Field of the Invention
[0001] The present invention relates to scaffolding. More particularly, the invention relates
to safety aspects of scaffolding.
Background to the Invention
[0002] In western countries the use of timber in scaffolding structures was prevalent in
the early part of the twentieth century. Due to the high number of industrial accidents
and fires arising from timber scaffolding, timber scaffolding has generally been replaced
worldwide by steel tubular scaffolding.
[0003] However, in Asia, bamboo has been traditionally used for scaffolding. Bamboo scaffolding
is still in use in China and Hong Kong. As a scaffolding material, bamboo has a number
of advantages. Bamboo is economical and can be simply constructed without special
tools. Bamboo scaffolding can also be constructed within a short period of time in
a limited working space. The most significant advantage of bamboo scaffolding is its
very strong bending strength and elasticity when freshly cut. However, the strength
of bamboo decreases as time goes by because it gradually dehydrates over time. When
the water content has reduced below 10% the bamboo becomes dry and cracks will appear.
The maximum lifespan ofbamboo scaffolding members is thus relatively short, only about
12 to 18 months. Thus bamboo is considered somewhat unreliable.
[0004] In view of the limitations of bamboo, it is gradually being superseded in Hong Kong
by steel scaffolding members. Steel scaffolding members still possess disadvantages
none the least of which is cost. The weight of steel scaffolding structures may also
be problematic in some situations. Because of the cost and strength characteristics
of steel, the distances between the structural members is generally very wide to reduce
material by taking advantage of steel strength. These distances are often inconvenient
for workers climbing on the scaffolding and pose safety problems.
[0005] Australian Patent Specification No. 45247/85 discloses a convention scaffolding structure with an additional guard panel spaced
outwardly from the scaffolding structure. This guard panel adds substantial additional
weight to the structure and requires special brackets to secure the guard panel to
the scaffolding structure.
[0006] It is therefore an objective to overcome or ameliorate at least one of the aforementioned
disadvantages or to provide the public with a useful choice.
Summary of the Invention
[0007] In accordance with a first aspect of the present invention there is provided a scaffolding
structure for a building being erected, the scaffolding structure being in the form
of a substantially two dimensional inner grid interconnected with a substantially
two dimensional outer grid, each of the grids being comprised of load bearing members
having relatively constant strength over time under expected loading conditions of
the scaffolding structure characterised in that additional bamboo members are secured
on the outer grid such that the interstices defined by the load bearing members and
the bamboo members of the outer grid are smaller than the interstices defined by the
load bearing members of the inner grid.
[0008] Preferably the load bearing members are elongate structural members intersecting
in a regular pattern to form the grids. The elongate members may be coupled by right
angle metal couplers at all or some of the intersections in the grid. In a most preferred
form of the invention the load bearing members are steel members, preferably of tubular
cross section. In an alternative aspect of the invention, the load bearing members
may comprise fibre reinforced plastic tubes. The grids are preferably constructed
of load bearing members arranged at 90° to each other although other configurations
are possible. Each grid may therefore have upright load bearing standards and substantially
horizontal load bearing ledgers. Desirably, at least some of the load bearing ledgers
in the inner grid correspond to a respective load bearing ledger in the outer grid
provided at the same height.
[0009] The additional bamboo members are preferably secured between the load bearing members
in the outer grid. In a most preferred form of the invention, the scaffolding structure
is erected such that each of the distances between any two adjacent bamboo members
and between any bamboo member and an adjacent load bearing member, are substantially
equal. Preferably the bamboo members include upright standards and horizontal ledgers
with intersections between any bamboo members and other members being effected by
nylon ties.
[0010] Additionally, bamboo transoms may provide the interconnection between the inner grid
and the outer grid.
[0011] The invention may further comprise one or more platforms on the structure, the or
each platform disposed between two corresponding load bearing ledgers from the inner
and outer grid which are of the same level, wherein the platform is of elongate configuration
and includes a planar supporting surface and attachment means coupling the platform
to the two load bearing ledgers.
[0012] Preferably, the attachment means comprise hook portions. These hook portions may
extend transversely out either side of the platform. Preferably there is a minimum
of four hook portions, each extending from a respective corner of the platform.
[0013] The invention may further include an anchoring device anchoring the scaffolding structure
to the building being erected, the anchoring device having an arm coupled to the scaffolding
structure, one end of the arm being provided with an anchoring means anchored to the
building, the anchoring device also including a tether secured thereto which is capable
of load bearing, the tether being attached to the scaffolding structure.
[0014] The arm is provided with appropriate couplers to couple the anchoring means to the
scaffolding structure. Where the scaffolding structure comprises an interconnected
inner grid and outer grid, preferably the arm is coupled to both the inner grid and
the outer grid. Furthermore, the load bearing tether is also suitably secured to the
outer grid at a point on the outer grid below the attachment point of the arm and
the outer grid so that the load bearing tether extends taut in a diagonal configuration.
[0015] Preferably, the load bearing tether is flexible and as such may comprise wire, cable
or chain. In use, the coupling on the load bearing tether is preferably secured to
the outer grid of the scaffolding structure to provide backup in case of bracket failure.
[0016] The anchoring means may comprise a plate which is suitably welded to the arm. Preferably
the anchor plate extends in a plane transverse to the longitudinal direction of the
arm and the plate is bolted to the building. The anchoring means may include an eyelet
by which one end of the tether can be secured to the anchoring means.
[0017] The scaffolding structure of the present invention may be supported from the building
being erected. This building suitably includes at least one concrete slab with one
or more structural beams supported from and extending outwardly from the concrete
slab in a cantilevered fashion. The scaffolding structure is then supported on the
one or more structural beams.
[0018] The spacing between adjacent cantilevered structural beams will depend upon the particular
application but a preferred spacing would be about 3 metres. The above method may
be used in conjunction with supporting brackets mounted on support columns of the
building. The above method is especially appropriate where the column spacing of the
building is more than 3 metres apart and the slab depth is insufficient to mount the
brackets across the depth of the slab. Accordingly, the supporting brackets may be
mounted to the support columns with an appropriate number of structural beams spaced
between neighbouring supporting brackets mounted on respective building columns.
[0019] In a preferred form of the invention the structural beams comprise I-beams. However
other types of structural beams are considered within the scope of the present invention
including box-section beams.
[0020] In accordance with a further aspect of the invention, there is provided an anchoring
device for anchoring a scaffolding structure to a building being erected, the anchoring
device including: an arm for coupling to the scaffolding structure, the arm having
a longitudinal axis; and an anchoring member to anchor the device and the scaffolding
structure to the building, the anchoring member being coupled to the arm and having
a first leg in the form of a bar or rod, the anchoring member being alignable such
that the first leg extends substantially parallel to the longitudinal axis of the
arm with the remote end of the first leg extending beyond the arm.
[0021] In accordance with another aspect of the invention, there is provided a scaffolding
structure for a building being erected, the scaffolding structure being in the form
of a substantially two dimensional inner grid interconnected with a substantially
two dimensional outer grid, each of the grids being comprised of load bearing members
in the form of elongate structural members including substantially horizontal ledgers
and upright standards intersecting to form the grids, the structure being erected
such that at least some of the load bearing ledgers in the inner grid correspond to
respective load bearing ledgers in the outer grid provided at the same height, the
scaffolding structure further comprising one or more platforms, the or each platform
disposed between two corresponding load bearing ledgers from the inner and outer grid
which are of the same level, wherein an access opening is provided in the platform
for access to a lower region of the scaffolding structure, the scaffolding structure
further comprising a ladder mounted on the scaffolding structure and disposed for
access by a worker through the access opening.
[0022] The invention consists in the foregoing and also envisages constructions of which
the following gives examples only.
Brief Description of the Drawings
[0023] In order that the invention may be more fully understood, one embodiment will now
be described with reference to the drawings in which:-
Figure 1 is a partial schematic perspective view of a scaffolding structure according
to a first preferred embodiment of the invention;
Figure 2 is a diagrammatic view of an inner grid of the scaffolding structure illustrated
in Figure 1;
Figure 3 is a diagrammatic view of an outer grid of the scaffolding structure of Figure
1;
Figure 4 is a side view of the scaffolding structure of Figure 1;
Figure 5 is a diagrammatic front elevation view of a base detail of the scaffolding
structure of Figure 1;
Figure 6a is a diagrammatic front elevation view of the scaffolding of Figure 1, illustrating
the main structural components only;
Figure 6b is a diagrammatic perspective view of a slightly modified arrangement of
the supporting brackets for the scaffolding structure;
Figure 7 is a front view of an alternative support detail for the scaffolding structure
of Figure 1;
Figure 8 is a side view of the alternative support detail illustrated in Figure 7;
Figure 9 is a diagrammatic side view of an anchoring method for the scaffolding illustrated
in Figure 1;
Figure 10a is a perspective view of an anchoring device used to implement the anchoring
method illustrated in Figure 9;
Figure 10b is a side view of an alternative form of an anchoring device;
Figure 11 is a diagrammatic view of appropriate bracing for the scaffolding structure
illustrated in Figure 1;
Figure 12 illustrates a typical detail of the outer grid of the scaffolding structure
of Figure 1, with the outline of an intended opening in the outer grid;
Figure 13 illustrates the outer grid detail illustrated in Figure 12 with an opening
cut therein with appropriate bracing to strengthen the outer grid;
Figure 14 is a side view of a catch fan for use with the scaffolding structure illustrated
in Figure 1;
Figure 15a is a side view of a supporting bracket and a protective layer for use with
the scaffolding structure illustrated in Figure 1;
Figure 15b is a side view of an alternative form of supporting bracket;
Figure 16 is a perspective view of a detail of the scaffolding of Figure 1 showing
a workers' platform installed;
Figure 17 is a detail of the scaffolding structure of Figure 1 with a staircase installed;
Figure 18 is a schematic perspective view of the scaffolding structure with an alternative
form of workers' platform installed;
Figure 19 is a plan view of a corner detail for the alternative form of the workers'
platform;
Figure 20 is a side view of a toeboard for use in the workers' platforms illustrated
in Figures 18 and 19;
Figure 21 is a schematic perspective view of a particular form of workers' platform
illustrating an access opening and a ladder; and
Figure 22 is a side and front view of the ladder illustrated in Figure 21.
Preferred Embodiment(s) of the Invention
[0024] The scaffolding structure 10 illustrated in Figure 1 is a three dimensional structure.
The scaffolding structure 10 includes an inner two dimensional grid 12 illustrated
in Figure 2 and an outer two dimensional grid 14 illustrated in Figure 3. As shown
in Figure 4, the inner grid 12 is disposed adjacent the wall of the building 15 being
constructed. The spacing of the inner grid 12 from the wall of the building 15 is
generally about 200 mm. The outer grid 14 is disposed outwardly of the scaffolding
structure 10 relative to the building 15. The outer grid 14 and the inner grid 12
are spaced approximately 600 to 700 mm apart. They are joined together by bamboo transoms
18 as shown in Figure 4 and Figure 1.
[0025] Referring to Figure 2, the inner grid is comprised of upright standards 20 and horizontal
ledgers 22. Each of the standards and ledgers are elongate steel tubular members.
At each intersection of a ledger and standard, the tubular members are joined by metal
couplers (not shown). The metal couplers are protected by covers to prevent contamination,
particularly from concrete.
[0026] As can be seen in Figure 2, each of the upright standards 20 are spaced 1.5 metres
apart whereas the horizontal ledgers 22 are spaced 2.25 metres apart. This rectangular
window created by the intersecting tubular members defines an interstice in the grid
through which workers on the scaffolding structure can access the various parts of
the building 15 as required. Due to the inherent strength of the steel ledgers 22
and standards 20, the interstices are comparatively large enabling easy access to
the building 15 for the workers on the scaffolding structure 10.
[0027] On the other hand, the outside grid illustrated in Figure 3 comprises bamboo ledgers
25 and bamboo standards 27 in combination with steel standards 24 and steel ledgers
26. The bamboo ledgers and standards are illustrated by the thin lines in Figure 3
whereas the steel ledgers 26 and standards 24 are illustrated by the thick vertical
and horizontal lines of Figure 3. The steel ledgers 26 and standards 24 provide the
structural strength for the outer grid 14 whereas the bamboo ledgers 25 and standards
27 provide guard rails for the safety of the workman on the scaffolding structure
10. The bamboo ledgers 25 and standards 27 thus increase the safety for workers on
the scaffolding structure 10 without unnecessarily increasing the cost or weight of
the structure.
[0028] The steel standards 24 in the outer grid 14 are spaced at intervals of 3 metres (in
contrast to the 1.5 metre spacing of the inner grid 12). The steel ledgers 26 are
arranged at a vertical spacing of 2.25 metres. This corresponds to the spacing of
the horizontal ledgers 22 so that the levels of the ledgers 26 in the outer grid correspond
to the levels of the ledgers 22 in the inner grid. This is appropriate because the
bamboo transoms 18 extend between the ledger 22 of the inner grid and the ledgers
26 of the outer grid as can be seen in Figure 4. Further, as shown in Figure 1, the
spacing of the bamboo transoms horizontally in the scaffolding structure 10 in line
with the ledgers 26, 22 corresponds to the spacing of the bamboo standards 27 in the
outer grid.
[0029] Reverting to Figure 3, the bamboo standards 27 are arranged at spacings of 0.75 metres
which allows for three at equal spacing from and between adjacent steel standards
24. Similarly, the bamboo ledgers 25 are arranged at equal spacing of 0.75 metres
from and between adjacent steel ledgers 26. Given that the steel ledgers are spaced
2.25 metres, apart this enables two bamboo ledgers 25 at equal spacing therebetween.
Generally speaking, the intersecting steel elongate members are joined by metal couplers.
The intersecting bamboo members are joined by nylon tie.
[0030] Figure 4 also illustrates the arrangement of netting 24 on the outer layer of the
scaffolding structure. This prevents materials or tools dropping outside the scaffolding
structure. The netting 24 should be securely attached to the scaffolding structure
by nylon ties or metal wire as illustrated.
[0031] Figure 6a shows diagrammatically only, the main structural components of the scaffolding
structure 10. Each of the steel standards 20, 24 is about 6 metres long. Each level
of the scaffolding structure 10 is referred to as a "zone" and is 24 metres in height
as indicated in Figure 6a. Thus each zone is made up of 4 x 6 metre lengths of the
steel standards 20, 24. The region between adjacent steel standards 20, 24 in each
zone is referred to as a "bay". In the present case the height of each bay is defined
by the vertical distance between support brackets 30. In the present case, with the
support brackets disposed at vertical intervals corresponding to the length of four
steel standards 20, 24, the height of each bay is thus 24 metres. However, the vertical
spacing of the brackets will naturally depend upon the weight of the scaffold and
the expected loading.
[0032] The configuration of the support bracket 30 is illustrated schematically in Figure
15a. The steel standards 20, 24 of the scaffolding structure 10 fit into suitable
recesses (not shown) on one arm of the bracket. The support bracket 30 is constructed
from angle iron configured in the shape of a right angle isosceles triangle having
side lengths of 900 mm. The angle iron might be 80x80x8 angle grade 43 depending on
the particular application. One side of the support bracket 30 is secured to the wall
of the concrete building, preferably at an upright support column of the building
15. An array of supporting brackets 30 thus provides support for the scaffolding structure
10 at the base thereof and at intervening levels of the scaffolding structure.
[0033] In order to erect the scaffolding structure, a temporary bamboo structure may be
first erected. Once the first layer of steel brackets 30 has been installed, the temporary
bamboo structure may be transformed to be components of the scaffolding structure.
[0034] Figure 15b illustrates an alternative form of support bracket 30b. It can be seen
from Figure 6a that the appropriate vertical spacing for the brackets is 24m. However,
by using the higher strength brackets illustrated in Figure 15b together with closer
spacing of the anchoring devices (see Figures 9, 10a and 10b), the bracket spacing
can be increased to 30 m as shown in Figure 6b. Figure 6b also illustrates that a
bracket 30b of one level should be offset by an appropriate amount (80mm) in relation
to the bracket 30b on an adjacent upper or lower level. This enables the steel standards
to be overlapped (preferably by about 3m) and clamped together in the manner illustrated.
The clamps 30c are arranged at a spacing of about 750mm.
[0035] In some instances, the building columns may be located too far apart for effective
securement of adjacent supporting brackets 30. In this case, an alternative supporting
arrangement for the scaffolding structure will be required as illustrated in Figure
7. Figure 7 illustrates adjacent columns 40 of the building 15 with a slab 42 extending
therebetween. Two supporting brackets 30 are bolted by bolts 46 to respective columns
40 as illustrated. However, these supporting brackets 30 exceed the maximum permissible
spacing therebetween for properly supporting the scaffolding structure 10. Therefore,
cantilevered I-beams 44 are bolted to the slab to extend outwardly beyond the slab
42 as illustrated in Figure 8. The inner grid 12 and the outer grid 14 are supported
on the I-beam 44 as illustrated in Figure 8, provided that the outer grid 14 is a
minimum of 200 mm from the cantilevered end of the I-beam 44 and a minimum of 200
mm from the end of the slab. The I-beams 44 are temporary and may be removed once
the scaffolding has been disassembled.
[0036] Figure 9 illustrates one method of anchoring the scaffolding structure 10 to the
building 15. The anchoring is achieved by way of an anchoring device 50 as shown in
Figure 9. The anchoring device 50 is illustrated more clearly in Figure 10a. The anchoring
device 50 comprises a relatively short arm of metal tube of approximately 1 metre
in length having an outside diameter of 48.6 mm. At one end of the metal tube 52 is
provided an anchoring plate 54 adapted to be bolted to the concrete building 15 as
shown in Figure 9. The metal tube 52 is secured to the upright standards of the inner
grid 12 and the outer grid 14 by way of metal right-angle couplers (see Figure 9).
The anchoring plate 54 also provides an eyelet 56 for attachment of a steel cable
58. The other end of the steel cable 58 of R6 steel wire is provided with a coupling
59 for securement to a member of the outer grid 14 as shown in Figure 9. By attaching
the coupling 59 to the outer grid 14, the scaffolding structure 10 will be effectively
tethered to the building 15.
[0037] The anchoring method illustrated in Figure 9 serves to anchor both the inner grid
12 and the outer grid 14 to the building given that only bamboo transoms 18 are provided
between the two grids. The anchoring method may serve as a backup in case of any failure
of the brackets 30.
[0038] Figure 10b illustrates an alternative anchoring device 50b. The anchoring device
50b includes a short arm 52b of about 1m in length. At one end of the arm, a through-aperture
50d is provided into which an anchoring member 50c in the form of an L-shaped rod
is received. The anchoring member 50c has a first leg having a free end which, in
the configuration shown in the drawing, extends past the end of the arm. The free
end of the first leg is threaded to enable the anchoring member to be secured into
the structure of the building being erected. The small footprint of the first leg
onto the building enables the first leg to be secured almost anywhere, thereby allowing
greater flexibility in locating the anchoring device. The anchoring member 50c may
be cast into position or alternatively secured to the concrete structure of the building
15 after the concrete has set. The threaded end may extend into the concrete about
750mm. The anchoring member 50c also includes a second leg which is received in the
through- aperture 50d. The second leg also has a threaded free end. This threaded
free end receives a nut (not shown) to retain the second leg within the aperture.
However, the length of the second leg is such that the arm 52b can slide along the
second leg, hence increasing the flexibility in locating the first leg at an appropriate
location on the building 15. As mentioned above, frequent use of the anchoring devices
reduces the demand for support brackets. Desirably, the vertical spacing should not
exceed 2.25m and the horizontal spacing should not exceed 3m. From a comparison of
Figures 6a and 6b, it can be seen that the vertical spacing between brackets can be
increased from 24m to 30m. This is achieved with frequent use of the anchoring devices
50b and the modified form of brackets 30b.
[0039] Figure 11 illustrates appropriate bracing 60 for the scaffolding structure 10. The
outside grid 14 of the scaffolding structure 10 is illustrated diagrammatically by
the spaced upright steel standards 24. As illustrated, for every 15 metre width ie
5 bays, diagonal cross bracing is typically arranged at an angle of 45- 60° plus or
minus 5°.
[0040] Figure 12 illustrates a detail of the outer grid 14 with the dotted line 70 illustrating
the location of an intended opening to be formed in the outer grid 14. An opening
70 such as that illustrated might be required to load materials onto the site. Figure
13 illustrates the detail of the outside grid 14 with the opening cut 70. The bamboo
and steel members have been cut as illustrated. To reinforce the grid 14, additional
bracing members 72 are installed. These extend diagonally as shown. Additionally,
warning signs are installed to notify workers on the scaffolding structure of potential
danger.
[0041] An additional feature of the scaffolding structure 10 is the provision of a catch
fan as illustrated in Figure 14. The catch fan 80 comprises a catchment surface 82
extending upwardly and outwardly from the scaffolding structure 10. The catchment
surface 82 is defined by spaced metal tubes 84 extending upwardly and outwardly from
the outer grid 14 with a canvas-like fire resistant material extending over the metal
support tubes 84. The upper and outer end of the metal support tubes 84 are supported
by further metal tubes 86. Each metal tube 86 is joined to the end of one of the metal
tubes 84 and extends from that end upwardly and inwardly towards the outer grid 14,
Generally, the catchment surface 82 is arranged at an angle of 45° from the horizontal
but is adjustable with adjustment of the further metal tubes 86. The catchment surface
82 is provided to catch materials falling off the building 15 or scaffolding structure
10 for easy collection of debris and removal. Catch fans 80 are generally provided
at each ten storey interval. However, individual contractors may install the catch
fans 80 to suit the requirements of a particular building site.
[0042] As shown in Figure 15, for the protection of workers on the scaffolding structure
10, protective layers 90 are disposed at regular intervals, preferably immediately
above the supporting brackets ie every ten storeys. The projective layers 90 provide
access for workers as well as protect the workers from falling. Additionally, the
protective layers 90 protect the workers from falling debris. Each protective layer
90 comprises a layer of horizontally arranged bamboo members 92 extending between
adjacent transoms 18. The spacing of the bamboo members should not exceed 200mm. The
bamboo members 92 can be above or below the transoms 18. These bamboo members provide
a buffer effect in case heavy objects fall from above. Above the horizontal bamboo
members 92, zinc sheet 94 is laid down. The zinc sheet may be formed with upturned
edges 94a of about 100mm in height. A bamboo ledger (not shown) fastened on top of
the zinc sheet prevents the sheet from blowing away.
[0043] Optionally, metal workers' platforms, referred to as "cat walks" may be installed
in addition to the protective layers 90 or in place of the protective layers 90. An
appropriate catwalk 100 is illustrated in Figure 16. The catwalk 100 is of generally
elongate planar form defined by an elongate rectangular metal frame 101 with a metal
sheet 102 providing an elongate rectangular supporting surface. The catwalk 100 is
supported by a horizontal steel ledger 26 of the outer grid 14 on one side and a horizontal
steel ledger 22 of corresponding height of the inner grid 12, on the other side. Hook
portions 107 extend transversely from the sides of the metal frame 101 to hook over
the associated horizontal steel ledgers 22, 26. It will be appreciated that the horizontal
steel ledgers 22, 26 on the inner and outer layer ought to be provided at the same
height in order to ensure that the catwalk resting thereon is level. For this reason,
during construction a piece of catwalk may be put into position on the outer layer
14 prior to the erection of the inner layer 12.
[0044] Figure 18 illustrates a slightly modified form of the catwalk. The catwalk illustrated
includes toeboards 100b on each longitudinal side. The specific form of the toeboards
100b is illustrated in Figure 20. The toeboards are in the form of generally rectangular
panels, the bottom corners being removed to enable the toeboards to be held within
a pair of opposed brackets. The form of the brackets 100c is illustrated most clearly
in Figure 19. The metal brackets 100c are an L-shape in plan with a height corresponding
to the height of the platform 102. Each longitudinal side of the platform is provided
with a pair of opposed brackets 100c. The toeboard is held between the opposed brackets
100c. Accordingly, the length between the opposed brackets TL corresponds to the distance
between the upright edges of the cut-out corners of the toeboard. The overall length
of the toeboard corresponds to the length of the platform 102.
[0045] Figure 19 also illustrates the form of a special corner platform with brackets 100c
on adjacent sides.
[0046] An additional feature of the scaffolding structure 10 is the provision of metal staircases
as illustrated in Figure 17. The metal staircases comprise a pair of spaced stiles
110 with appropriately spaced stair treads 112 extending therebetween. The ends of
the elongate stiles 110 are provided with hook or loop portions 114 for attachment
to appropriate structural members of the scaffolding structure 10.
[0047] It will be appreciated that the form of the metal staircases illustrated in Figure
17 can only be installed at the corner of the scaffolding structure otherwise the
platform will be blocked. Figures 21 and 22 illustrate an alternative form of the
ladder 120 which can be installed at intermediate locations along the platforms. A
particular type of platform 125 has been developed for use in connection with the
alternative form of the ladder 120. The platform 125 incorporates an access opening
127 of sufficient size to position the ladder therein and enable a worker to pass
therethrough. An access hatch 128 is hingedly connected to the platform 125 by means
of hinges 129. The access hatch covers a portion of the opening 127, leaving a space
sufficient for the ladder 120 to pass therethrough. A hand-hole 130 in the access
hatch enables a worker to open the hatch 128 from above.
[0048] The specific form of the ladder is illustrated in Figure 22. The ladder 120 has stiles
132 and rungs 133. The rungs 133 are of rectangular cross-section. At the top of the
ladder 120, the stiles are shaped in a U-shape, with the respective ends being formed
in a C-bracket 135 to conform to the contour of the steel ledger on which they are
supported. Likewise, the lower ends of the stiles 132 are formed with respective C-brackets
137. Additionally, the lower ends of the stiles are formed with a step since the upper
and lower C-brackets 135, 137 must necessarily align.
Additional Statements of Invention
[0049]
- 1. A scaffolding structure for a building being erected, the scaffolding structure
being in the form of a substantially two dimensional inner grid interconnected with
a substantially two dimensional outer grid, each of the grids being comprised of load
bearing members having relatively constant strength over time under expected loading
conditions of the scaffolding structure, characterised in that additional bamboo members
are secured on the outer grid such that the interstices defined by the load bearing
members and the bamboo members of the outer grid are smaller than the interstices
defined by the load bearing members of the inner grid.
- 2. The scaffolding structure as in statement 1 wherein the load bearing members are
steel members of tubular cross section.
- 3. The scaffolding structure as in statement 1 wherein the load bearing members comprise
fibre reinforced plastic tubes.
- 4. The scaffolding structure as in any one of statements 1 to 3 wherein the bamboo
members include upright standards and substantially horizontal ledgers with the intersection
between any two bamboo members or a bamboo member and another member being effected
by nylon ties.
- 5. The scaffolding structure as in any one of statements 1 to 4 wherein bamboo transoms
provide the interconnection between the inner grid and the outer grid.
- 6. The scaffolding structure as in any one of statements 1 to 5 wherein each of the
distances between any two adjacent bamboo members and between any bamboo member and
an adjacent load bearing member are substantially equal.
- 7. The scaffolding structure as in statement 1 wherein the load bearing members are
elongate structural members including substantially horizontal ledgers and upright
standards intersecting in a regular pattern to form the inner and outer grids.
- 8. The scaffolding structure as in statement 7 wherein the structure is erected such
that at least some of the load bearing ledgers in the inner grid correspond to respective
load bearing ledgers in the outer grid provided at the same height.
- 9. The scaffolding structure as in statement 8 further including one or more platforms,
the or each platform disposed between two corresponding load bearing ledgers from
the inner and the outer grid which are of the same level, wherein the platform includes
a planar supporting surface and attachment means coupling the platform to the two
load bearing ledgers.
- 10. The scaffolding structure as in statement 9 wherein the attachment means comprise
hook portions.
- 11. The scaffolding structure as in statement 9 or statement 10 wherein the platform
is elongate and the attachment means extend transversely out either side of the platform.
- 12. The scaffolding structure as in any one of statements 9 to 11 wherein there are
four hook portions, each extending from a respective corner of the platform.
- 13. The scaffolding structure as in any one of statements 1 to 12 further including
an anchoring device anchoring the scaffolding structure to the building being erected,
the anchoring device having an arm coupled to the scaffolding structure, one end of
the arm being provided with an anchoring means anchored to the building, the anchoring
device also including a tether secured thereto which is capable of load bearing, the
tether being attached to the scaffolding structure.
- 14. The scaffolding structure as in statement 13 wherein the arm is coupled to both
the inner grid and the outer grid.
- 15. The scaffolding structure as in statement 14 wherein the tether is secured to
the outer grid of the scaffolding structure.
- 16. The scaffolding structure as in statement 15 wherein the tether is secured to
the outer grid at a point below the coupling of the arm and the outer grid such that
the tether extends taut in a diagonal configuration.
- 17. The scaffolding structure as in any one of statements 13 to 16 wherein the tether
comprises a flexible cable.
- 18. The scaffolding structure as in any one of statements 13 to 17 wherein the tether
is secured to the anchoring device at or adjacent to the anchoring means.
- 19. The scaffolding structure as in any one of statements 13 to 18 wherein the anchoring
means comprises a plate which is welded to the arm, the plate extending in a plane
transverse to the longitudinal direction of the arm with the plate being bolted to
the building.
- 20. The scaffolding structure as in any one of statements 1 to 19 wherein the building
being erected includes at least one concrete slab with one or more temporary structural
beams supported by and extending outwardly from the concrete slab in a cantilevered
fashion, the scaffolding structure being supported on the one or more structural beams.
- 21. The scaffolding structure as in statement 20 wherein the spacing between any two
adjacent cantilevered structural beams is about 3 metres.
- 22. The scaffolding structure as in either statement 20 or statement 21 wherein one
or more of such cantilevered structural beams are spaced between two neighbouring
supporting brackets mounted on respective neighbouring support columns of the building.
- 23. The scaffolding structure as in any one of statements 20 to 22 wherein the structural
beams comprise I-beams.
- 24. The scaffolding structure as in any one of statements 1 to 23 further including
an anchoring device anchoring the scaffolding structure to the building being erected,
the anchoring device including:
an arm coupled to the scaffolding structure, the arm having a longitudinal axis; and
an anchoring member anchoring the device and the scaffolding structure to the building,
the anchoring member being coupled to the arm and having a first leg in the form of
a rod or bar which extends beyond the arm, the rod or bar being anchored into the
building.
- 25. The scaffolding structure as in statement 24 wherein the arm is movable relative
to the anchoring member in a direction transverse to the longitudinal axis.
- 26. The scaffolding structure as in statement 24 or statement 25 wherein the anchoring
member is L-shaped and incorporates the first leg, a second leg of the L-shape being
coupled to the arm.
- 27. The scaffolding structure as in statement 26 wherein the second leg of the L-shaped
member is received in an aperture in the arm, the arm being slidable along the second
leg, with a stop provided to limit movement along the arm.
- 28. The scaffolding structure as in any one of statements 24 to 27 further including
a tether secured thereto which is capable of load bearing, the tether being attachable
to the scaffolding structure.
- 29. The scaffolding structure as in any one of statements 9 to 12 wherein an access
opening is provided in the planar supporting surface for access to a lower region
of the scaffolding structure, the scaffolding structure further comprising a ladder
mounted on the scaffolding structure and disposed for access by a worker through the
access opening.
- 30. The scaffolding structure as in statement 29 further including an access hatch
movable between a closed position to at least partially close the access opening and
an open position which provides sufficient space for a worker to use the ladder.
- 31. The scaffolding structure as in statement 30 wherein the access hatch is such
to leave a space in the access opening when in the closed position, the ladder extending
through the space.
- 32. The scaffolding structure wherein the ladder includes rungs and stiles, the stiles
at the upper end being formed in a U-shape, the remote ends of the U-shape having
respective couplers which are complementary to the shape of the ledgers, the stiles
at the bottom end also having respective couplers complementary to the shape of the
ledgers.
- 33. A method of constructing a scaffolding structure for a building being erected,
the method including:
erecting the structure in the form of a substantially two dimensional inner grid interconnected
with a substantially two dimensional outer grid, each of the grids being comprised
of load bearing members having relatively constant strength over time under expected
loading conditions of the scaffolding structure; and
securing additional bamboo members on the outer grid such that the interstices defined
by the load bearing members and the bamboo members of the outer grid are smaller than
the interstices defined by the load bearing members of the inner grid.
- 34. The method as in statement 33 wherein the load bearing members are steel members
of tubular cross section.
- 35. The method as in statement 33 wherein the load bearing members comprise fibre
reinforced plastic tubes.
- 36. The method as in any one of statement 33 to 35 wherein the bamboo members include
upright standards and substantially horizontal ledgers with the intersection between
any two bamboo members or a bamboo member and another member being effected by nylon
ties.
- 37. The method as in any one of statements 33 to 36 wherein bamboo transoms provide
the interconnection between the inner grid and the outer grid.
- 38. The method as in any one of statements 33 to 37 wherein the structure is erected
such that each of the distances between any two adjacent bamboo members and between
any bamboo member and an adjacent load bearing member, are substantially equal.
- 39. The method as in statement 33 wherein the load bearing members are elongate structural
members including substantially horizontal ledgers and upright bearers intersecting
in a regular pattern to form the inner and outer grids.
- 40. The method as in statement 39 wherein the structure is erected such that at least
some of the load bearing ledgers in the inner grid correspond to respective load bearing
ledgers in the outer grid provided at the same height.
- 41. The method as in statement 40 further including erecting one or more platforms
on the structure, the or each platform disposed between two corresponding load bearing
ledgers from the inner and outer grid which are of the same level, wherein the platform
is of elongate configuration and includes a planar supporting surface and attachment
means coupling the platform to the two load bearing ledgers.
- 42. The method as in statement 41 wherein the attachment means comprise hook portions.
- 43. The method as in statement 41 or statement 42 wherein the attachment means extend
transversely out either side of the platform.
- 44. The method as in any one of statements 41 to 43 wherein there are four hook portions,
each extending from a respective corner of the platform.
- 45. The method as in any one of statements 33 to 44 further including anchoring the
scaffolding structure to the building being erected, the method employing an anchoring
device having an arm, one end of which is provided with an anchoring means, the anchoring
device also including a tether secured thereto which is capable of load bearing, the
method further including:
anchoring the anchoring means to the building;
coupling the arm to the scaffolding structure; and
attaching the tether to the scaffolding structure.
- 46. The method as in statement 45 wherein the arm is coupled to both the inner grid
and the outer grid.
- 47. The method as in statement 46 wherein the tether is secured to the outer grid
of the scaffolding structure.
- 48. The method as in statement 47 wherein the tether is secured to the outer grid
at a point below the coupling of the arm and the outer grid such that the tether extends
taut in a diagonal configuration.
- 49. The method as in any one of statements 45 to 48 wherein the tether comprises a
flexible cable.
- 50. The method as in any one of statements 45 to 49 wherein the tether is secured
to the anchoring device at or adjacent to the anchoring means.
- 51. The method as in any one of statements 45 to 50 wherein the anchoring means comprises
a plate which is welded to the arm, the plate extending in a plane transverse to the
longitudinal direction of the arm with the plate being bolted to the building.
- 52. The method as in any one of statements 33 to 51 wherein the building being erected
includes at least one concrete slab, the method including:
extending and supporting one or more structural beams outwardly from the concrete
slab in a cantilevered fashion; and
supporting the scaffolding structure on the one or more structural beams.
- 53. The method as in statement 52 wherein the spacing between any two adjacent cantilevered
structural beams is about 3 metres.
- 54. The method as in either statement 52 or 53, as dependent on any one of claims
45 to 51 wherein one or more cantilevered structural beams are spaced between two
neighbouring anchoring devices.
- 55. The method as in any one of statements 52 to 54 wherein the structural beams comprise
I-beams.
- 56. An anchoring device for anchoring a scaffolding structure to a building being
erected, the anchoring device including:
an arm for coupling to the scaffolding structure, the arm having a longitudinal axis;
and
an anchoring member to anchor the device and the scaffolding structure to the building,
the anchoring member being coupled to the arm and having a first leg in the form of
a bar or rod, the anchoring member being alignable such that the first leg extends
substantially parallel to the longitudinal axis of the arm with the remote end of
the first leg extending beyond the arm.
- 57. The anchoring device as in statement 56 wherein the arm is movable relative to
the anchoring member in a direction transverse to the longitudinal axis.
- 58. The anchoring device as in statement 56 or 57 wherein the anchoring member is
L-shaped and incorporates the first leg, a second leg of the L-shape being coupled
to the arm.
- 59. The anchoring device as in statement 58 wherein the L-shaped anchoring member
is pivotable about the coupling relative to the arm.
- 60. The anchoring device as in statement 58 or statement 59 wherein the second leg
of the L-shaped member is received in an aperture in the arm, the arm being slidable
along the second leg, with a stop provided to limit movement along the second arm.
- 61. The anchoring device as in statement 60 wherein the second leg is threaded at
a remote end thereof and receives a nut.
- 62. The anchoring device as in statement 61 wherein the remote end of the first leg
is threaded.
- 63. The anchoring device as in any one of statements 56 to 62 further including a
tether secured thereto which is capable of load bearing, the tether being attachable
to the scaffolding structure.
- 64. The anchoring device as in any one of statements 56 to 63 including one or more
couplers to couple the arm to scaffolding structure.