(19)
(11) EP 1 836 660 A1

(12)

(43) Date of publication:
26.09.2007 Bulletin 2007/39

(21) Application number: 04812891.2

(22) Date of filing: 03.12.2004
(51) International Patent Classification (IPC): 
G06Q 10/00(2006.01)
(86) International application number:
PCT/US2004/040467
(87) International publication number:
WO 2006/062500 (15.06.2006 Gazette 2006/24)
(84) Designated Contracting States:
AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

(71) Applicant: THE STATE OF OREGON acting by and through THE STATE BOARD OF HIGHER EDUCATION on behalf of THE UNIVERSITY OF OREGON
Eugene, OR 97403-1238 (US)

(72) Inventors:
  • BAKER, Andrew, B.
    Eugene, OR 97401 (US)
  • GINSBERG, Matthew, L.
    Eugene, OR 97405 (US)
  • SMITH, Tristan
    Eugene, OR 97405 (US)
  • KEITH, Daniel, B.
    Eugene, OR 97405 (US)
  • PARKES, Andrew, J.
    Walsall Wood, West Midlands WS9 9LL (GB)
  • SMITH, Bryan
    Eugen, OR 97405 (US)

(74) Representative: Round, Edward Mark 
Marks & Clerk 90 Long Acre
London WC2E 9RA
London WC2E 9RA (GB)

   


(54) SYSTEM AND PROCESS FOR JOB SCHEDULING TO MINIMIZE CONSTRUCTION COST