[0001] The invention belongs to the technical field related to the burning of the natural
materials and their products and can be used in construction materials manufacturing
(in particular, bricks).
[0002] The tunnel oven containing the channel divided into item drying, burning and cooling
zones and ventilation system is known (patent
RU 2187771,
2002). The hot gases are taken from the working channel, mixed with atmospheric air pumped
in by forcing ventilator and fed to the oven's working channel in the drying zone.
These operations provide the rational oven's working and item processing mode. However,
the roof is heated much in the burning area. The heat comes to the over-roof space
and thus is not used, i.e. resulting in the non-rational heat consumption in the burning
zone, and, besides, the significant local roof's overheat can lead to the roof's deflection
and destroying.
[0003] The tunnel oven with main and additional roofs with inter-roof space over the working
channel is also applied (patent
RU 2091688,
1997). The gaseous combustion products together with the gases extracted from the burnt
items in the burning zone are led to the inter-roof space where they are neutralized
and removed through the holes in the heat zone's walls.
[0004] Another one tunnel oven for the ceramic items burning (prototype) containing the
working channel with preheating, burning and cooling zones limited by side walls,
principal and additional roofs with inter-roof space. The inter-roof space is divided
into sections. The oven is also supplied by ventilation system in the form of the
forcing ventilator with the pipeline taking the hot gases from the inter-roof space
and feeding pipeline (patent
GB 1281504,
1972). The gases are taken from the inter-roof space section located over the cooling
zone and from the inter-roof space section located before the burning zone and led
to the working channel's preheating zone.
[0005] In some cases the appliance, which provides rather quick item's cooling by atmospheric
air, are used. The big temperature and humidity difference between the hot items and
atmospheric air can lead to the burnt items' cracking.
[0006] According to the invention, the tunnel kiln for the ceramic items firing includes
the working channel with ceramic item preheating, firing and cooling zones. The working
channel is defined by side walls, main arch roof and additional arch roof with inter-arch
space. The main and additional arch roofs are implemented in the form of the overlaps.
The inter-arch space is a space between the arch roofs. The tunnel kiln's gas distribution
(ventilation) system contains, at least, the intake pipeline, ventilator and feeding
pipeline, and the intake pipeline connects the ventilator with working channel's cooling
zone and/or the space between the firing zone and working channel's cooling zone.
[0007] The technical result of the requested invention is in the stabilization of the finished
products qualitative parameters providing the most rational processing's temperature
mode, as well as in fuel consumption decrease at the expense of the heat from the
inter-arch space. Another one technical result is a gas consumption's increase in
the inter-roof space thus preventing the excessive roof's overheat and contributes
to its longevity's increase.
[0008] The pipes act as channels for the gas movement - gas guides (gas ducts). The pipes
can have a rectangular, square or oval profile. The intake pipeline can be equipped
with outer-air inlet appliance, e.g. in the form of the manifold with a door. In more
admissible constructive variant the intake pipeline is connected with kiln's inter-arch
space over the working channel's firing zone. The intake pipeline can be also connected
with kiln's inter-arch space over the working channel's heat zone or cooling zone.
[0009] The feeding pipeline usually contains the collector-distributor with several manifolds
having the direct output to the working channel's cooling zone.
[0010] The inter-arch space is made in the form of one cavity without any continuous partitions
or with partitions bearing holes.
[0011] The tunnel kiln is included in the ceramic item manufacturing equipment. The ceramic
item manufacturing equipment contains the drying oven and ceramic items firing kiln.
To increase the gas (air) consumption through the inter-arch space the inter-arch
space is connected with drying oven by pipeline (air duct or gas guide) and ventilator.
[0012] The drawing shows the tunnel kiln for the ceramic item firing in its longitudinal
section.
[0013] Position 1 indicates the working channel's preheating zone, position 2 - firing zone,
position 3 - cooling zone. There is an inter-arch space 6 between the main arch roof
4 and additional arch roof 5. The gas distribution (ventilation) system includes the
intake pipeline 7, ventilator 8, feeding pipeline 9 and collector-distributor 10 with
manifolds 11; the intake pipeline 7 connects the kiln's inter-arch space 6 over firing
zone 2 with ventilator 8, and manifolds 11 of the collector-distributor 10 have an
output directly to the cooling zone 3 near the working channel's firing zone 2. Position
13 indicates the burners located in the firing zone 2. The ventilation system can
include several ventilators 8 with the corresponding amount of the connecting pipelines.
Yet, the kiln can be supplied by exhaust ventilation to waste some part of the gases
into the atmosphere and pipelines to feed the hot gases to the ceramic item's preheating
zone 1 (such constructive elements are not shown on the drawing because they don't
pertain to the invention).
[0014] The proposed tunnel kiln works as follows.
[0015] The burning trolleys filled with dried ceramic items move along the kiln's working
channel. The trolleys move from the right to the left on the drawing, smoke gases
- in the opposite direction. The ceramic items put to the thermal processing pass
through the preheating, firing and cooling zones indicated by figures 1, 2 and 3 respectively.
First, the items are heated in preheating zone 1 at the expense of the heat coming
from the firing zone 2 as a fuel combustion's result, then the firing at maximal temperatures
(zone 2) takes place and afterwards the items gradually cool in cooling zone 3.
[0016] During their firing in the tunnel kiln the items (in particular, bricks) undergo
the rising temperature's influence (from 80°C to 750°C) in the preheating zone; influence
of temperature 750°C - 1100°C (in the firing zone); influence of the lowering temperature
from 1100°C down to 50°C - in the cooling zone. The firing has been held for 40-55
hours.
[0017] The air forced at the kiln's end passes through the cooling zone 3, heats and comes
to the firing zone where it takes part in the fuel combustion process, which fuel
has come to firing zone 2. The heated air can be also withdrawn for the formed items
drying in the drying ovens. The smoke gases resulted from the fuel combustion are
directed to the preheating zone 1 where they are used for the final water's removal,
heating and item's preparation for firing.
[0018] The heat generated from the fuel combustion is spent not only for the items burning,
but also for the heating of the oven's fencing constructions (so called heat losses),
including the suspended roof's heating. At the end of preheating zone 1, burning zone
2 and at the beginning of cooling zone 3 rather high temperatures are created influencing
the strength parameters of the supporting metallic constructions of the principal
and additional roofs. The heat from the working channel reaches the inter-roof space
at the expense of the heat transfer through the main arch roof.
[0019] The hot air from the inter-arch space 6 is removed through the intake pipeline 7
by ventilator 8 and led via feeding pipeline 9 to working channel's cooling zone 3
or space between the firing zone 2 and working channel's cooling zone 3. The temperature
of the gases removed from the inter-arch space 6 is 250-300°C, which is apparently
lower than the temperature of the items leaving the firing zone, but it significantly
exceeds the atmospheric air's temperature (which is also led to the fired items' cooling).
The optimal cooling-down mode of the items can be attained at the expense of the items'
cooling by air having a relatively high temperature (comparing with the atmospheric
air) and gradual decrease of the cooling air's temperature combined with trolleys'
movement along the cooling zone to the working channel's output. Under these conditions
the item spoilage rate (caused by sharp temperature changes at cooling and uneven
cooling of the different parts of the items) essentially decreases due to the atmospheric
air blow-off only (comparing with cooling process).
[0020] When the temperature of the gases fed to the cooling zone 3 becomes too high, it
can be lowered to the required level by mixing the hot gases with atmospheric air.
For that purpose there is an atmospheric air inlet's manifold 12 on the intake pipeline
7. To regulate the taken air's quality, the consumption regulator (door) can be installed
on the intake pipeline.
[0021] The gas distribution system provides the gas feeding from the inter-arch space to
the working channel with consumption rate 0.01-10m
3/c. The system is constructed to provide the gas consumption regulation.
[0022] Thus the stabilization of the qualitative parameters of the ceramic items is facilitated.
Yet, the most rational temperature mode of the ceramic item's processing can be guaranteed,
the fuel consumption at the expense of the heat from the inter-arch space can be lessened.
The feeding of the heated air from the inter-arch space to the working channel shall
compensate the heat losses arising after the kiln doors have been opened.
1. A tunnel kiln for the firing of the ceramic items containing the working channel with
preheating, firing and cooling zones, defined by side walls, main arch roof and additional
arch roof with the inter-arch space and gas distribution system equipped, at least,
with the intake pipeline, ventilator and feeding pipeline, while the intake pipeline
connects the kiln's inter-arch space with the ventilator, and the feeding pipeline
connects the ventilator with the working channel's cooling zone and/or space between
the firing zone and working channel's cooling zone.
2. The tunnel kiln of claim 1, wherein an atmospheric air inlet appliance is installed
on the intake pipeline.
3. The tunnel kiln of claim 2, wherein the atmospheric air inlet appliance is in the
form of the manifold with a door.
4. The tunnel kiln of claim 1, wherein the intake pipeline and the kiln's inter-arch
space are connected over the working channel's firing zone.
5. The tunnel kiln of claim 1, wherein a collector-distributor with the manifolds is
assembled in the feeding pipeline.