| (19) |
 |
|
(11) |
EP 1 760 201 B1 |
| (12) |
EUROPEAN PATENT SPECIFICATION |
| (45) |
Mention of the grant of the patent: |
|
21.05.2008 Bulletin 2008/21 |
| (22) |
Date of filing: 05.09.2006 |
|
| (51) |
International Patent Classification (IPC):
|
|
| (54) |
Method for raising a building
Verfahren zum Anheben eines Gebäudes
Procédé pour élever des bâtiments
|
| (84) |
Designated Contracting States: |
|
AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE
SI SK TR |
|
Designated Extension States: |
|
AL BA HR MK RS |
| (30) |
Priority: |
06.09.2005 IT BO20050546
|
| (43) |
Date of publication of application: |
|
07.03.2007 Bulletin 2007/10 |
| (73) |
Proprietors: |
|
- SO.L.E.S. Societa' Lavori Edili e Serbatoi S.p.A.
47100 Forli' (IT)
- Mattioli S.p.A.
35141 Padova (IT)
|
|
| (72) |
Inventors: |
|
- Collina, Vincenzo
47100, Villagrappa (IT)
- Marabello, Gioacchino
35141, Padova (IT)
- Zago, Roberto
38068, Rovereto (IT)
- Zambianchi, Lamberto
47010, Villafranca (IT)
|
| (74) |
Representative: Jorio, Paolo et al |
|
Studio Torta S.r.l.
Via Viotti, 9 10121 Torino 10121 Torino (IT) |
| (56) |
References cited: :
WO-A-20/05014940 US-A- 3 796 055
|
GB-A- 2 024 283 US-B1- 6 814 524
|
|
| |
|
|
|
|
| |
|
| Note: Within nine months from the publication of the mention of the grant of the European
patent, any person may give notice to the European Patent Office of opposition to
the European patent
granted. Notice of opposition shall be filed in a written reasoned statement. It shall
not be deemed to
have been filed until the opposition fee has been paid. (Art. 99(1) European Patent
Convention).
|
[0001] The present invention relates to a method for raising a building.
[0002] In the construction sector, the need to raise a building frequently arises. For example,
a raising intervention is needed when one wants to elevate a building standing near
waterways or near the sea over the level reached by the waters by effect of floods
or tides; a typical example of this situation occurs in the City of Venice, where
the ground floor of buildings is cyclically subject to flooding by high tides, commonly
called 'high-water' events.
[0003] Alternatively, a raising intervention is needed when making an underground room under
a building when one either cannot or does not want to excavate under the building
itself. Another raising operation is required when one wants to increase the working
height of a floor so as to the make the floor itself fully accessible.
[0004] In order to raise a building resting on the ground it was proposed to form a building
foundation structure provided with a plurality of through holes and a plurality of
connection elements, each of which is fixed to the foundation structure near a hole;
later, a pile is then arranged through each hole, which pile presents a lower end
resting on the supporting body and an upper end protruding from the hole. At this
point, a thrust device is applied to each pile, which device on one side rests on
the upper end of the pile and on the other side is fastened to the corresponding connection
element; finally a thrust is applied to each of the piles by means of the thrust devices
to raise the building with respect to the supporting body. Once raised, each pile
is axially fastened to the foundation structure.
[0005] The method for raising a building described above requires the making of a new building
foundation structure; however, in some situations, it may not be economically advantageous
to make the new foundation structure. According to
US-A-3796055 a complete building in its entirety is being lifted.
[0006] It is the object of the present invention to provide a method for raising a building
which is simple and cost effective to make and in particular does not require the
making of the new building foundation structure.
[0007] According to the present invention, a method for raising a building as recited in
the attached claims is provided.
[0008] The present invention will now be described with reference to the accompanying drawings
illustrating some non-limitative embodiments, in which:
- figures 1-5 are schematic frontal section views of a building which is being raised
using the method according to the present invention; and
- figure 6 schematically shows a different embodiment of a raising station in figures
3 and 4.
[0009] In figure 1, number 1 indicates as a whole a building, which rests on the ground
2 by means of a foundation structure 3 and which must be raised with respect to the
ground 2. Building 1 presents a number of load-bearing walls 4, each of which rests
on foundation structure 3 and up to a roof 5 supporting four floors 6. Building 1
also presents non-load-bearing walls, which are not shown in the attached figures.
[0010] As shown in figure 2, during a first step, a horizontal cut along a cutting line
is made through each load-bearing wall 4 to define a lower portion and an upper portion
of the load-bearing wall 4 reciprocally separated by the cutting line itself. Subsequently,
an upper edge 7 is made immediately over the cutting and line and through each load-bearing
wall 4, which edge is horizontal and concerns either part or all of the extension
of the load-bearing wall 4 both in width and in depth. Similarly, a lower edge 7 is
made under the cutting line and through each load-bearing wall 4, which edge is horizontal
and parallel to the upper edge 7 and concerns either part or all of the extension
of the load-bearing wall 4 both in width and in depth.
[0011] Each edge 7 or 8 consists of a series of reinforced concrete or steel beams 9, which
are inserted in the load-bearing walls 4 and connected together at least along the
same load-bearing wall 4. The insertion of a beam 9 within a load-bearing wall 4 envisages
the formation through the load-bearing wall 4 itself of a through slot 10 and therefore
the arrangement of beam 9 within slot 10. Typically, at least two beams 9 in different
instants are inserted for each load-bearing wall 4 and for each edge 7 and 8, so that
a through slot 10 never concerns more than half the load-bearing wall 4 itself.
[0012] As shown in figure 3, a series of niches 11 is formed after ending the formation
of the edges 7 and 8 along all the load-bearing walls 4, between edges 7 and 8, each
of which is upperly delimited by edge 7 and lowerly delimited by edge 8. At least
one thrust device 12 is arranged within each niche 11, which device on one side rests
on lower edge 8 and on the other side is carried supportingly carried by upper edge
7. In other words, each thrust device 12 is arranged within a niche 11 so as to exert
a vertical thrust between lower edge 8 and upper edge 7, i.e. between the lower portion
and the upper portion of load-bearing wall 4.
[0013] Each thrust device 12 is defined by a hydraulic jack, which presents a body 13 and
an axially mobile rod 14 with respect to body 13 with an adjustable intensity force;
in particular, body 13 rests on lower edge 8 while rod 14 is carried in contact with
upper edge 7.
[0014] A shown in figure 4, once thrust devices 12 are arranged within niches 10, each thrust
device 12 is operated to generate an intensity force determined between its body 13
and its rod 14; the result of the generation of such force is the static application
of a vertical thrust of intensity equal to the value of the force itself, between
lower edge 8 and upper edge 7, i.e. between the lower portion and the upper portion
of load-bearing wall 4, to determine the progressive raising of the upper portion
of load-bearing wall 4.
[0015] A control unit 15 is connected to thrust devices 12 for transmitting a control signal
of the thrust to be applied to each thrust device 12; the control unit 15 is also
connected to a series of pressure sensors 16, each of which is associated to a thrust
device 12 for measuring the instantaneous pressure value exerted by thrust device
12 itself, and is connected to a series of wide base strain gauges 17 applied to the
load-bearing walls of the building 1 and which are adapted to measure the strain induced
by the raising of the building 1 itself. By using pressure sensors 16, control unit
15 can control by feedback thrust devices 12 and is adapted to detect the intensity
of the thrust exerted by thrust devices 12 instant-by-instant. More in general, several
control units 15 can be used (also redundant to prevent a calculation error from causing
structural damage to the building 1), each of which controls a group of thrust devices
12.
[0016] Once thrust devices 12 are installed in the manner described above, the situation
shown in figure 3 is presented; at this point, control unit 15 (automatically or under
the supervision of an operator) operates each thrust device 12 entirely independently
so as to apply a determined thrust between lower edge 8 and upper edge 7 and so as
to raise upper edge 7 (carrying the upper part of load-bearing wall 4) with respect
to lower edge 8, i.e. with respect to the lower portion of load-bearing wall 4. The
instantaneous thrusts applied by a thrust device 12 are generally different from those
applied by the other thrust devices 12 and are calculated instant-by-instant according
to the type of raising required for building 1 and according to the signals from strain
gauges 17.
[0017] According to the raising height to be reached, when a thrust device 12 reaches its
maximum extension, supporting piles are arranged around the thrust device 12, the
thrust device is compressed and spacers 18 (shown in figure 4) are inserted between
thrust device 12 and upper edge 7 and/or lower edge 8; at this point, the raising
cycle may resume. Alternatively to spacers 18, other similar solutions may be used,
such as, for example, a sand spacing method; in this case, raising devices 12 are
of the known type called 'sand jacks'.
[0018] As shown in detail in figure 5, once the raising of building 1 is complete, between
upper edges 7 and lower edges 8, i.e. between the lower portion and the upper portion
of load-bearing walls 4, supporting piles 19 are arranged capable of supporting with
the due safety margin building 1 and then thrust devices 12 are removed. Finally,
the empty spaces between supporting piles 19 and inside the niches 11 are closed by
means of common brickwork.
[0019] The function of edges 7 and 8 is to uniformly distribute the thrusts along the entire
section of load-bearing walls 4 so as to avoid the concentration of thrusts in limited
areas which could locally collapse. It is clear that according to the structural features
of building 1, the formation of lower edge 8 and/or upper edge 7 may not be necessary.
[0020] According to a different embodiment shown in figure 6, a pair of thrust devices 12
is arranged at each niche 11 outside niche 11 on opposite bands of the niche 11 itself.
Furthermore, within each niche 11 is arranged a horizontal thrust I-beam 20 (or other
steel element) perpendicular to load-bearing wall 4; the two thrust devices 12 associated
to each niche 11 are supportingly carried by upper edge 7 through thrust I-beam 20.
It is apparent that in this second embodiment, niches 11 are very small in size, because
each niche 11 does not need to contain a thrust device 12 but only needs to allow
the passage of thrust I-beam 20. Furthermore, according to this embodiment, the formation
of lower edge 8 is practically never required, because thrust devices 12 do not rest
on the lower portion of load-bearing wall 4; consolidation or reinforcement of the
floor 6 underneath on which trust devices 12 rest may be required instead.
[0021] According to a further embodiment (not shown), no niches 11 are made through load-bearing
walls 4 and each thrust device 12 rests on a lower floor 6 and is supportingly carried
by an upper floor 6; in order to better distribute thrusts on each floor 6, a relatively
large steel plate is generally interposed between each thrust device 12 and floor
6. In this case, load-bearing walls 4 are cut immediately underneath upper floor 6
and consolidation of the two concerned floors 6 is generally required; for example,
upper floor 6 may be remade by incorporating upper edge 7 itself in the remade floor
6.
[0022] According to a different embodiment (not shown), foundation structure 3 may not rest
directly on the ground 2 but instead rest on a further foundation structure provided
with a high number of piles driven into the ground 2 underneath a waterway or a water
basin (e.g. a lagoon); such constructive solution is typical of a building 1 made
over water, because the piles of the further foundation structure are fixed into the
ground underneath the water level and maintain building 1 over the water level.
[0023] It is important to underline that before performing the raising operations described
above, static analysis of the building 1 must be performed, so as to ensure that the
building 1 itself is capable of withstanding the stress induced by the raising operation;
if required, consolidation and strengthening works may be performed on building 1,
in particular on load-bearing walls 4, before raising. By the way of example, such
consolidation works may envisage the installation of tie-rods between two load-bearing
walls 4, the installation of bracing, the installation of cages which enclosure a
load-bearing wall 4 or a portion of load-bearing wall 4, or the remaking of a floor
6 incorporating upper edge 7 in the remade floor 6 itself.
[0024] It is important to underline that while raising building 1, foundation structure
3 is not subjected to particularly high stress because it must support the weight
of the building 1 increased by the weight of edges 7 and 8 and of thrust devices 12;
it is important to stress that the weight of building 1 is generally much higher than
that of edges 7 and 8 and of thrust devices 12, therefore the presence of edges 7
and 8 and of thrust devices 12 generally does not require consolidation interventions
on the foundation structure.
[0025] In the embodiments shown in the attached figures, building 1 presents only load-bearing
walls 4; according to a different embodiment (not shown), the building 1 may also
have other load-bearing elements (typically load-bearing columns) in combination with
or instead of load-bearing walls 4.
[0026] If building 1 has one or more load-bearing walls 4 in common with other contiguous
buildings, it is necessary to detach from the load-bearing wall 4 in common all floors
6 connected to the load-bearing wall 4 so as to allow the raising of the floors 6
with respect to the common load-bearing wall; at the end of the raising operation,
the floors 6 must be reconnected to the common load-bearing wall 4. Obviously, before
detaching a floor 6 from a common load-bearing wall 4, the floor 6 itself must be
appropriately supported by means of a temporary metallic frame next to, but not in
contact with, load-bearing wall 4 in common. The method described above may be applied
also to particularly large buildings (indicatively with a base larger than 1000 m
2), which are divided into parts raised independently one from the other.
1. A method for raising a building (1) provided with a number of load-bearing elements
(4); the method comprising the steps of:
making a horizontal cut through each load-bearing element (4) along a cutting line
to define a lower portion and an upper portion of the load-bearing element (4) reciprocally
separated by the cutting line itself;
arranging a plurality of thrust devices (12), each of which is adapted to exert a
vertical thrust between the lower portion and the upper portion of the load-bearing
element (4);
operating each thrust device (12) so as to apply between the lower portion and the
upper portion of load-bearing element (4) an upward thrust and determine the progressive
raising of the upper portion of the load-bearing element (4);
arranging, at the end of the raising operation, a series of supporting piles (19)
between the lower portion and the upper portion of load-bearing elements (4); and
removing the thrust devices (12).
2. A method according to claim 1, and comprising the further steps of:
making a series of niches (11) immediately underneath the cutting line and through
the load-bearing elements (4); and
arranging at each niche at least one thrust device (12), which is adapted to exert
a vertical thrust between the lower portion and the upper portion of the load-bearing
element (4).
3. A method according to claim 2, and comprising the further step of making through each
load-bearing element (4) an upper horizontal edge (7) at the cutting line; each niche
(11) is made immediately underneath the upper edge (7) so that the niche (11) itself
is upperly delimited by the upper edge (7); each thrust device (12) is supportingly
carried by the upper edge (7).
4. A method according to claim 3, and comprising the further step of making through each
load-bearing element (4) a lower edge (8), which is horizontal and parallel to upper
edge (7); each niche (11) is made between the lower edge (8) and the upper edge (7)
so that the niche itself (11) is upperly delimited by the upper edge (7) and lowerly
delimited by the lower edge (8); each thrust device (12) is supported on one side
by the lower edge (8) and on the other side is supportingly carried by the upper edge
(7).
5. A method according to claim 3 or 4, wherein each edge (7; 8) consists of a series
of beams (9), which are inserted within the load-bearing elements (4).
6. A method according to claim 5, wherein at least along one same load-bearing element
(4) the beams (9) are connected together.
7. A method according to claim 5 or 6, wherein the insertion of a beam (9) within a load-bearing
element (4) envisages the formation through the load-bearing element (4) itself of
a through slot (10) and therefore the arrangement of beam (9) within slot (10).
8. A method according to claim 7, wherein for each load-bearing element (4) and for each
edge (7; 8) are inserted at least two beams (9) in two different moments, so that
a through slot (10) never concerns more than half of the load-bearing element (4)
itself.
9. A method according to one of the claims from 5 to 8, wherein the beams (9) are made
of reinforced concrete.
10. A method according to one of the claims from 5 to 8, wherein the beams (9) are made
of steel.
11. A method according to one of the claims from 2 to 10, wherein each niche (11) accommodates
within at least one thrust device (12).
12. A method according to one of the claims from 2 to 10, wherein at least a pair of thrust
devices (12) is arranged at each niche (11) outside niche (11) on opposite bands of
the niche (11) itself.
13. A method according to claim 12, wherein within each niche (11) is arranged a horizontal
thrust element (20) perpendicular to the load-bearing element (4); the two thrust
devices (12) associated to each niche (11) are supportingly carried by the upper portion
of the load-bearing element (4) by means of thrust device (20).
14. A method according to claim 2, wherein each thrust device (12) rests on a lower floor
(6) and is supportingly carried by an upper floor (6).
15. A method according to claim 14, wherein a steel plate is arranged between each thrust
device (12) and each floor (6).
16. A method according to claim 14 or 15, wherein the load-bearing elements (4) are immediately
cut underneath the upper floor (6).
17. A method according to claim 14, 15 or 16 and comprising the further steps of:
making through each load-bearing element (4) an upper horizontal edge (7) at the cutting
line; and
remaking the upper floor (6) incorporating the upper edge (7) in the remade floor
(6) itself.
18. A method according to one of the claims from 1 to 17, wherein each thrust device (12)
is defined by a hydraulic jack, which presents a body (13) and a rod (14) axially
mobile with respect to the body (13) with an adjustable intensity force.
19. A method according to one of the claims from 1 to 18, wherein the raising is controlled
by at least one control unit (15), which is adapted to drive the thrust devices (12)
and is connected to a number of strain gauges (17) fixed to the building (1).
20. A method according to claim 19, wherein the control unit (15) is connected to sensors
(16) fitted on thrust devices (12) to detect instant-by-instant the intensity of the
thrusts exerted by the thrust devices themselves (12).
21. A method according to claim 20, wherein the control unit (15) is adapted to control
the thrust devices (12) in feedback.
22. A method according to claim 21, wherein the instantaneous thrusts applied to each
thrust device (12) are generally different from those applied by other thrust devices
(12) and are calculated instant-by-instant according to the type of raising required
for the building (1) and on the basis of the signals from the strain gauges (17).
1. Verfahren zum Anheben eines Bauwerkes (1), das mit einer Anzahl von lastabtragenden
Elementen (4) versehen ist, wobei das Verfahren die Schritte aufweist:
Ausbilden eines Horizontalschnittes durch jedes lastabtragende Element (4) hindurch
entlang einer Schnittlinie zum Definieren eines unteren Abschnittes und eines oberen
Abschnittes des lastabtragenden Elements (4), die von der Schnittlinie an sich gegenseitig
getrennt sind,
Anordnen einer Mehrzahl von Druckvorrichtungen (12), wobei jede von denselben zum
Ausüben eines Vertikaldruckes zwischen dem unteren Abschnitt und dem oberen Abschnitt
des lastabtragenden Elements (4) angepasst ist,
Betätigung jeder Druckvorrichtung (12), so dass zwischen dem unteren Abschnitt und
dem oberen Abschnitt des lastabtragenden Elements (4) ein Aufwärtsdruck angelegt wird,
und ermitteln des allmählichen Anhebens des oberen Abschnittes des lastabtragenden
Elements (4),
Anordnen am Ende der Anhebebetätigung von einer Reihe von Stützpfeilern (19) zwischen
dem unteren Abschnitt und dem oberen Abschnitt der lastabtragenden Elemente (4), und
Beseitigen der Druckvorrichtungen (12).
2. Verfahren gemäß Anspruch 1 und aufweisend die weiteren Schritte:
Ausbilden einer Reihe von Nischen (11) unmittelbar unterhalb der Schnittlinie und
durch die lastabtragenden Elemente (4) hindurch, und
Anordnen an jeder Nische von mindestens einer Druckvorrichtung (12), die zum Ausüben
eines Vertikaldruckes zwischen dem unteren Abschnitt und dem oberen Abschnitt des
lastabtragenden Elements (4) angepasst ist.
3. Verfahren gemäß Anspruch 2 und aufweisend den weiteren Schritt des Ausbildens durch
jedes lastabtragende Element (4) hindurch von einem oberen Horizontalrand (7) an der
Schnittlinie, wobei jede Nische (11) unmittelbar unterhalb des oberen Randes (7) ausgebildet
wird, so dass die Nische (11) an sich oberhalb von dem oberen Rand (7) begrenzt ist,
wobei jede Druckvorrichtung (12) von dem oberen Rand (7) stützend getragen wird.
4. Verfahren gemäß Anspruch 3 und aufweisend den weiteren Schritt des Ausbildens durch
jedes lastabtragende Element (4) hindurch von einem unteren Rand (8), der horizontal
und parallel zu dem oberen Rand (7) ist, wobei jede Nische (11) zwischen dem unteren
Rand (8) und dem oberen Rand (7) ausgebildet ist, so dass die Nische (11) an sich
oberhalb von dem oberen Rand (7) begrenzt ist und unterhalb von dem unteren Rand (8)
begrenzt ist, wobei jede Druckvorrichtung (12) auf einer Seite von dem unteren Rand
(8) abgestützt ist und auf der anderen Seite von dem oberen Rand stützend getragen
wird.
5. Verfahren gemäß Anspruch 3 oder 4, wobei jeder Rand (7; 8) aus einer Reihe von Trägern
(9) besteht, die innerhalb der lastabtragenden Elemente (4) eingesetzt werden.
6. Verfahren gemäß Anspruch 5, wobei wenigsten entlang eines selben lastabtragenden Elements
(4) die Träger (9) miteinander verbunden sind.
7. Verfahren gemäß Anspruch 5 oder 6, wobei das Einsetzen eines Trägers (9) innerhalb
eines lastabtragenden Elements (4) die Ausbildung eines Durchgangsschlitzes (10) durch
das lastabtragende Element (4) an sich und daher die Anordnung des Trägers (9) innerhalb
des Schlitzes (10) vorsieht.
8. Verfahren gemäß Anspruch 7, wobei für jedes lastabtragende Element (4) und für jeden
Rand (7; 8) mindestens zwei Träger (9) in zwei unterschiedlichen Momenten eingesetzt
werden, so dass ein Durchgangsschlitz (10) niemals mehr als die Hälfte des lastabtragenden
Elements (4) an sich aufweist.
9. Verfahren gemäß einem der Ansprüche 5 bis 8, wobei die Träger (9) aus bewehrtem Beton
hergestellt sind.
10. Verfahren gemäß einem der Ansprüche aus 5 bis 8, wobei die Träger (9) aus Stahl hergestellt
sind.
11. Verfahren gemäß einem der Ansprüche aus 2 bis 10, wobei jede Nische (11) im Inneren
mindestens eine Druckvorrichtung (12) aufnimmt.
12. Verfahren gemäß einem der Ansprüche aus 2 bis 10, wobei mindestens ein Paar von Druckvorrichtungen
(12) an jeder Nische (11) außerhalb der Nische (11) auf gegenüberliegenden Streifen
der Nische (11) an sich angeordnet sind.
13. Verfahren gemäß Anspruch 12, wobei innerhalb jeder Nische (11) ein horizontales Druckelement
(20) senkrecht zu dem lastabtragenden Element (4) angeordnet ist, wobei die beiden
Druckvorrichtungen (12), die je Nische (11) zugehörig sind, von dem oberen Abschnitt
des lastabtragenden Elements (4) mittels einer Druckvorrichtung (20) stützend getragen
werden.
14. Verfahren gemäß Anspruch 2, wobei jede Druckvorrichtung (12) auf einem unteren Boden
(6) ruht und von einem oberen Boden (6) stützend getragen wird.
15. Verfahren gemäß Anspruch 14, wobei eine Stahlplatte zwischen jeder Druckvorrichtung
(12) und jedem Boden (6) angeordnet ist.
16. Verfahren gemäß Anspruch 14 oder 15, wobei die lastabtragenden Elemente (4) unmittelbar
unterhalb des oberen Bodens (6) geschnitten werden.
17. Verfahren gemäß Anspruch 14, 15 oder 16 und aufweisend die weiteren Schritte:
Ausbilden durch jedes lastabtragende Element (4) hindurch von einem oberen horizontalen
Rand (7) an jeder Schnittlinie, und
Wiederausbilden des oberen Bodens (6), wobei der obere Rand (7) in den wiederausgebildeten
Boden (6) an sich einbezogen wird.
18. Verfahren gemäß einem der Ansprüche aus 1 bis 17, wobei jede Druckvorrichtung (12)
von einem Hydraulikheber ausgebildet ist, der einen Körper (13) und eine Stange (14)
aufweist, der bezüglich des Körpers mit einer einstellbaren Kraftstärke axial bewegbar
ist.
19. Verfahren gemäß einem der Ansprüche aus 1 bis 18, wobei das Anheben von mindestens
einer Steuerungseinheit (15) gesteuert wird, die zum Antreiben der Druckvorrichtung
(12) angepasst ist und an eine Anzahl von Dehnungsmessern (17) angeschlossen ist,
die an dem Bauwerk (1) fixiert sind.
20. Verfahren gemäß Anspruch 19, wobei die Steuerungseinheit (15) an Sensoren (16) angeschlossen
ist, die an Druckvorrichtungen (12) montiert sind zum Detektieren von einem Moment
zum anderen der Stärke der Drücke, die von den Druckvorrichtungen (12) an sich ausgeübt
werden.
21. Verfahren gemäß Anspruch 20, wobei die Steuerungseinheit (15) zum Steuern der Druckvorrichtungen
(12) mit Rückkopplung angepasst ist.
22. Verfahren gemäß Anspruch 21, wobei momentane Drücke, die an jeder Druckvorrichtung
(12) angelegt werden allgemein unterschiedlich zu jenen sind, die von anderen Druckvorrichtungen
(12) angelegt werden und von einem Moment zum anderen gemäß dem Anhebetyp, der für
das Bauwerk (1) erforderlich ist, und auf Basis der Signale aus den Dehnungsmessern
(17) berechnet werden.
1. Procédé pour élever un bâtiment (1) pourvu d'un nombre d'éléments porteurs (4) ; le
procédé comprenant les étapes consistant à :
réaliser une coupe horizontale à travers chaque élément porteur (4) le long d'une
ligne de coupe pour définir une partie inférieure et une partie supérieure de l'élément
porteur (4) réciproquement séparé par la ligne de coupe elle-même ;
agencer une pluralité de dispositifs de poussée (12), dont chacun est adapté pour
exercer une poussée verticale entre la partie inférieure et la partie supérieure de
l'élément porteur (4) ;
mettre en fonctionnement chaque dispositif de poussée (12) afin d'appliquer entre
la partie inférieure et la partie supérieure de l'élément porteur (4) une poussée
ascendante et déterminer l'élévation progressive de la partie supérieure de l'élément
porteur (4) ;
agencer, à la fin de l'opération d'élévation, une série de pieux de support (19) entre
la partie inférieure et la partie supérieure des éléments porteurs (4) ; et
retirer les dispositifs de poussée (12).
2. Procédé selon la revendication 1, comprenant les étapes supplémentaires consistant
à :
réaliser une série de niches (11) immédiatement en dessous de la ligne de coupe et
à travers les éléments porteurs (4) ; et
agencer au niveau de chaque niche au moins un dispositif de poussée (12), qui est
adapté pour exercer une poussée verticale entre la partie inférieure et la partie
supérieure de l'élément porteur (4).
3. Procédé selon la revendication 2, comprenant l'étape supplémentaire consistant à réaliser
à travers chaque élément porteur (4) un bord horizontal supérieur (7) au niveau de
la ligne de coupe ; chaque niche (11) est réalisée immédiatement en dessous du bord
supérieur (7) de sorte que la niche (11) elle-même soit délimitée en partie supérieure
par le bord supérieur (7) ; chaque dispositif de poussée (12) est supporté par le
bord supérieur (7).
4. Procédé selon la revendication 3, comprenant l'étape supplémentaire consistant à réaliser
à travers chaque élément porteur (4) un bord inférieur (8), qui est horizontal et
parallèle au bord supérieur (7) ; chaque niche (11) est réalisée entre le bord inférieur
(8) et le bord supérieur (7) de sorte que la niche elle-même (11) soit délimitée en
partie supérieure par le bord supérieur (7) et délimitée en partie inférieure par
le bord inférieur (8) ; chaque dispositif de poussée (12) est supporté sur un côté
par le bord inférieur (8) et sur l'autre côté est supporté par le bord supérieur (7).
5. Procédé selon la revendication 3 ou 4, dans lequel chaque bord (7 ; 8) est constitué
d'une série de poutres (9), qui sont insérées à l'intérieur des éléments porteurs
(4).
6. Procédé selon la revendication 5, dans lequel au moins le long d'un même élément porteur
(4) les poutres (9) sont reliées les unes aux autres.
7. Procédé selon la revendication 5 ou 6, dans lequel l'insertion d'une poutre (9) à
l'intérieur d'un élément porteur (4) envisage la formation à travers l'élément porteur
(4) lui-même d'une fente débouchante (10) et donc l'agencement de poutre (9) à l'intérieur
de la fente (10).
8. Procédé selon la revendication 7, dans lequel pour chaque élément porteur (4) et pour
chaque bord (7 ; 8) sont insérées au moins deux poutres (9) à deux moments différents,
de sorte qu'une fente débouchante (10) ne concerne jamais plus de la moitié de l'élément
porteur (4) lui-même.
9. Procédé selon l'une des revendications 5 à 8, dans lequel les poutres (9) sont réalisées
en béton armé.
10. Procédé selon l'une des revendications 5 à 8, dans lequel les poutres (9) sont réalisées
en acier.
11. Procédé selon l'une des revendications 2 à 10, dans lequel chaque niche (11) se loge
à l'intérieur d'au moins un dispositif de poussée (12).
12. Procédé selon l'une des revendications 2 à 10, dans lequel au moins une paire de dispositifs
de poussée (12) est agencée au niveau de chaque niche (11) à l'extérieur de la niche
(11) sur des bandes opposées de la niche (11) elle-même.
13. Procédé selon la revendication 12, dans lequel à l'intérieur de chaque niche (11)
est agencé un élément de poussée horizontal (20) perpendiculaire à l'élément porteur
(4) ; les deux dispositifs de poussée (12) associés à chaque niche (11) sont supportés
par la partie supérieure de l'élément porteur (4) au moyen du dispositif de poussée
(20).
14. Procédé selon la revendication 2, dans lequel chaque dispositif de poussée (12) repose
sur un plancher inférieur (6) et est supporté par un plancher supérieur (6).
15. Procédé selon la revendication 14, dans lequel une plaque d'acier est agencée entre
chaque dispositif de poussée (12) et chaque plancher (6).
16. Procédé selon la revendication 14 ou 15, dans lequel les éléments porteurs (4) sont
immédiatement coupés en dessous du plancher supérieur (6).
17. Procédé selon la revendication 14, 15 ou 16, comprenant les étapes supplémentaires
consistant à :
réaliser à travers chaque élément porteur (4) un bord horizontal supérieur (7) au
niveau de la ligne de coupe ; et
modifier le plancher supérieur (6) incorporant le bord supérieur (7) dans le plancher
modifié (6) lui-même.
18. Procédé selon l'une des revendications 1 à 17, dans lequel chaque dispositif de poussée
(12) est défini par un vérin hydraulique qui présente un corps (13) et une tige (14)
mobile de façon axiale par rapport au corps (13) avec une force d'intensité réglable.
19. Procédé selon l'une des revendications 1 à 18, dans lequel l'élévation est commandée
par au moins une unité de commande (15) qui est adaptée pour entraîner les dispositifs
de poussée (12) et est connectée à un nombre d'extensomètres (17) fixés au bâtiment
(1).
20. Procédé selon la revendication 19, dans lequel l'unité de commande (15) est connectée
à des capteurs (16) installés sur les dispositifs de poussée (12) pour détecter instant
par instant l'intensité des poussées exercées par les dispositifs de poussée eux-mêmes
(12).
21. Procédé selon la revendication 20, dans lequel l'unité de commande (15) est adaptée
pour commander les dispositifs de poussée (12) en rétroaction.
22. Procédé selon la revendication 21, dans lequel les poussées instantanées appliquées
sur chaque dispositif de poussée (12) sont généralement différentes de celles appliquées
par les autres dispositifs de poussée (12) et sont calculées instant par instant selon
le type d'élévation nécessaire pour le bâtiment (1) et sur la base des signaux provenant
des extensomètres (17).
REFERENCES CITED IN THE DESCRIPTION
This list of references cited by the applicant is for the reader's convenience only.
It does not form part of the European patent document. Even though great care has
been taken in compiling the references, errors or omissions cannot be excluded and
the EPO disclaims all liability in this regard.
Patent documents cited in the description