| (84) |
Designated Contracting States: |
|
AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE
SI SK TR |
| (30) |
Priority: |
17.02.2005 EP 05075384 17.02.2005 EP 05075391 17.02.2005 EP 05075392 17.02.2005 EP 05075393
|
| (43) |
Date of publication of application: |
|
13.02.2008 Bulletin 2008/07 |
| (73) |
Proprietors: |
|
- Unilever N.V.
3013 AL Rotterdam (NL) Designated Contracting States: AT BE BG CH CZ DE DK EE ES FI FR GR HU IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR
- Unilever PLC
London, EC4P 4BQ (GB) Designated Contracting States: CY GB IE
|
|
| (72) |
Inventors: |
|
- JANSSEN, Johannes, J, m Unilever R & D Vlaardingen
NL-3133 AT Vlaardingen (NL)
- HOGERVORST, Wim, T Unilever R & D Vlaardingen
NL-3133 AT Vlaardingen (NL)
- POTMAN, Ronald, P Unilever R & D Vlaardingen
NL-3133 AT Vlaardingen (NL)
- VERBEEK, Jan, H, t Unilever R & D Vlaardingen
NL-3133 AT Vlaardingen (NL)
|
| (74) |
Representative: Wurfbain, Gilles L. |
|
Unilever N.V.
Unilever Patent Group Olivier van Noortlaan 120
3133 AT Vlaardingen Olivier van Noortlaan 120
3133 AT Vlaardingen (NL) |
| (56) |
References cited: :
EP-A- 0 897 671 WO-A-01/00046 DE-A1- 10 253 111 US-B1- 6 248 389
|
EP-A- 1 419 698 WO-A-2005/014158 US-A1- 2002 168 450
|
|
| |
|
|
- GERBER P ET AL: "EFFECT OF PROCESS-PARAMETERS ON PARTICLES OBTAINED BY THE RAPID EXPANSION
OF SUPERCRITICAL SOLUTIONS" PROCEEDINGS WORLD CONGRESS ON PARTICLE TECHNOLOGY, 6 July
1998 (1998-07-06), pages 1-11, XP001080632
|
|