[0001] The invention refers to a method and a device for producing asphalt mix as known
from EP 0 756 615 B1.
[0002] Reference is first made to WO 83/00700 which describes a method and apparatus for
the production of asphalt concrete. According to this previous method, the aggregate
is divided into a coarse fraction, a fine fraction and a filler portion. First, the
coarse fraction and the bituminous liquid are mixed, then the filler fraction is added,
and last, the fine fraction is added. The apparatus for carrying out such production
method is described in detail. The mixing method of WO 83/00700 has been commonly
known as "KGO II" mixing method. The known mixing method is characterized by force
mixing. The filler is discharged at once, and then the mixing is conducted by the
force of mixing paddles.
[0003] Reference is now made to the above mentioned EP 0 756 615 B1. In such patent, there
is shown and described a test equipment and method for testing of asphalt specimens,
called TOD test. The specimens are heated and the deformation in the specimens is
determined. The deformation over temperature is plotted in a graphic. The curve of
a specimen produced by the KGO II mixing method still shows sharp buckles and cracks.
This shows the tendency of an asphalt to crack. In EP 0 756 615 B1, a new mixing method
is given reducing such tendency to crack. The mixing method of EP 0 756 615 B1 - known
as KGO III mixing method - is characterized by controlling the flow rate and time
intervals for discharging the filler and the fine fraction. The filler discharge is
such controlled that the filler is powdered over the liquid distributed over the surface
of the coarse fraction. To understand this, one can compare the mixing methods with
a preparation of a pancake dough. If the flour is discharged at once into the milk,
a forced mixing is necessary. Nevertheless, the dough becomes lumpy. If, however,
the flour is powdered over the milk when mixing the dough, lumps are avoided. The
same technique is used in the KGO III mixing method. By such mixing, the bituminous
liquid, the filler and the fine fraction material becomes enclosed in a combined suspension
where the filler, the fine fraction and the coarse fraction are parts of a closed
liquid volume. This condition is testable by the TOD-test. The flow rate and the time
intervals for discharging the filler and the fine fraction are controlled in such
a way that the closed liquid volume is established.
[0004] With the mixing method of EP 0 756 615 B1, one has changed from a force mixing to
a flow mixing. Further details of the theory and the praxis of such flow mixing are
given in "Method and means used in production of asphalt mix. Theory of suspension,
mixing method, method of testing, method of analyses", dissertation at Lund University
by Ohlson, Karl Gunnar, Institutionen för Trafikteknik, LTH, bulletin 132, available
at the Lund University, Box 118, SE-22100 Lund (Sweden) under the code "CODEN LUTVDG/(TVTT-3110)/1-113/(1995)",
Lund 1995. This dissertation is incorporated here by reference.
[0005] When trying to conduct the KGO III mixing method in practice, namely in some asphalt
plants, especially such one as given in WO 83/00700, some problems have been raised.
It was particularly difficult to find the optimised time intervals and flow rates
for developing the closed liquid volume.
[0006] Further, reference is made to the European Patent Application 03023201.1 published
on the priority date of the present application as EP 1 408 157 A2 and such being
state of art according to Art 54(3) EPC, only. The aim of this state of art according
to EP 1 408 157 A2 is to find optimal time intervalls and flow rates for production
of a closed liquid volume of the mix.
[0007] An object of the present invention is to improve the mixing methods as known from
EP 0 756 615 B1 in such a way that the intervall and flow rates can easier be optimized.
[0008] A further object of the invention is to increase the viscous resource in batch plant
mixed asphalt pavings.
[0009] Such objects are achieved by the method according to claim 1 and by the device according
to the claim 8.
[0010] Advantageous embodiments are given in the subclaims.
[0011] The invention especially refers to a start up procedure for starting production of
asphalt mix in an asphalt plant. Beginning with such procedure, the optimized intervall
and flow rates easily can be found by starting with a particular time schedule. The
optimized adjustments of an asphalt plant can such be found easily by producing the
mix, testing it with the TOD test and amending the intervall and flow rates, if necessary
or advantageous.
[0012] When comparing the invention with the method according to EP 1 408 157 A2, it is
clear that the order and intervalls for discharging and mixing of the different fractions
are different. In EP 1 408 157 A2, the method is started by discharging the coarse
fraction during 3s, then discharging the bitumen for 8s, then mixing coarse fraction
and bitumen for 10s. The result of the mixing process is depending on the mixing time
of each fraction before the next material is added. According to EP 1 408 157 A2,
the discharge of bitumen starts after having discharged all the coarse aggregate into
the mixer. Then, the mixing time starts at the time when all bitumen has been discharged
into the mixer. Thus, the effective mixing time for mixing coarse fraction and bitumen,
corresponds only to the mixing time of 10s.
[0013] According to the invention, the coarse fraction and the bitumen are discharged and
mixed together in one step. The amount of coarse aggregate and of the bitumen are
increasing simultanously. Thus, the mixing time for mixing coarse aggregate and bitumen
starts at the time starting the discharge of the aggregate and the liquid. So, the
efective mixing time starts earlier and can last longer. Since the amount of coarse
aggregat and liquid are increasing simultanously, each particle of coarse aggregat
will be better covered with liquid so that the closed liquid volume of the whole asphalt
mix can be achieved more easily. The effect of the invention is visible by the TOD
test. With the invention, one can achieve a smoother curve of the deformation versus
temperature. The behaviour of a mix produced according to the invention is more like
a liquid as compared with Fig. 1 a) of EP 0 756 615 B1. The known asphalt product
still shows a sharp, sudden fall at a higher temperature. An aspalt product produced
by the invention shows a smooth curve without sudden changes or flanks.
[0014] Embodiments of the invention are now explained in more detail with reference to the
enclosed drawings in which:
- Fig. 1
- is a graph showing the viscous source of different road bitumen.
- Fig. 2
- is a diagramm showing an example of material composition of asphalt mix used by the
invention.
- Fig. 3
- shows an example of a mixing time schedule used by the invention.
- Fig. 4a
- shows an test apparatus for testing the viscous resource of produced mix.
- Fig. 4b
- shows an diagramm, comparable with Fig. 1 of EP 0 756 615 B1, showing the deformation
of a specimen over the temperature for a specimen produced with the invention. The
diagramm represents an example of a characterisitc result from test of the viscous
resource of produced mix.
- Fig. 5
- illustrates a first example of a device for producing asphalt mix.
- Fig. 6
- illustrates a second example of a device for producing asphalt mix.
[0015] The invention results from a discovery of that the property of viscosity that characterizes
the unmixed bituminous liquid, figure 1 refers, is drastically reduced in the known
process of mixing, this from lack of relevant time schedule for adding and flow rates
of the different fractions of solids at discharge to the mixer.
[0016] "Viscosity resist flow by inertia. Inertia is a combined function of ductility and
cohesion, properties recognized as the resource of durability of the bituminous liquid
as the binder of paved mix".
[0017] One novelty of the invention is the time schedule for entering to the mixer the different
fractions of the aggregate and the bituminous liquid of the mix, the mixing times
of each fraction entered and the time of emptying the mixer of the ready asphalt mix
that is characterized by the viscous resource of the unmixed bituminous liquid.
[0018] The basic components of asphalt mix are the following:
- Bituminous liquid (road bitumen) of different viscosity, figure 1 refers;
- Aggregate coarse fraction, particles mainly > 4 mm;
- Aggregate fine fraction, particles mainly < 4 mm; and
- Filler, particles mainly < 0.0074 mm.
[0019] In the known technology there are a number of different types of mixes used for paving
work, each with different material composition that concern both the fine and the
coarse fraction.
[0020] The composition of the mixes of an embodiment of the invention differs from the known
by that, independent of the type of the mix, the fine fraction and filler, has more
or less the same percentage in mix and the different types of the mixes are recognized
by the difference in the size of the largest particles of the coarse fraction.
[0021] An example of material composition for use with the invention for production of asphalt
paving of type surface layer, is shown by figure 2.
[0022] A time schedule, figure 3 refers, shows the order of discharge, the intervals between
discharge, the rate of flow at discharge and the mixing time between discharge of
each component added to the mixer. The production of asphalt paving mix by the shown
time schedule, results in a paving characterized by the property of the viscosity
of the bituminous liquid. The property of viscosity in the mix is shown by test on
specimens drilled from the paving. Figure 4a) shows a test equipment, and figure 4b)
represents a graph of viscous mix.
[0023] The time schedule of figure 3 is universal for starting up different make of asphalt
plants and will function with all types of mix with the material composition of the
invention. Trimming the schedule for adjustment of the respective asphalt plant capacity
is allowed, the extent is however limited by the test on the viscous behaviour of
the mix. Figure 4 b) refers.
[0024] Am embodiment of the invention requires the following mechanical changes to the asphalt
plant:
1) an apparatus set to administrate the mixing process in accordance with the time
schedule shown by fig. 3;
2) the device for discharge of the filler into the mixer to be furnished with an apparatus
for regulating the flow rate of the filler at discharge to the mixer. Example: If
there is a screw feed, the flow rate can be adjusted by lowering the revolution/minute
of the screw, this by a frequency converter on the motor of the screw. Fig. 5 refers.
3) a device that prevent the aggregate material from being discharged in to area (C),
figure 6 refers, where the material flow in the mixer is countercurrent to the flow
of the discharged material.
[0025] The described invention is a technology here described by a time schedule, an example
of mix composition, a method for trimming the asphalt plant and a method for testing
the asphalt mix. By the method of testing, the limit to which the time schedule can
be trimmed is also learned.
[0026] One embodiment of the invention provides a method for production of asphalt mix depending
on a time schedule for entering to the mixer the different fractions of the aggregate
and the bituminous liquid of the mix, the mixing times of each fraction entered and
the time of emptying the mixer of the ready asphalt mix, this having the effect of
the invention of the viscous resource of bituminous liquid, the time schedule being
universal for different make of asphalt batch plants for discharges of the components
to the mixer to be used when starting production by the invention. The time schedule
includes
a) discharge the coarse fraction and the bituminous liquid simultaneous and mix over
a timeperiod of 17s,
b) spread the discharge of the filler over a timeperiod of 17s,
c) discharge and mixing the fine fraction material over a timeperiod of 18s, and
d) discharge of the ready mix from the mixer.
[0027] By starting the production of asphalt mix with such time schedule, any type of asphalt
plant easily can be adjusted to produce asphalt mix with increased viscous behaviour
which is testable by TOD test. Such, the time schedule of the invention is universal
for starting up production at any asphalt plant.
[0028] Further, a time schedule to weigh and discharge the material to the mixer can be
provided including
e) to weigh up the desired amount of coarse fraction and fine fraction separately
at the same time or one after the other to the weigh hopper of the plant
f) to discharge to the mixer, the coarse fraction together with the desired amount
of bituminous liquid, discharge time and mixing time 17s
g) to discharge the desired amount of filler to the mixer, at the flow rate that spread
the discharge over 17s.
h) discharge the fine fraction, the discharge time and mixing time, 18s, whereupon
the mixer is emptied.
i) to repeat the time schedule for continuous production.
[0029] The apparatus that controls the discharge and mixing times makes those adjustable
to the extent allowed for trimming of the plants capacity.
[0030] An example of a device for carrying out the method has a screw (D) for discharge
of the filler into the mixer, wherein the flow rate is adjusted by the change of the
revolution/minute of the screw by a frequency converter connected to the motor of
the screw.
[0031] A further example of a device for carrying out the method has a wall fitted in the
weigh hopper above the mixer or alternative in the mixer (A), depending on space,
the function of this is to prevent the aggregate material from being discharges into
area (C) of the mixer where the material flow in the mixer is countercurrent to the
flow of the discharged material.
[0032] The invention results from a discovery that the property of viscosity that characterize
the unmixed bituminous liquid is drastically reduced in the known processes of mixing,
this from lack of a relevant time schedule for adding, and flow rates of the different
fractions of solids at discharge into the mixer.
[0033] The invention is a technology of mixing the components of the asphalt mix without
reduction in the viscous resource of the bituminous liquid. The technology is here
described by a time schedule, an example of mix composition, a method for testing
the asphalt mix of the viscous resource and devices that control the flow of the components
in mix at discharged to the mixer. By the method of testing is also learned the limit
to which the time schedule can be trimmed, as to the asphalt plants capacity.
[0034] The invention is important to the production of asphalt mixes. This as the
viscosity of the bituminous liquid is a product of ductility and cohesion, a combination recognized
as the resource of durability of the bituminous liquid as the binder of paved mix.
1. Method for producing an asphalt mix that includes a coarse fraction, a fine fraction,
filler and a bituminous liquid with the following steps in the mentioned order:
a) mixing the coarse fraction and the bituminous liquid in a mixer,
b) discharging the filler to be spread over the coarse fraction and the bituminous
liquid and
c) discharging the fine fraction over the filler and mixing,
d) discharging the ready mix from the mixer,
wherein the discharge of the fractions are optimized so that the mix behaves like
a liquid in a test where a deformation of a specimen of the mix depending from the
temperature of the specimen is measured,
characterized in that,
for conducting step a), the coarse fraction and the liquid binder are discharged and
mixed simultanously over a first time period.
2. Method according to claim 1,
characterized in that, for starting production of the asphalt mix in an asphalt plant, the following time
schedule is used universally in different types of asphalt plants and for different
mix compositions:
a) discharging the coarse fraction and the bituminous liquid simultanously and mix
over a first time period of 17s,
b) spreading the discharge of the filler over a second time period of 17s,
c) discharging and mixing the fine fraction material over a third time period of 18s,
d) discharging the ready mix from the mixer.
3. Method according to claim 2,
characterized in that the time schedule is thereafter amended to achieve and/or optimize the viscous behaviour
of the mix.
4. Method according to any of the claims 2 or 3,
characterized in that the time schedule is then trimmed for adjustment of the respective asphalt plant
capacity wherein the extent of trimming is limited by testing the viscous behaviour
of the mix.
5. Method according to any of the preceding claims,
characterized in that
the filler and/or the fine fraction is discharged into a downwardly directed material
flow in the mixer.
6. Method according to claim 5,
characterized by using a mixer with a mixing shaft extending in a horizontally direction and having
paddles for driving the flow of the material to be mixed and by discharging the fine
fraction material along a mixer wall extending essentially parallel to the shaft where
the paddles are rotated in a downward direction.
7. Method according to any of the claims 5 or 6,
characterized by using a mixer with at least two mixing shafts having mixing paddles wherein the shafts
and their paddles are rotating in opposite directions so that the paddles on the side
near to the other shaft are moving upwards and the paddles located near to a wall
of the mixer which wall extends essentially parallel to the shafts are moving downwards.
8. Device for carrying out the method according to any of the preceding claims, comprising
a mixer,
characterized by
a control apparatus administrating the mixing process wherein said control apparatus
is configured such that the coarse fraction and the bituminous liquid are discharged
and mixed simultanously and that further steps b) to d) are conducted.
9. Device according to claim 8,
characterized by an regulating apparatus for regulating the flow rate of the filler at discharge into
the mixer.
10. Device according to claim 9,
characterized in that the regulating apparatus has a screw for (D) for discharge of the filler into the
mixer and an adjustment means for adjusting the flow rate of the filler by changing
the revolutions per minute of the screw wherein said
adjustment means include a frequency converter for changing the revolutions per minute
wherein the frequnecy converter is connected to a motor of the screw.
11. Device for carrying out the method according any of the claims 1 to 7, comprising
a mixer,
characterized by a guiding means that prevents the aggregate material from being discharged in an
area of the mixer where the material flow in the mixer is countercurrent to the flow
of the discharged material.