[0001] This invention generally relates to elevator tension members such as those used in
belts or ropes. More particularly, this invention relates to handling and arranging
tension member components within an assembly.
[0002] Elevator systems often include a car and counterweight supported by a rope or belt.
Conventional machines move the rope or belt to cause the desired movement of the car
between levels within a building, for example. Traditionally, steel ropes were used.
More recently, flat belt technology has been introduced. The flat belts provide traction
and bending fatigue resistance advantages. One example flat belt arrangement includes
a plurality of steel tension members encased in a polyurethane jacket. The steel tension
members may include a plurality of wires that are wound together to form cords, which
serve as the tension members. It is possible for one or more wires to break at different
times during the assembly process. A broken wire end that becomes entangled in the
assembly machinery during the winding process or later when the jacket is applied
to the tension members can cause a problem such as damage to the machinery or at least
significantly interrupting production.
[0003] Similar problems exist in jacketed round rope manufacturing, There is a need for
techniques to manage such broken wires.
US-4,591,995 discloses a system for monitoring stranding machines and detecting wire breakages.
[0004] Is the stock were simply cut at the point of each break, the length of stock would
be randomly and undesirably limited, Most elevator installations require lengthy,
uninterrupted tension member.
[0005] One proposed arrangement has been to cut an entire strand or cord (i.e., all of the
constituent wires) at the point of the wire break and then to weld together the two
cut ends. This proposal provides significant shortcomings. The breaking strength and
bending fatigue resistance required for tension members in an elevator belt are significantly
compromised when the out-and-weld technique is employed. In some circumstances, the
service life based on bending fatigue is reduced by more than 50%.
[0006] This invention provides alternatives for handling situations where one or more wires
are broken during an elevator tension member or belt or rope assembly process.
[0007] In general terms, this invention is a technique for effectively managing broken wires
during an elevator tension member or rope or belt assembly process.
[0008] According to the present invention there is provided a method of making a tension
member as defined by claim 1.
[0009] One preferred method of making an elevator tension member includes arranging a plurality
of wires into at least one strand A plurality of strands are then arranged into at
least one cord. The method includes determining if there is at least one broken wire
end protruding from at least one of the strands or at least one of the cords while
performing the corresponding arranging steps. If there is at least one broken wire,
the ends of the wire are manipulated to prevent them from protruding away from the
corresponding strand or cord.
[0010] In one example, any detected broken wire ends are inserted into the corresponding
strand or cord. In one example, the broken ends are twisted around at least one adjacent
unbroken wire. In another example, the broken ends are weaved among unbroken wires.
[0011] In another example, the broken wire ends are secured against an outer surface of
the corresponding strand or cord. In one example, the broken wire ends are welded
or brazed in place. In another example, the broken wire ends are adhesively secured
in place.
[0012] The various features and advantages of this invention will become apparent to those
skilled in the art from the following detailed description of the currently preferred
embodiments. The drawings that accompany the detailed description can be briefly described
as follows.
BRIEF DESCRIPTION OF THE DRAWINGS
[0013]
Figure 1A schematically shows a portion of an elevator belt assembly.
Figure 1B schematically shows an end of a jacketed rope assembly.
Figure 2 schematically illustrates a belt assembly process.
Figure 3A and 3B schematically illustrate, in somewhat more detail, the belt assembly
process, highlighting a situation where one or more broken wires exist.
Figure 4 is a schematic illustration of method of making a belt assembly designed
according to an embodiment of this invention.
Figure 5 schematically illustrates an example tool for performing a method of this
invention.
Figure 6 schematically illustrates a preferred feature of the example tool also shown
in Figure 5.
[0014] Figure 1A schematically shows a portion of an elevator belt 20. A plurality of tension
members 22 are encased in a polyurethane jacket 24. In one example, the tension members
22 are cords that comprise seven strands, which each comprise seven individual wires.
The wires are wound in a known manner to form strands and the strands are wound in
a known manner to form the cords. In the illustrated example there are twelve tension
members 22 (i.e., twelve cords). In another example, there are eight tension members
across the width of the belt 20.
[0015] Figure 1B shows an end of a jacketed rope 25 having a plurality of tension members
26 made much like the tension members 22 of the example in Figure 1A. A polyurethane
jacket 28 surrounds the tension members 26, which are wound together as a rope.
[0016] Figure 2 schematically illustrates an assembly process 30 where wire stock 32 of
individual wires is provided to a cord winding machine 34 that first winds a plurality
of wires into individual strands and then winds a plurality of strands into a cord.
The completed cords are placed on spools and eventually provided to a jacket application
machine 36 where the cords are appropriately positioned and placed within the jacket
24 or 28 to form the belt or rope eventually sent to appropriate storage 38. Known
techniques can be used for each of the stages schematically shown in Figure 2.
[0017] Referring to Figures 3A and 3B, a plurality of wires 40 from the wire stock 32 are
twisted in a known manner to establish a strand 42. In this example, seven individual
wires 40 are within each individual strand 42. As shown in Figure 3A, one of the wires
40 has a broken section with two ends 44 protruding away from the exterior of the
strand 42. This condition is detected by a detector 50, which can be a known device
as used in high speed winding machinery, for example. Once the broken ends 44 are
detected, the winding machinery preferably is shut down so that the condition of the
broken wire can be addressed. If the winding process continued, the broken wire would
likely become entangled in the machinery causing significant problems and machine
down time.
[0018] In this example, the broken ends 44 shown in Figure 3A are recaptured as part of
the strand 42 in a manner that the broken ends do not protrude away from the strand
such that there is any risk of entanglement with the belt manufacturing machinery.
In one example, the broken ends 44 are manipulated manually and inserted in between
other ones of the wires 40 in the area of the broken ends. Other example techniques
include weaving the broken portions of the wires within the strand or twisting them
around at least one adjacent unbroken wire. By tucking in the broken ends, they are
effectively captured within the strand in a manner that they will not protrude out
and cause difficulties for the machinery.
[0019] In another example, the broken wire ends are manipulated and placed against the strand.
An adhesive is applied to the strands 42 in the vicinity of the broken ends 44 such
that the broken ends are secured in position as part of the strand and they do not
protrude outward. In still another example, the ends 44 are welded or brazed in place
against adjacent wires at the appropriate location along the strand. Any brazing or
welding material preferably is kept from protruding in a manner that may interfere
with the manufacturing process.
[0020] Another example includes welding or brazing the broken ends of a wire together.
[0021] In another example, the portion of a wire that protrudes outward is cut off so that
the remaining portions are flush with the rest of the strand.
[0022] Once the winding machinery stops upon detection of a broken wire, the tension on
the wires is relaxed so that manual manipulation of the broken wire ends 44 is possible
to achieve the recapture of the broken ends using a chosen technique.
[0023] Figure 3B schematically illustrates a later portion of the process where the individual
strands 42 are wound together to form a cord 46. As shown in the example of Figure
3B, another detector 52 inspects the cords for broken wires protruding away from the
exterior of the cord, for example. In the illustration, broken wire ends 54 are detected
and the machinery is stopped so that the broken wire ends can be recaptured into the
cord. Any one of the example techniques described above are used in this stage of
the process to again ensure no entanglements during later processing of the cords
to form the elevator belt 20 or rope 25. The detector 52 comprises known detecting
components.
[0024] Once a cord has passed inspection by the detector 52, it can be provided to a jacket
application machine including an extruder, for example, for applying the polyurethane
jacket 24 or 28 to establish the belt or rope configuration.
[0025] Figure 4 schematically illustrates a method of making one example belt assembly 20.
In this example, the jacket is extruded over the cords such that the jacket exterior
is smooth, continuous and not interrupted by any grooves. A cord supply 50 provides
the cords 46. In one example, the cord supply 50 comprises a plurality of spools containing
the wound steel wire strands that form the cords 46. The cords may be formed at the
same facility as where the method of applying the jacket 24 is accomplished or the
cords may be preformed and prespooled, depending on the needs of a particular situation.
[0026] A positioning device 52 aligns the cords 46 in a desired alignment so that the cords
will extend parallel to a longitudinal axis of the belt assembly 20. A tensioning
device 54 controls an amount of tension on the cords 46 during the jacket application
process. Although a single tension station 54 is schematically illustrated, multiple
tension devices may be used along the assembly line of the belt assembly 20. For example,
the same tension preferably is applied to the cords on both sides of the jacket application
station 56. The tension station 54 preferably includes a suitably programmed controller
that monitors and controls the tension within a desired range.
[0027] More particularly, the tension on each individual cord preferably is maintained at
a desired level throughout the process of making the belt assembly so that the belt
configuration or geometry is controlled as much as possible. The tension on each individual
cord may be different with respect to the other cords. In one example, a base tension
of approximately 50 Newtons is placed on each cord and a sample belt assembly is made.
The sample belt assembly preferably then is inspected to make sure that the geometry
is as desired. If there are undesirable variations, such as a slight longitudinal
curvature, the tension on one or more individual cords is adjusted to address the
undesirable belt geometry variation. By making several samples and taking measurements
and making adjustments, the necessary individual cord tensions to yield the desired
belt geometry can be determined.
[0028] The tension on each individual cord preferably is significant enough so that the
cord horizontal position remains the same throughout the jacket application process.
Because this example includes eliminating cord supports in the jacket application
portion of the manufacturing process, the tensions used during the example process
may need to be higher than those that were used in supported cord techniques.
[0029] Although not specifically illustrated, tension feedback devices (as known in the
art) preferably are incorporated into the manufacturing equipment so that the tension
on each individual cord can be monitored and adjusted as needed throughout the entire
assembly process.
[0030] The jacket application station 56 preferably includes a suitable mold or other device
for applying the jacket material onto the cords 46. A supply 58 provides the chosen
material to the jacket application station 56 in a conventional manner. The jacket
material may be pressure molded, extruded or otherwise applied to the cords 46.
[0031] In one example, rollers 59 are included as part of or immediately after the jacket
application station 56. The rollers 59 preferably are Teflon coated. The rollers 59
provide a surface treatment to the sheave-contacting surfaces of the belt assembly
immediately after the application of the jacket material. In this example, the rollers
provide smooth, flat, parallel belt surfaces. The rollers 59 may provide an embossed
pattern on the jacket surfaces, for example. The rollers 59 preferably are included
because the elimination of the cord supports as used in conventional equipment introduces
a need for additional dimensional control. The rollers 59 provide such additional
dimensional control.
[0032] In the illustrated example, the rollers 59 are positioned on opposite sides of the
belt assembly (although only one roller is visible in the illustration of Figure 4).
The rollers 59 preferably extend across the entire width of the belt assembly for
best dimensional control of the belt surfaces.
[0033] In one example, the rollers 59 are freewheeling and move responsive to movement of
the belt assembly as it passes through the rollers. In another example, the rollers
are motorized so that they move at a controlled rate.
[0034] The formed belt assembly 20 is then processed at a finishing station 60. In one example,
the finishing station 60 includes a forming device, a dimensional inspection device
and a curing cold water bath where the jacket material and the cords within the material
are cooled to a suitable temperature.
[0035] The inspection device, such as a known laser triangulation measuring device, determines
whether the desired geometry was achieved.
[0036] The resulting belt assembly 40 preferably is then stored at 62, for example on spools
for shipment to various locations for installation in elevator systems. The belt assembly
20 may be precut to specific lengths or may be provided in larger quantities where
a technician at the installation selects the appropriate amount of belt material for
a particular application.
[0037] Figure 5 schematically illustrates an example molding device 70 for applying the
jacket 24 to the cords 46. Conventional arrangements include a plurality of cord supports,
which cause the formation of grooves in at least one exterior surface on the belt
assembly 20. Because this invention includes eliminating such grooves, a typical cord
supporting arrangement having such cord supports preferably is not used.
[0038] The example forming device 70 of Figure 5 includes a mold housing 72 having an input
side 74. A cord positioning device 76 preferably is situated at the input side 74.
The cord positioning device 76 includes a plurality of openings 78 through which the
cords 46 are fed into the device 70. The openings 78 preferably are accurately machined
or otherwise formed so that a close tolerance is kept between the exterior of the
cords 46 and the interior of the opening 78. Having a tight fitting between the openings
78 and the cords 46 prevents backflow of the jacket material during the molding process.
[0039] As can be appreciated from Figure 5, for example, as the cords 46 pass through the
openings 78 in the cord positioning device 76, any stray, broken wire ends might not
get past the openings 78. This could cause distortion of the cords and interrupt the
belt manufacturing process.
[0040] In one example, the condition of the cords is inspected as part of the jacket application
process to prevent any difficulties that might otherwise occur because of stray wire
ends. Another detector like those described above may be associated with the forming
device 70 at appropriate locations to ensure appropriate wire placement during the
belt manufacturing process.
[0041] The mold housing 72 includes one or more openings 79 through which the jacket material
is applied to the cords using pressure injection. As known in the art, pressure injection
can be used for molding materials such as polyurethane when the material is suitably
heated. Given this description, those skilled in the art will be able to select appropriate
conditions for achieving a desired result.
[0042] The molding device 70 includes an opening 80 at an output side 82 of the mold housing
72. The opening 80 preferably is shaped to control the exterior shape and surfaces
on the belt assembly 20.
[0043] The opening 80 of the molding device 70 in the example of Figure 6 has a non-linear
configuration along the portions of the opening that form the sheave-contacting belt
surfaces. The non-linear configuration provides for differences in the thickness of
the belt assembly as seen across the width. As can be appreciated from the illustration,
the portions of the belt assembly corresponding to the locations of the cords 46 have
a reduced thickness compared to the portions of the belt assembly where no cords are
present.
[0044] The varying, non-linear configuration of the surfaces 86 and 88 are designed to accommodate
the variation in the amount of shrinkage across the width of the belt that will occur
during the finishing and curing of the belt assembly. It is believed that the amount
of shrinkage corresponds to the cross section of urethane jacket material. In the
areas where the cords 46 are present, there will be less shrinkage because of the
presence of the cord material, which in some examples is steel. The portions of the
belt assembly where cords are not present has a temporary greater thickness because
there will be more shrinkage at those points of the assembly.
[0045] Providing a variation in the thickness across the width of the assembly facilities
achieving a final resulting flat, parallel alignment between the surfaces 86 and 88.
The type of configuration illustrated in Figure 6 is unique to the example approach
to manufacturing a belt assembly. In prior processes, mold wheels were included as
part of the jacket application station. Such mold wheels operated to compress the
jacket material into more of a flat configuration as part of the initial cooling process.
Therefore, the non-linear, varying thickness approach, which is part of one example
implementation of this invention, addresses the varying amounts of shrinkage that
occur during a curing process in a unique manner.
[0046] In one example, there is approximately a .05 to .10 millimeter variation in the thickness
of the jacket provided by the opening 80 of the molding device illustrated in Figure
6. The overall dimensions of a particular belt assembly, the dimensions of the cords
and the chosen jacket material will dictate the particular thickness variation required
for a particular situation. Given this description, those skilled in the art will
be able to select appropriate dimensions to meet the needs of their particular situation.
[0047] With this invention, the length of belt or rope stock and cord stock is significantly
enhanced. If the sections of strand or cord were simply cut each time a wire was broken,
there would be an undesirable amount of material scrap and many potentially unuseful
lengths for most elevator installations. Using the example techniques described above
provides for significant enhancement of the length of cord and belt stock. In one
example, the length of belt without any cut-and-weld joints in the tension members
can be on the order of 13 km. Accordingly, the example techniques make the tension
member manufacturing process far more economical and efficient.
[0048] The example embodiments may include one or more broken wires at some point. In examples
where seven wires form each strand and seven strands form each cord, one broken wire
presents approximately a 2% loss of continuous wire tension-bearing capability. This
minor difference does not appreciably affect strength because so many of the wires
are intact and there are a plurality of cords, some or a majority of which may have
no wire breaks at all.
[0049] With the example techniques, broken wires are manageable in a manner that increases
manufacturing efficiency and the economies associated with making and installing elevator
belts and ropes.
[0050] The preceding description is exemplary rather than limiting in nature. Variations
and modifications to the disclosed examples may become apparent to those skilled in
the art that do not necessarily depart from the scope of this invention as determined
by studying the following claims.
1. A method of making a tension member for use in an elevator system, comprising:
(A) arranging a plurality of wires (40) into at least one strand (42);
(B) arranging a plurality of the strands (42) into at least one cord (46);
(C) determining if there is at least one broken wire end protruding from at least
one of the strands (42) or at least one of the cords (46) while performing steps (A)
and (B); and
(D) manipulating the broken wire end (44, 54) to prevent the wire end from protruding.
2. The method of claim 1, wherein step (D) includes inserting the broken wire end (44,
54) into the corresponding strand (42) or cord (46).
3. The method of claim 1, wherein step (D) includes securing the broken wire end (44,
54) against an outer surface of the corresponding strand (42) or cord (44).
4. The method of claim 3, wherein step (D) includes brazing the wire end (44, 54) to
a portion of at least one adjacent unbroken wire.
5. The method of claim 3, wherein step (D) includes welding the wire end (44, 54) to
a portion of at least one adjacent unbroken wire.
6. The method of claim 3, wherein step (D) includes adhesively securing the broken wire
end (44, 54) to a portion of at least one adjacent unbroken wire.
7. The method of claim 1, wherein step (D) includes twisting the broken wire end (44,
54) around a portion of at least one adjacent unbroken wire.
8. The method of claim 1, wherein step (D) includes cutting off a protruding portion
of the wire.
9. The method of any preceding claim, including applying a jacket (24) over the at least
one cord and performing steps (C) and (D) in association with the step of applying
the jacket (24).
1. Verfahren zum Herstellen eines Zugelements zur Verwendung in einem Aufzugsystem, wobei
das Verfahren folgende Schritte aufweist:
(A) Anordnen einer Mehrzahl von Drähten (40) zu mindestens einer Litze (42);
(B) Anordnen einer Mehrzahl von Litzen (42) zu mindestens einem Strang (46);
(C) Feststellen, ob mindestens ein gebrochenes Drahtende, das von mindestens einer
der Litzen (42) oder mindestens einem der Stränge (46) wegragt, vorhanden ist, während
die Schritte (A) und (B) ausgeführt werden; und
(D) Handhaben des gebrochenen Drahtendes (44, 54) derart, dass ein Wegragen des Drahtendes
verhindert ist.
2. Verfahren nach Anspruch 1,
wobei der Schritt (D) das Einführen des gebrochenen Drahtendes (44, 54) in die entsprechende
Litze (42) oder den entsprechenden Strang (46) beinhaltet.
3. Verfahren nach Anspruch 1,
wobei der Schritt (D) das Befestigen des gebrochenen Drahtendes (44, 54) in Anlage
an einer äußeren Oberfläche der entsprechenden Litze (42) oder des entsprechenden
Strangs (46) beinhaltet.
4. Verfahren nach Anspruch 3,
wobei der Schritt (D) das Hartlöten des Drahtendes (44, 54) an einen Bereich von mindestens
einem benachbarten, nicht gebrochenen Draht beinhaltet.
5. Verfahren nach Anspruch 3,
wobei der Schritt (D) das Verschweißen des Drahtendes (44, 54) mit einem Bereich von
mindestens einem benachbarten, nicht gebrochenen Draht beinhaltet.
6. Verfahren nach Anspruch 3,
wobei der Schritt (D) die haftende Befestigung des gebrochenen Drahtendes (44, 54)
an einem Bereich von mindestens einem benachbarten, nicht gebrochenen Draht beinhaltet.
7. Verfahren nach Anspruch 1,
wobei der Schritt (D) das Verdrillen des gebrochenen Drahtendes (44, 54) um einen
Bereich von mindestens einem benachbarten, nicht gebrochenen Draht beinhaltet.
8. Verfahren nach Anspruch 1,
wobei der Schritt (D) das Abschneiden eines vorstehenden Bereichs des Drahts beinhaltet.
9. Verfahren nach einem der vorausgehenden Ansprüche,
welches das Anbringen einer Umhüllung (24) über der mindestens einen Litze sowie das
Ausführen der Schritte (C) und (D) in Verbindung mit dem Schritt des Anbringens der
Umhüllung (24) beinhaltet.
1. Procédé de fabrication d'un élément de tension à utiliser dans un système d'ascenseur,
comprenant les étapes suivantes:
(A) arranger une pluralité de fils (40) de manière à former au moins un toron (42);
(B) arranger une pluralité de torons (42) de manière à former au moins une corde (46);
(C) déterminer s'il y a au moins une extrémité de fil cassée qui fait saillie au niveau
d'au moins un des torons (42) ou au niveau d'au moins une des cordes (46) tout en
exécutant les étapes (A) et (B); et
(D) manipuler l'extrémité de fil cassée (44, 54) pour empêcher l'extrémité de fil
de faire saillie.
2. Procédé selon la revendication 1, dans lequel l'étape (D) comprend l'insertion de
l'extrémité de fil cassée (44, 54) dans le toron correspondant (42) ou dans la corde
correspondante (46).
3. Procédé selon la revendication 1, dans lequel l'étape (D) comprend la fixation de
l'extrémité de fil cassée (44, 54) contre une surface extérieure du toron correspondant
(42) ou de la corde correspondante (46).
4. Procédé selon la revendication 3, dans lequel l'étape (D) comprend le brasage de l'extrémité
de fil (44, 54) sur une partie d'au moins un fil intact voisin.
5. Procédé selon la revendication 3, dans lequel l'étape (D) comprend le soudage de l'extrémité
de fil (44, 54) sur une partie d'au moins un fil intact voisin.
6. Procédé selon la revendication 3, dans lequel l'étape (D) comprend la fixation de
l'extrémité de fil cassée (44, 54) sur une partie d'au moins un fil intact voisin
en utilisant des moyens adhésifs.
7. Procédé selon la revendication 1, dans lequel l'étape (D) comprend la torsion de l'extrémité
de fil cassée (44, 54) autour d'une partie d'au moins un fil intact voisin.
8. Procédé selon la revendication 1, dans lequel l'étape (D) comprend la coupe d'une
partie saillante du fil.
9. Procédé selon l'une quelconque des revendications précédentes, comprenant l'application
d'au moins une gaine (24) sur ladite au moins une corde, et l'exécution des étapes
(C) et (D) en association avec l'étape d'application de la gaine (24).