(19)
(11) EP 1 431 469 A3

(12) EUROPEAN PATENT APPLICATION

(88) Date of publication A3:
27.12.2006 Bulletin 2006/52

(43) Date of publication A2:
23.06.2004 Bulletin 2004/26

(21) Application number: 03104795.4

(22) Date of filing: 18.12.2003
(51) International Patent Classification (IPC): 
E04B 1/16(2006.01)
E04C 5/06(2006.01)
E04C 3/34(2006.01)
E04B 5/43(2006.01)
(84) Designated Contracting States:
AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR
Designated Extension States:
AL LT LV MK

(30) Priority: 20.12.2002 IT UD20020265

(71) Applicants:
  • Pezzi, Paola
    33054 Lignano Sabbiadoro UD (IT)
  • Leone, Ubaldo
    33054 Lignano Sabbiadoro UD (IT)
  • Leone, Lucio
    20090 Segrate MI (IT)

(72) Inventor:
  • Leone, Salvatore
    xxx (IT)

(74) Representative: Pizzoli, Pasquale Vincenzo et al
Società Italiana Brevetti S.p.A, Via G. Carducci 8
20123 Milano (MI)
20123 Milano (MI) (IT)

   


(54) Method of forming a pillar and its junction with a girder, and pillar thus obtained


(57) Method to achieve a pillar for building constructions, roads or similar, comprising a first step of preparing a containing element (44), a second step wherein into the containing element (44) a metal structure (14) is inserted, of a self-supporting type and comprising at least a first reticulated lattice (20). The first reticulated lattice (20) is arranged so that at least an upper segment thereof protrudes vertically with respect to the containing element (44) so as to be anchored to at least a main girder in correspondence with a plane (P) and thus define a structural junction (16) of a monolithic type. In a third step, a first cast of concrete (12) is made in the containing element (44) in order to drown the first reticulated lattice (20).







Search report