Field of the Invention
[0001] The object of this invention is to provide the construction industry with a new slab
formwork system which has a minimal number of parts in contact with the concrete makes
the structural mounting quicker, allows the very rapid recovery of a large number
of parts, beams and panels, before the concrete maturity, without jeopardizing the
safety of the construction site.
Background of the invention
[0002] Within the slab formwork systems available in the market, considering the use of
heads, two kinds of systems can be distinguished: one using headstocks and another
using poppet heads. In the headstocks systems the panels rest directly on the heads
and the formwork is not recovered, i.e. the formwork elements can only be removed
when the concrete maturity (when the hardening coefficient is achieved. This kind
of system is usually applied to small concrete areas. The slab formwork systems using
poppet heads were designed so that most of their parts can be recovered before the
concrete maturity achievement allowing the use of these parts in other formworks.
[0003] The poppet heads are composed by three sections: the fixed part which touches the
prop at one end and the concrete at the other, the movable part that supports the
longitudinal beams and has a upper position or working position and a position for
removal of the formwork and the third element, which is the blocking system for the
working position of the movable part.
[0004] The assembly of the system on the props begins with the positioning of the longitudinal
beam, then the transversal beam is placed perpendicularly to the longitudinal beam.
In this way the distance between the longitudinal beams is estimated. Finally the
several panels are placed between those beams, which determines the actual distance
between the longitudinal beams. The assembly of the panels involves a readjustment
to the position of the beams and, consequently of the props. Therefore, at least two
manual workers are needed during the assembly of the system; one is responsible for
the positioning of the props and the other makes the necessary adjustments to the
props and beams.
[0005] In accordance with the above descriptions and as examples of slab formwork systems
using poppet heads, we can quote the documents relating to British patent no. 2.005.332
of Rapid Metal Developments Limited, German patent no. 3316557 and the German utility
model G9005901 of NOE Schaltechnik GmbH, the Spanish patent no. 440.081 of SGB GROUP
LIMITED; European patent no. 0718 453, French patent no. 2.475. of PERI GmbH and the
Spanish patent with the publication no. WO 02084050 of ULMA.
[0006] The slab formwork systems described above have some inconveniences regarding the
concrete surface finish. In the slab formwork systems described above all of their
parts, poppet heads, beams and panels are in contact with the concrete. When the formwork
is assembled there are several borders or separation lines between their parts. Each
contact plane between two components in the formwork system implies a mark in the
concrete finish. This has consequences in situations where the final appearance of
the concrete is important.
Summary of the invention
[0007] The formwork system of the invention is fundamentally composed of vertical props,
poppet heads mounted on the upper edge of the props, longitudinal beams supported
on the edges of the poppet heads, formwork panels supported on the longitudinal beams
and transversal beams with the purpose of setting the distance between the longitudinal
beams.
[0008] This new formwork system was designed to satisfactorily solve the inconveniences
and problems mentioned in the previous paragraphs relating to the prior art.
[0009] One of the main novel characteristics of the formwork consists of placing the transversal
beams under the panels, thus reducing the number of components in contact with the
concrete.
Brief description oh the drawings
[0010] The present description is accompanied by the attached non-restrictive drawings where:
Figure 1 represents one isolated formwork system, when it is in position, with the
several constituent components.
Figures 2 and 3 illustrate a front and side view of the way of encasing the three
principal components: panel, poppet head and longitudinal beam.
Figure 4 shows a side and perspective view of the poppet head.
Figure 5 represents an image sequence showing the assembly of the formwork system
of the invention.
Figure 6 represents one isolated formwork system, after it has removed, with the several
constituent components.
Figure 7 shows a front, side and perspective view of the longitudinal beam
Figure 8 shows front, top and perspective view of the formwork panel.
Figure 9 illustrates in a perspective view an isolated formwork system, in the particular
situation where there is a pillar in the middle of the formwork area.
Detailed description of the invention
[0011] As can be seen, the slab formwork system is composed of vertical props (19), poppet
heads (4), longitudinal beams (2), transversal beams (3) and panels (1). The longitudinal
beams provide support for the formwork panels ground (figures 5f, 5g and 5 h) and
rest on the poppet heads (figure 5b and 5 c) and the poppet heads are supported by
props (figure 5 a). The transversal beams rest on the poppet heads, in their own encasement
(11), and they mark the distance between the longitudinal beams as shown in figures
5d and 5e.
[0012] As mentioned above, one of the main novel characteristics of this formwork system
consists of placing the transversal beam under the panels, therefore removing one
element in contact with the concrete.
[0013] The system is assembled as follows: the regular longitudinal beams are mounted on
the poppet heads and then the transversal beams are positioned, which will indicate
the position of the next prop. After this the panels are placed above the longitudinal
beams (2). This assembly is illustrated by a sequence of images in figure 5.
[0014] The transversal beams (3) are therefore placed before the panels (1) and under the
panels (1), so that they will not touch the concrete. These beams serve the purpose
of marking the distance between the longitudinal beams.
[0015] When the desired concrete hardening coefficient is obtained, the formwork is removed.
For that purpose, the poppet heads are changed to the removal position, as shown in
figure 6, and then the panels (1), and the longitudinal (2) and transversal (3) beams
are removed in the opposite order to which they were mounted, without the need to
make any changes in the shoring.
[0016] Unlike most slab formwork systems available on the market, this one is characterized
by being built with profiles and beams that are designed in order to obtain a much
lighter formwork system, which is easily handled and maintained (cleaning and repairing)
after being used on the construction site, having the same load capability as the
systems that can be found on the market, using standard profiles and beams such as
U sections and rectangular pipes among others.
[0017] The invention is essentially different from other existing slab formwork systems
because of:
- The positionig of the transversal beams (3) under the panels (1);
- The form of encasement between the panels (1) and the longitudinal beams (2) (see
figure 2); and
- The form of encasement between the longitudinal beams (2) and the poppet heads (4)
(see figure 3), because the existing systems use a wedge quoin mortise.
[0018] The panel of the invention rests on and adjusts to the longitudinal beams through
a ladder mortise as can be seen in figure 2, making use of four pins (5), one in each
panel (1) vertex (see figure 8) to adjust the longitudinal beams and at the same time
to serve as a blocking of the system when this one is mounted. For the encasement
of the pins, the longitudinal beams have a boring every 5 cm along their length as
shown in figure 7, so that adjusts in the formwork limits can be made, such as a wall
or a pillar and also in order to allow the use of panels with various dimensions.
The poppet head (4) is also equipped with a boring continuing the one existing in
the longitudinal beams (2) (figure 4).
1. Horizontal formwork system, of the recoverable type, which uses poppet heads (4) supported
on the upper edge of vertical props (19), longitudinal beams (2) supported on the
edges of poppet heads (4), formwork panels (1) supported on those beams (2) and transversal
beams (3)
characterized by:
- The positioning of the transversal beams (3) under the panels (1);
- The form of encasement between the panels (1) and the longitudinal beams (2) (see
figure 2); and
- The form of encasement between the longitudinal (2) beams and the poppet heads (4)
(see figure 3), because the existing systems use a wedge quoin mortise.
2. Horizontal formwork system, as claimed in claim 1, characterized by the positioning of the transversal beams (3) before the panels and under the panels,
fixed in a groove (11) on the poppet head, so that these beams do not come into contact
with the concrete; these beams serve the purpose of marking the distance between the
longitudinal beams (2).
3. Horizontal formwork system, as claimed in claim 1, characterized by the longitudinal beams (2) being supported by the poppet heads (4) through rotation
supports (12); these supports make it possible to raise the longitudinal beam (2)
to a horizontal or working position and when it is supported on the other poppet head
the system gets blocked due to the encasement interface, regardless of whether the
concrete has been made or not, the system unblocking when the poppet head is placed
in the removal position.
4. Horizontal formwork system, as claimed in claim 1, characterized by the poppet head having a blocking system using a wedge quoin (8), allowing the positioning
of its movable part, built with hook shape elements (9), in a working position, and
when the wedge quoin is loosened after the formwork has been made those same elements
are lowered and therefore the panels (1) and longitudinal beams (2) are also lowered
to a a removal position; afterwards those components can be recovered in order to
be used in the next formwork areas.
5. Horizontal formwork system, as claimed in claim 1, characterized by the longitudinal beam having a boring along its length in the panel (1) supporting
area to allow encasement and accommodation of the panels (1) and at the same time
to allow the use of panels with different dimensions within the limits of the formwork.
6. Horizontal formwork system, as claimed in claim 1, characterized by the positioning of the panels between the longitudinal beams (2) with an encased
ladder type using pins (5) to be fixed in the horizontal plane; theses pins not only
help in the encasement but also confer on the system assembly extra rigidity; the
distance between the longitudinal beams (2) is determined by the transversal beams
(3) and the panels should only be positioned after at least two longitudinal beams
(2) have been fixed.
7. Horizontal formwork system, as claimed in claim 1, characterized in that the existing boring in the poppet head (4) movable component continues the one along
the longitudinal beam (2) which is intended to receive the panel encasing pins (17),
giving stability in the assembly of the system.
8. Horizontal formwork system, as claimed in claim 1, characterized in that, in the event of a break in the natural mounting of the formwork due to a pillar,
it allows the removal of a panel so that the formwork will not be interrupted and
the blank spaces can be filled with wooden panels.