Technical field
[0001] The present invention relates to a method of blast-furnace smelting, more particularly
to a metallurgical method of ferronickel by blast-furnace smelting nickel oxide ore
without crystal water.
Background of the invention
[0002] Global extensive uses of stainless steel and special steel lead to supply shortage
and rapid rise in price of nickel metal, a main element used to smelt stainless steel
and special steel. Conventional technology is mature that nickel metal is produced
by mainly extracting from nickel sulfide ore, which covers 30% of the nickel resources
on the earth. But at present, reserves are in shortage and resources are in crises
after continuous exploitation for near one century. People have to pay more attention
to the extraction of nickel metal from laterite nickel ore (nickel oxide ore) covering
70% of nickel resources on the earth. The main reason that laterite nickel ore haven't
been exploited on a large scale for a long time is that the technology extracting
Ni from such mineral resources is characterized by high cost, technological complexity,
low yield, severe pollution. At Present, for high-grade laterite nickel ore(nickel
content above 2.0%),ore-smelting furnace is generally used to smelt on the international,
however, this method is provided with disadvantages such as high power consumption,
severe environmental pollution and low yield of intermittent production. For low-grade
laterite nickel ore, hydrometallurgy is commonly used, namely, a method of vitriol
soaking, ie converting solid-state nickel oxide, chromic oxide, ferric oxide or the
like in the laterite nickel ore to mixed solution of liquid-state nickel sulfate,
chrome sulfate, ferrite sulfate (Fe
2+) and the like, then separating nickel sulfate thereby, forming nickel metal only
accounting for 1-2% of the gross by electrolysis with all the other components wasted.
The process equipment is characterized by large one-off investment, complex process,
long periodicity, severe environmental pollution. Blast-furnace smelting may also
be use, however, because Cr
20
3 as concomitant commonly exists in laterite nickel ore, extremely high melting point
of its own can lead to large viscosity of molten iron water so that iron water containing
nickel and chrome can't flow out successfully and cause severe results such as frozen
furnace and damaged furnace. Many corporations and research organizations at home
and abroad have studied the technology for a long time that ferronickel (nickel iron)
can be obtained by blast-furnace smelting laterite nickel ore in one-step way, but
hitherto no success is reported. Consequently, it is urgent problem to be solved in
this business to find an industrial method that nickel iron is smelted directly from
laterite nickel ore, which is characterized by high efficiency, low consumption, high
yield, low cost and no pollution or little pollution.
Summary of the invention
[0003] To solve the above problem, the present invention provides a metallurgical method
of ferronickel by blast-furnace smelting nickel oxide ore containing no crystal water
in one-step way.
[0004] The above inventive object is achieved by the following technical proposal.
[0005] The invention provides a metallurgical method of ferronickel by blast-furnace smelting
nickel oxide ore containing no crystal water, mainly comprising the steps as follows:
[0006] Crushing and sieving raw ores, wherein the raw ore block in particulate diameter
of 10-60mm is used as raw material for blast furnace smelting and mixing the feed
of ore powder in grain diameter smaller than 10mm with coke powder, calcium lime/limestone
and sintering to obtain sintered ore blocks;
[0007] Crushing and sieving the sintered ore blocks, wherein the sintered ore block in particulate
diameter of 10-50mm is used as raw material for blast furnace smelting and sintering
the ore powder in particulate diameter smaller than 10mm again.
[0008] Mixing sintered ore block, raw ore block, coke, limestone/calcium lime, dolomite
and fluorite and blast-furnace smelting to obtain ferronickel, wherein the weight
ratio of the following additives to sintered ore is:
| fluorite |
0.3~8% |
| dolomite |
0~8% |
| limestone/calcium lime |
4~35%. |
[0009] Wherein the raw ore block may not be added as metallurgical raw material in smelting
steps.
[0010] Wherein the main component of the nickel oxide ore and the weight ratio of its own
are:
| Nickel: |
0.5~4.5%; |
| Chrome: |
0.3~12%; |
| iron: |
38~55%. |
[0011] Wherein the preferable weight ratio of the additives to the sintered ore is:
| fluorite |
0.3~5% |
| dolomite |
0.5~5% |
| limestone/calcium lime |
8~15%. |
[0012] Wherein the content of CaO in limestone is greater than 50%, while that of CaO in
calcium lime is greater than 80%; the content of Mg in the dolomite is higher than
10% and that of CaF in dolomite is bigger than 80%.
[0013] Compared with the prior art, furnace temperature can reach up to about 1700 °C in
the conventional blast-furnace smelting technology, chrome contained in nickel oxide
ore mainly exists in the form of Cr
2O
3 whose melting point is about 2300° C, consequently, the reduction degree of chrome
in nickel oxide ore is limited to cause bad fluidity of the obtained iron water and
easily to produce phenomenon of frozen furnace, and even result in accidents. In metallurgical
method of ferronickel by smelting nickel and chrome iron ore provided by the present
invention, the addition of fluorite can lower the influence of chrome on furnace temperature
effectively and raise the fluidity of iron water, meanwhile, because the addition
quantity of fluorite in metallurgical method provided by the present invention is
strictly calculated, the accidents, such as burnout of the crucible, caused by too
high addition quantity of fluorite, can be effectively avoided. In the metallurgical
method provided by the present invention, meanwhile, magnesium contained in dolomite
may also be helpful to solve the problem on bad fluidity of iron water caused by chrome
in nickel and chrome ores. Limestone can not only provide alkalinity, but also can
balance the above two additives. The metallurgical method of one-step blast-furnace
smelting provided by the present invention is characterized by short technical process,
high yield of continuous production, total extraction of nickel, chrome and iron in
laterite nickel ore once for all, high ratio of resource utilization. The slag obtained
by smelting is an excellent raw material to produce concrete, except the exhaustion
of a given mass of CO
2 gas, no other solid or liquid wastes are produced and there is no pollution.
[0014] By contrast, the metallurgical technology of blast-furnace smelting provided by the
present invention has some advantages, for example low cost. Blast furnace in the
technology provided by the present invention can consume 150-200 kilowatt-hours per
ton iron, while the conventional ore smelting technology need consume 2000-4000 kilowatt-hours
and coke of 0.5 ton per ton iron; For example economic resources, high yield, namely
the mean yield of blast furnace is bigger than that of ore-smelting furnace; such
as little pollution, little dust, high recovery rate of the raw materials which are
respectively 97~ 98% for iron, 99% for nickel and 40~50% for chrome.
Specific embodiment:
[0015] The present invention can further be explained and described in combination with
specific examples below. The following examples are not intended to limit the scope
of the present invention and all the modifications and rearrangements based on the
spirits of the present invention are without departing from scope of the present invention.
[0016] Crushing and sieving raw ores, wherein the raw ore block in particulate diameter
of 10-60mm is used as raw material for blast furnace smelting and mixing the feed
of ore powder in grain diameter smaller than 10mm thereof with coke powder, calcium
lime/limestone and sintering to obtain sintered ore blocks;
[0017] Crushing and sieving the sintered ore blocks, wherein the sintered ore block in particulate
diameter of 10-50mm is used as raw material for blast furnace smelting and sintering
the ore powder in particulate diameter smaller than 10mm again.
[0018] Mixing sintered ore block, raw ore block, coke, limestone/calcium lime, dolomite
and fluorite and blast-furnace smelting to obtain ferronickel.
[0019] Sintered ore and other raw materials can be mixed and smelted, wherein the sintered
ore and raw ore may be combined in any proportions and also used in total sintered
ore or total raw ore. When raw ore is used in total quantity, the ratio of ore stone
to coke is 1.9-2.1:1, when sintered ore is used as the total, that ratio of ore to
coke is 2.2-2.4:1.
[0020] The main component in used nickel and chrome iron ore and its content (wt.%) are:

[0021] The main component in obtained sintered ore and its content (wt.%) are:

[0022] Constitution of the furnace materials (Weight: Kg) is shown in following table.

[0023] Metallurgical technology parameters of blast furnace:

[0024] The main component in the obtained nickel iron by smelting and its content (wt.%)
are:

1. A metallurgical method of ferronickel by blast-furnace smelting nickel oxide ore without
crystal water, wherein the said method of blast furnace smelting mainly comprising
the following steps:
Crushing and sieving raw ores, wherein the raw ore block in particulate diameter of
10-60mm is used as raw material for blast furnace smelting and mixing the feed of
ore powder in grain diameter smaller than 10mm with coke powder, calcium lime/limestone
and sintering to obtain sintered ore blocks;
Crushing and sieving the sintered ore blocks, wherein the sintered ore block in particulate
diameter of 10-50mm is used as raw material for blast furnace smelting and sintering
the ore powder in particulate diameter smaller than 10mm again.
Mixing sintered ore block, raw ore block, coke, limestone/calcium lime, dolomite and
fluorite and blast-furnace smelting to obtain ferronickel. wherein the weight ratio
of the following additives to sintered ore is:
| fluorite |
0.3~8% |
| dolomite |
0~8% |
| limestone/calcium lime |
4~35%. |
2. The metallurgical method according to Claim 1, wherein main component of the said
nickel oxide ore and the weight ratio of its own are: Nickel: 0.5~4.5%; Chrome: 0.3-~12%;
iron: 38~55%.
3. The metallurgical method according to Claim 1, wherein the raw ore block may not be
added as metallurgical raw material in smelting steps.
4. The metallurgical method according to Claim 1 or 3, wherein the preferable weight
ratio of the said additives to the sintered ore is:
| fluorite |
0.3~5% |
| dolomite |
0.5~5% |
| limestone/calcium lime |
8~15%. |
5. The metallurgical method according to Claim 1 or 3, wherein the content of CaO in
the limestone is greater than 50%, while that of CaO in calcium lime is greater than
80%.
6. The metallurgical method according to Claim 1 or 3, wherein the content of Mg in the
dolomite is higher than 10%.
7. The metallurgical method according to Claim 1 or 3, wherein the content of CaF in
the dolomite is bigger than 80%.