Statement of Related Cases
Background of the Invention
[0002] The present invention relates generally to offshore oil and gas exploration and production
systems, and in a specific, non-limiting embodiment, to a system and method of capturing,
lifting and coupling a plurality of sea vessels using a centralized wet docking station,
so that relative deck sizes are effectively increased, and equipment packages and
other facilities are exchanged between the decks of captured vessels in a stable and
efficient manner.
Background of the Invention
[0003] Innumerable systems and methods have been employed in efforts to find and recover
hydrocarbon reserves around the world. At first, such efforts were limited to land
operations involving simple but effective drilling methods that satisfactorily recovered
reserves from large, productive fields. As the number of known producing fields dwindled,
however, it became necessary to search in ever more remote locales, and to move far
offshore, in the search for new resources. Eventually, sophisticated drilling systems
and advanced signal processing techniques enabled energy companies to search virtually
anywhere in the world for recoverable hydrocarbons.
[0004] Initially, deepwater exploration and production efforts consisted of expensive, large
scale drilling operations supported by tanker storage and transportation systems,
due primarily to the fact that most offshore drilling sites are associated with difficult
and hazardous sea conditions, and thus large scale operations provided the most stable
and cost-effective manner in which to search for and recover hydrocarbon reserves.
A major drawback to the large-scale paradigm, however, is that explorers and producers
have little financial incentive to work smaller reserves, since potential financial
recovery is generally offset by the lengthy delay between exploration and production
(approximately 3 to 10 years), and by the large capital investment required for conventional
platforms and related drilling, production and transportation equipment. Moreover,
complex regulatory controls and industry-wide risk aversion have led to standardization,
leaving operators with few opportunities to significantly alter the prevailing paradigm.
As a result, offshore drilling operations have traditionally been burdened with long
delays between investment and profit, excessive cost overruns, and slow, inflexible
recovery strategies dictated by the operational environment.
[0005] More recently, deepwater sites have been found in which much of the danger and instability
usually present in such operations can be avoided. For example, off the coast of West
Africa, Indonesia and Brazil, potential drilling sites have been identified where
surrounding seas and weather conditions are relatively mild and calm in comparison
to other, more volatile sites such as the Gulf of Mexico and the North Sea. These
recently discovered sites tend to have favorable producing characteristics, yield
positive exploration success rates, and admit to production using simple extraction
and transportation techniques similar to those employed in dry land or near-shore
operations.
[0006] However, since lognormal distributions of recoverable reserves tend to be spread
over a large number of small fields, each of which yield less than would normally
be required in order to justify the expense of a conventional large-scale operation,
most such regions have to date been underexplored and underproduced relative to their
potential. Consequently, many potentially productive smaller fields have already been
discovered, but remain undeveloped due to economic considerations.
[0007] Currently, most deep water exploration and production operations are facilitated
by means of a large, expensive floating production and storage offtake (FPSO) vessel,
which is used to arrange and store essentially all of the facilities and equipment
packages likely to be required aboard a single ship, with lesser vessels being employed
only in support roles for purposes such as transporting crews back and forth from
shore, delivery of new or replacement equipment packages,
etc.
[0008] As seen in prior art Figure 1, for example, an FPSO system 100 similar to those presently
being employed in the field is depicted, wherein the FPSO comprises a large deck surface
(e.g., in excess of about 20,000 square feet) capable of accommodating useful operational
structures such as a helicopter pad 101; officer, crew and control rooms 102; a water
treatment facility 103; one or more fluid injection pumps 104; one or more oil, gas,
sand and water separators 105; a gas treatment injection facility 106; a power generator
107; and a gas flare 108.
[0009] The FPSO has deck space for uploading additional equipment packages from other vessels
on an as-needed basis, and serves as a central station for the entire exploration
and production operation. In one common application, the FPSO is held in place during
operations by a mooring system using a plurality of mooring lines (not shown) that
are tied off to other vessels, mooring buoys,
etc. In alternative embodiments, the FPSO is moored to a turret, so that it essentially
revolves around a fixed point; and in a further embodiment, the FPSO is dynamically
positioned, so that it is allowed to move in response to wave and swell actions, while
still being held in position relative to the support vessels and drilling sites in
the surrounding area.
[0010] A modem FPSO used to service subsea production wells 110 and/or injection wells 111
will typically have a keel length of between about 900 and 1,500 feet, with a storage
section 109 having a storage capacity of between about 500,000 barrels and about four
million barrels disposed beneath the ship's deck surface. In vessels where the storage
volume is essentially zero but all of the other facilities and equipment packages
necessary for injection and production operations are present, the vessel is instead
called a floating production unit (FPU).
[0011] While relatively effective in deepwater environments, those of ordinary skill in
the art will appreciate that FPSO systems also have several major drawbacks. For example,
a modem FPSO can take as long as eight to ten years from start-up to completion before
it can be used at sea, and the total cost associated with manufacturing the vessel
can run in excess of one billion dollars.
[0012] Moreover, since an FPSO is so large and expensive to manufacture, only very large
field operations (
e.g., those producing about 50,000 barrels a day or more) will economically justify an
operator's investment in such a vessel. Consequently, a great many lesser fields (for
example, fields have the capacity to yield only about 10,000 barrels a day) are known
by explorers to contain reserves, but are not being worked by producers because the
cost of production using an FPSO would exceed the profits that could be obtained from
recoverable reserves.
[0013] Past efforts to provide simpler, less expensive vessel docking systems include
U.S. Letters Patent No. 853,328 to Wiking, which discloses a pontoon-type floating dock, which captures and lifts one or more
vessels so as to serve as an extension of an attendant dry dock. The Wiking system
is deficient, however, in that it is useful "only for small vessels," lacks the buoyant
capacity to capture and lift vessels of any significant size and weight (which is,
of course, a critical aspect of any modem exploration and production system), and
utterly fails to contemplate the coupling of multiple deck surfaces in order to form
a larger, unified deck from which exploration and production operations can be carried
out.
[0014] Similarly,
U.S. Letters Patent No. 6,336,419 to Breivik discloses a barge having one or more docking stations formed at either end in which
captive ships can be docked, but fails to appreciate the advantages of lifting and
coupling two or more vessels so that their respective deck surfaces are combined into
a larger, unitary surface from which exploration and production operations can be
carried out with maximum efficiency and safety.
[0015] There is, therefore, a need for a system and method of exploring and producing offshore
wells in such a manner that the functions of two or more vessels can be combined to
work the wells without interruption, and where a number of closely disposed sites
can be worked simultaneously by a limited number of such vessels.
[0016] There is also a need for a system and method by which a centralized, floating docking
station provides access to a number of associated deck surfaces flexibly capable of
meeting the changing needs of operators during exploration and production, so that
the delay between operator investment and profit is minimized.
[0017] There is also a need to provide a substitute for existing floating production and
storage offtake vessels that admits to safe and reliable transfer of equipment packages
(e.g., drilling packages, testing packages, production packages, workover packages,
etc.) between and amongst associated deck surfaces, and for secure vessel connections
so that associated deck surfaces can be safely and easily connected and/or disconnected
during operations.
[0018] There is also a need to provide a surface vessel arrangement wherein a plurality
of associated deck surfaces are complementary in function, so that unnecessary delays
and undesirable safety conditions are avoided throughout the entirety of exploration
and production.
[0019] Finally, there is a need for vessel capturing, lifting and coupling systems that
permit older, less expensive and more widely available exploration and production
vessels to participate in offshore operations by serving as a platform from which
equipment packages and extracted hydrocarbon reserves are loaded, stored and transported
in a safe, efficient and well-organized manner.
Summary of the Invention
[0020] A wet docking station for exploring and producing offshore energy sites is provided,
in which the wet docking station includes at least: a buoyant central docking station;
an adjustable buoyancy chamber for adjusting the buoyancy of the buoyant central docking
station; and at least one subordinate docking station for capturing and lifting at
least one sea vessel.
[0021] A method of exploring and producing offshore energy sites using a wet docking station
is also provided, in which the method includes at least: disposing a buoyant central
docking station in communication with an adjustable buoyancy chamber, wherein said
adjustable buoyancy chamber is used to adjust the buoyancy of said buoyant central
docking station; and disposing the buoyant central docking station in communication
with at least one subordinate docking station, wherein the subordinate docking station
is used to capture and lift at least one sea vessel.
Brief Description of the Drawings
[0022] Figure 1 is a side view of a floating production and storage offtake vessel presently
known in the prior art.
[0023] Figure 2 is a side view of an example wet docking station according to the invention.
[0024] Figure 3 is a rear view of a combined central stabilizer and bumper guard structure
useful with the wet docking station depicted in Figure 2.
[0025] Figure 4 is the wet docking station depicted in Figure 3, shown after two vessels
have been captured within the docking station.
[0026] Figure 5 is a rear view of a portion of the docking station depicted in Figure 4,
shown with two ships that have already been captured being lifted and pinched between
a central divider and a plurality of side stabilizers.
[0027] Figure 6 is an elevated depiction of a wet docking station according to the invention.
[0028] Figure 7 is an elevated view of a wet docking station having additional storage capacity
according to the invention.
[0029] Figure 8 is a rear view of a wet docking station used to load and offload equipment,
material, supplies,
etc., between the decks of captured vessels.
[0030] Figure 9 is a front view of a wet docking station having additional storage capacity
and additional deck surface for accommodating and storing equipment packages, technical
facilities,
etc.
[0031] Figure 10 is a top view of an alternative wet docking system according to the invention,
in which a plurality of individual wet docks are coupled together.
[0032] Figure 11 is a front view of the wet docking station depicted in Figure 10, wherein
vessels of different sizes are shown captured, lifted and coupled together, so that
associated deck surfaces are combined into a single, unitary whole.
Detailed Description
[0033] The present invention is directed to an offshore docking system in which a number
of multifunctional sea vessels are captured, lifted and coupled in a central "wet"
dock using one or more adjustable buoyancy chambers. For the purposes of this application,
a wet docking station is defined as a docking station capable of rising up from beneath
sea level to capture and couple one or more vessels, so that greater deck and storage
space, and a more flexible combination of facilities and equipment packages, is achieved.
[0034] The buoyancy chambers are generally disposed beneath the hulls of either the wet
docking station or the vessels captured within the dock (or both), so that the buoyancy
chambers are capable of transmitting a significant lifting force toward the bottom
of the hulls; however, in some embodiments the adjustable buoyancy chambers are disposed
within the hull of the docking station itself, with external buoyancy chambers being
added to the system on an as-needed basis.
[0035] Once the captured vessels are lifted and secured within the central docking station,
their deck surfaces are then coupled to one another, so that equipment packages, technical
facilities,
etc., can be quickly transferred between the vessels in a safe and controlled manner, thereby
reducing the risk of accidents and collisions, as well as establishing a large combined
deck surface from which operations can be carried out. Consequently, project time
horizons are reduced, and a flexible, modularized exploration and production system
is achieved on a cost effective basis.
[0036] In the specific, non-limiting embodiment of the invention depicted in Figure 2, for
example, a sea vessel docking station according to the invention comprises a rib shaped
support hull or other central docking station 200; one or more adjustable buoyancy
chambers 201, which are held or connected to the bottom of the docking station 200
by adjustment control means 202; and one or more vessel capturing stations 203 used
to capture incoming vessels prior to lifting and coupling them together.
[0037] In practice, adjustable buoyancy chamber 201 and the vessel capturing stations 203
rise up from beneath the hull of a vessel and apply a significant lifting force, thereby
lifting, supporting and pinching the vessel together in the arms of the docking station
200, so that a mutual deck surface can be established between the newly captured vessel
and other, previously captured vessels in a safe and reliable manner.
[0038] In the depicted embodiment, the depth at which adjustable buoyancy chamber 201 is
disposed beneath the wave surface is controlled by an adjustable control means 202,
though in other embodiments adjustable buoyancy chamber 201 is disposed in direct
communication with support hull 200. In still other embodiments, either (or both)
of adjustable buoyancy chamber 201 and adjustment control means 202 are withheld from
the system, and support hull 200 is instead equipped with one or more buoyancy chambers
(such as an internal ballast system), so that the depth of the docking station is
controlled by either flooding or evacuating the buoyancy chambers disposed in support
hull 200 with a fluid, such as sea water, pneumatic pressure supplied from an outside
source,
etc.
[0039] During this process, the central docking station can be dynamically positioned with
respect to surrounding vessels and buoys (not shown), fixed to a turret so that the
station revolves around a mooring, or simply tied off to suction anchors 204 or the
like using one or more sets of mooring lines 205.
[0040] As seen in the example embodiment depicted in Figure 3, portions of the central docking
station 300 comprise a divider 301 disposed between the capturing stations, so that
captured vessels cannot collide or transmit wave forces toward other vessels captured
in the docking station 300. In other embodiments, outer portions of divider 301 and
the inner portions 302 of the capturing stations are fitted with ship bumpers 303
or the like, so that captured vessels can be lifted and pinched against the bumpers
303 by, for example, tying off the vessel against the bumpers using ropes or chains,
or by inwardly pivoting an arm of the station about a pivoting member 305.
[0041] In a further embodiment, captured vessels are lifted and held in place against the
ship bumpers 303 by means of an adjustable buoyancy chamber 304. In cases where the
captured vessels are of significantly different sizes, an adjustable buoyancy chamber
304 disposed in the capturing station can be used to lift the decks of the vessels
to a similar elevation, so that a mutual deck surface can be established between them,
and equipment packages and the like can be transferred from ship to ship.
[0042] As seen in the example embodiments depicted in Figures 4 and 5, however, vessels
of similar size and dimensions 401, 402 and 501, 502, respectively, can be captured
and controlled in such a manner that adjoining deck surfaces are disposed in a relatively
even and level plane without requiring a secondary buoyancy chamber to lift either
vessel. In such embodiments, portions 400, 500 of the docking station will still comprise
primary buoyancy chambers used for raising the station up from beneath the vessels
and initiating the capturing process, and for sinking the station back into the sea
so that captured vessels can be maneuvered away to make room for other, newly acquired
vessels.
[0043] Turning now to the detailed, non-limiting embodiment depicted in Figure 6, a wet
docking station 600 according to the invention is shown which illustrates how two
or more vessels can be captured, lifted and coupled in the station so that a unitary,
multifunctional, sea-worthy vessel is created for furthering an exploration and production
operation.
[0044] A principle advantage of the system is that the total deck surface area of a smaller
vessel 601 can effectively be increased by adding the deck surface area of a second,
adjoining vessel 602 that has been captured, lifted and coupled to the first vessel
601. For example, if first captured vessel 601 has a working deck space of about 150
in length and about 50 feet wide, then the total available workspace on that vessel
is about 7,500 square feet. Likewise, if second captured vessel 602 has a working
deck space of about 200 feet in length and 70 feet wide, then the total available
workspace is about 14,000 square feet. By lifting and coupling the two vessels together,
however, a total available working deck space of about 21,500 square feet (7,500 plus
14,000) is achieved.
[0045] In this particular example embodiment, first captured vessel 601 is equipped with
one or more of a power generator 603; a water treatment facility 604; a water injection
package 605 with attendant water injection lines 617; and a crew housing and control
unit 606. Those of ordinary skill in the art will appreciate, however, that virtually
any number of other packages, production and storage units, stacks of riser or drilling
equipment,
etc., can instead be disposed on the first vessel.
[0046] While such a vessel would be helpful for supporting an existing exploration and production
project, it lacks many of the structures and technical packages necessary to initiate
and complete an ongoing operation. For example, first captured vessel 601 lacks an
oil and gas separator, gas compression and injection units, an oil treatment unit,
and many other facilities and packages customarily found on floating storage and offtake
vessels that might prove useful during operations. According to the invention, therefore,
a second vessel 602 is captured, raised to an essentially equal deck height as the
first vessel, and then coupled to either the first vessel or the docking station so
that personnel can safely and reliably enjoy the advantages of both vessels simultaneously,
even as the two coupled vessels and the docking station proceed as a single, unitary
whole.
[0047] In the depicted embodiment, for example, captured second vessel 602 further comprises
a helicopter pad 607; a gas compressor 608 having attendant gas injection lines 616;
oil, gas and/or water separators 609; a gas treatment unit 618; an oil treatment unit
610; a gas flare boom 611; and a plurality of oil production lines 615. In one embodiment,
the vessel is controlled by ballasting at least part of the docking station down into
the sea, and then floating the vessel over the docking station 600 so that it can
be captured and raised to the deck height of the first vessel. Alternatively, at least
part of the docking station 600 is ballasted down into the sea, moved beneath the
hull of the vessel intended for capture, and then raised, so that the vessel is now
securely held in the dock, and the facilities and packages disposed thereupon can
be used by operators in conjunction with the facilities and packages disposed on the
first captured vessel 601.
[0048] In this particular embodiment, since all of the technical facilities and equipment
packages necessary to carry out operations in a typical exploration and production
project are provided, it might not be necessary for any other vessels to be brought
in with additional equipment in order to complete the operation. However, should it
turn out that additional facilities or packages are in fact required, one (or both)
of the vessels presently captured in the station can be released, and a third ship,
a fourth ship, and so on, can be captured and employed to achieve the advantages of
their technical configurations.
[0049] In this embodiment, the station releases a captured vessel by employing a protocol
that is essentially the reverse of the capturing process. For example, if it is desirable
to release second captured vessel 602 from the station for some reason, at least part
of the station beneath the vessel is ballasted down until the vessel is free of the
frictional forces holding the vessel between central stabilizer 613 and side docking
ribs 614; the vessel is then moved out of the station under its own power, towed out
of the station using a support vessel, or simply held in place using either a tethering
system or dynamic positioning techniques while the station is moved out from under
the vessel.
[0050] In the example embodiment of Figure 7, a barge-like storage tank 700 is equipped
with a ribbed hull docking station comprising a central stabilizer 701 and a plurality
of side stabilizers 702, which define a first vessel docking port 703 and a second
vessel docking port 704, as described above with respect to various other embodiments.
In this embodiment, however, a large fluid storage facility 705 is also provided,
wherein about 500,000 barrels of fluid can be stored during production, and then discharged
into a tanker when its storage capacity has been reached or is otherwise convenient
for operators. The entire docking station, or, alternatively, part of the docking
station can be submerged beneath sea level 705 at any given time, so long as the station
remains sufficiently stable to accommodate the lifting and coupling of captured vessels.
[0051] As mentioned, it may at times be desirable to replace or remove equipment packages
disposed on one or more of the vessels captured in the station. Thus, Figure 8 depicts
another embodiment of a sea vessel docking station according to the invention, wherein
the system's improved loading and offloading capabilities are emphasized.
[0052] As in previous embodiments, an offshore wet dock 800, within which a plurality of
vessels 801, 802 are captured, is provided, comprising two or more docking stations
formed by a plurality of docking station inner surfaces 807, 808 and a plurality of
lockable, pivoting side stabilizers 805, 806. The buoyancy of wet dock 800 is controlled
by either an external buoyancy chamber, or by one or more internal ballast chambers
used to either improve or retard the dock's buoyancy characteristics, depending on
whether water or another fluid is being pumped into or evacuated from the ballast
chambers. Those of ordinary skill in the art will appreciate that such ballast chambers
satisfy the definition of the term "adjustable buoyancy chamber" within the context
of claimed design.
[0053] In such embodiments, the functionality of secondary buoyancy chambers 809, 810 can
be replaced by a more conventional, mechanical lifting system (not shown) without
departing from the scope of the invention. Other presently contemplated methods of
leveling captured vessels' decks include holding the height of one of the deck surfaces
in a static position while raising the deck surface of a second vessel, and/or holding
one of the deck surfaces at a static height and then lowering the deck surface of
the other vessel. Since many ships already include ballast systems that admit to the
raising and lowering of a deck surface by raising or lowering the profile of the entire
vessel, it is also possible to utilize that functionality and avoid the need for a
secondary lifting system contained within the docking station in order to level the
deck surfaces of captured vessels.
[0054] In this particular embodiment, wet dock 800 is further equipped with a docking station
connecting member 811, comprised of one or more vertical support members 812, a conveyer
belt and roller assembly 813, and, in the depicted embodiment, a spool for winding
and unwinding cable or chain,
etc., in response to winch system 814, 817, which feeds its line over pulley 816 so that
cargo or equipment package 815 can be transferred from the deck of captured vessel
802 down onto the surface of conveyer belt and roller assembly 813. The cargo or equipment
package can then be moved closer to the deck surface 818 of captured vessel 801, or
else moved on board the deck surface 818 of captured vessel 801, so that operators
can begin to use the equipment package 815 while captured vessel 802 is allowed to
leave the docking station.
[0055] In a detailed example of this embodiment, captured vessel 802 has a testing package
aboard that is useful in conjunction with an exploration package stored on vessel
801. By coupling the raised deck surface of vessel 802 with the lower deck surface
of the docking station 800, the testing package is transferred down onto the deck
surface of the docking station by means of an elevated winch and pulley system, a
hoist, or a small crane or the like. Continuing the process, vessel 802 is then removed
from the docking station, and a third ship is captured and raised in its place, so
that additional equipment can be transferred onto the deck of docking station 800.
[0056] As seen in the example embodiment of Figure 9, a larger intermediate deck surface
907 disposed above the entirety (or part) of the docking station hull 900 will result
in the creation of a large, stable platform surface having a total area greater than
even the combined deck surfaces 908, 909 of the captured vessels 901, 902 from which
additional operations can be carried out. In some embodiments, a portion of wet dock
900 is large enough to serve as a fluid storage container, which can be fully or partially
submerged beneath sea level until such time as a transfer of stored fluids becomes
either desirable or necessary (
e.g., in the case where the storage container becomes full of stored fluid during the
course of operations).
[0057] In the example embodiment depicted in Figure 10, the general-purpose hull of the
prior embodiments is replaced with a floating frame 1000, within which an individual
vessel can be captured. Additional floating frames 1001, 1002, each of which house
other captured vessels 1003, 1004, are then connected to the first floating frame
1000 using a known connecting means 1006 (
e.g., ship bumpers, connecting rods,
etc.), so that the resultant structure becomes coupled into a single, modularized whole.
[0058] In some embodiments, the entire structure is supported by an external adjustable
buoyancy chamber (not shown); in other embodiments, however, the structure is not
supported by a separate buoyancy chamber, and instead relies on its own ballast and
weighting systems to raise and lower the frames beneath desired vessels' hulls prior
to capture.
[0059] In still other embodiments (see, for example, Figure 11), after the deck surfaces
of the captured vessels 1103, 1104 are raised to a desired height, a mutual deck surface
111 or other, similar structure is fitted over the topmost surfaces of each ship.
In this manner, the two vessels 1103, 1104 are coupled, so that necessary operations
can be carried out while the system continues to safely perform at sea as a single
unitary structure. For example, once the vessels 1103, 1104 have been coupled together,
operators can thereafter use all of the various equipment packages (
e.g., drilling packages, testing packages, production packages, workover packages,
etc.) originally stored on the individual ships as if the packages were originally all
present on a single FPSO.
[0060] In practicing the invention, a number of older, less expensive vessels can be used
to duplicate the effectiveness of a far more costly, fully equipped, modem FPSO vessel,
which in practice is often unavailable on short notice, or infeasible due to financial
considerations. A principal advantage of the invention in this respect is that ships
of any size, age and hull design can be captured and coupled in the docking station,
while the docking station itself proceeds at sea, essentially performing as an integrated,
unitary housing within which various ships are serviced. Since the captured ships
collectively contain all of the equipment and design packages required to satisfy
the many different needs of an exploration and production vessel, piecemeal assembly
of the technical packages required for any particular operation is achieved, without
the need for a large, expensive, exploration and production vessel that contains all
of the equipment that might ever be useful in an operation irrespective of whether
it is actually needed in the application at hand.
[0061] In short, the invention disclosed herein provides a unique system and method by which
a central docking station can capture, lift and couple a plurality of sea vessels,
so that a flexible, modularized production system is achieved on a cost effective
basis. The capabilities of a number of older, less expensive vessels can be combined
to achieve an effective FPSO substitute that allows lower producing fields to be explored
and produced in a profitable manner. Time horizons between initiation and consummation
of field operations are reduced, and older vessels that might otherwise be scrapped
or retired are again made useful and seaworthy.
[0062] The foregoing specification is provided for illustrative purposes only, and is not
intended to describe all possible aspects of the present invention. Moreover, while
the invention has been shown and described in detail with respect to several exemplary
embodiments, those of ordinary skill in the pertinent arts will appreciate that minor
changes to the description, and various other modifications, omissions and additions
may also be made without departing from either the spirit or scope thereof.
1. A wet docking station for exploring and producing offshore energy sites, the wet docking
station comprising:
a buoyant central docking station;
an adjustable buoyancy chamber for adjusting the buoyancy of said buoyant central
docking station; and
at least one subordinate docking station for capturing and lifting at least one sea
vessel.
2. The wet docking station of Claim 1, wherein said adjustable buoyancy chamber further
comprises a chamber that is externally disposed relative to said central docking station.
3. The wet docking station of Claim 1, wherein said adjustable buoyancy chamber further
comprises a chamber that is internally disposed relative to said central docking station.
4. The wet docking station of Claim 1, wherein said adjustable buoyancy chamber further
comprises a plurality of discrete inner chambers.
5. The wet docking station of Claim 1, wherein said adjustable buoyancy chamber further
comprises at least one fluid intake port and at least one fluid evacuation port.
6. The wet docking station of Claim 1, further comprising a coupling member used to couple
said at least one sea vessel to said central docking station.
7. The wet docking station of Claim 1, further comprising a coupling member used to couple
a plurality of captured sea vessels to one another.
8. The wet docking station of Claim 7, wherein said coupling member further comprises
an intermediate deck surface.
9. The wet docking station of Claim 1, wherein said at least one sea vessel further comprises
an offshore energy exploration equipment package.
10. The wet docking station of Claim 1, wherein said at least one sea vessel further comprises
an offshore energy production equipment package.
11. The wet docking station of Claim 1, wherein said at least one sea vessel further comprises
at least one of a helicopter pad; a crew quarters; a ship control room; an oil separating
unit; a gas separating unit; a water separating unit; a sand separating unit; a gas
treatment unit; a gas injection unit; a power generating unit; and energy exploration
and production equipment.
12. A method of exploring and producing offshore energy sites using a wet docking station,
the method comprising:
disposing a buoyant central docking station in communication with an adjustable buoyancy
chamber, wherein said adjustable buoyancy chamber is used to adjust the buoyancy of
said buoyant central docking station; and
disposing said buoyant central docking station in communication with at least one
subordinate docking station, wherein said at least one subordinate docking station
is used to capture and lift at least one sea vessel.
13. The method of Claim 12, further comprising disposing an adjustable buoyancy chamber
that is externally disposed relative to said central docking station.
14. The method of Claim 12, further comprising disposing an adjustable buoyancy chamber
that is internally disposed relative to said central docking station.
15. The method of Claim 12, further comprising disposing an adjustable buoyancy chamber
having a plurality of discrete inner chambers.
16. The method of Claim 12, further comprising disposing an adjustable buoyancy chamber
having at least one fluid intake port and at least one fluid evacuation port.
17. The method of Claim 12, further comprising disposing an adjustably buoyant central
docking station having a coupling member used to couple said at least one sea vessel
to said central docking station.
18. The wet docking station of Claim 12, further comprising disposing a buoyant central
docking station having a coupling member used to couple a plurality of captured sea
vessels to one another.
19. The method of Claim 18, further comprising disposing a buoyant central docking station
having an intermediate deck surface.
20. The method of Claim 12, further comprising equipping said at least one sea vessel
with an offshore energy exploration equipment package.
21. The method of Claim 12, further comprising equipping said at least one sea vessel
with an offshore energy production equipment package.