Field of Invention
[0001] The present invention relates to a packing apparatus for pressure type soil-nailing
and soil-nailing construction method using the packing apparatus. More specifically,
the invention relates to a packing apparatus for pressure type soil-nailing and soil-nailing
construction method using the packing apparatus which is suitable for sealing closely
grouting area which is formed in a bored hole and improving construction efficiency
through grouting by pressure, that is, filling pressuringly of liquid grout.
Background of Invention
[0002] Generally, according to industrial development, it is unavoidable situation to develop
a steep slope district such as a mountain district by production of housing complex
or construction of new city, etc.
[0003] Accordingly, it is required to provide a construction method for slope stability
that can satisfy construction efficiency, economical efficiency and preservation efficiency
of environment as well as heighten an availability of land and secure stability and
amenities of residing complex.
[0004] Soil-nailing which has been used most widely as a construction method for slope stability
is a construction method which reinforces the ground and is utilized widely in Europe
and United States of America with a purpose of slope reinforcement a soft timbering
to dug surface and so on.
[0005] Such soil-nailing construction method is a construction method that augments a whole
shearing strength of original ground oneself and prohibits a displacement of the ground
within the limits of the possibility which is expected during construction or after
completion of construction by inserting a nail in original ground to comparatively
dense space without prestressing.
[0006] Especially, in the case of a replacement construction of dug site, when compared
with other constructing method such as a heavy weight of concrete wall, a big pile
wall and a slurry wall which places at a spot, etc., soil-nailing construction method
has the advantage of inexpensive construction cost, a light weight of construction
equipment and adaptation and flexibility of a spot and a ground condition, etc. and
has a characteristic that can have enough resistibility without excessive displacement
in case of even a dynamic load of earthquake, etc.
[0007] Conventional soil-nailing construction method is done in the order of digging of
the ground, establishment of nail, placing of shot-crete, digging etc. and is as follows
if explain referring to Fig. 1a-1d and Fig. 2.
[0008] First, as illustrated to Fig. 1a, dig the ground to a stable height in which slope
or wall 1 of pit digging is capable of self -support.
[0009] That is, ground digging for establishing a slope protection and a stiffener is basically
the same as general ground digging.
[0010] However, because the dug surface of soil-nailing is used in many cases as the main
structure, it needs to dig into correct position and shape. Also, according to the
nature of the soil, it needs to dig by considering an dug depth in which the ground
is capable of self-support, a curing time for injected grout or shot-crete to obtain
a predetermined intensity and the like.
[0011] Maximum dug depth is generally related with apparent cohesion of the ground, it is
good to limit to 2m to the maximum for perpendicular digging of step by step.
[0012] Next, as illustrated to Fig. 1b, for establishing the stiffener, bore wall 1 and
establish the nail 3 at a bored hole.
[0013] This time, said boring is done by a rock drill or a boring machine etc. and most
of said boring use fluid. (air, water, cement grout and bentonite)
[0014] Ordinarily, a deformed bar or a steel bar etc. can be used as the nail 3 which is
used at the soil-nailing construction method and noxious earth or oil etc. of portions
which are attached to grout should be removed beforehand.
[0015] The nail 3 that is used for permanent structures should consider an extra for rust
when designed or use steel materials in which rust prevention is processed, and it
is good that said nail 3 uses without a joint, however, in case that said nail should
be obliged to connect because insertion length thereof is long, a coupler should be
used and connection by general welding should be avoided.
[0016] At insertion of the nail 3, in order to secure the minimum thickness of grout, it
is good to use interval materials so that the nail 3 may be situated at center of
the boring hole.
[0017] Next, as illustrated to Fig. 1c, if shot-crete is cured after placing, execute ground
digging again, as showed to Fig. 1d.
[0018] In the meantime, process to establish the nail 3 at the bored hole is as follows.
[0019] First, after inserting the nail 3 to said bored hole 11, grout cement milk (do not
illustrate) into a hole by no pressure.
[0020] Next, establish a wire mesh 13 to said wall 1 and arrange a reinforcing bar 15 to
crosswise on said wire mesh 13.
[0021] Next, after fixing pressurizingly said reinforcing bar 15 with a plate 17 and a nut
19 that is fastened to said nail 3, place shot-crete toward said wall.
[0022] This time, said grouting should fill completely interior of the bored hole 11 and
should be executed repeatedly 3 ~ 6 times according to a tendency that liquid grout
is permeated in surrounding the ground.
[0023] However, because such conventional soil-nailing construction method adapts gravity
type grouting, solidifying time is long and grouting should be repeated about 3 ∼
6 times in order to supplement contraction phenomenon.
[0024] Thereby, because conventional soil-nailing construction method prolongs the process,
construction efficiency is depreciated, thus there was a problem that construction
period becomes longer.
[0025] Also, because the bored hole is slanted downwardly, it is impossible to fill liquid
grout in grouting area, a gap between the boring hole and the ground is produced,
whereby there was a problem to provoke a fatal defect at ground reinforcements.
Summary of Invention
[0026] The present invention is proposed in order to solve the above-described problems.
An object of the present invention is to provide a packing apparatus for pressure
type soil-nailing and soil-nailing construction method using the packing apparatus
which can shorten a construction term and improve construction efficiency by executing
grouting at a situation which seals completely grouting area by injecting a quick
forming expansion agent at the packing apparatus.
[0027] Another purpose of the present invention is provide to the packing apparatus for
pressure type soil-nailing and soil-nailing construction method using the packing
apparatus which is suitable for improving stability of ground reinforcements by filling
liquid grout to even a gap between the boring hole and the ground and void of the
ground through pressure type soil-nailing.
[0028] In order to achieve the above objects, a packing apparatus for pressure type soil-nailing
according to the present is characterized by comprising, in a packing apparatus for
sealing a grouting area by being inserted at a hole that is bored on an dug surface,
a nail; a first packing and a second packing that are fitted at a predetermined interval
mutually at to the lengthwise direction of said nail; a non-woven fabric for sealing
space between the first packing and the second packing by providing to wrap the circumferential
surface of said first packing and second packing; a first grouting pipe for injecting
liquid grout in said grouting area, the first grouting pipe pierces said first packing
and second packing but one end of the pipe is established in a position near from
one end of said nail; a discharging pipe of air and foreign material for discharging
air and foreign material of a grouting area by said grouting, the discharging pipe
of air and foreign material pierces said first packing and second packing but one
end of the pipe is established in a position near from of said second packing; and
a foaming urethane injection pipe for injecting a foaming urethane of which bulk is
expanded by being gel at space that is sealed by said non-woven fabric, the foaming
urethane injection pipe pierces said first packing but one end of the pipe is established
at space between said first packing and second packing.
[0029] Here, it is desirable that said packing apparatus for pressure type soil-nailing
further comprises a second grouting pipe for injecting liquid grout into said grouting
area by piercing said first packing and second packing but establishing the end thereof
at a position near from said second packing, and further comprises wire rings for
combining closely said non-woven fabric on the circumferential surface of said first
and second packing by screwing, said wire rings are established at outside of said
non-woven fabric along the circumferential surface of said first and second packing
in order to combine said first, second packing and said non-woven fabric.
[0030] In the meantime, soil-nailing construction method using a packing apparatus for pressure
type soil-nailing of the present invention is characterized by comprising digging
the ground to a stable height in which slope or wall of pit digging is capable of
self - support; forming a boring hole by boring a hole of a predetermined diameter
at a proper position of said dug ground; establishing by inserting at the boring hole
said packing apparatus for pressure type soil-nailing with which a nail is established;
forming isolated grouting area for injecting liquid grout by contacting closely said
packing apparatus for pressure type soil-nailing at a inner diameter of the boring
hole; filling by injecting liquid grout in said grouting area; discharging to outside
air and foreign material in grouting area when liquid grout is injected in said grouting
area; sealing said grouting area by blocking a passage in which said air and foreign
material are discharged; and filling pressurizingly liquid grout in said grouting
area so that liquid grout may fill up to even void and joint of the ground surrounding
boring hole.
Here, soil-nailing construction method further comprises injecting liquid grout again
after passing a predetermined time since completion of step to fill pressurizingly
liquid grout in said grouting area.
Brief description of the Drawings
[0031] Further objects and advantages of the invention can be more fully understood from
the following detailed description taken in conjunction with the accompanying drawings,
in which:
Figs. 1a-1d are flowcharts of construction for explaining a soil-nailing construction
method according to the prior art.
Fig. 2 is a conceptual view showing an embodiment to establish a nail according to
conventional soil-nailing construction method.
Fig. 3 is a perspective view of the packing apparatus for pressure type soil-nailing
of the present invention.
Fig. 4 is a perspective view with parts taken away of the packing apparatus for pressure
type soil-nailing of the present invention.
Fig. 5 is a cross section of the ground for explaining the establishment state of
the packing apparatus for pressure type soil-nailing of the present invention.
Fig. 6 is a flowchart illustrating step-by-step soil-nailing construction method using
the packing apparatus of the present invention.
Best mode for Implementing the Invention
[0032] Below, the packing apparatus for pressure type soil-nailing of the present invention
as described above will be explained in detail with reference to the accompanying
drawings.
[0033] Fig. 3 is a perspective view of the packing apparatus for pressure type soil-nailing
of the present invention, Fig. 4 is a perspective view with parts taken away of the
packing apparatus for pressure type soil-nailing of the present invention, and Fig.
5 is a cross section of the ground for explaining the establishment state of the packing
apparatus for pressure type soil-nailing of the present invention.
[0034] As illustrated to drawings, at the packing apparatus for pressure type soil-nailing
of the present invention are inserted the first packing 33a and the second packing
33b at a predetermined interval mutually to a lengthwise direction of the nail 31
in which screw threads are formed on the circumferential surface.
[0035] Also, at the packing apparatus for pressure type soil-nailing of the present invention
is established non-woven fabric 35 that seals empty space between said first packing
33a and second packing 33b by wrapping the circumferential surface of said first packing
33a and second packing 33b.
[0036] Instead of said non-woven fabric 35, nylon or tent fabric, etc. can be used and it
does not matter if any material that has enough resistibility to pressure according
to bulk swelling of foaming urethane to be injected into empty space between said
first packing 33a and second packing 33b.
[0037] Also, as the material of said first packing 33a and second packing 33b, rubber, soft
plastic, wood, steel plate, etc. can be used and rubber of the materials is most desirable.
[0038] That is, in case of using the packing of rubber quality, more close unity is possible
between a grouting pipe, a discharging pipe of air and a foreign material, or a foaming
urethane injection pipe and so on and a packing that will be explained more in detail
in below.
[0039] Also, at the packing apparatus for pressure type soil-nailing of the present invention,
the first grouting pipe 37 is established which pierces said first packing 33a and
second packing 33b and firstly injects liquid grout in said grouting area, and the
discharging pipe 39 of air and foreign material is established which pierces said
first packing 33a and second packing 33b and discharges air and foreign material of
grouting area due to said grouting.
[0040] It is desirable that one end of said first grouting pipe 37 is established at a longitudinal
end of said boring hole, that is, near one end of said nail 31, and it is also desirable
that one end of said discharging pipe 39 of air and foreign material is established
near said second packing 33b.
[0041] For reference, due to injecting of liquid grout, said discharging pipe 39 of air
and foreign material does so that pressure can be applied in said grouting area by
closing the inlet after discharging air or foreign material as well as discharging
to outside of the boring hole foreign materials such as air or water which occurs
in said grouting area.
[0042] If pressure is applied in said grouting area, as said liquid grout is filled closely
to even void and joint that is formed at the ground around the boring hole by said
pressure while said liquid grout is solidified, whole stability of soil nail can be
improved.
[0043] Also, the packing apparatus for pressure type soil-nailing of the present invention
is established so that foaming urethane injection pipe 43 for injecting a quick forming
expansion agent such as foaming urethane at space which is sealed by said non-woven
fabric 35 may pierce said first packing 33a.
[0044] One end of said foaming urethane injection pipe 43 is situated at space between said
first packing 33a and second packing 33b.
[0045] Said foaming urethane becomes gel by injecting liquid urethane in the state in which
nail 31 is established and said liquid urethane becomes gel at space between said
first packing 33a and second packing 33b, thereby the bulk swells.
[0046] Generally, liquid urethane has an advantage that can regulate very variously all
sorts of material properties such as foaming magnification and mechanical strength,
etc. Because the time in which liquid urethane becomes gel is actually no more than
a few minutes, in case of filling this to space which is sealed by non-woven fabric
35, the first liquid grout can be injected in a little while.
[0047] In order to combine said non-woven fabric 35 and said first and second packing 33a,
33b, wire rings 45 are established on outside of said non-woven fabric 35 along the
circumferential surface of said first and second packing 33a, 33b.
[0048] As said wire rings 45 unite closely said non-woven fabric 35 with the circumferential
surface of said first and second packing 33a, 33b by screw fastening, liquid urethane
is injected into non-woven fabric 35, thus even if the bulk swells, more strong support
is possible.
[0049] Additionally, the packing apparatus for pressure type soil-nailing of the present
invention further comprises a second grouting pipe 41.
[0050] Said second grouting pipe 41 pierces said first packing 33a and second packing 33b
but is established so that the one end thereof may approximate to said second packing
33b.
[0051] Such second grouting pipe 41 is a pipe for injecting the second liquid grout in order
to fill empty space that occurs at interior of boring hole by dry shrinkage of cement
after the first grouting.
[0052] Said second grouting pipe 41 fills liquid grouts secondly by a pressure method to
space in which the first liquid grout does not to fill, whereby close filling can
be done over a whole grouting area, and at the same time it does so that liquid grout
can be filled sufficiently to even void that is formed on the ground around the boring
hole.
[0053] Below, soil-nailing construction method using the packing apparatus of the present
invention will explain to step-by-step referring to Fig. 6. However, explain one embodiment
in main a use of the packing apparatus for pressure type soil-nailing of the present
invention.
[0054] Soil-nailing construction method using the packing apparatus of the present invention
comprises step to dig the ground (S101), step to form the boring hole (S102), step
to establish the packing apparatus for pressure type soil-nailing (S103), step to
form isolated grouting area (S104), step to fill liquid grout (S105), step to discharge
air and foreign material (S106), step to seal grouting area (S107) and step to fill
pressurizingly liquid grout (S108).
[0055] If explain in detail such soil-nailing construction method of the present invention,
first, step (S101) is executed to dig the ground to a stable height in which slope
or wall of pit digging is capable of self-support.
[0056] Next, step (S102) is executed to form the boring hole by boring a hole of a predetermined
diameter in a proper position of said dug ground.
[0057] Next, step (S103) is executed to establish by inserting the packing apparatus for
pressure type soil-nailing in which the nail 31 such as showed in Fig. 3 is established
at the bored hole of said dug ground.
[0058] Next, step (S104) is executed to form isolated grouting area by closely contacting
said packing apparatus for pressure type soil-nailing at diameter of the boring hole.
[0059] For this, inject a quick forming expansion agent such as liquid urethane at space
between the first packing 33a and the second packing 33b that are sealed by said non-woven
fabric 35 through said foaming urethane injection pipe 43.
[0060] As described above, since said liquid urethane becomes gel very fast, if passing
several minutes after injecting, it becomes gel, whereby the bulk swells.
[0061] This time, because non-woven fabric 35 is expanded, said non-woven fabric 35 closely
contacts with inner diameter of the boring hole.
[0062] Herewith, isolated grouting area that can inject liquid grout is formed at interior
of said boring hole.
[0063] Next, step (S105) is executed to fill by injecting in grouting area liquid grout
such as cement milk.
[0064] For this, inject liquid grout in isolated grouting area through said first grouting
pipe 37.
[0065] In order that said liquid grout is filled smoothly in said grouting area, air or
foreign material etc. in said grouting area should be discharged to outside.
[0066] Accordingly, step (S106) is executed to discharges air or foreign material etc. to
outside through the discharging pipe 39 of air and foreign material, at the same time
liquid grout is filled in grouting area.
[0067] Next, step (S107) to seal grouting area by blocking a discharge passage of air and
foreign material is executed.
[0068] For this, the discharging pipe 39 of air and foreign material that did the function
of the passage in which said air and foreign material is exhausted is to be closed.
[0069] Next, step (S108) to fill pressurizingly liquid grout in said grouting area by continuing
to inject liquid grout is executed.
[0070] By filling pressurizingly of such liquid grout, liquid grout is filled to even void
and joint that is formed in the ground surrounding the boring hole.
[0071] If a predetermined time passes after step (S108) to fill pressurizingly liquid grout
is completed, step to inject again liquid grout can be further included.
[0072] If tens of minutes pass after filling of liquid grout in said grouting area is completed,
dry shrinkage occurs while filled liquid grout, that is, cement milk is solidified
and due to this, empty space exists at surrounding said second packing 33b. In order
to inject liquid grout to said empty space, additional injecting of liquid grout is
required.
[0073] Because said second grouting pipe 41 is established so that one end thereof may approximate
to said second packing 33b, it can fill liquid grout more easily at surrounding said
second packing 33b where due to dry contraction, the first liquid grout was not filled.
[0074] If characteristic steps of the present invention as mentioned above are executed,
the finish work of construction can then be carried out.
[0075] For example, step to establish a wire mesh at wall of the ground is executed.
[0076] Next, after arranging a reinforcing bar to crosswise on said wire mesh, step is executed
to fix pressurizingly said reinforcing bar with a plate and a nut that are fastened
to said nail 31.
[0077] Finally, as step to place shot-crete is executed, soil-nailing construction method
using the packing apparatus for pressure type soil-nailing of the present invention
is completed.
[0078] Although preferred embodiments of the present invention has been described, various
modifications, variations and equivalents may be used for the present invention. Manifestly,
the above embodiments of the present invention may be properly modified and applied
equivalently. Accordingly, the above descriptions do not limit the scope of the present
invention defined by means of the accompanying claims.
Industrial Availability
[0079] As described above, the packing apparatus for pressure type soil-nailing and soil-nailing
construction method using the packing apparatus of the present invention has the following
effects.
[0080] As grouting by pressurizing is progressed at the situation that seals firmly inner
surface of the boring hole by using the packing apparatus that injected a quick forming
expansion agent, grouting work can be done in a short time, thereby can shorten a
construction time.
[0081] Also, because liquid grouting can be filled firmly to even void and joint that is
formed at the ground through pressure type soil-nailing, stability of the ground reinforcements
can be improved.