or roof structure is built up for secure attachment of the gully member (1) therein,
that the extension ring member (2) during said first build-up step is held temporarily
fixed to the gully member (1) in a first position in which the flanges (9 and 6 respectively)
of said members extend substantially in parallel adjacent each other,
that the extension ring member (2) after conclusion of the first build-up step is adjusted
as required relative to the gully member (1) to a second position in which the flange
(9) of the extension ring member (2) extends substantially horizontally and flush
with the future top surface of the floor or roof structure, and
that a second construction or build-up step is carried through, during which the extension
ring member (2) is temporarily fixed to the gully member (1) in said second horizontal
position until the extension ring member (2) through said second build-up step is
finally fixed in this position with the flange (9) thereof flush with the top surface
of the floor or roof structure.
6. Method according to claim 5, characterized in that the extension ring member (2) is held temporarily fixed to the gully member (1) in
said first position and is held temporarily fixed in said second, horizontal position
by the fixation from one and the same fixing means (26).
7. Method according to claim 5, characterized in that the extension ring member (2) is held temporarily fixed to the gully member (1) in
said first position by the fixation force from a first fixing means (27) and is held
temporarily fixed in said second, horizontal position by the fixation force from a
second fixing means (26).
8. Method according to claim 7, characterized in that said first fixing means (27), after the first build-up step but before the extension
ring member (2) is adjusted relative to the gully member (1), is released from the
flanges (6, 9) of said members (1, 2).
9. Method according to any of claims 6-8, characterized in that after the first build-up step but before the extension ring member (2) is adjusted
relative to the gully member (1), a protecting device which prevents material for
build-up of the floor or roof structure from falling down into the interior of the
gully during said first build-up step, is released from the flanges (6, 9) of said
members (1, 2) and removed from the gully.
10. Method according to claim 8, characterized in that said first fixing means consists of a protecting device which prevents material for
build-up of the floor or roof structure from falling down into the interior of the
gully during the first build-up step, and that this protecting device, after having
been released from the flanges (6, 9) of the gully member (1) and the extension ring
member (2), is removed from the gully.
11. Method according to any of claims 6-10, characterized in that the extension ring member (2) is adjusted relative to the gully member (1) against
the fixation force from said fixing means (26) and said second fixing means (26) respectively.
12. Method according to any of claims 1-11, characterized in that the floor or roof structure during the first construction or build-up step is built
up to a level just beneath the flange (6) of the gully member (1).
13. Device for carrying through the method according to claim 1 to permit, during construction
or build-up of a floor or roof structure in a building, building-in of a gully consisting
of a gully member (1) with a cup-shaped inlet portion (3), a tubular outlet portion
(4) and a substantially in a radial direction protruding flange (6) on top of the
inlet portion, and of an extension ring member (2) with a tubular portion (7) protruding
down into the inlet portion of the gully member and a flange (9) protruding substantially
in a radial direction from the upper end (7a) of the tubular portion protruding upwards
from said inlet portion, into the floor or roof structure with at least the flange
of the extension ring member substantially horizontal and flush with the top surface
of the floor or roof structure,
characterized in that the device comprises
a fixing means (26) for, during a second construction or build-up step, after a first
construction or build-up step during which the floor or roof structure is built up
for attachment of the gully member (1) therein and after location of the extension
ring member (2) in the gully member (1) and adjustment as required thereof relative
to the gully member (1) to a position in which the flange (9) of the extension ring
member (2) extends substantially horizontally and flush with the future top surface
of the floor or roof structure, holding the extension ring member (2) temporarily
fixed to the gully member (1) in said horizontal position until the extension ring
member (2) through said second build-up step is finally fixed in this position with
the flange (9) thereof flush with the top surface of the floor or roof structure.
14. Device according to claim 13, characterized in that a protecting device is provided on the gully member (1) for preventing material for
construction or build-up of the floor or roof structure from falling down into the
interior of the gully member (1) during the first build-up step.
15. Device according to claim 14, characterized in that the protecting device consists of a protective cover which, at the outer periphery
thereof, is provided with an edge piece which grasps around the outer edge portion
(6a) of the flange (6) of the gully member (1).
16. Device according to claim 15, characterized in that the edge piece is defined by an outer edge portion of the protective cover which
is bent downwards substantially perpendicular to the main portion of the protective
cover.
17. Device according to claim 15, characterized in that the edge piece is defined by an outer edge portion of the protective cover which
is bent downwards and back towards the centre of the protective cover substantially
in parallel with and at a distance from the main portion of the protective cover,
thereby defining at least one surrounding, inwardly open recess for the outer edge
portion (6a) of the flange (6).
18. Device according to any of claims 13-17, characterized in that the fixing means (26) is designed to resiliently engage the tubular portion (7) of
the extension ring member (2) from the outside.
19. Device according to claim 18, characterized in that the fixing means consists of an annular gasket (26) of elastic material which is
located on a step (30) in the transition (5) between the cup-shaped inlet portion
(3) of the gully member (1) and its flange (6).
20. Device according to claim 19, characterized in that the annular gasket (26) has a radially inwards directed sealing lip (26a) which resiliently
engages the outside of the tubular portion (7) of the extension ring member (2), and
a radially outwardly directed sealing lip (26b) which resiliently engages a surface
(30a) in said step (30) in the transition (5) between the cup-shaped inlet portion
(3) of the gully member (1) and its flange (6).
21. Device according to claim 19 or 20, characterized in that the gasket (26) is held in position on the step (30) by a preferably annular gasket
support (31) which is attached to a transition surface (5a) between the step (30)
and the flange (6) of the gully member (1) and which engages the gasket (26) from
above.
22. Device for carrying through the method according to claim 4 to permit, during construction
or build-up of a floor or roof structure in a building, building-in of a gully consisting
of a gully member (1) with a cup-shaped inlet portion (3), a tubular outlet portion
(4) and a substantially in a radial direction protruding flange (6) on top of the
inlet portion, and of an extension ring member (2) with a tubular portion (7) protruding
down into the inlet portion of the gully member and a flange (9) protruding substantially
in a radial direction from the upper end (7a) of the tubular portion protruding upwards
from said inlet portion, into the floor or roof structure with at least the flange
of the extension ring member substantially horizontal and flush with the top surface
of the floor or roof structure,
characterized in that the device comprises
a fixing means (26; 27) for, during a first construction or build-up step during which
the floor or roof structure is built up for attachment of the gully member (1) therein,
holding the extension ring member (2) temporarily fixed to the gully member (1) in
a first position in which the flanges (9 and 6 respectively) of said members extend
substantially in parallel adjacent each other, and
a fixing means (26) for during a second construction or build-up step, after said
first build-up step and after adjustment as required of the extension ring member
(2) relative to the gully member (1) to a second position in which the flange (9)
of the extension ring member (2) extends substantially horizontally and flush with
the future top surface of the floor or roof structure, holding the extension ring
member (2) temporarily fixed to the gully member (1) in said second horizontal position
until the extension ring member (2) through said second build-up step is finally fixed
in this position with the flange (9) thereof flush with the top surface of the floor
or roof structure.
23. Device according to claim 22, characterized in that said fixing means for holding the extension ring member (2) temporarily fixed to
the gully member (1) in said first position and for holding the extension ring member
(2) temporarily fixed in said second, horizontal position, is one and the same fixing
means.
24. Device according to claim 23, characterized in that a protecting device is provided on the gully for preventing material for construction
or build-up of the floor or roof structure from falling down into the interior of
the gully during the first build-up step.
25. Device according to claim 22, characterized in that said fixing means for holding the extension ring member (2) temporarily fixed to
the gully member (1) in said first position is a first fixing means (27), and for
holding the extension ring member (2) temporarily fixed in said second, horizontal
position, a second fixing means (26).
26. Device according to claim 25, characterized in that said first fixing means (27) is designed to grasp around at least parts of outer
edge portions (6a, 9a) of the flanges (6, 9) of the gully member (1) and the extension
ring member (2) and hold the flanges (6, 9) in a substantially parallel position adjacent
each other.
27. Device according to claim 26, characterized in that the first fixing means consists of a protecting device (27) for preventing material
for construction or build-up of the floor or roof structure from falling down into
the interior of the gully during the first build-up step.
28. Device according to claim 27, characterized in that the protecting device consists of a protective cover (27) which, at the outer periphery
thereof, is provided with an edge piece (28) which grasps around the outer edge portions
(6a, 9a) of said flanges (6, 9).
29. Device according to claim 28, characterized in that the edge piece (28) is defined by an outer edge portion (28) of the protective cover
(27) which is bent downwards substantially perpendicular to the main portion (29)
of the protective cover (27).
30. Device according to claim 28, characterized in that the edge piece (28) is defined by an outer edge portion (28) of the protective cover
(27) which is bent downwards and back towards the centre of the protective cover (27)
substantially in parallel with and at a distance from the main portion (29) of the
protective cover (27), thereby defining at least one surrounding, inwardly open recess
for the outer edge portions (6a, 9a) of the flanges (6, 9).
31. Device according to any of claims 22-30, characterized in that said fixing means (26) and said second fixing means (26) respectively, is designed
to resiliently engage the tubular portion (7) of the extension ring member (2) from
the outside.
32. Device according to claim 31, characterized in that said fixing means and said second fixing means respectively, consists of an annular
gasket (26) of elastic material which is located on a step (30) in the transition
(5) between the cup-shaped inlet portion (3) of the gully member (1) and its flange
(6).
33. Device according to claim 32, characterized in that the annular gasket (26) has a radially inwards directed sealing lip (26a) which resiliently
engages the outside of the tubular portion (7) of the extension ring member (2), and
a radially outwardly directed sealing lip (26b) which resiliently engages a surface
(30a) in said step (30) in the transition (5) between the cup-shaped inlet portion
(3) of the gully member (1) and its flange (6).
34. Device according to claim 32 or 33, characterized in that the gasket (26) is held in position on the step (30) by a preferably annular gasket
support (31) which is attached to a transition surface (5a) between the step (30)
and the flange (6) of the gully member (1) and which engages the gasket (26) from
above.