[0001] The invention relates to an assembly for use in a ship with a cargo hold having a
substantially flat bottom provided with at least one unloading opening for unloading
a cargo.
[0002] A cargo hold of a ship, for instance a trailing suction hopper dredger suitable among
other things for transporting bulk material, is typically equipped with a flat bottom
and steep side walls such that the cargo can be easily unloaded, for instance using
dry unloading machines, in particular a gripper. If it is also wished to make such
a ship suitable for offloading or dumping via the bottom of a cargo which has for
instance been sucked up in the context of maintenance dredging operations, the bottom
of the cargo hold can then be equipped with closable unloading openings, so-called
bottom doors.
[0003] The flat bottom of the cargo hold with bottom doors has the drawback that after offloading
of the cargo via the bottom doors a load residue is left behind on the bottom. This
load residue can take on considerable proportions and results in a limitation of the
actual hopper capacity, which has a counterproductive effect.
[0004] The present invention has for its object to obviate the above stated drawback, and
has the object of making a ship, which is suitable for dry unloading, in particular
by means of a gripper, also suitable for unloading via unloading openings in the bottom
of the cargo hold by considerably reducing the amount of load residue which typically
occurs in this latter case.
[0005] For this purpose the invention consists of an assembly for use in a ship with a cargo
hold having a substantially flat bottom which is provided with at least one unloading
opening for unloading a cargo, which assembly is distinguished in that it comprises
a system of jet water lines which can be connected to a supply pipe of the vessel,
and in that at least some of the jet water lines are provided with nozzles, which
nozzles are adapted to move the cargo on the bottom in the direction of one of the
at least one unloading openings.
[0006] In this manner a cargo in a ship with a cargo hold having a flat bottom can be unloaded
in efficient manner in both dry manner and by means of unloading openings in the bottom.
The flat bottom provides the option of efficient dry unloading, and the assembly that
can be mounted on the bottom of the cargo hold ensures that, during unloading by means
of unloading openings in the bottom, the load residue is moved in the direction of
the unloading openings and does not remain behind on the bottom.
[0007] The system of jet water lines is preferably accommodated in a support construction
so as to form a rigid whole.
[0008] According to a preferred embodiment of the assembly according to the invention, the
assembly is suitable for use in a hopper dredger. Such a ship, if designed for recovering
building materials such as gravel and sand at sea, is typically equipped with a cargo
hold with a flat bottom and steep side walls, and with an installation for dry unloading
of the sucked-up load.
[0009] If such a ship is utilized for instance to transport dredging material which must
be offloaded via bottom doors in the cargo hold, the assembly according to the invention
can be arranged on the bottom of the cargo hold. The nozzles of the assembly will
then ensure that the load residue, which would normally be left behind, is sprayed
in the direction of the unloading openings so that it is also unloaded and the load
residue is substantially eliminated.
[0010] According to a first variant of the invention, the support construction is a framework
structure. This framework structure provides an additional robustness to the system
of jet water lines, and ensures the formation of a rigid whole which can be placed
on the bottom of the cargo hold using for instance a crane.
[0011] According to a possible variant of the assembly according to the invention, the system
of jet water lines comprises a main line with a length substantially the same as that
of the cargo hold, and a number of side lines which are directed transversely thereof
and each equipped with a number of nozzles. These side lines are for instance connected
to the main line in known manner via flanged connections.
[0012] This main line can be connected, for instance via a bulkhead passage through a side
wall of the cargo hold, to a supply line which is for instance a dredging line of
the ship and is supplied by a water supply pump. Water is carried via the main line
to the side lines and the nozzles so that the load residue is still unloaded by water
jets from the nozzles.
[0013] The characteristics of respectively the water supply pump and the nozzles are adapted
to each other, this such that all nozzles can be supplied simultaneously.
[0014] According to a further developed embodiment of the above described variant, the support
construction is arranged substantially above the main line. The support construction
can preferably be further connected at its outer ends to a front and rear end wall
of the cargo hold.
[0015] The support construction ensures that the main line is supported so as to form a
self-supporting assembly which can be displaced easily, for instance with a crane.
[0016] According to a possible embodiment, the supply line is laid closely against the bottom,
wherein the support construction has a height such that a sufficient rigidity is obtained
to allow the assembly to be lifted in its entirety.
[0017] The assembly according to the invention is generally equipped with fastening means
for fastening the assembly in the cargo hold. At least a number of fastening elements
are preferably adapted to allow a limited movement of the assembly relative to the
cargo hold, this in respect of deformations of the beam of the ship.
[0018] According to a possible embodiment of the assembly according to the invention, the
connection between one outer end of the support construction and an end wall of the
cargo hold is adapted to allow a limited movement of the assembly in longitudinal
direction of the cargo hold.
[0019] Finally, the invention relates to a method for arranging an assembly according to
any of the foregoing claims in a cargo hold of a ship, wherein the assembly is carried
integrally above the cargo hold and then lowered onto the bottom of the cargo hold,
whereafter the system of jet water lines is connected to a supply line and the assembly
is fastened in the desired position in the cargo hold.
[0020] The simple construction and self-supporting structure of the assembly according to
the invention has the great advantage that, normally speaking, it can be installed
or removed within a period of a few hours. Using a crane the assembly can for instance
be carried into the cargo hold or hoisted therefrom in one crane movement.
[0021] The invention will be further elucidated on the basis of the following figure description
and the annexed drawing of an exemplary embodiment of the invention. In the drawing:
figure 1 shows a longitudinal section of a hopper dredger in which the assembly of
the invention can be used;
figure 2 shows a top view of the tank top of the vessel of figure 1;
figure 3 is a top view of an assembly according to the invention;
figure 4 is a side view of an assembly according to the invention;
figure 5A is a top view of a side branch of an assembly according to the invention;
figure 5B is a side view of a side branch of an assembly according to the invention;
figure 6 shows a cross-section of the cargo hold during placing of the assembly according
to the invention on the bottom of the cargo hold;
figure 7 shows a detail view of the connection between the main line of the assembly
according to the invention and a line of the vessel;
figure 8A shows a side view of the connection between the framework structure of the
assembly according to the invention and a rear end bulkhead of the cargo hold with
longitudinal freedom of movement;
figure 8B shows a front view of the connection between the framework structure of
the assembly according to the invention and a bulkhead of the cargo hold;
figure 8C shows a top view of the connection between the framework structure of the
assembly according to the invention and a bulkhead of the cargo hold.
[0022] Figure 1 shows a hopper dredger designed for recovering building materials such as
sand and gravel at sea, so-called marine aggregates. The dredged material is carried
by means of an underwater pump to cargo hold 1 via pressure pipelines 3 and 7. Cargo
hold 1 has a flat bottom with six bottom doors 2 for unloading a sucked-up cargo.
This is more clearly visible in the top view at tank top level shown in figure 2,
and in figure 6 in which one of the two shown bottom doors is in the opened position.
[0023] The ship is further equipped with an automated gripper installation which can travel
over the hopper and can carry the gripped load ashore via a system of conveyor belts.
The load can hereby be unloaded in dry manner, i.e. without addition of water.
[0024] When this hopper dredger is used to unload a cargo via bottom doors 2 without the
assembly of the invention, a considerable quantity of load residue remains behind
on the flat bottom of cargo hold 1, whereby the hopper capacity is considerably limited.
[0025] Figure 3 shows an exemplary embodiment of the assembly 9 according to the invention
which can be placed on the bottom of cargo hold 1. Assembly 9 is constructed from
a main line 10, around which is arranged a framework structure 11, and from six side
lines 12. Side lines 12 are arranged at a distance from each other transversely of
main line 10 and on either side thereof via flange connections 19.
[0026] As seen more readily in the side view of figure 4, the framework structure is provided
at both its outer ends with fastening means 17, 18 which will be further described
with reference to figure 8.
[0027] Figures 5A and B show respectively a detail top and side view of a side line 12.
Five nozzles 13 are arranged on either side on each side line 12. These nozzles 13
can optionally be arranged at different angles (not shown), depending on the location
of the unloading openings and the form of the cargo hold. The side lines are further
provided with support legs 15 which support the side line 12 and place it at the desired
height.
[0028] Figure 6 illustrates the method of the invention for arranging an assembly of the
above described type. Assembly 9 is first carried integrally above cargo hold 1 and
is then lowered downward at an angle into cargo hold 1, wherein it is gradually returned
to the horizontal position until it can be placed on the bottom of cargo hold 1. Main
line 10 will then have to be connected and assembly 9 will have to be fastened in
the desired position in cargo hold 1, as will be further described. In order to facilitate
the hoisting, the main line is provided on the top, as shown in figure 4, with a number
of lifting lugs 16 for connection of a hoisting cable of a crane via a harp shackle.
[0029] Figure 7 illustrates the connection of main line 10 to a supply line 3 of the dredging
vessel. This connection takes place by means of a flexible pipe piece 20 connected
to a fitting piece 22 which is mounted with flange 21 against the passage through
the hopper front end bulkhead 25. The passage is connected to the supply line (dredging
pressure pipeline) 3 by means of branch 24 and compensator 23. This latter is connected
to supply line 3.
[0030] Figures 8A, B and C show the connection 17 between one end of the framework structure
and a hopper rear end bulkhead 26 of cargo hold 1. This connection is adapted to allow
a limited movement of assembly 9 in longitudinal direction of cargo hold 1.
[0031] Figure 8A shows a saddle part 37 connected to an outer end of framework structure
11 and having a slot opening 38. This saddle part 37 is connected to a sliding piece
30 by means of a locking pin 31. Sliding piece 30 is pushed between two fixed guides
32 on a hopper rear end bulkhead 26 of the cargo hold (see figures 8B and C) to a
position against a stop part 36, and secured by means of a second locking pin 34 which
passes transversely through the two guides 32.
[0032] It will be understood that the invention is not limited to the above described exemplary
embodiment, and that many variants of for instance the construction of the system
of jet water lines, or of the position of the nozzles, are possible without departing
from the scope of the invention.
1. Assembly for use in a ship with a cargo hold which is suitable for dry unloading of
a cargo, which cargo hold has steep walls and a substantially flat bottom provided
with at least one unloading opening for unloading the cargo via the bottom, characterized in that the assembly comprises a system of jet water lines which is mountable on the bottom
and which can be connected to a supply pipe of the vessel, and that at least some
of the jet water lines are provided with nozzles, which nozzles are adapted to move
the cargo on the bottom in the direction of one of the at least one unloading openings.
2. Assembly as claimed in claim 1, characterized in that the system of jet water lines is accommodated in a support construction so as to
allow a rapid installation of the assembly.
3. Assembly as claimed in claims 1-2 for use in a hopper dredger.
4. Assembly as claimed in any of the foregoing claims, characterized in that the support construction is a framework structure.
5. Assembly as claimed in any of the foregoing claims, characterized in that the system of jet water lines comprises a main line with a length substantially the
same as that of the cargo hold, and a number of side lines which are directed transversely
thereof and each equipped with a number of nozzles.
6. Assembly as claimed in any of the claims 2-5, characterized in that the support construction is arranged substantially above the main line.
7. Assembly as claimed in any of the claims 2-6, characterized in that the support construction can be connected at its outer ends to a front and rear end
wall of the cargo hold.
8. Assembly as claimed in any of the foregoing claims, characterized in that the assembly is equipped with fastening elements for fastening the assembly in the
cargo hold.
9. Assembly as claimed in claim 8, characterized in that at least a number of fastening elements are adapted to allow a limited movement of
the assembly relative to the cargo hold.
10. Assembly as claimed in claim 9, characterized in that the connection between one outer end of the support construction and an end wall
of the cargo hold is adapted to allow a limited movement of the assembly in longitudinal
direction of the cargo hold.
11. Method for arranging an assembly as claimed in any of the foregoing claims in a cargo
hold of a ship, characterized in that the assembly is carried integrally above the cargo hold and then lowered onto the
bottom of the cargo hold, whereafter the system of jet water lines is connected, and
the assembly is fastened in the desired position in the cargo hold.