BACKGROUND OF THE INVENTION
Field of the Invention
[0001] The present invention relates generally to a structure and a method of connecting
I-type prestressed concrete beams (hereinafter referred to simply as PSC-I beams)
using steel brackets, and more particularly, to a structure and a method of connecting
a plurality of PSC-I beams, separately precasted on the ground, to each other using
steel brackets.
Description of the Related Art
[0002] FIG. 1A is a side view of a two-span bridge with a conventional structure for connecting
two I-type prestressed concrete beams 1 (PSC-I beams) to each other. The two PSC-I
beams 1, used in the conventional two-span bridge of FIG. 1A, are separately precasted
on the ground. Thereafter, each of the PSC-I beams 1 is independently placed between
a pier 2 and a pair of support grounds, which support both ends of the two-span bridge,
to form a simple beam system. At this time, the two PSC-I beams 1 are connected to
each other by only a concrete slab 16 which is constructed on the two PSC-I beams
1. Otherwise, the plurality of PSC-I beams 1 may be connected to each other by another
conventional beam connecting structure, as shown in FIG. 1B.
[0003] To construct a bridge with the conventional beam connecting structure of FIG. 1B,
each of PSC-I beams 1 is precasted, so that a plurality of reinforcing bars 17 are
embedded in each of the PSC-I beams 1 while an end of each of the reinforcing bars
17 is exposed from an end of the PSC-I beam 1 to a predetermined distance. Thereafter,
each of the PSC-I beams 1 are placed between the pair of support grounds and the piers
2. There is a predetermined space between ends of the two PSC-I beams 1 placed on
the piers 2. When the PSC-I beams 1 are linearly arranged, the reinforcing bars 17
exposed from an end of one of the PSC-I beams 1 are respectively coupled to the reinforcing
bars 17 exposed from an end of a neighboring PSC-I beam 1. Thereafter, concrete is
filled in each of the predetermined space defined between the ends of the PSC-I beams
1 to form a concrete part 15. The concrete slab 16 is, thereafter, integrally constructed
on the PSC-I beams 1 and the concrete parts 15.
[0004] However, in the conventional structure for connecting the PSC-I beams, each of the
PSC-I beams 1 has a role as the simple beam system. That is, an additional support
bearing 3 is provided under each of both ends of the PSC-I beam 1 to support the PSC-I
beams 1 on the pier 2 and the support grounds. Therefore, at least two support bearings
3 must be placed on the pier 2. At this time, ideally, a reaction force against a
live load must be evenly applied to the two support bearings 3 on the pier 2. However,
in reality, one of the two support bearings 3 has a negative (-) reaction force, and
the other support bearing 3 has an excessive positive (+) reaction force. Therefore,
the support bearing 3, which has the excessive positive (+) reaction force, must have
a larger capacity. Thus, the conventional beam connecting structure imposes excessive
constructing costs on users.
[0005] In the bridge with the conventional beam connecting structure of FIG. 1B, the concrete
part 15 is filled in the space defined between the PSC-I beams. At this time, a cold
joint is undesirably generated on each of junctions of both ends of the concrete part
15 and the ends of the PSC-I beams 1. Therefore, a crack may be generated around the
cold joint by the live load. As described above, when the crack is generated around
the cold joint, the PSC-I beams 1 are not firmly connected to each other. Thus, structural
defect may be caused in the bridge with the conventional beam connecting structure.
[0006] In the meantime, a negative moment is generated around parts of the PSC-I beams,
which are supported on the pier 2. However, the conventional beam connecting structure
does not have sufficient strength for resistance against the above-mentioned negative
moment. Therefore, tensile stress is generated around a part of the concrete slab
16 which is positioned on the concrete part 15 filled between the PSC-I beams. Thus,
a crack is undesirably caused around the part of the concrete slab 16, which is positioned
on the concrete part 15, by the above-mentioned tensile stress.
SUMMARY OF THE INVENTION
[0007] Accordingly, the present invention has been made keeping in mind the above problems
occurring in the prior art, and an object of the present invention is to provide a
structure and a method of connecting a plurality of PSC-I beams to each other using
end plates and steel brackets which have higher structural durability, different from
a conventional structure for connecting the plurality of PSC-I beams using only the
reinforcing bars and concrete, so that the plurality of PSC-I beams are firmly connected
to each other.
[0008] Another object of the present invention is to provide an structure and method of
connecting the plurality of PSC-I beams, which has only one support bearing on each
of piers to support the PSC-I beams, thus solving the disadvantages caused by using
the plurality of support bearings in the prior art.
[0009] In an aspect, the present invention provides an structure for connecting a plurality
of PSC-I beams, each having a sheath pipe therein, to each other. The beam connecting
structure includes an end plate mounted on each of both ends of each of the PSC-I
beams, with a through hole provided on an upper portion of the end plate to correspond
to the sheath pipe embedded in each of the PSC-I beams; a steel bracket integrally
provided on the end plate to be perpendicular to the end plate, so that the steel
brackets of the neighboring end plates of the PSC-I beams are aligned with each other
while the PSC-I beams are arranged linearly; a bracket coupling plate to integrally
couple the aligned steel brackets to each other; a bottom connecting plate provided
on lower ends of the aligned steel brackets to connect the steel brackets to each
other; a connecting sheath pipe provided between the PSC-I beams so that both ends
of the connecting sheath pipe are respectively inserted into the through holes of
the neighboring end plates of the PSC-I beams while the PSC-I beams are arranged linearly,
thereby the sheath pipes of the PSC-I beams are connected to each other; a prestress
strand inserted in the sheath pipes of the PSC-I beams and the connecting sheath pipe
while the PSC-I beams are linearly connected to each other, the PC strand being prestressed
in the sheath pipes and the connecting sheath pipe for transfer of prestress to the
PSC-I beams; and a concrete part filled in a space between the PSC-I beams to embed
the aligned steel brackets, the bracket coupling plate and the connecting sheath pipe
in the concrete part.
[0010] In another aspect, the present invention provides a method of connecting a plurality
of PSC-I beams, each having a sheath pipe therein, to each other. The beam connecting
method includes mounting an end plate on each of both ends of each of the PSC-I beams,
with a through hole provided on an upper portion of the end plate to correspond to
the sheath pipe embedded in each of the PSC-I beams; providing integrally a steel
bracket on the end plate to be perpendicular to the end plate; placing the PSC-I beams
on a plurality of piers while the steel brackets of the neighboring end plates of
the PSC-I beams are aligned with each other on a bottom connecting plate placed on
a support bearing mounted on each of the plurality of piers; mounting the aligned
steel brackets of the neighboring end plates of the PSC-I beams to the bottom connecting
plate to connect the steel brackets to each other; mounting a bracket coupling plate
to the aligned steel brackets to integrally couple the aligned steel brackets to each
other; placing a longitudinal connecting bolt on upper portions of the aligned steel
brackets to connect the steel brackets to each other; placing a connecting sheath
pipe between the PSC-I beams so that both ends of the connecting sheath pipe are respectively
inserted into the through holes of the neighboring end plates of the PSC-I beams while
the PSC-I beams are arranged linearly, thereby the sheath pipes are connected to each
other; inserting a prestress strand (PC strand) in the sheath pipes of the PSC-I beams
and the connecting sheath pipe while the PSC-I beams are linearly connected to each
other, and prestressing the PC strand for transfer of prestress to the PSC-I beams;
and filling concrete in a space defined between the PSC-I beams to form a concrete
part, thus embedding the aligned steel brackets, the bracket coupling plate and the
connecting sheath pipe in the concrete part.
BRIEF DESCRIPTION OF THE DRAWINGS
[0011] The above and other objects, features and other advantages of the present invention
will be more clearly understood from the following detailed description taken in conjunction
with the accompanying drawings, in which:
FIG. 1A is a side view of a two-span bridge with a conventional structure for connecting
two PSC-I beams to each other;
FIG. 1B is a side view showing another conventional structure for connecting a plurality
of PSC-I beams to each other;
FIG. 2 is a sectional view of one of a plurality of PSC-I beams connected to each
other by a structure for connecting the plurality of PSC-I beams, according to an
embodiment of the present invention;
FIG. 3 is a partially broken perspective view of the PSC-I beam of FIG. 2, in which
a part around an end of the PSC-I beam is shown;
FIG. 4A is a side view showing a step for connecting the two PSC-I beams of FIG. 2
to each other, in which the two PSC-I beams are placed on a pier while the two PSC-I
beams are arranged linearly;
FIG. 4B is a sectional view taken along the line A-A of FIG. 4A;
FIG. 5 is a side view showing a step for connecting the PSC-I beams of FIG. 2 executed
after the connecting process shown in FIG. 4A, in which a bracket connecting plate
and a connecting sheath pipe are provided between the neighboring end plates of the
PSC-I beams;
FIG. 6A is a side view showing a state of the structure for connecting the PSC-I beams
of FIG. 2 after the connecting process shown in FIG. 5 is executed, in which the aligned
steel brackets are connected to each other by the bracket connecting plate;
FIG. 6B is a sectional view taken along the line B-B of FIG. 6A;
FIG. 7 is a sectional view taken along the line C-C of FIG. 6B;
FIG. 8 is an exploded perspective view of the structure for connecting the PSC-I beams
of FIG. 2;
FIG. 9 is a partially broken perspective view showing the beam connecting structure
of FIG. 8 with a concrete part filled in a space defined between the PSC-I beams;
and
FIG. 10 is a sectional view of a three-span bridge having the three PSC-I beams connected
to each other by the beam connecting structure of FIG. 9, in which a prestress strand
arranged in the three PSC-I beams is shown.
DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Hereinafter, embodiments of the present invention will be described in detail with
reference to the attached drawings.
[0013] Reference now should be made to the drawings, in which the same reference numerals
are used throughout the different drawings to designate the same or similar components.
[0014] FIG. 2 is a sectional view of one of a plurality of I-type prestressed concrete beams
1 (PSC-I beams) connected to each other with a structure for connecting the plurality
of PSC-I beams, according to an embodiment of the present invention. FIG. 3 is a partially
broken perspective view of the PSC-I beam 1 of FIG. 2, in which a part around an end
of the PSC-I beam 1 is shown. As shown in FIGS. 2 and 3, in the beam connecting structure
according to the present invention, each of the PSC-I beams, made of concrete, has
a sheath pipe 18 therein. That is, when the PSC-I beam 1 is produced, the sheath pipe
18 is previously embedded in the concrete. The sheath pipe 18 receives therein a prestress
strand. The beam connecting structure of the present invention includes an end plate
4 which is mounted on at least one of both ends of each of the PSC-I beams 1. In detailed,
a plurality of anchor bolts 7 are previously embedded in the concrete of at least
one of both ends of each of the PSC-I beams 1, while each of the PSC-I beam 1 is precasted.
Thereafter, the end plate 4 is fitted over ends of the plurality of anchor bolts 7.
A nut 13 is, thereafter, tightened to each of the plurality of anchor bolts 7 to couple
the end plate 4 to the end of the PSC-I beam 1.
[0015] In the beam connecting structure of the present invention, two steel brackets 6 are
integrally provided on each of the end plates 4 by welding to be perpendicular to
the end plate 4. A through hole 5 is provided on an upper portion of the end plate
4 to correspond to the sheath pipe 18 which is embedded in each of the PSC-I beams
1. A plurality of bolt holes are provided on each of the steel brackets 6, so that
the steel bracket 6 is coupled to a following bracket coupling plate 9 by a plurality
of coupling bolts 10 and coupling nuts 10a which will be described later herein.
[0016] FIG. 4A is a side view showing a step for connecting the two PSC-I beams 1 of FIG.
2 to each other, in which the two PSC-I beams 1 are placed on a pier 2 while the two
PSC-I beams 1 are arranged linearly. FIG. 4B is a sectional view taken along the line
A-A of FIG. 4A.
[0017] As shown in FIGS. 4A and 4B, a support bearing 3 is provided on the pier 2 before
the PSC-I beams 1 are placed over the pier 2. A plurality of temporary support units
14 are provided around the support bearing 3 on the pier 2 to support the neighboring
ends of the PSC-I beams 1 on the pier 2. A bottom connecting plate 8 is placed on
the support bearing 3. Thereafter, the PSC-I beams 1, separately precasted on the
ground, are placed over the pier 2 while the neighboring ends of the PSC-I beams 1
are supported on the plurality of temporary support units 14. At this time, the steel
brackets 6 of the neighboring end plates 4 of the PSC-I beams 1 are aligned with each
other on the bottom connecting plate 8. The steel brackets 6 of the neighboring end
plates 4 are mounted at lower ends thereof to the bottom connecting plate 8 by welding,
so that the steel brackets 6 are connected to each other.
[0018] FIG. 5 is a side view showing a step for connecting the PSC-I beams 1 of FIG. 2 executed
after the connecting process shown in FIG. 4A, in which a bracket connecting plate
9 and a connecting sheath pipe 19 are provided between the neighboring end plates
4 of the PSC-I beams 1.
[0019] As shown in FIG. 5, the connecting sheath pipe 19 is provided between the PSC-I beams
1 so that both ends of the connecting sheath pipe 19 are respectively inserted into
the through holes 5 which are respectively provided on the upper portions of the neighboring
end plates 4 of the PSC-I beams 1, while the PSC-I beams are arranged linearly. By
placing of the connecting sheath pipe 19, the sheath pipes 18 of the PSC-I beams 1
are connected to each other.
[0020] In the meantime, the two bracket coupling plates 9 are respectively provided on both
sides of the aligned steel brackets 6 of the neighboring end plates 4. The bracket
coupling plates 9 and the aligned steel brackets 6 are integrally coupled to each
other by the plurality of coupling bolts 10 and the plurality of nuts 10a. Therefore,
the aligned steel brackets 6 are connected to each other by the bottom connecting
plate 3, in addition to the bracket coupling plates 9.
[0021] FIG. 6A is a side view showing a state of the structure for connecting the PSC-I
beams 1 after the connecting step shown in FIG. 5 is executed, in which the aligned
steel brackets 6 are connected to each other by the bracket connecting plate 9. FIG.
6B is a sectional view taken along the line B-B of FIG. 6A. As show in FIGS. 6A and
6B, the aligned steel brackets 6 are also connected to each other by a plurality of
longitudinal connecting bolts 12. That is, a bolt holding unit 11 is provided on an
upper end of each of the steel brackets 6 of the PSC-I beams 1. A connecting nut 21
is tightened to each of the longitudinal connecting bolts 12 while the longitudinal
connecting bolt 12 passes through both the bolt holding units 11 of the aligned steel
brackets 6. Thus, the steel brackets 6 are more firmly connected to each other by
the longitudinal connecting bolts 12 and the connecting nuts 21. At this time, the
bolt holding unit 11 is mounted to an upper support plate 22 which is provided on
the upper end of each of the steel brackets 6.
[0022] FIG. 7 is a sectional view taken along the line C-C of FIG. 6B. As described above,
in a state in that the sheath pipes 18 of the PSC-I beams 1 are connected to each
other by the connecting sheath pipe 19, a prestress strand 20 is continuously inserted
in the sheath pipes 18 and the connecting sheath pipe 19. Particularly, even when
the PSC-I beams 1 are placed over at least two spans, the strand 20 is continuously
inserted in every sheath pipe 18 and connecting sheath pipe 19 through every span.
At this time, the strand 20 may be inserted in the sheath pipe 18 and the connecting
sheath pipe 19, after a space defined between the PSC-I beams 1 receives concrete,
which will be described later herein. The strand 20, inserted in the every sheath
pipe 18 and the connecting sheath pipe 19, is prestressed for transfer of prestressed
force to the PSC-I beams 1, before or after a following concrete slab 16 is constructed
on the PSC-I beams 1.
[0023] FIG. 8 is an exploded perspective view of the structure for connecting the above-mentioned
PSC-I beams 1. After, as shown in FIG. 7, the steel brackets 6 of the PSC-I beams
1 are connected to each other, the concrete is filled in the space defined between
the PSC-I beams 1 to form a concrete part 15. Thus, the aligned steel brackets 6,
the bracket coupling plate 9 and the connecting sheath pipe 19 are embedded in the
concrete part 15. FIG. 9 is a partially broken perspective view showing the beam connecting
structure of FIG. 8 with the above-mentioned concrete part 15 filled in the space
defined between the PSC-I beams 1. FIG. 10 is a sectional view of a three-span bridge
having the three PSC-I beams 1 connected to each other by the beam connecting structure
of FIG. 9, in which the PC strand 20 arranged in the three PSC-I beams 1 is shown.
As shown in FIGS. 9 and 10, the temporary support units 14, provided under the neighboring
ends of the PSC-I beams 1, are removed, after the concrete part 15 is filled in the
space defined between the PSC-I beams 1. Thus, only the support bearing 3 on each
of the piers 2 supports the bridge with the beam connecting structure of the present
invention.
[0024] As described above, the plurality of PSC-I beams 1 are firmly connected to each other
by the beam connecting structure of the present invention. Thus, the bridge with the
beam connecting structure forms a continuous beam system. Therefore, the bridge with
the beam connecting structure reduces the positive moment generated in the PSC-I beams
1, thus reducing the size of the PSC-I beams 1 in comparison to a bridge with conventional
beam connecting structure.
[0025] Generally, in case of bridges with continuous beam systems, the positive moment is
reduced. However, negative moments are generated in upper portions of the bridges
by dead loads caused by the weight of the concrete slab 16 and additional asphalt
pavements. In above state, when cars pass through the bridges, the negative moments
are increased.
[0026] In the bridge with the beam connecting structure according to the present invention,
the above-mentioned negative moment is also generated in the bridge. However, the
beam connecting structure of the present invention has the plurality of longitudinal
connecting bolts 12 to withstand tensile stress generated by the negative moment.
Furthermore, as described above with reference to FIG. 7, the PC strand 20 is continuously
arranged in the bridge. Therefore, the PC strand 20 also withstands the tensile stress.
[0027] As described above, the present invention provides a structure and a method of connecting
a plurality of PSC-I beams to each other using steel brackets, bracket connecting
plates, longitudinal connecting bolts, a connecting bottom plate and a concrete part,
different from conventional structure for connecting the PSC-I beams using a plurality
of reinforcing bars and a concrete part. That is, the beam connecting structure of
the present invention more firmly connects the plurality of PSC-I beams to each other
in comparison with the conventional beam connecting structure which cannot sufficiently
connect the PSC-I beams to each other to form a simple beam system.
[0028] Furthermore, the beam connecting structure of the present invention has a prestress
strand which is arranged through entire spans. Therefore, the prestress force is evenly
transferred to a concrete part filled in a space defined between the PSC-I beams,
in addition to the PSC-I beams. Thus, the bridge with the beam connecting structure
efficiently responds to a tensile stress generated by a negative moment.
[0029] In addition, the bridge with the beam connecting structure according to the present
invention has sufficient strength to respond the negative moment generated in the
space defined between the PSC-I beams. Therefore, the bridge with the beam connecting
structure of the present invention completely forms a continuous beam system. Thus,
both a size of each of the PSC-I beams and construction costs are reduced in comparison
with the conventional beam connecting structure with the simple beam system.
[0030] Furthermore, even though the beam connecting structure of the present invention has
only one support bearing on each of piers, different from the conventional beam connecting
structure with at least two support bearings on each of the piers, the bridge is sufficiently
supported on the piers.
[0031] Although the preferred embodiments of the present invention have been disclosed for
illustrative purposes, those skilled in the art will appreciate that various modifications,
additions and substitutions are possible, without departing from the scope and spirit
of the invention as disclosed in the accompanying claims.
1. A structure for connecting a plurality of I-type prestressed concrete beams (PSC-I
beams), each having a sheath pipe therein, to each other, the structure comprising:
an end plate mounted on each of both ends of each of the PSC-I beams, with a through
hole provided on an upper portion of the end plate to correspond to the sheath pipe
embedded in each of the PSC-I beams;
steel brackets integrally provided on the end plate to be perpendicular to the end
plate, so that the steel brackets of the neighboring end plates of the PSC-I beams
are aligned with each other while the PSC-I beams are arranged linearly;
bracket coupling plates to integrally couple the aligned steel brackets to each other;
a bottom connecting plate provided on lower ends of the aligned steel brackets to
connect the steel brackets to each other;
a connecting sheath pipe provided between the PSC-I beams so that both ends of the
connecting sheath pipe are respectively inserted into the through holes of the neighboring
end plates of the PSC-I beams while the PSC-I beams are arranged linearly, thereby
the sheath pipes of the PSC-I beams are connected to each other;
a prestress strand inserted in the sheath pipes of the PSC-I beams and the connecting
sheath pipe while the PSC-I beams are linearly connected to each other, the strand
being prestressed in the sheath pipes and the connecting sheath pipe for transfer
of prestress force to the PSC-I beams; and
a concrete part filled in a space between the PSC-I beams to embed the aligned steel
brackets, the bracket coupling plate and the connecting sheath pipe in the concrete
part.
2. The structure according to claim 1, further comprising:
longitudinal connecting bolts provided on upper portions of the aligned steel brackets
to connect the steel brackets to each other
3. The structure according to claim 1, further comprising:
a support bearing provided on each of a plurality of piers,
wherein the bottom connecting plate is placed on the support bearing, and the
lower ends of the aligned steel brackets are mounted to the bottom connecting plate,
so that the steel brackets are connected to each other.
4. A method of connecting a plurality of I-type prestressed concrete beams (PSC-I beams),
each having a sheath pipe therein, to each other, the method comprising:
mounting an end plate on each of both ends of each of the PSC-I beams, with a through
hole provided on an upper portion of the end plate to correspond to the sheath pipe
embedded in each of the PSC-I beams;
providing integrally steel brackets on the end plate to be perpendicular to the end
plate;
placing the PSC-I beams on a plurality of piers while the steel brackets of the neighboring
end plates of the PSC-I beams are aligned with each other on a bottom connecting plate
placed on a support bearing mounted on each of the plurality of piers;
mounting the aligned steel brackets of the neighboring end plates of the PSC-I beams
to the bottom connecting plate to connect the steel brackets to each other;
mounting a bracket coupling plate to the aligned steel brackets to integrally couple
the aligned steel brackets to each other;
placing a longitudinal connecting bolt on upper portions of the aligned steel brackets
to connect the steel brackets to each other;
placing a connecting sheath pipe between the PSC-I beams so that both ends of the
connecting sheath pipe are respectively inserted into the through holes of the neighboring
end plates of the PSC-I beams while the PSC-I beams are arranged linearly, thereby
the sheath pipes are connected to each other;
inserting a prestress strand in the sheath pipes of the PSC-I beams and the connecting
sheath pipe while the PSC-I beams are linearly connected to each other, and prestressing
the strand for transfer of prestress to the PSC-I beams; and
filling concrete in a space defined between the PSC-I beams to form a concrete part,
thus embedding the aligned steel brackets, the bracket coupling plate and the connecting
sheath pipe in the concrete part.