Technical field
[0001] The invention belongs under the field of road construction and handles a road surface
construction where a rigid infrasystem protection construction, e.g., a sewer header,
is installed under the road surface.
Prior art
[0002] Carriageways with an asphalt concrete surface crack and crumble in transition points
from the elastic basis to rigid basis due to a high difference in deformations. In
order to reduce cracking of road surface, several solutions have been proposed.
[0003] In a known solution "Roadway construction and method therefor" (
US 3,909,143, Walton W. Chusman, published on 30 September 1975), a containerized roadbed is used to increase the durability of roadway. Thereby,
the enveloping walls are made of a suitable elastomeric material and the roadbed contains
suitable filler material, such as dirt, sand, and rock. The containerized roadbed
serves for removing moisture through the filler material. On this roadbed, a suitable
road surface such as concrete is laid.
[0004] In the US patent (
US 5,445,473, Chaverot etc., published on 29 August 1995), a crack anti-rise system inbetween the structural
layer and the road carpet of a carriageway has been presented. The system comprises
a geotextile layer impregnated with a first asphalt binder, and further comprises
a layer of roadstones coated with a second asphalt binder adjacent to the geotextile
layer. The double-layer construction of the rising crack prevention system is efficient
in preventing or at least greatly slowing down the spread of cracks on the road.
[0005] Technically, the closest solution to the invention is the one presented in the US
patent (
US 4,909,662 Robert L. Baker, published on 20 March 1990) where the elastic bed is covered with a compacted dry concrete mix layer and then
with a moisture impervious material. Then, a surface of wet concrete mix is applied
atop the moisture impervious material and air passages are formed through the road
surface as to be situated transversely thereof.
[0006] In these known solutions, there is no rigid bed under the road surface such as a
protection construction for utility service lines or a bridge where the rigid and
the elastic beds have different deformations.
Description of the invention
[0007] The purpose of the present invention is to develop a construction for road surface
with a transition from the elastic base to the rigid base. For that purpose, a road
surface construction is presented where the surface covers a rigid base, and the construction
has been designed by taking into account the transition from the elastic base to the
rigid base. The construction includes a rigid and an elastic base, a compensator for
vertical and horizontal deformations of the rigid base, a drain layer, a bed for the
surface, a net for receiving and diffusing shear stress, elastic deformable adhesive
layers, a mounting layer for the surface, a net for receiving and diffusing shear
stress from the surface, a two-layer top surface, and drains.
List of figures
[0008] On the figure, the construction of the road surface has been schematically presented.
Embodiment of the invention
[0009] The invention relates to a construction for road surface where a rigid basis such
as a bridge, a protection construction for utility service lines, or a construction
resisting to reinforced concrete loads of sewer drains and wells or cables. In the
example, the rigid basis is a sewer header under the road surface (D = 120 mm).
[0010] The road surface construction comprises a rigid base 1, an elastic base 2, a compensator
for vertical and horizontal deformations of the rigid base 3, a drain layer 4, a bed
for the surface 5, a net for receiving and diffusing shear stress 6, elastic deformable
adhesive layers 7, a mounting layer for the surface 8, a net for receiving and diffusing
shear stress from the surface 9, a two-layer top surface 10, and drains 11.
[0011] The draining layer 4 is a draining compacted sand layer, the bed 5 for the surface
is compacted crushed stone, the two-layer surface 10 is made of asphalt concrete.
[0012] The road surface construction is made as follows: on the sides of the protection
construction on the sewer header situated under the road surface or the so-called
rigid base 1, an elastic base 2 is planned and compacted. On the footing of the rigid
base, a drain pipework 11 is built. Adjacent to the rigid base, the road surface 10,
and under the road surface bed 5, the layer 4 made of draining compacted soil is built.
On the rigid base 1, the compensator 3 of glass fibre geotextile receiving the vertical
and horizontal deformations of the rigid base is installed. First, the compensator
3 is installed to one side of the rigid base and then to the other side. The ends
of the compensator on the rigid base are not glued in the beginning and a sufficient
reserve for overlay is left. After the compensator has been installed on the compacted
draining layer 4, the nets 6 receiving and diffusing shear stress from the bed 5 of
the surface are placed. Then, the base layer of the surface is installed and compacted,
and the loose ends of the compensator are glued to the rigid base with a sufficient
overlay to each other.Then, the mounting layer 8 is installed and compacted and the
net 9 for receiving and diffusing shear stress from the surface is placed onto it;
finally, the double-layer elastic surface 10 is installed and compacted.
[0013] In case of such a road surface construction, the vertical and horizontal deformations
in transition of the elastic base to the rigid base are ensured without breaking of
the surface construction. Additionally, no groundwater reservoir is formed behind
the rigid base.
1. A road surface construction comprising an elastic base (2), a draining compacted layer
(4), elastically deforming adhesive layers (7), a road surface (10), and drains (11)
characterized in that by containing a rigid base (1), a compensator (3) for vertical and horizontal deformations
of the rigid base, a bed (5) for the surface, a net (6) for receiving and diffusing
shear stress of the surface bed, a mounting layer (8) for the surface, and a net (9)
for receiving and diffusing shear stress of the surface.
2. A road surface construction according to claim 1 characterized in that by having a protection construction of a service medium or a bridge as a rigid base.
3. A road surface construction according to claim 1 characterized in that by having a compacted sand layer as the drain layer, and compacted crushed stone
as the bed (5) for the surface.
4. A road surface construction according to claim 1 characterized in that by a compensator (3) made of glass fibre geotextile for receiving vertical and horizontal
deformations.
5. A road surface construction according to claim 1 characterized in that by the two-layer road surface (10) made of asphalt concrete.