Technical Field
[0001] The present invention relates to a system and method for exchanging ballast at a
railroad bed which is laid under rail support ties.
Background Art
[0002] A railroad track has a railroad bed for allowing car loads borne on the railroad
ties to be distributed onto the railroad bed. This kind of railroad bed is comprised
of layered ballast and there is a need for such ballast to be exchanged, as required,
so as to maintain the railroad track. As a ballast exchange method there are conventionally
known a first working method as shown in FIG. 5 and a second working method as shown
in FIG. 8.
[0003] In the first working method, a first working train 1 for scraping up the already
laid ballast B and a second working train 2 for carrying new ballast NB for exchange
are prepared. The first and second working trains 1 and 2 are each made up of an independent
one-line unit system and wait on the same tracks for maintenance to be done.
[0004] The first working train 1 comprises a ballast working car 4 for scraping up the already
laid ballast B, a plurality of hopper cars 5a, 5b for allowing the scraped-up ballast
B to be loaded thereon, and a track motor car 6 for hauling the ballast working car
4 and hopper cars 5a, 5b and running at low speeds.
[0005] The ballast working car 4 is located at the rearmost position of the first working
train 1. A ballast scraping-up device 8 is mounted at the rearmost end of the ballast
working car 4. As shown in FIG. 6, the ballast scraping-up device 8 is equipped with
a cutter 11 guided beneath many ties 10 supporting two rails 9a, 9b. The cutter 11
comprises an endless-like cutter link unit 12 and many scrapers 13 arranged at intervals
along the side surface of the cutter link unit 12. The cutter link unit 12 extends
in a direction orthogonal to the rails 9a, 9b in a position below the ties 10 and
is rotationally and continuously driven in an arrow direction by means of a motor
14. IN this way, the ballast B beneath the ties 10 is scraped out toward the lateral
side of the rails 9a, 9b.
[0006] The ballast B which is scraped up by the ballast scraping-up device 8 is conveyed
by a first out conveyor 15 onto the upper side of the ballast working car 4 and from
there onto the rearmost hopper car 5b through a second out conveyor 16.
[0007] As shown in FIG. 5, the hopper cars 5a and 5b each have a loading space 18 for allowing
the ballast B to be loaded thereon. At the loading spaces 18 of the hopper cars 5a
and 5b, main conveyors 19a and 19b and feed-out conveyors 20a and 20b are located,
respectively. The main conveyors 19a and 19b are located at the bottoms of the loading
spaces 18 and horizontally extend along the running direction of the hopper cars 5a
and 5b. The feed-out conveyors 20a and 20b are located at the discharge ends of the
main conveyors 19a and 19b. The feed-out conveyor 20b of the rear hopper car 5b is
situated astride relative to the loading space 18 of the front hopper car 5a.
[0008] The first working train 1, while scraping up the ballast B below the ties 10 through
the ballast scraping-up device 8, runs forward at low speed in a direction away from
a dug-up site 21 where the ballast B has been scraped up. The ballast B which has
been scraped up by means of the ballast scraping-up device 8 is fed through the first
and second out conveyors 15 and 16 onto the loading space 18 of the rearmost hopper
car 5b. The ballast B is sequentially fed through the main conveyor 19b and feed-out
conveyor 20b into the loading space 18 of the front hopper car 5a.
[0009] The second working train 2 comprises a plurality of hopper cars 23a, 23b and a track
motor car 24 for propelling these hopper cars 23a, 23b toward the dug-up site 21 set
out above. The hopper cars 23a and 23b have loading spaces 25 where new ballast NB
has been loaded for exchange. Main conveyors 26a and 26b and feed-out conveyors 27a
and 27b are located at loading spaces 25 of the hopper cars 23a and 23b, respectively.
[0010] The main conveyors 26a and 26b are located at the bottoms of the loading spaces 25
and horizontally extend along the running direction of the hopper cars 23a and 23b.
The feed-out conveyors 27a and 27b are located at the discharge ends of the main conveyors
26a and 26b. The feed-out conveyor 27b of the back hopper car 23b is situated astride
the loading space 25 of the front hopper car 23a.
[0011] The second working train 2 is moved toward the dug-up site 21 after the scraping-up
operation of the ballast B by the first working train 1 has been done. When the front
hopper car 23a has arrived at the dug-up site 21, new ballast NB which has been loaded
in the loading space 25 is unloaded into the dug-up site 21 through the feed-out conveyor
27a of the front hopper car 23a.
[0012] At this time, the new ballast NB loaded in the loading space 25 of the rear hopper
23b is sequentially fed through the main conveyor 26b and feed-out conveyor 27b into
the loading space 25 of the front hopper car 23a and from there into the dug-up site
21 through the feed-out conveyor 27a.
[0013] In the second working method shown in FIG. 8, a first working train 31 for scraping
up already laid ballast B, a second working train 32 for loading the scraped-up ballast
B therein and a third working train 33 with new ballast NB loaded therein for exchange
are prepared. The first, second and third working trains 31 to 33, are each organized
into an independent one-line unit system. The first working train 31 and third working
train 33 wait on the same tracks 34 for maintenance to be done there and the second
working train 32 waits on the adjacent track 35.
[0014] The first working train 31 comprises a ballast working car 37 for scraping up the
ballast B and a track motor car 6 hauling the ballast working car 37 and running at
low speed. The ballast working car 37 has a ballast scraping-up device 8 of the same
type as used in the first working method set out above, a first out conveyor 15 and
a second out conveyor 16. The ballast scraping-up device 8 is provided at the front
end of the ballast working car 37 and located opposite to the track motor car 6 for
traction. The ballast B which has been scraped up by means of the ballast scraping-up
device 8 is fed from the first out conveyor 15 through the second out conveyor 16
onto the waiting second working train 32 on the adjacent track 35.
[0015] The second working train 32 comprises a plurality of mutually coupled trucks 38a
to 38c and two track motor cars 39a, 39b coupled together one at the front and one
at the rear. The trucks 38a to 38c each have an empty loading space 40 and the ballast
B which is scraped up is loaded through the second out conveyor 16 into the empty
loading space 40.
[0016] When the empty loading space 40 of one truck 38a is filled, then the trucks 38a to
38c are moved by the track motor cars 39a, 39b on the track 25 and such ballast B
is loaded into the loading space 40 of the next sequential truck 38b ···.
[0017] The third working train 33 comprises a plurality of mutually coupled hopper cars
42a to 42c and two track motor cars 43a, 43b coupled together one at the front and
one at the rear. The hopper cars 42a, ···, 42c have a loading space 44 equipped with
a hopper function and new ballast NB is loaded into the loading space 44.
[0018] After the scraping-up of the ballast B by the first working train 31 has ended, the
third working train 33 is moved to the dug-up site 21 where new ballast NB is unloaded
from the loading space 44 of the hopper cars 42a to 42c.
[0019] In the second working method, on the other hand, the ballast scraping-up device 8
is located at the front end of the ballast working car 37 and, with an advance of
the ballast scraping-up operation, the ballast working car 37 passes over the dug-up
site 21. In the operation of the second working method, however, a worker walks into
the dug-up site 21 after the ballast scraping-up operation and it is necessary to
insert many tie support bases 46 beneath floated ties 10 as shown in FIG. 7. By doing
so, the tie 10 is supported on the tie support base 46 so that the rails 9a, 9b are
prevented from sunking under the weight of the ballast working car 37.
[0020] According to the conventional first working method, it is necessary to prepare a
first working train 1 for scraping up the already laid ballast B and loading it thereon
and a second working train 2 with new ballast NB loaded thereon for exchange. It is,
therefore, necessary to individually run the first and second working trains 1 and
2 so that a maintenance operation is performed. As a result, many workers are needed
and a high labor cost is involved.
[0021] Further, the second working train 2 with new ballast NB loaded thereon is moved to
the dug-up site 21 at the track 3 after the ballast scraping-up operation by the first
working train 1 has ended, and it takes a lot of time to switch the working trains
from one track to another track and it also takes a long time to perform a ballast
exchange operation.
[0022] According to the conventional second working method, the trucks 38a to 38c need to
wait for ballast B which has been scraped up by the ballast working car 37 to be loaded
therein on the track 35 situated adjacent to the track 34 to allow maintenance to
be done. It is, therefore, necessary to block the two adjacent tracks 34 and 35 for
such maintenance to be done, which may involve some inconvenience in the running of
trains.
[0023] In the second working method, in order to prevent the sinking of the rails 9a and
9b, the worker walks into the dug-up site 21 where the ballast B has been scraped
up, and it is necessary to mount the tie support bases 46 manually beneath the ties
10. It is also necessary to manually remove the tie support bases 46 from the dug-up
site 21 prior to the unloading of the new ballast NB into the dug-up site 21.
[0024] From this viewpoint, an extra operation is necessary upon the insertion and removal
of the tie support bases 46 into and out of the dug-up site 21 and more working operations
are required. As a result, it takes a lot of time and labor to perform the ballast
exchange operation.
[0025] Further, according to the second working operation also, the first to third working
trains 31 to 33 need to be run individually and a ballast exchange operation becomes
greater in scale. For this reason, many more workers are required than in the first
working method and there arises a greater labor cost problem.
[0026] Further, the third working train 33 with new ballast NB loaded therein is moved toward
the dug-up site 21 at the track 34 after the ballast scraping-up operation by the
first working train 31 has ended. Therefore, a greater time is required as in the
first working method to switch the first and third working trains 31 and 33 from one
track to another and it is not possible to perform a ballast exchange operation efficiently.
[0027] The present invention is achieved with the above-mentioned situations in view and
it is accordingly the object of the present invention to provide a ballast exchanging
system and method for a railroad bed which can efficiently and positively perform
a ballast exchanging operation while reducing the number of workers and cars involved
in the ballast exchanging operation and can reduce the ballast exchanging time involved.
Disclosure of Invention
[0028] In one aspect of the present invention there is provided a ballast exchanging system
for a railroad bed according to claim 1, comprising a working train formed as a one-line
unit system having a plurality of load carrying cars coupled together with new ballast
loaded thereon for exchange and a ballast working car coupled to a rearmost load carrying
car and having collecting means configured to scrape up ballast which has already
been laid under the railroad. The ballast working car has out-conveying means configured
to convey the ballast which is scraped up by the collecting means toward the rearmost
load carrying car and unloading means configured to unload the new ballast into a
dug-up site where the laid ballast has been scraped up, and the load carrying cars
have first conveying means configured to sequentially convey the ballast which is
conveyed through the out-conveying means from the rearmost load carrying car toward
a forwardmost load carrying car and second conveying means configured to convey the
loaded new ballast to the unloading means of the ballast working car via the rearmost
load carrying car.
[0029] In another aspect of the present invention there is provided a ballast exchanging
method according to claim 2, comprising a step of, while allowing the ballast which
is scraped up by the collecting means of the ballast collecting car to be sequentially
conveyed from a rearmost load carrying car toward a forwardmost load carrying car,
supplying the new ballast which is loaded on the load carrying car to the unloading
means of the ballast working car via the rearmost load carrying car and a step of
allowing the scraped-up ballast to be replaced by the new ballast, for exchange, which
is loaded in the working train of a one-line unit system.
Brief Description of Drawings
[0030]
FIG, 1 is a side view diagrammatically showing a multi-car working train according
to an embodiment of the present invention;
FIG. 2 is a side view showing a hopper car having first to third belt conveyors;
FIG. 3 is a plan view diagrammatically showing a driving room and central monitoring
room in a cabin of a track motor car;
FIG. 4 is a block diagram diagrammatically showing the central monitoring system;
FIG. 5 is a side view diagrammatically showing a one-line unit system of first and
second working trains for use in a conventional first working method;
FIG. 6 is a perspective view showing a ballast scraping-up device provided in the
conventional ballast working train;
FIG. 7 is a cross-sectional view showing a state in which, in the conventional second
working method, railroad tie support bases are inserted in a dug-up site where ballast
has been scraped up; and
FIG. 8 is a side view diagrammatically showing a one-line unit system of a first,
a second and a third working train for use in a conventional second working method.
Best Mode for Carrying Out of the Invention
[0031] The embodiment of the present invention will be explained below with reference to
FIGS. 1 to 4.
[0032] FIG. 1 is a view diagrammatically showing a working train 51 for use in the replacement
of ballast B under railroad ties 10 by new ballast. The working train 51 comprises
a ballast working car 52, five hopper cars 53a to 53e serving as load carrying cars,
and two track motor cars 54a, 54b for hauling the ballast working car 52 and hopper
cars 53a to 53e. The ballast working car 52, hopper cars 53a to 53e and track motor
cars 54a, 54b are coupled into a one-line unit system and wait on a track 50 for maintenance
to be done.
[0033] The ballast working car 52 is located at the rearmost end of the working train 51.
The ballast working car 52 has a ballast scraping-up device 56 serving as a ballast
collecting means, and first and second out-conveyors 57a, 57b serving as out-conveying
means. The ballast scraping-up device 56 is provided at the rear end of the ballast
working car 52. The ballast scraping-up device 56 has a structure similar to that
of the above-mentioned conventional ballast scraping-up device 8 and its detailed
explanation is omitted.
[0034] The ballast B scraped up by the ballast scraping-up device 56 is conveyed through
the first out-conveyor 57a onto the upper side of the ballast working car 52 where
it is fed from the first out-conveyor 57a onto the second out-conveyor 57b. The second
out-conveyor 57b extends toward the rearmost hopper car 53e above the ballast working
car 52.
[0035] Further, the ballast working car 52 has an unloading conveyor 58 serving as an unloading
means. The unloading conveyor 58 is located below the second out-conveyor 57b and
situated substantially horizontally along a running direction of the ballast working
card 52. A discharge end 58a of the unloading conveyor 58 is projected more rearwardly
than the first out-conveyor 57a above the ballast scraping-up device 56.
[0036] The hopper cars 53a to 53e, each, have a loading space 60. The loading space 60 of
the forwardmost hopper car 53a is set in an empty state so as to allow the scraped-up
ballast B to be loaded therein. In the loading spaces 60 of the remaining hopper cars
53b to 53e, on the other hand, new ballast NB is loaded for exchange.
[0037] In the loading space 60 of the respective hopper cars 53a to 53e, a first belt conveyor
61 is provided as a first conveying means and second and third belt conveyors 62 and
63 are provided as second conveying means.
[0038] As best shown in FIG. 2, the first belt conveyor 61 comprises a receiving conveyor
61a and a discharging conveyor 61b. These conveyors 61a, 61b are set by a plurality
of stays 64 above the loading space 60. And the conveyors 61a and 61b are arranged
in one row above the loading space 60 and driven toward a front side from the rear
side of the working train 51.
[0039] The receiving conveyor 61a and discharging conveyor 61b are upwardly tilted from
the receiving side toward the discharging side along the conveying direction of the
ballast B. By this tilted structure, the receiving end of the discharging conveyor
61b is situated below the discharging end of the receiving conveyor 61a. And between
the mutually adjacent hopper cars 53a, ···, 53e the discharging end of the discharging
conveyor 61b is situated above the receiving end of the receiving conveyor 61a. At
the rearmost hopper car 53e, the receiving end of the receiving conveyor 61a is situated
below the discharge end of the second out-conveyor 57b of the ballast working car
52.
[0040] Therefore, the ballast B scraped up by the ballast scraping-up device 56 is fed from
the second out-conveyor 57b onto the first belt conveyor 61 of the rearmost hopper
car 53e. The ballast B is conveyed sequentially through the first belt conveyor 61
of the hopper cars 53a to 53d into the loading space 60 of the forwardmost hopper
car 53a.
[0041] The second belt conveyor 62 is located at the bottom portion of the loading space
60 and horizontally extends along the running direction of the hopper cars 53a to
53e. The second belt conveyor 62 is driven from the front side of the working train
51 toward the rear side. The discharging end of the respective second belt conveyor
62 is located at the back side of the loading space 60 of the respective hopper cars
53a to 53e.
[0042] The third belt conveyor 63 extends in an upwardly tilted direction from the back
of the loading space 60 rearwardly. The third belt conveyor 63 is driven from the
forward side of the working train 51 toward the rear side in a way to follow the second
belt conveyor 62. The discharge end of the third belt conveyor 63 is located above
the forward portion of the loading space 60 of the rear hopper cars 53b to 53e. At
the rearmost hopper car 53e, the discharging end of the third belt conveyor 63 is
located above the receiving end 58b of the above-mentioned unloading conveyor 58.
[0043] As seen from the above, new ballast NB loaded into the loading space 60 is sequentially
sent through the second and third belt conveyors 62 and 63 into the loading space
60 of the rearmost hopper car 53e and from there onto the unloading conveyor 58 of
the ballast working car 52.
[0044] The track motor cars 54a and 54b are located at the forwardmost side of the working
train 51 and haul the ballast working car 52 and hopper cars 53a to 53e at a given
speed by means of a low-speed running device not shown. For this reason, the working
train 51 is moved at a low speed in a direction away from a dug-up site 21 where the
ballast B has been scraped up.
[0045] The track motor cars 54a and 54b each include a crew attended cabin 65. As shown
in FIG. 3, the cabin 65 has an operation room 66 and central monitoring room 67. The
central monitoring room 67 has a plurality of monitors 68. The monitors 68 display
the scraping-up state of the ballast B, unloading state of the new ballast NB, conveying
state of the ballast B sent on the first belt conveyor 61 and conveying state of the
new ballast NB sent on the second belt conveyor 62.
[0046] As shown in FIG. 1, a color camera 70 is set on the rear end of the ballast working
car 52 to photograph the scraping-up state of the ballast B and unloading state of
the new ballast NB. Similarly, a color camera 71 is set at the discharge end of the
discharging conveyor 61b of the respective hopper cars 53a to 53e to photograph the
loading space 60 from above. The video signals taken by the color cameras 70, 71 are
sent to a control unit 72 for image division and to a transmit/receive unit 74 via
a controller 73 and transmitted from an antenna 75 of the transmit/ receive unit 74.
[0047] Further, a light illumination unit 76 (see FIG. 4) is set on the rear end of the
ballast working car 52 and on the loading space 60 of the respective hopper cars 53a
to 53e. The light illumination unit 76 illuminates a ballast scraping-up site and
a conveying path of the ballast B. By doing so it is possible to secure a uniform
illumination of an object.
[0048] As shown in FIG. 4, the monitors 68 of the central monitoring room 67 are connected
through a controller 78 to a transmit/receive unit 79. The transmit/receive unit 79
has an antenna 80. The antenna 80 receives a video signal transmitted from the antenna
75 of the transmit/receive unit 74. The scraping-up state of the ballast B, unloading
state of the new ballast NB, and conveying states of the ballast B and new ballast
NB are displayed as video images on the monitors 68.
[0049] The monitor 68 includes a liquid crystal display 80 having a four-segmented image
screen and a touch panel type operation display 81. The operation display 81 has a
finger actuated image screen and, upon finger actuation, an image on the screen of
the liquid crystal display 80 can be switched.
[0050] Now the working process will be explained below in connection with the replacement
of the already laid ballast by the new ballast.
[0051] First, the working train 51 waiting on the track 50 is moved to a location for maintenance
to be done. And the ballast scraping-up device 56 of the ballast working car 52 is
driven to cause it to slide beneath the ties 10 from the lateral sides of the rails
9a, 9b.
[0052] In this state, the working train 51 is forwardly moved at low speeds to allow the
ballast B which has already been laid beneath the railroad ties 10 to be sequentially
scraped up. The scraped-up ballast B is conveyed through the first and second out-conveyor
57a and 57b onto the first belt conveyor 61 of the rearmost hopper car 53e and from
there past the first conveyors 61 of these hopper cars 53d to 53b onto the loading
space 60 of the forwardmost hopper car 53a. In this way, the scraped-up ballast B
is once loaded into the loading space 60 of the forwardmost hopper car 53a.
[0053] The new ballast NB loaded in the rearmost hopper car 53e is transported onto the
unloading conveyor 58 of the ballast working car 52 through the corresponding second
and third belt conveyors 62 and 63, which at the same time the ballast B is scraped
up. The new ballast NB is unloaded through the unloading conveyor 58 into the dug-up
site 21 where the ballast B has been scraped up.
[0054] The new ballast NB loaded in the intermediate hopper cars 53b to 53d is conveyed
toward a sequentially rearward hopper cars 53c to 53e through the corresponding second
and third belt conveyors 62 and 63 in the respective loading spaces 60. By doing so,
the new ballast NB is unloaded into the dug-up site 21 from the unloading conveyor
58 of the ballast working car 52.
[0055] The ballast B which has been conveyed into the loading space 60 of the forwardmost
hopper 53a is conveyed onto the sequentially rearward hopper cars 53b, ···, 53e through
the corresponding second and third belt conveyors 62 and 63. With an advance of an
exchange between the ballast B and he new ballast NB, therefore, the new ballast NB
is conveyed from the loading space 60 of the hopper cars 53b, ···, 53e, while at the
same time the scraped-up ballast B is loaded into that loading space 60 involved.
[0056] By doing so, an exchange is made between the new ballast NB and the scraped-up ballast
B in the working train 51 of a thus organized single-unit line system.
[0057] Further, during the ballast exchange operation, the scraping-up state of the ballast
B, unloading state of the new ballast NB, and conveying states of the ballast B and
new ballast NB are photographed by means of color cameras 70 and 71. Those video signals
from the color cameras 70 and 71 are transferred to the central monitoring room 67
of the track motor cars 54a, 54b where they are displayed on the monitors 68.
[0058] For the monitoring personnel it is possible to monitor the scraping-up state of the
ballast B, conveying state of it, etc., in the central monitoring room 67 in the working
train 51. It is, therefore, possible to immediately perceive any abnormal state in
the scraping up of the ballast B, unloading of the new ballast NB and conveying of
the ballast B. In such an abnormal time, a prompt action can be taken by quickly stopping
the ballast scraping-up device 56, and conveyors 57a, 57b, 58, 61, 62, 63, and issuing
an alarm sound.
[0059] According to such a ballast exchanging method, it is possible to scrape up the ballast
B under the railroad ties 10 while, at the same time, unloading the new ballast NB
loaded on the hopper cars 53b to 53e into the dug-up site 21 where the ballast B has
been scraped up. After the already laid ballast B has been scraped up, it is possible
to promptly shift a working phase to a track maintenance phase with the use of the
new ballast NB. It is, therefore, possible to promptly perform the ballast exchanging
operation, while suppressing any warp on the track 50 to a minimal extent.
[0060] Further, since the ballast scraping-up device 56 is provided at the rear end of the
ballast working car 52 and, in addition, the working train 51 is moved in a direction
away from the dug-up site 21 where the laid ballast B has been scraped up, there occurs
no running of the heavy working train 51 over the dug-up site 21. It is also not necessary
to perform any cumbersome work by inserting the tie support bases at the dug-up site
21 and removing the tie support bases at a time of unloading the new ballast NB into
the dug-up site. It is possible to suppress the working steps of the maintenance to
a minimal extent and reduce the working time involved.
[0061] Further, a series of working steps from the scraping up of the already laid ballast
B to the unloading of the new ballast NB can be continuously done by one working train
51. It is, therefore, not necessary to switch the ballast scraping-up working train
and new ballast unloading train from one track to another as encountered in the prior
art. This contributes to a shortening of the working time and there is no hindrance
to the running of railroad trains.
[0062] Further, the working train 51 is constructed of a one-line unit system and, in comparison
with the conventional second working method in particular, it is possible to reduce
the number of the track motor cars 54a, 54b and hopper cars 53a to 53e as well as
the number of workers on the running of the working train 51. Therefore, any larger-scale
of working with the adjacent two tracks closed is unnecessary and the ballast exchanging
cost can be reduced.
Industrial Applicability
[0063] According to the present invention, as set out in more detail above, since it is
not necessary to effect track switching between a plurality of working trains and
close the adjacent two tracks, a ballast exchanging operation can be efficiently done
in a shorter time without any hindrance to the running of railroad trains and it is
possible to reduce the cost involved in the ballast exchange.
1. A ballast exchanging system for a railroad bed where ballast has already been laid
under railroad ties on which rails are supported, comprising
a working train formed as a one-line unit system capable of running on the rails
and having a plurality of load carrying cars coupled together with new ballast loaded
thereon for exchange, and a ballast working car coupled to a rearmost load carrying
car and having collecting means configured to scrape up the laid ballast, wherein
the ballast working car has out-conveying means configured to convey the ballast
which is scraped up by the collecting means toward the rearmost load carrying car
and unloading means configured to unload new ballast into a dug-up site where the
laid ballast has been scraped up; and
the load carrying car has first conveying means configured to sequentially convey
the ballast which is conveyed through the out-conveying means from the rearmost load
carrying car toward a forwardmost load carrying car and second conveying means configured
to convey the loaded new ballast onto the unloading means of the ballast working car
via the rearmost load carrying car.
2. A ballast exchanging system according to claim 1, wherein the load carrying car has
a loading space with the new ballast loaded thereon, the first conveying means is
arranged above the loading space, and the second conveying means is arranged at the
bottom portion of the loading space.
3. A ballast exchanging system according to claim 1, wherein the working train includes
a self-running traction car configured to self-run while hauling the load carrying
cars and ballast working car, and the traction car is arranged at the forwardmost
side of the working train to haul the ballast working car in a direction away from
the dug-up site.
4. A ballast exchanging system according to claim 3, wherein the ballast working car
has a camera configured to photograph the scraping-up state of the laid ballast and
unloading state of the new ballast, and the traction car has a monitoring room where
a monitor unit is arranged to display video information taken by the camera.
5. A ballast exchanging system according to claim 4, wherein the load carrying car has
a camera configured to photograph the conveyed state of the scraped-up ballast and
video information taken by the camera is displayed on the monitor unit of the monitoring
room.
6. A ballast exchanging method for a railroad bed, comprising
a step of preparing a working train formed as a one-line unit system having a ballast
working car including collecting means configured to scrape up ballast already laid
under railroad ties on which rails are supported and unloading means configured to
unload new ballast into a dug-up site where the laid ballast has been scraped up and
a plurality of load carrying cars sequentially coupled together, before the ballast
working car, with new ballast loaded thereon for exchange;
a step of, while allowing the ballast which is scraped up by the collecting means
of the ballast working car to be sequentially conveyed from a rearmost load carrying
car toward a forwardmost load carrying car, supplying the new ballast which is loaded
on the load carrying cars to the unloading means of the ballast working car via the
rearmost load carrying car; and
a step of, by doing so, allowing the scraped-up ballast to be replaced by the new
ballast, for exchange, which is loaded in the working train of a one-line unit system.
7. A ballast exchanging method according to claim 6, wherein the working train, while
scraping up the already laid ballast, is run in a direction away from the dug-up site.