[0001] The present invention, according to a first aspect thereof, relates to a method for
building terrace houses or comparable structures. The term "building" as used herein
is understood to comprise at least the building of a hull, but it may also extend
to a desired degree of finishing of the structure.
[0002] Terrace houses are traditionally built by successively constructing horizontal layers
one on top of the other. That is, first a foundation for a row of houses is poured.
Then the floor for the ground level of the row of houses is constructed. Following
that, the first-floor level of the houses is constructed, and subsequently the second
floor level and possibly the attic. Construction of a next floor level may already
be started before construction of the floor level below is complete, but this does
not alter the principle of building in layers. The fact that in this way some form
of series production can be realised is considered to be an advantage of this method
according to the known principle. First, all the floor elements are placed, and subsequently
the wall elements, etc. Thus, an efficient use is made of the tools, the equipment
and the materials for a series of repetitive operations. A tower crane that can travel
along the structure is used for transporting building elements. Due to the major deformations
of the telescopic jib and vibrations that occur in such a crane construction during
construction it is not possible to realise a high degree of precision in positioning
building elements, not even if a rail track for the crane is provided.
[0003] In a known method for putting up walls, for example for houses, an automatic bricklaying
or building block stacking machine is used. Such machines are disclosed in, for example,
DE 3,722,244,
DE 4,412,681 and
WO97/02397. A drawback of such machines, however, is the fact that they are heavy and voluminous.
Because of this, they cannot be placed on upper level floors. Nor can they be moved
through a doorway, and they are very difficult to manoeuvre, especially inside a building.
They can for example be lifted and placed in a desired space by means of a crane.
Due to the major deformations of the telescopic jib and vibrations in the crane construction,
working with a high degree of precision in positioning building elements is not possible
with such a crane, either. The relatively high weight of the block stacking machine
will cause the upper level floors to sag, making it impossible to position the prefab
elements with some degree of precision.
[0004] From
WO 2007/076581 and
DE 2,108,482 there are known telescopic crane-like structures which are disposed outside the building
site and which are capable of putting elements or materials in place in vertical direction
from above, but they require major investments. Moreover, dimensionally precise construction
is hardly possible with said crane-like structures, if at all, whilst it is furthermore
considered to be a drawback that the use of the crane-like structures, which makes
it necessary to use very large building elements in order to work efficiently, has
a limitative effect on architects' freedom of design.
[0005] Accordingly it is an object of the present invention to provide a method for building
terrace houses in an efficient and dimensionally precise manner. This object is accomplished
by the present invention by providing a method for building a structure of terrace
houses, comprising the steps of:
- a) providing a foundation for the structure;
- b) placing at least one elongated guide member on a longitudinal axis of the foundation
at least substantially along at least substantially the entire length of the foundation
and fixing said elongated guide member with a robot crane device which is movable
along said guide member to the foundation, which robot crane device is arranged for
picking up and transporting building elements to a desired position on the structure;
- c) positioning the robot crane device at or near a first end of said at least one
elongated guide member;
- d) erecting a first part of the structure to at least substantially its entire height
by means of the robot crane device;
- e) moving and positioning the robot crane device in the direction of the second end
of said at least one elongated guide member located opposite the first end of said
at least one elongated guide member;
- f) subsequently erecting a part of the structure adjoining the already erected part
of the structure by means of the robot crane device;
- g) repeating steps e) and f) until the construction of the structure is at least substantially
complete.
[0006] In the method according to the invention, the longitudinal axis of the foundation
may form a physical part of the foundation for the structure to be built. The foundation
may also comprise a longitudinal axis which is specifically provided as a foundation
for the guide rail needed for building the structure by using the method according
to the invention. Since the elongated guide member is fixed to the foundation, it
is possible to realise a precise manipulation from the robot crane device to parts
of the structure to be built, thus providing a correct reference point for the robot
crane device with respect to the structure. It is important in that connection that
the elongated guide element be fixed to the foundation in such a manner that it is
suitable for absorbing pulling forces exerted thereon when heavy building elements
are lifted by means of the robot crane.
[0007] When the surface on which the structure is being built allows so, a concrete beam
serving as a support for a guide rail may function as a foundation. Steps a) and b)
may in fact coincide.
[0008] The term "robot crane" is understood to mean a crane device provided with control
means that can be programmed for controlling the crane device for picking up a building
element from a defined location and placing said building element at a desired position
on the structure to be built, and that without human interference.
[0009] An elongated guide member can be fixed to a foundation on a surface in a relatively
simple manner and at relatively low cost, for example by integrating said guide member
in the foundation when pouring the foundation or by anchoring the guide member to
the foundation by means of bolts. The guide member per se does not necessarily require
a large investment, either. By programming the robot crane device such that it is
capable of transporting the building elements for building part of the structure to
a desired location more or less independently, the robot crane device can carry out
the operations once again (repetitively) at different positions on said at least one
elongated guide member and thus gradually complete the structure. In this way a structure
of terrace houses can be built in an efficient manner, thus accomplishing the object
of the present invention.
[0010] In the prior art, cranes are known which can move along a structure on rails disposed
outside the structure (to be built). This is necessary when using the known construction
methods, because a rail disposed within the structure would be covered upon placement
of the floor slabs and no longer be available for erecting the next layers (walls,
ceilings, second floor level, etc).
[0011] From
NL 6514210 A there is known a method in which a construction bridge on wheels can be moved over
rails. The rails are to that end arranged crosswise over transversely extending foundation
elements. The rails are not fixed to the foundation, however. Static, at least non-movable
lifting cranes are disposed on the movable construction bridge. In the method according
to
NL 6514210 A, only the trusses of a building are placed and possibly propped by means of the construction
bridge, but the construction bridge is not used for building successive parts of a
structure, in the sense of building defined in the introduction paragraph.
[0012] To be able to conceal said at least one elongated guide member under the floor slabs,
it is preferable if space is reserved in the foundation for accommodating said at
least one elongated guide member in a low position. This can for example be realised
by leaving out cross beams and vertical walls extending transversely to the longitudinal
axis of said at least one elongated guide member in the crawl space of the foundation.
Said cross beams and vertical walls are in that case only placed on the respective
part of the foundation upon erection of the structure by the robot crane device, or
they may be left out altogether, in which case the load-bearing capacity of the foundation
can be provided by a part of the foundation that extends parallel to the front and
rear walls, for example. The robot crane device can thus be supported in a very stable
manner, which has an advantageous effect on the precision with which the robot crane
can operate.
[0013] Although it is preferable to provide said at least one elongated guide member as
a whole in one operation, it is also possible to carry out the provision of said at
least one elongated guide member in phases, in which case said guide member is extended
in the direction away from the first end as construction progresses. The elongated
guide member is preferably a rail over which the robot crane device can be moved,
but it may also be configured differently.
[0014] Preferably, said at least one elongated guide member is placed so that it extends
at least substantially over the central longitudinal axis of the foundation. The distance
from said at least one elongated guide member to the (foundation for the) exterior
walls of the structure to be built located on either side of said at least one elongated
guide member is preferably the same on both sides, and the distance from said at least
one elongated guide member to the furthest point to be reached is minimal. This is
important because the moment exerted by the grab load on the robot crane device in
the outermost position of the jib thus needs not be unnecessarily large.
[0015] To be able to build the structure up to and including the very last part of the structure
to be built, for example the end terrace, it is preferable if said at least one elongated
guide member is placed so that it extends beyond the foundation at the second end.
The robot crane device can thus be disposed "outside" the structure for manipulating
building elements for the last part to be built.
[0016] To provide a stable guidance for the robot crane device, it is preferable if a chassis
for said at least one elongated guide member is supported on the fixed world via stabilisation
elements extending transversely to said at least one elongated guide member. Alternatively,
a chassis for the elongated guide member may be provided with such stabilisation elements.
The stabilisation elements may be supported on a surface within the foundation of
the structure to be built. Alternatively, the stabilisation elements may be directly
or indirectly supported on the foundation of the structure, for example the foundation
for the exterior walls thereof. In the latter case, a correct reference point with
respect to the structure to be built is again provided for the robot crane device.
[0017] To achieve a correct positioning in the longitudinal direction of said at least one
elongated guide member for the robot crane device, it is preferable if in steps c
and e said at least one elongated guide member is positioned on the basis of reference
points provided on said at least one elongated guide member. The robot crane device
can be maintained in transverse direction and in vertical direction by said at least
one elongated guide member. The reference points on said at least one elongated guide
member thus provide a two-dimensional reference point for the robot crane device.
Anchor points may be provided on said at least one elongated guide member. An anchor
point may for example comprise a through hole through said at least one elongated
guide member, so that the robot crane device can be fixed in position at the reference
point by means of a locking pin.
[0018] In a preferred embodiment of the present invention, the robot crane device comprises
a slewing jib crane, by means of which building elements are transported to the desired
location during erection of a part of the structure. A slewing jib crane is very suitable
for picking up and moving (heavy) building elements to various positions on the structure
to be built.
[0019] It is preferable in that case if a jib of the robot crane device is moved in vertical
direction so as to reach a desired height. Thus, any desired point on the structure
to be built can be reached with a relatively short arm of the manipulator.
[0020] It is preferable to use a manipulation robot for carrying out operations on positioned
building elements. This makes it possible to arrange the robot crane device for carrying
and moving building elements, whilst the manipulation robot can be of relatively light
construction, for example for carrying tools and carrying out operations on building
elements that are already in place. The manipulation robot may for example be movable
over a guide member fixed to the chassis, which guide member extends transversely
to said at least one elongated guide member. If the manipulation robot is of relatively
light construction, the chassis for said at least one elongated guide member will
not be subjected to overly large forces. Thus, a concrete drill can be moved to a
positioned building element, for example, by means of the relatively light manipulation
robot for drilling holes therein. The manipulation robot may be programmed dependently
or independently of the robot crane device. If the manipulation robot is less high
than the robot crane device, it can be passed under the robot crane device upon movement
over the guide member.
[0021] A very flexible and versatile device is provided if the manipulation robot is equipped
for carrying out operations with exchangeable tools. Said operations preferably comprise
the placing of marks on positioned building elements and the drilling of holes therein.
[0022] To realise an efficient supply of building elements to the robot crane device, it
is preferable if a further guide member is provided, over which building elements
can be transported from an intermediate storage location to a location near the programmable
manipulator. The building elements can thus also be presented at a fixed reference
point with respect to the robot crane device and possible also the manipulation robot,
so that not only the positioning but also the grabbing of the building elements by
means of a robot crane device and/or the manipulation robot is simplified. Said further
guide member may be used in combination with said at least one elongated guide member
for supplying building elements, for example building elements which are moved on
pallets over said further guide member (and possibly the first elongated guide member).
If further guide members are provided on either side of said at least one elongated
guide member, pallets with building elements may be presented alternately from one
side and from the other side of the robot crane device. As a result, new stock can
be supplied via one further guide member, whilst the robot crane device can continue
to operate by manipulating building elements previously supplied via the other further
guide member. Alternatively, said at least one elongated guide member for the robot
crane device may be used independently for supplying and/or discharging building elements.
[0023] In a preferred method of the present invention, one bay or bay part of the structure
is built before the robot crane device is moved to a new position for building a next
bay, or a next bay part. It is not relevant in that connection whether the successive
bays have the same width or are arranged in a pattern of alternating wide bays (for
example for a living room) and narrow bays (for example for a hallway), of two wide
bays and two narrow bays, respectively, or another regular or irregular pattern of
bays.
[0024] If the robot crane device is equipped with a receiver and a reading device for reading
information present on building elements to be manipulated by the robot crane device
for the purpose of correctly manipulating the building elements in question on the
basis of said information, a possibility is provided to have the robot crane device
operate essentially automatically by programming the positions at which the various
building elements are to be positioned on the basis of the information provided thereon.
[0025] Preferably, tunnel elements are placed over of said at least one elongated guide
member after the erection of least part of the structure. If a comparatively inexpensive
elongated guide member is used in the present invention, the cost of dismantling it
would probably exceed the cost of the guide member itself. The tunnel elements hide
the guide rail from view in an inexpensive and simple manner and can subsequently
serve to support a floor element to be placed. Another advantage is that the part
of said at least one elongated guide member that is disposed under the tunnel elements
remains available, for example for a front jib arm (yet to be described).
[0026] The present invention, according to a second aspect thereof, relates to a device
for building terrace houses or comparable structures, and accordingly provides a device
for use in the method according to the first aspect of the invention, comprising at
least one elongated guide member extending over a longitudinal axis of a foundation
for a structure, which elongated guide member is fixed to said foundation and on which
a robot crane device comprising a slewing jib crane with a grab and means for moving
the slewing jib crane or at least one slewing jib thereof in vertical direction is
movably provided. The advantages of such a device correspond to the advantages described
above in relation to the method according to the first aspect of the present invention.
The same applies to the term "robot crane".
[0027] It is preferable in that connection if one or more stabilisation elements extending
transversely to a chassis for said at least one elongated guide member are provided,
which can be supported on a surface in a stabilising manner. The stabilisation elements
provide a stable and dimensionally precise positioning of said at least one elongated
guide member. The robot crane device can thus be positioned with a high degree of
precision with respect to a foundation for building a structure by means of the robot
crane device.
[0028] It is furthermore preferable if a second guide extends transversely to said first
elongated guide element, along which guide a manipulation robot can be moved. The
robot crane device and the manipulation robot can be optimised for their respective
tasks in that case. Thus it is possible, for example, to adapt the robot crane device
for grabbing and moving relatively heavy building elements, whilst the manipulation
robot may for example be arranged for handling relatively light tools, by means of
which operations can be carried out on building elements that are already in place.
[0029] To be able to quickly present building elements to the robot crane device at a predetermined
position, it is preferable if at least one further guide member is provided, over
which, in use, carriers for building elements can be supplied in the direction of
the robot crane device. It is even more advantageous if such a further guide member
is provided on both sides of said at least one elongated guide member. Alternatively,
said at least one elongated guide member may be arranged for supporting and guiding
a carrier for building elements. The advantage of this is that the carrier, for example
a pallet, will at all times be correctly aligned relative to the robot crane device.
[0030] In a preferred embodiment of the present invention, a slewing jib crane for the robot
crane device is movable transversely to the longitudinal axis of said at least one
elongated guide member. This can for example be realised by means of a guide on the
chassis of the robot crane device.
[0031] A very efficient and relatively labour extensive construction method can be provided
if a reading device is provided, by means of which information present on the building
elements to be manipulated by the robot crane device is read in use for correctly
manipulating the building element in question on the basis of said information.
[0032] The present invention will be explained below by means of a description of a preferred
embodiment of the present invention, in which reference is made to the appended figures,
in which:
Figures 1a-1f are schematic side views of a structure of terrace houses under construction
according to the method of the present invention;
Figure 2 is a top plan view showing the erection of a part of the structure by means
of a method according to the present invention;
Figure 3 is a more detailed top plan view of part of the device of figure 2;
Figure 4 is a side view of the device of figures 2 and 3;
Figure 5 is a rear view of the device of figures 3 and 4;
Figure 6 shows the step of positioning a building element in a method according to
the present invention;
Figure 7 shows a detail view of a way of concealing a guide rail;
Figures 8a-8e are schematic representations of the supply of building elements; and
Figures 9a and 9b show an alternative embodiment of a device according to the present
invention.
[0033] Figures 1a-1f show a schematic side view of the erection in stages of a second house
in a structure of terrace houses to be built (houses yet to be built are indicated
in dotted lines). The houses 1 (to be) built comprise a wide bay 1a and a narrow bay
1b. The houses are erected by means of a slewing jib crane 2, which is movable over
a guide rail.
[0034] Figure 2 shows a top plan view of terrace houses 1 which have been or will be built
by means of a slewing jib crane 2 according to the present invention. The slewing
jib crane 2 is centrally positioned on a guide rail 3 and is supported at its side
on a foundation 4, viz. a foundation for the front and rear walls of the houses to
be built. The slewing jib crane 2 comprises a jib 5, which is vertically adjustable
and rotatable about a column 6 of the slewing jib crane 2. Arrow P1 indicates the
direction in which building takes place. This part of the top plan view is shown in
more detail in figure 3. Located at the end of the foundation, where the last houses
will be built, is a second crane 7, which is movable on rails 8 extending perpendicularly
to the guide rail 3.
[0035] Figure 3 shows in more detail the slewing jib crane 2 which is supported on the foundation
4 for the houses to be built via a frame comprising a chassis 9 and support beams
10. The slewing jib crane 2 is movable over the guide rail 3. A jib 5 is adjustable
and rotatable about the column 6. Provided at the end of the jib 5 is a grabbing device
12, which is movable along the longitudinal axis of the jib. Disposed at the construction
side of the slewing jib crane 2 are tunnel elements 12, on which ends of floor slabs
14 are supported.
[0036] Figure 4 shows a side view of the slewing jib crane 2, which is supported on the
central longitudinal beam with the guide rail 3 via wheels 15 (only one of which is
shown in figure 4). In the centre, the slewing jib crane 2 is supported on the guide
rail 3 via a guide slide 17. A jib 5 is mounted in a U-shaped guide 20 of the column
6 via twin rollers 18 and a mounting plate 19. The column 6 can pivot in the direction
indicated by the arrow R1. Suspended from the jib 5 is a grab (not shown in figure
4). A second column 21 of a manipulation robot embodied as a tool and dimensioning
crane 44 is movable in horizontal direction along a guide plate 22. Mounted to the
second column 21, via twin rollers 24 and a mounting plate 25, is a second jib 23.
A tool holder 26 is suspended from the second jib 23. The tool holder 26 is movable
in horizontal and vertical direction as indicated by the arrows P2 and P3, respectively,
and can be pivoted about a vertical axis as indicated by the arrow R2. Standards 27
are fixed to the longitudinal beam 10, which standards are interconnected by means
of a girder 28 and over which a tarpaulin 29 is stretched.
[0037] Figure 5 shows in rear view an arrangement according to the present invention with
the jib 2 and the tool and dimensioning crane 44. The elongated chassis 9 is supported
on the foundation 4 via the guide rail 3 and the guides 30. The jib 5 on the column
6 has been pivoted to the left and the grab 12 is located near the end of the jib
5. Wall elements 31 have been placed in position by means of the grab 12. The tool
and dimensioning crane 44 is located to the right of the slewing jib crane 2. A tarpaulin
29 covering the cranes 2 and 44 is stretched over the standards 27 and the girder
28, respectively.
[0038] Figure 6 shows a detail view of the step of positioning a building element 32b on
a previously positioned building element 32a by means of the grab 12. The grab 12
is suspended from the jib 5 via a guide plate 33. The jib is vertically movable along
the column 6 (not shown in figure 6). The grab 12 is movable in the longitudinal direction
of the jib 5 via the guide plate 33a and guides 34 on the jib 5. The grab is movable
in the direction transversely to the longitudinal axis of the jib 5 by means of the
guide plate 33b and guides 35. The building element 32a is provided with bores 36,
into which dowels 37 having a rubbery end 38, which project from the building element
32b, can be positioned. Disposed within the tube 39 is a camera, which is capable
of detecting a mark 41 via the through bore 40 in the building element 32b so as to
be able to position the building element 32b.
[0039] Figure 7 shows a detail of the finishing of the building. A guide rail 3 is disposed
on the foundation 4, over which a front jib arm 42 of the slewing jib crane 2 is movable.
By placing tunnel elements 13 on the foundation 4, the guide rail 3 for the front
jib arm 42 remains accessible and the front jib arm 42 of the slewing jib crane can
continue to move over the guide rail 3 under the tunnel elements. Floor slabs 14 and
a concrete prefab element 43 are disposed on the tunnel elements 13.
[0040] Figures 8a-8e schematically show the manner in which building elements 51 loaded
on a pallet can be transported from a truck 53 to the slewing jib crane 55 over the
guide rail 54, and subsequently be handled by the slewing jib crane 55. Once a pallet
52a is empty, a new pallet 52b is supplied, whilst the first pallet 52a can be returned
to the truck 53 over the guide rail 54.
[0041] Figures 9a and 9b schematically show an alternative embodiment of the method and
device according to the present invention. As figure 9a shows, a slewing jib crane
61 may also be supported on two guide rails 62. In figure 9a the guide rails 62 are
disposed on an upper level floor, and the slewing jib crane 61 can move sideways over
a transverse beam 63, as is illustrated in dotted lines in figure 9b (slewing jib
crane 61'). The tool and dimensioning crane 64 is likewise movable along the transverse
beam 63.
[0042] With reference to figures 1a-1f again, the figures show in schematic side view the
steps of realising the erection of terrace houses 1 according to the present invention.
In figure 1a, a first house 1 comprising a wide bay 1a and a narrow bay 1b has been
built by means of the slewing jib crane 2. The slewing jib crane 2 is then moved away
from the completed house 1 in the direction indicated by the arrow P to a position
as shown in figure 1b. Then the ground level (figure 1b), the first-floor level (figure
1c) and the second-floor level with the roof (figure 1d) are erected by means of the
slewing jib crane 2. Following that, the slewing jib crane 2 is again moved away from
the completed part of the structure to a position as shown in figure 1e. The movement
that is made in this step is smaller than the movement made in the preceding step,
because a narrower bay will now be built. Since the movement of the jib 5 could be
impeded by already positioned building elements upon being manoeuvred, it is alternatively
possible to move the slewing jib crane 2 the same distance in all cases. When a narrow
bay is being built, the slewing jib crane 2 will in that case be removed further from
said narrow bay than it would be from a wide bay during erection of said wide bay.
[0043] Figures 1e and 1f show the subsequent steps of erecting the first-floor and the second-floor
level, respectively, of a narrow bay. The steps shown and described above are successively
repeated until the structure is complete.
[0044] Figure 2 shows a top plan view of a structure under construction as shown in figures
1a-1f, in which use is made of a slewing jib crane 2 according to the present invention.
The slewing jib crane 2 is centrally positioned on the guide rail 3 and is supported
at its sides on the foundation for the front and rear walls, respectively, of the
houses to be built. At its base, the pillar of the slewing jib crane 2 is mounted
on a turntable bearing and steel sliding plate 46, which can move in longitudinal
direction over the chassis 9. The slewing jib crane 2 comprises a jib 5, which is
rotatable about the column 6 of the slewing jib crane 2 and which is vertically adjustable
along said column 6. The arrow P1 indicates the direction in which building takes
place and in which the slewing jib crane 2 is moved as construction progresses for
erecting successive bays. At the end of the foundation 4, where the last houses will
be built, the foundation 4 and the guide rail 3 extend beyond the last house to be
built, as the figure shows. The fact is that when the last vertical part of the structure
is being built, the slewing jib crane 2 will have to be located outside the contours
of the structure so as not to be built in. Furthermore, the figure shows rails 8,
along which a second crane 7 can move. The second crane 7 can be used for placing
pallets 45 loaded with building elements from a truck (not shown), for example, onto
the guide rail 3 for supplying said pallets to the slewing jib crane 2. The pallets
45 can be kept in balance by telescopic support beams, for example, whose distal ends
are supported on the foundation 4 for the front and rear walls.
[0045] Figure 3 shows in more detail the slewing jib crane 2 with a frame of the elongated
chassis 9 and support beams 10 and a tool and marking robot 21. Via the chassis, the
slewing jib crane 2 is supported with its ends on the foundation 4 for the houses
to be built. At the base of the pillar, the slewing jib crane 2 is supported on a
sliding plate 46 via a turntable bearing, which sliding plate can slide over guides
47 in a direction transversely to the longitudinal direction of the guide rail 3.
The jib 5 is rotatable about the column of the slewing jib crane 2 and is vertically
adjustable along said column 6. Located at the free end of the jib 5 is a grab 12
provided with a so-called data vision system, which grab is movable along the longitudinal
axis of the jib 5 and which is provided with fine control means, so that the grab
12 can be placed exactly over a marking point. At the construction side of the slewing
jib crane 2, tunnel elements 13 are placed over the guide rail 3, which tunnel elements
obviate the necessity to move the slewing jib crane 2 and which function to support
the floor slabs 14. The slewing jib crane 2 further comprises a front jib arm 42 functioning
as an anti-tipping beam. Said front jib arm 42 obviates the necessity to move the
slewing jib crane 2 during erection of a bay, so that its construction side can remain
as close as possible to the part to be built. It is assumed in this connection that
the guide member is not arranged for absorbing large pulling forces and can be loaded
in particular by pressure forces.
[0046] Figure 4 is a side view of the slewing jib crane 2, which is supported by means of
wheels 15 on the central longitudinal beam of the foundation 4 on which the guide
rail 3 is disposed. The jib 5 of the slewing jib crane 2 is mounted in a U-shaped
guide 20 of the column 6 via twin rollers 18 and a mounting plate 19. The support
arm 5 may also be rotatably mounted on top of the column 6, in which case the column
6 is telescopic so as to be able to move the jib 5 in vertical direction. In the illustrated
embodiment, the column can pivot in the direction indicated by the arrow R1 and back
again. A grab (not shown in figure 4) is suspended from the jib 5. A second column
21 of a tool and marking robot 44 is horizontally movable along a guide plate 22.
A jib 23 is mounted to the column 21 of the tool and marking robot 44 via twin rollers
18 and a mounting plate 25. Said jib 23 is provided with a grab 26, which is arranged
for being fitted with various tools and which can place marking points on the underlying
substructure or concrete elements by means of a so-called laser pointer. The tool
holder 26 is movable in horizontal and vertical direction as indicated by the arrows
P2 and P3, respectively, and can be pivoted about a vertical axis of rotation as indicated
by the arrow R2. Standards 27 are fixed to the support beam 10 at the ends of the
frame, which standards are interconnected by means of the girder 28 and over which
a tarpaulin 29 is stretched. Thus it is possible with the device shown in figure 4
to transport a heavy load, such as a wall element, for example, to the correct position
and position said load on a part of the already existing structure, using fine control
means. Subsequently, operations can be carried out on the building element in question
by means of the tool and marking robot 44. One of said operations is the placing of
a mark, which can be used for the fine control by means of the data vision system
upon positioning a next building element. The tarpaulin 29 protects an important part
of the slewing jib crane 2 and the tool and marking crane 44 against undesirable weather
influences and dust that is blown up.
[0047] Figure 5 shows a rear view of the device discussed herein. To avoid repetition, only
those elements which are relevant for a better understanding of the present invention
will be discussed. Thus, figure 5 for example shows that the tarpaulin 29 extends
over the entire width of the foundation 4. Furthermore it can be inferred from figure
5 that the jib 5 of the slewing jib crane 2 is capable of positioning wall elements
31 over a foundation 4. The slewing jib crane 2 on the one hand and the tool and marking
robot 44 on the other hand can move independently of each other in the transverse
direction of the device. The figure shows the guide plate 22 for the column 6 of the
slewing jib crane, which guide plate is positioned on guide rails 47.
[0048] Figure 6 shows a detail view of the step of positioning a building element 32 on
a previously moved building element 31 (see figure 5) by means of the grab 12. Dotted
lines indicate an area in the building element 31 in which a plastic insert is located,
in which bores 36 and a mark 41 have been made by means of the tool and marking robot
44. Guide rails 47 having tapered rubber ends 38 can be placed in the bores 36. The
rubbery ends 38 will act to make any vibrations in the element to be positioned fade
away upon making contact with the previously positioned element 31. This construction
is also suitable for other embodiments, such as the provisions of rubber damping elements
directly on the building element to be positioned. To realise a correct positioning,
a through bore 40 (indicated in dotted lines) is provided, through which the mark
41 can be detected from the grab 12. The building element 32 can thus be precisely
positioned on the building element 31 by using the fine control means, which are provided
on the jib 5 of the slewing jib crane 2 via guides 34, 35.
[0049] Figure 7 shows in detail how the device according to the present invention can cooperate
with a foundation 4, so that the slewing jib crane (not shown in figure 7) can move
with respect to already positioned floor slabs 14. Disposed on the foundation, viz.
on the central longitudinal beam 4, is a guide rail 3, over which a guide 8 can be
moved. The guide 48 is located under the front jib arm 42 of the slewing jib crane,
which is provided to function as an anti-tipping beam. Said front jib arm 42 prevents
the slewing jib crane 2 from tipping forward when a heavy building element is suspended
from the jib 5 of the slewing jib crane. To ensure that the slewing jib crane 2 can
still be moved sufficiently far in the direction of the structure to be built, tunnel
elements 13 are placed over the guide rail 3, which elements provide sufficient space
to allow the front jib arm 42 to move under the tunnel. The tunnel elements 13 in
turn function as support points for the floor jabs 14 and any other concrete prefab
elements, such as the elements 43.
[0050] Figures 8a-8e schematically show the manner in which building elements 51 a loaded
on a pallet 52a can be transported to the building site by means of a truck 53 and
be further handled at said site. The truck 53 drives to a position near the guide
rail 54, and the building elements 51a are placed from the truck 53 onto the guide
rail 54. It has already been described with reference to figure 2 that this may be
realised by means of a second crane 7, which can be moved over the rails 8. Once the
pallet 52a with the building elements 51a has been transported to a position near
the slewing jib crane 55, the building elements 51 a can be positioned on the structure
to be built, as is schematically shown in figure 8c. When all the building elements
51 a have been picked up from the pallet 52a, a next pallet 52b is transported to
the slewing jib crane 55 in a comparable manner over the guide rail 54. The slewing
jib crane 55 lifts the pallet 52a, so that the pallet 52b with new building elements
51b can be moved to a position near the slewing jib crane 55. The slewing jib crane
55 subsequently places the empty pallet 52a back on the guide rail 54 (see figure
8e) for discharge, and the picking up of building elements 51b can be started in a
manner as already described in the foregoing.
[0051] Figures 9a and 9b schematically show an alternative embodiment of the device according
to the present invention. To avoid repetition, only the most characteristic elements
will be discussed. It is clearly shown in figures 9a and 9b that two guide rails 62
are provided instead of one guide rail in the preceding embodiments. A dual-track
guide rail system moreover has the advantage that this part can be produced as a prefab
element with a high degree of dimensional precision at the works. Said prefab element,
for example having the size of one or two houses, has concrete longitudinal beams
with guide rails and three or more connecting beams. Said prefab elements can be directly
positioned in succession in the structure. When construction is started, the foundation
may thus only consist of interconnected dual-track prefab elements. The robot crane
device may be programmed so that the rest of the foundation, i.e. the longitudinal
beams of the outside walls, can be produced or positioned from there by means of the
robot crane device. In case the longitudinal beams are produced, the load-bearing
elements etc. are for example positioned in the structure and the dimensions are plotted
by means of the tool and marking robot. Moreover, the guide rails 62 are not placed
directly on a foundation, but they are situated on an upper level floor 65 of a building
that was previously erected, for example by means of a crane device that was moved
over a rail on the foundation. Furthermore a method according to the present invention
is used again. By placing the guide rails 62 on an upper level floor, it is possible
to build relatively high without an unnecessarily heavy slewing jib crane being needed.
Inaccuracies will become exponentially greater as the crane height increases. Figure
9b, which is a top plan view of the device of figure 9a, shows that the column of
the slewing jib crane 61 can move over the transverse beam 63 to outermost positions,
one of which is indicated in dotted lines at 61'. The second crane 64, also referred
to as the tool and marking robot 64, is located at the opposite end of the transverse
beam 63. The operating range of the tool and marking robot 64 is schematically indicated.
[0052] Although the present description relates to the construction of so-called terrace
houses, it is also possible to use the present invention in building structures of
a different type, where construction is to take place along a relatively long axis,
as is for example the case in relatively low apartment blocks.
[0053] In the present document a method has been described in which a structure, for example
of terrace houses, is built from one end to the opposite end. It is also possible,
of course, to work in two directions from the centre towards the two end terraces.
Furthermore it is not relevant to the scope of protection whether or not the structure
forms a continuous whole. It is also possible, for example, to build partially detached
or even entirely detached houses by means of the method according to the present invention.
It is desirable in that case if the buildings in question are substantially in line
with each other, and the effect of the present invention becomes more distinct as
the character of the construction work becomes more repetitive.
[0054] In the figures and the description, only exemplary embodiments of a device and a
method according to the present invention have been shown and described. However,
these examples by no means have a limitative effect on the scope of protection of
the present invention, which is defined in the appended claims. Thus, an elongated
guide member may also be provided laterally of the longitudinal axis of the foundation.
1. A method for building a structure of terrace houses, comprising the steps of:
a) providing a foundation for the structure;
b) placing at least one elongated guide member on a longitudinal axis of the foundation
at least substantially along at least substantially the entire length of the foundation
and fixing said elongated guide member with a robot crane device which is movable
along said guide member to the foundation, which robot crane device is arranged for
picking up and transporting building elements to a desired position on the structure;
c) positioning the robot crane device at or near a first end of said at least one
elongated guide member;
d) erecting a first part of the structure to at least substantially its entire height
by means of the robot crane device;
e) moving and positioning the robot crane device in the direction of the second end
of said at least one elongated guide member located opposite the first end of said
at least one elongated guide member;
f) subsequently erecting a part of the structure adjoining the already erected part
of the structure by means of the robot crane device;
g) repeating steps e) and f) until the construction of the structure is at least substantially
complete.
2. A method according to claim 1, characterised in that said at least one elongated guide member is placed so that it extends at least substantially
over the central longitudinal axis of the foundation.
3. A method according to claim 1 or 2, characterised in that said at least one elongated guide member is placed so that it extends beyond the
foundation at the second end.
4. A method according to one or more of the preceding claims, characterised in that a chassis for said at least one elongated guide member is supported on the fixed
world via stabilisation elements extending transversely to said at least one elongated
guide member.
5. A method according to one or more of the preceding claims, characterised in that in steps c and e said at least one elongated guide member is positioned on the basis
of reference points provided on said at least one elongated guide member.
6. A method according to one or more of the preceding claims, characterised in that the robot crane device comprises a slewing jib crane, by means of which building
elements are transported to the desired location during erection of a part of the
structure.
7. A method according to one or more of the preceding claims, characterised in that a manipulation robot is used for carrying out operations on positioned building elements.
8. A method according to one or more of the preceding claims, characterised in that a further guide member is provided, over which building elements can be transported
from an intermediate storage location to a location near the programmable manipulator.
9. A method according to one or more of the preceding claims, characterised in that one bay or bay part of the structure is built before the robot crane device is moved
to a new position for building a next bay, or a next bay part.
10. A method according to one or more of the preceding claims, characterised in that the robot crane device is equipped with a reading device by means of which information
present on the building elements to be manipulated by the robot crane device is read
for the purpose of correctly manipulating the building elements in question on the
basis of said information.
11. A device for use in the method according to one or more of the preceding claims, comprising
at least one elongated guide member extending over a longitudinal axis of a foundation
for a structure, which elongated guide member is fixed to said foundation and on which
a robot crane device comprising a slewing jib crane with a grab and means for moving
the slewing jib crane or at least one slewing jib thereof in vertical direction is
movably provided.
12. A device according to claim 11, characterised in that one or more stabilisation elements extending transversely to a chassis for said at
least one elongated guide member are provided, which can be supported on a surface
in a stabilising manner.
13. A device according to claim 11 or 12, characterised in that a second guide extends transversely to said first elongated guide element, along
which guide a manipulation robot can be moved.
14. A device according to one or more of claims 11-13, characterised in that at least one further guide member is provided, over which, in use, carriers for building
elements can be supplied in the direction of the robot crane device.
15. A device according to one or more of claims 11-14, characterised in that a slewing jib crane for the robot crane device is movable transversely to the longitudinal
axis of said at least one elongated guide member.