[0001] The present invention relates to an apparatus and method for laying a kerb at an
edge of a road surface, and relates particularly, but not exclusively, to an apparatus
and method for laying a temporary kerb for use during construction work.
[0002] During the construction of new housing sites, concrete road kerbs are prone to chipping
and cracking when heavy plant machinery moves over the kerb stones. As a result, kerb
stones may have to be replaced once construction work has been completed on the housing
site, thus increasing costs.
[0003] Traditional concrete kerb stones are also very heavy. Current safety guidelines advise
that a compact load of 30kg can be safely carried by an average male worker providing
proper techniques are used, whereas an average concrete kerbstone weighs approximately
70kg. Consequently, replacing damaged kerbstones after construction work introduces
manual-handling problems.
[0005] GB-A-2 280 464 discloses a kerb at an edge of a road surface, comprising:- a or several base members
adapted to be laid at an edge of said road surface, the base members comprising a
first engaging portion and at least one cover member adapted to be mounted on at least
one said base member and comprising a respective second engaging portion for engaging
a respective said first engaging portion.
GB-A-2 280 464 also discloses one intermediate member adapted to be mounted on at least one said
base, and comprising a respective third engaging portion for engaging a respective
said first engaging portion
[0006] GB683336A discloses a kerb assembly comprising top unit having a rebate for a paving slab and
a frog or groove; and a sub-kerb having a tongue at the top and a groove at the bottom.
[0007] WO92/09747A discloses a kerbing between a roadway and a pavement comprised of individual runs
of kerbing structure formed from lightweight plastics material having internal cavities
for accommodating service conduits and/or water drainage.
[0008] WO02/0474 discloses a method of laying a kerb, the method comprising a first kerb in a base,
wherein the first kerb is not fixedly secured in the base, the method further comprising
subsequently removing the first kerb from the base and replacing the first kerb with
a second kerb which is fixedly secured to the base.
[0009] Preferred embodiments of the present invention seek to overcome the above disadvantages
of the prior art.
[0010] According to the present invention, there is provided an assembly for forming a kerb
at an edge of a road, the assembly comprising:-
at least part of a road, the road comprising a base layer having a first surface and
a top layer substantially covering said base layer and having a second surface;
at least one base member adapted to be laid at an edge of said road, the or each said
base member comprising a respective first engaging portion;
at least one cover member adapted to be mounted on at least one said base member and
comprising a respective second engaging portion for engaging a respective said first
engaging portion, wherein when said cover member is mounted to said base member, said
cover member is adapted to project above the vertical level of said second surface;
and
at least one intermediate member adapted to be mounted on at least one said base as
an alternative to said cover member, and comprising a respective third engaging portion
for engaging a respective said first engaging portion, characterised in that when
at least one said intermediate member is mounted to said base member, an upper surface
of the or each said intermediate member is adapted to be positioned at substantially
the same vertical level as the level of said first surface in use.
[0011] By providing a base member adapted to be laid at an edge of a road surface and having
a first engaging portion and a cover member having a respective second engaging portion
adapted to engage the first engaging portion such that the cover member can be laid
on top of the base member, this means that a base kerb and base course of tarmac can
be laid whilst site construction work is ongoing. The base kerb can be made of a material
which is resistant to damage due to heavy site machinery, such that when the construction
work is completed the cover member can be mounted on the base member to form the completed
kerb. The top layer of tarmac can then be laid to complete the road. This provides
two main advantages. Firstly, overall costs are reduced as there is no need to replace
damaged concrete kerb stones, the cover member only needs to be put in place once
the construction work is completed and heavy machinery has left the site. Also, the
base unit and cover member are lighter than a complete kerb stone thus reducing the
problems associated with manual handling of heavy loads.
[0012] Also, by providing an intermediate member with a third engaging portion adapted to
engage the first engaging portion of the base member, provides the advantage that
the intermediate member can be mounted on top of the base member such that it is level
with the tarmac surface of the road. This provides the advantage that the base member
is protected from site machinery passing over it, and the intermediate member which
is designed to be removed once the construction work has been completed takes any
damage which may be caused. The intermediate member can then be removed once site
construction has been completed allowing the cover member to be positioned on top
of the base member to complete the kerb.
[0013] By providing an intermediate member which is adapted to be mounted to the base member,
wherein an upper surface of the intermediate member is adapted to be positioned at
substantially the same vertical level as the level of the first surface in use, provides
the advantage of providing a level surface for site machinery to travel across, thus
presenting no edges of either the tarmac road surface or intermediate member to which
damage can be caused.
[0014] The upper surface of said base member in use may be adapted to be positioned at a
lower vertical level than the level of said first surface in use.
[0015] At least one said base member, intermediate member and/or cover member may be formed
from durable plastics material.
[0016] This provides the advantage of both reducing the cost and weight of the components
of the assembly.
[0017] In a preferred embodiment, said durable plastics material may be recycled.
[0018] In a preferred embodiment, said plastics material is recycled by a co-mingling process.
[0019] This provides the advantage of reducing costs as unsorted, mixed and contaminated
plastics waste can be used as raw materials for the recycling process.
[0020] According to the present invention, there is provided a method of forming a kerb,
comprising:
laying at least one base member at an edge of a road, the road comprising a base layer
having a first surface and top layer substantially covering said base layer and having
a second surface;
mounting at least one intermediate member on top of at least one said base member
such that said intermediate member resiliently engages said base member
removing the or each intermediate member from the corresponding said base member;
mounting at least one cover member on top of at least one said base member in use,
such that said cover member resiliently engages said base member, and that the or
each said cover member projects above the vertical level of said second surface in
use, characterised in that an upper surface of said intermediate member in use is
positioned at substantially the same vertical level as a first surface in use.
[0021] A preferred embodiment of the invention will now be described, by way of example
only and not in any limitative sense, with reference to the accompanying drawings
in which:-
Figure 1 is a cross sectional view of a road incorporating a two part kerb assembly;
Figure 2a is a cross sectional view of the top unit of the present invention;
Figure 2b is a cross sectional view of the base unit of the present invention;
Figure 2c is a cross sectional view of the protective strip of the present invention;
Figure 3 is a schematic view of the base kerb unit with the protective strip of the
present invention mounted thereto;
Figure 4 is a schematic view of the base kerb unit with the upper kerb unit of the
present invention mounted thereto;
Figure 5 is a schematic view of a second embodiment of the present invention showing
the base kerb unit with a protective strip mounted thereto; and
Figure 6 is a schematic view of the second embodiment of the present invention with
the upper kerb unit mounted to the base kerb unit.
[0022] Referring to Figure 1, a road comprises a base layer of tarmac 2 covered by a top
layer of tarmac 4. A two part kerb assembly shown generally by 6 comprises a base
unit 8 and a top unit 10. The kerb assembly 6 is laid between concrete haunching 12
which may form part of a pathway (not shown), and a road formed from tarmac layers
2 and 4.
[0023] Referring to Figure 2a to 2c, the components of the three part kerb assembly comprise
a base unit 8, a top unit 10 and an intermediate protective strip 14. Base unit 8
comprises a connection channel 8a and a connection rib 8b. Both the top unit 10 and
protective strip 14 comprise corresponding connection channels 10a, 14a and connection
ribs 10b, 14b which are formed such that both the top unit 10 and protective strip
14 can be mounted to the base unit 8. Preferably, the connection channel 14a and connection
rib 14b of protective strip 14 are adapted to resiliently engage the connection channel
8a and connection rib 8b of the base unit 8 such that the protective strip 14 can
be easily removed from base unit 8.
[0024] The base unit 8, top unit 10 and intermediate strip 14 are all formed from a post
consumer recycled durable plastics material. The plastic material used to formed the
components of the kerb assembly is produced in a co-mingling process. A co-mingling
process allows unsorted and unwashed plastic waste products to be used as raw materials
for the recycling process thus making the use of this material economically viable.
The co-mingled plastic is surprisingly durable enough to be used to form kerb structures
for roads and the like. This plastic also has the advantage that it is a lot lighter
than prior art concrete kerb assemblies and therefore presents fewer problems relating
to the manual handling of the kerb structures.
[0025] Referring to Figure 1 to 4, the process of building a road and kerb using the three
part kerb assembly will now be described.
[0026] The first step in the construction of a road on a new housing site using the three
part kerb assembly is the laying of a plurality of base units 8 to define the edges
of a road (not shown). The base units 8 can be levelled such that when the top units
10 are mounted onto the base units the kerb is complete and does not need re-levelling.
The second step is to mount a protective strip 14 on each base unit 8. The connection
channel 14a and rib 14b of the protective strips 14 are dimensioned such that they
resiliently engage the protection channel 8a and rib 8b of each base unit 8 to allow
the protection strip 14 to be removed when required. A base layer of tarmac can then
be laid on the road surface between the base units 8. Additionally, concrete haunching
12 can be placed alongside the base unit 8 to provide support. In this configuration
(best shown in Figure 3) the base units 8 of the kerb assembly are protected by protective
strips 14 such that plant machinery moving around the construction site can move across
the kerb assembly without damaging the base unit 8 and only damaging the removable
protection strips 14.
[0027] When the construction work is complete and it is necessary to complete construction
of the road, the protection strips 14 can be removed from the base units 8 by simply
pulling them off. As the base units were levelled in the first step of road construction,
it is not necessary to perform a further levelling operation and a plurality of top
units 10 can be mounted onto the base unit 8 to complete the kerb. A top layer of
finishing tarmac can then be added to the road surface to complete the road.
[0028] A second embodiment of the three part kerb assembly is shown in Figures 5 and 6.
Instead of having connection channels and ribs, the base unit 16 protective strip
18 and top unit 20 are interconnected by means of a plurality of pegs 22 which are
received in respective holes in the assembly members. In this embodiment, the protective
strip 18 protects a roadside edge of the base member 16.
[0029] A traditional method of laying a temporary kerb has been to lay bricks in the region
where the kerb is to be laid whilst construction work is performed, and then remove
the bricks and replace them with kerb stone to complete the kerb. It has been found
that this operation generally costs more per metre when all materials and labour costs
are taken into account than the method of the present invention. If a co-mingled recycled
plastic is used to form the components of the three part kerb assembly then the cost
of using this method to form the kerbs is substantially less.
[0030] Also, a single concrete kerb stone weights approximately 70 kilograms whilst the
heaviest component of the three part kerb assembly weight only 40 kilograms. It can
therefore be seen that the present invention is advantageous in terms of both cost
and weight as well as providing a use for plastic waste thus diverting this waste
from landfill sites and benefiting the environment.
[0031] It will be appreciated by persons skilled in the art that the above embodiment have
been described by way of example only, and not in any limitative sense, and that various
alterations and modifications are possible without departure from the scope of the
invention as defined by the appended claims. For example, it will be appreciated that
the components of the three part assembly may be made from materials other that a
co-mingled recycled plastic, for example reinforced concrete. It will also be appreciated
that the assembly may be a two part assembly with only the top unit and base unit
used and also it will be appreciated that there are other methods for interconnecting
the components such as the use of adhesives etc.
1. An assembly (6) for forming a kerb at an edge of a road , the assembly comprising:-
at least part of a road, the road comprising a base layer (2) having a first surface
and a top layer (4) substantially covering said base layer and having a second surface;
at least one base member (18) adapted to be laid at an edge of said road, the or each
said base member comprising a respective first engaging portion (8a, 8b);
at least one cover member (10) adapted to be mounted on at least one said base member
and comprising a respective second engaging portion (10a, 10b) for engaging a respective
said first engaging portion, wherein when said cover member is mounted to said base
member, said cover member is adapted to project above the vertical level of said second
surface; and
at least one intermediate member (14) adapted to be mounted on at least one said base
as an alternative to said cover member, and comprising a respective third engaging
portion (14a, 14b) for engaging a respective said first engaging portion, characterised in that when at least one said intermediate member is mounted to said base member, an upper
surface of the or each said intermediate member is adapted to be positioned at substantially
the same vertical level as the level of said first surface in use.
2. An assembly according to claim 1, wherein an upper surface of said base member in
use is adapted to be positioned at a lower vertical level than the level of said first
surface in use.
3. An assembly according to claims 1 or 2, wherein at least one said base member, intermediate
member and/or cover member is formed from durable plastics material.
4. An assembly according to claim 3, wherein said durable plastics material is recycled.
5. An assembly according to claim 4, wherein said plastics material is recycled by a
co-mingling process.
6. A method of forming a kerb, comprising:-
laying at least one base member (8) at an edge of a road, the road comprising a base
layer (2) having a first surface and top layer (4) substantially covering said base
layer and having a second surface;
mounting at least one intermediate member (14) on top of at least one said base member
such that said intermediate member resiliently engages said base member;
removing the or each intermediate member from the corresponding said base member;
mounting at least one cover member .(10) on top of at least one said base member in
use, such that said cover member resiliently engages said base member, and that the
or each said cover member projects above the vertical level of said second surface
in use, characterised in that an upper surface of said intermediate member in use is positioned at substantially
the same vertical level as a first surface in use.
7. A method according to claim 6, wherein the step of laying at least one said base member
includes laying at least one said base member such that an upper surface of said base
member in use is positioned at a lower vertical level than the level of a first surface
in use.
1. Anordnung (6) zum Herstellen eines Bordsteins an einem Rand einer Straße, wobei die
Anordnung Folgendes umfasst:
wenigstens einen Teil einer Straße, wobei die Straße eine Unterschicht (2) mit einer
ersten Oberfläche und eine die genannte Unterschicht im Wesentlichen bedeckende Oberschicht
(4) mit einer zweiten Oberfläche umfasst;
wenigstens ein Basiselement (18) zum Verlegen an einem Rand der genannten Straße,
wobei das oder jedes genannte Basiselement einen jeweiligen ersten Eingriffsteil (8a,
8b) hat;
wenigstens ein Aufsatzelement (10) zum Anbringen auf wenigstens einem genannten Basiselement,
das einen jeweiligen zweiten Eingriffsteil (10a, 10b) für den Eingriff mit einem jeweiligen
genannten ersten Eingriffsteil hat, wobei das genannte Aufsatzelement zum Überstehen
über die senkrechte Höhe der genannten zweiten Oberfläche ausgeführt ist, wenn das
genannte Aufsatzelement auf dem genannten Basiselement angebracht ist; und
wenigstens ein Zwischenelement (14) zum Anbringen an wenigstens einer genannten Basis
als eine Alternative zu dem genannten Aufsatzelement, das einen jeweiligen dritten
Eingriffsteil (14a, 14b) für den Eingriff mit einem jeweiligen genannten ersten Eingriffsteil
hat, dadurch gekennzeichnet, dass, wenn wenigstens ein genanntes Zwischenelement auf dem genannten Basiselement angebracht
ist, eine obere Oberfläche des oder jedes genannten Zwischenelements ausgeführt ist,
um im Wesentlichen auf der gleichen senkrechten Höhe positioniert zu sein wie die
Höhe der genannten in Gebrauch befindlichen ersten Oberfläche.
2. Anordnung nach Anspruch 1, bei der eine obere Oberfläche des genannten Basiselements
im Gebrauch zur Positionierung auf einer niedrigeren senkrechten Höhe als die Höhe
der genannten in Gebrauch befindlichen ersten Oberfläche ausgeführt ist.
3. Anordnung nach Anspruch 1 oder 2, bei der wenigstens ein genanntes Basiselement, Zwischenelement
und/oder Aufsatzelement aus widerstandsfähigem Kunststoff hergestellt ist.
4. Anordnung nach Anspruch 3, bei der der genannte widerstandsfähige Kunststoff recycliert
wurde.
5. Anordnung nach Anspruch 4, bei der der genannte Kunststoff durch ein Vermischungsverfahren
recycliert wurde.
6. Verfahren zum Herstellen eines Bordsteins, umfassend:
Verlegen von wenigstens einem Basiselement (8) an einem Rand einer Straße, wobei die
Straße eine Unterschicht (2) mit einer ersten Oberfläche und eine die genannte Unterschicht
im Wesentlichen bedeckende Oberschicht (4) mit einer zweiten Oberfläche umfasst;
Anbringen von wenigstens einem Zwischenelement (14) auf wenigstens einem genannten
Basiselement, so dass das genannte Zwischenelement elastisch in das genannte Basiselement
eingreift;
Entfernen des oder jedes Zwischenelements von dem entsprechenden genannten Basiselement;
Anbringen von wenigstens einem Aufsatzelement (10) auf wenigstens einem genannten
Basiselement im Gebrauch, so dass das genannte Aufsatzelement elastisch in das genannte
Basiselement eingreift und das oder jedes genannte Aufsatzelement über die senkrechte
Höhe der genannten im Gebrauch befindlichen zweiten Oberfläche übersteht, dadurch gekennzeichnet, dass eine obere Oberfläche des genannten Zwischenelements im Gebrauch auf im Wesentlichem
der gleichen senkrechten Höhe wie eine im Gebrauch befindliche erste Oberfläche positioniert
wird.
7. Verfahren nach Anspruch 6, bei dem der Schritt des Verlegens wenigstens eines genannten
Basiselements das Verlegen von wenigstens einem genannten Basiselement umfasst und
zwar so, dass eine obere Oberfläche des genannten Basiselements im Gebrauch auf einer
niedrigeren senkrechten Höhe positioniert ist als die Höhe einer im Gebrauch befindlichen
ersten Oberfläche.
1. Ensemble (6) permettant de former une bordure sur un bord d'une route, l'ensemble
comportant :
au moins une partie d'une route, la route comportant une couche de base (2) ayant
une première surface et une couche supérieure (4) recouvrant sensiblement ladite couche
de base et ayant une deuxième surface ;
au moins un organe de base (18) adapté pour être posé sur un bord de ladite route,
ledit ou chaque dit organe de base comportant une première partie respective de mise
en prise (8a, 8b) ;
au moins un organe de couverture (10) adapté pour être monté sur ledit au moins un
organe de base et comportant une deuxième partie respective de mise en prise (10a,
10b) à des fins de mise en prise avec ladite une première partie respective de mise
en prise, dans lequel, quand ledit organe de couverture est monté sur ledit organe
de base, ledit organe de couverture est adapté pour faire saillie au-dessus du niveau
vertical de ladite deuxième surface ; et
au moins un organe intermédiaire (14) adapté pour être monté sur ledit au moins une
base comme autre variante audit organe de couverture, et comportant une troisième
partie respective de mise en prise (14a, 14b) à des fins de mise en prise avec ladite
une première partie de mise en prise, caractérisé en ce que, quand ledit au moins un organe intermédiaire est monté sur ledit organe de base,
une surface supérieure dudit ou de chaque dit organe intermédiaire est adaptée pour
être positionnée sur sensiblement le même niveau vertical que le niveau de ladite
première surface lors de l'utilisation.
2. Ensemble selon la revendication 1, dans lequel une surface supérieure dudit organe
de base lors de l'utilisation est adaptée pour être positionnée sur un niveau vertical
inférieur au niveau de ladite première surface lors de l'utilisation.
3. Ensemble selon la revendication 1 ou la revendication 2, dans lequel au moins l'un
quelconque dudit organe de base, organe intermédiaire et/ou organe de couverture est
formé à partir d'une matière plastique durable.
4. Ensemble selon la revendication 3, dans lequel ladite matière plastique durable est
recyclée.
5. Ensemble selon la revendication 4, dans lequel ladite matière plastique est recyclé
par un processus de co-mélange.
6. Procédé permettant de former une bordure, comportant :
la pose d'au moins un organe de base (8) sur un bord d'une route, la route comportant
une couche de base (2) ayant une première surface et une surface supérieure (4) recouvrant
sensiblement ladite couche de base et ayant une deuxième surface ;
le montage d'au moins un organe intermédiaire (14) sur ledit au moins un organe de
base de telle manière que ledit organe intermédiaire se met en prise de manière élastique
avec ledit organe de base ;
le retrait dudit ou de chaque dit organe intermédiaire dudit organe de base correspondant
;
le montage d'au moins un organe de couverture (10) sur ledit au moins un organe de
base lors de l'utilisation, de telle manière que ledit organe de couverture se met
en prise de manière élastique avec ledit organe de base, et de telle manière que ledit
ou chaque dit organe de couverture fait saillie au-dessus du niveau vertical de ladite
deuxième surface lors de l'utilisation, caractérisé en ce qu'une surface supérieure dudit organe intermédiaire lors de l'utilisation est positionnée
sur sensiblement le même niveau vertical qu'une première surface lors de l'utilisation.
7. Procédé selon la revendication 6, dans lequel l'étape consistant à poser ledit au
moins un organe de base comprend la pose dudit au moins un organe de base de telle
manière qu'une surface supérieure dudit organe de base lors de l'utilisation est positionnée
sur un niveau vertical inférieur au niveau d'une première surface lors de l'utilisation.