FIELD OF THE INVENTION
[0001] An aspect of the invention relates to an assembly for placing a cement plug in a
well-bore. Another aspect of the invention also relates to a corresponding cement
plug placing method.
[0002] A particular application of the invention relates to the oilfield industry, for example
in cementing operation.
BACKGROUND OF THE INVENTION
[0003] During a hydrocarbon well drilling operation and after a hydrocarbon well has been
drilled, various fluid injecting operations are generally carried out. The fluid injecting
operations serves various purposes, for example delivering a cement slurry for borehole
cementing operation. These operations are well known in the oilfield industry.
[0004] Typically, cement plug placement techniques recommend the use of a stinger for the
section of the drill pipe immersed in the fluid in the borehole, the stinger having
a diameter substantially smaller than the well-bore diameter. In this condition, the
preferred mud removal technique, namely turbulent flow is nearly impossible to achieve
due to the important gap (annulus) existing between the stinger and the well-bore
wall. Further, there is also a risk that the cement sets with the drill pipe immersed
in the well-bore. Furthermore, after a cement plug has been placed, the drill pipe
is pulled through the cement plug which may result in contamination. Finally, the
plug placement assembly must be completely pull out of the well-bore before resuming
any further operation to be conducted in the well-bore, which leads to a loss in rig
time.
SUMMARY OF THE INVENTION
[0005] It is an object of the invention to propose an assembly for placing a cement plug
in a well-bore that overcomes one or more of the limitations of the existing cementing
apparatus or method for well-bore.
[0006] According to an aspect, the invention relates to an assembly for placing a cement
plug in a well-bore comprising a landing and disconnecting collar, a shoe track, a
circulation element, and a guide shoe, said elements forming an internal conduit,
the circulation element comprising side conduits directed towards a well-bore wall.
The assembly diameter is such as to create a narrow annulus in which a fluid pumped
through the side conduits circulates in the annulus according to a turbulent flow.
The assembly further comprises a sealing element comprising a bottom sealing element.
The landing and disconnecting collar, shoe track, circulation element, and guide shoe
are made of material that are drillable, said elements forming the cement plug when
a cement slurry is set into the annulus and the internal conduit.
[0007] The assembly may further comprise a top sealing element.
[0008] The material may be chosen among the group of material comprising Aluminum, fiberglass,
cement, plastic, and carbon fiber reinforced material.
[0009] The assembly may further comprise a centralizer.
[0010] The guide shoe may further comprise a differential pressure valve for reducing any
piston effect on a geological formation surrounding the well-bore.
[0011] The sealing element may be a flexible cup-like packer or an external casing packer.
[0012] According to a further aspect, the invention relates to a method of placing a cement
plug in a well-bore comprising the steps of:
- assembling a cement plug placing assembly and coupling said assembly to a drill pipe
at the surface,
- running the cement plug placing assembly to a desired depth,
- cleaning the well-bore wall by circulating fluid in said assembly by producing a jetting
effect towards the well-bore wall and a turbulent flow in a limited annulus portion
defined between the cement plug placing assembly and the well-bore wall,
- mixing and pumping a cement slurry into the drill pipe,
- displacing the cement slurry towards the cement plug placing assembly and into the
annulus portion, and
- disconnecting the drill pipe after a pressure bump at the end of the displacing step.
[0013] The length of the cement plug may be defined by coupling casing joints during the
assembling step.
[0014] The drill pipe may be rotated for sweeping a whole circumference of the well-bore
wall during the cleaning step.
[0015] The invention enables enhancing the safety and the quality of the cement plug placement
operation.
[0016] Further, the invention allows high pump rates throughout the operation, and avoids
having to balance the plug.
[0017] Furthermore, the invention eliminates contamination caused by pulling the drill pipe
through the plug after placement, and reduces the risk of cementing the drill pipe
in the well-bore.
[0018] In addition, it is not necessary anymore to create a bottom support for the plug
cement.
[0019] These and other aspects of the invention will be apparent from and elucidated with
reference to the embodiments described hereinafter.
BRIEF DESCRIPTION OF THE DRAWINGS
[0020] The present invention is illustrated by way of example and not limited to the accompanying
figures, in which like references indicate similar elements:
Figure 1 schematically shows an onshore hydrocarbon well location;
Figure 2 schematically shows the assembly for placing a cement plug in a well-bore;
and
Figures 3 to 7 schematically and partially illustrate the cement plug placement method
and the fluid displacement during the cement plug placement operation.
DETAILED DESCRIPTION OF THE INVENTION
[0021] Figure 1 schematically shows an onshore hydrocarbon well location and equipments
WE above a hydrocarbon geological formation GF after drilling operation has been carried
out and after a drill pipe DP has been run. At this stage, the well-bore WB is an
open-hole OH generally filled with various fluid mixtures (e.g. the drilling mud or
the like). The well-bore WB may also be partially cased CH. The equipment WE comprises
a drilling rig DR for running the drill pipe DP in the well-bore, cementing equipment
comprising cement silo CR and pumping arrangement CP, and a well head and stuffing
box arrangement WH providing a sealing for deploying the drill pipe DP or pumping
down the cement into the generally pressurized well-bore WB.
[0022] Subsequently, cementing operations are generally undertaken to seal the annulus AN
(i.e. the space between the well-bore WB and the casing where fluid can flow). A first
application is primary cementing which purpose is to achieve hydraulic isolation around
the casing. Other applications are remedial cementing which purposes are to stabilize
the well-bore, to seal a lost circulation zone, to enable deflecting a subsequent
drilling assembly into a different path than that previously drilled, to set a plug
in an existing well or to plug a well so that it may be abandoned. The cement may
be pumped into the drill pipe DP through a plug placement assembly 1 near the bottom
of the bore-hole after the assembly has been positioned at the desired location.
[0023] Cementing engineers prepare the cementing operations by determining the volume and
physical properties of cement slurry and other fluids pumped before and after the
cement slurry. In many situations, chemical additives are mixed with the cement slurry
in order to modify the characteristics of the slurry or set cement. Cement additives
may be broadly categorized as accelerators (i.e. for reducing the time required for
the set cement to develop sufficient compressive strength to enable further operations
to be carried out), retarders (i.e. for increasing the thickening time of cement slurries
to enable proper placement), dispersants (i.e. for reducing the cement slurry viscosity
to improve fluid-flow characteristics), extenders (i.e. for decreasing the density
or increasing the yield of a cement slurry), weighting agents (i.e. for increasing
or lightening the slurry weight), fluid-loss or lost-circulation additives (i.e. for
controlling the loss of fluid to the formation through filtration) and special additives
designed for specific operating conditions.
[0024] Figure 2 schematically shows the assembly 1 for placing a cement plug in a well-bore
WB according to a cross-section view. The plug placement assembly 1 comprises a landing
and disconnecting collar 2, a shoe track 3, a circulation element 4, a guide shoe
5 and a sealing element 6. All these elements have a cylindrical section and define
an internal conduit 10.
[0025] The landing collar and disconnecting 2 is installed immediately under the bottom
of the casing string or the drill pipe DP. The landing and disconnecting collar is
a component on which the cementing plugs BP, TP land during the cementing operation.
The landing and disconnecting collar is coupled to the drill pipe via a releasing
mechanism (not shown), for example through a known shear-pinned coupling. The landing
and disconnecting collar may be disconnected from the drill pipe by means of a downstream
pressure bump, for example by breaking the shear-pinned coupling of the releasing
mechanism. The landing and disconnecting collar may comprise a valve arrangement (not
shown). The landing and disconnecting collar is made of plastics, cement, carbon fiber
reinforced material or other high strength and drillable material.
[0026] The shoe track 3 is a closed space between the landing and disconnecting collar 2
and the guide shoe 5. The principal function of this space is to ensure that the guide
shoe is surrounded in high-quality cement such that any contamination that may bypass
the top plug is safely contained within the shoe track. The shoe track may be a casing
portion, namely a casing joint, made of fiber glass, carbon fiber reinforced material,
aluminum or any other high strength and drillable material. The shoe track may comprise
a plurality of casing joint coupled together. The shoe track may be fitted with one
or more centralizer 7 for keeping the bottom hole assembly in the center of the tubing,
casing or well-bore (Figure 2 only show an embodiment comprising one centralizer).
The centralizer comprises bow-spring profile made of plastic or light metal like aluminum.
[0027] The circulation element 4 is a component that allows a direct communication between
the shoe track 3 and the annulus AN. The circulation element may comprise a circulation
valve (not shown) that may be operated to open and close on demand. The circulation
element 4 comprises side conduits 8 extending radially from the internal conduit 10
towards the annulus AN2 and disposed all around the circulation element. The circulation
element enables the circulation of fluids, namely pumping of fluid or cement slurry
from the casing string or drill pipe directly into the annulus for well-bore wall
cleaning purposes or for placing a cement plug, respectively. Though, the side conduits
8 are represented as round holes in the Figures, they may have other shapes. As an
example, the side conduits 8 forming helical slots may be more efficient in distributing
the fluid around the circumference of the cement plug placement assembly. The circulation
element is made of plastics, cement, carbon fiber reinforced material or other high
strength and drillable material.
[0028] The guide shoe 5 is a tapered, e.g. having bullet-nosed element installed on the
bottom of the assembly 1, immediately under the circulation element 4. The guide shoe
function is to guide the drill pipe DP toward the center of the hole of the well-bore
and minimizes problems associated with hitting rock ledges or washouts in the well-bore
as the drill pipe is lowered into the well. The external face of the guide shoe is
made from steel, generally matching the assembly in size. The inside part of the guide
shoe is made of cement, plastic, carbon fiber reinforced material or other high strength
and drillable material. It can be drilled out if the well is to be deepened beyond
the cement plug point. The guide shoe 5 may be replaced by a float shoe comprising
an additional check valve. The guide shoe 5 may comprise a differential pressure valve
9 that allows circulation of fluid through the guide shoe port reducing any piston
effect on the formation GF. The assembly may be sealed downwards by means with either
a rubber wiper plug or a ball that seats in the guide shoe at the bottom of the assembly
(not shown). When sealed downwards, the downward flow is shut off and the fluid flow
is forced to flow out of the assembly via the side conduits 8 of the circulation element
4.
[0029] The sealing element 6 comprises a bottom sealing element 6A that seals the communication
at the end of the casing shoe in order to prevent downward flow in the annulus behind
the plug placement assembly. The sealing element is a ring positioned around the casing
shoe and/or the circulation element and contacting the well-bore wall WBW. Advantageously,
the sealing element is a flexible cup-like packer that may slide down the well-bore
wall during running operations. As an example, the sealing element may be made of
Hydrobonder
™ manufactured by the company Weatherford. As another example (not shown), the sealing
element may be an external casing packer which offers self support to the assembly
and hydraulic isolation in the annulus. The use of such sealing elements eliminates
the need for viscous pills or other supporting means to support the cement plug. In
an alternate embodiment, the sealing element 6 may also comprise a top sealing element
6B, similar to the bottom sealing element 6A, that seals the communication at the
top of the shoe track or at the landing collar in order to prevent upward flow in
the annulus AN1 above the plug placement assembly. Thus, the cement slurry pumped
into the annulus AN2 tends to be contained between the bottom 6A and top 6B sealing
elements. This is also practical for placement of cement plugs in horizontal wells.
[0030] The cement plug placement assembly 1 diameter is such as to create a narrow annulus
portion AN2 compared to the standard annulus AN1 defined by the drill pipe DP. Thus,
a fluid pumped through the side conduits 8 circulates in the narrow annulus portion
AN2 according to a turbulent flow.
[0031] The method of the invention will now be described in relation with Figures 3 to 7
schematically illustrating certain steps of the method and the fluid displacement
during the cement plug placement operation.
[0032] Figure 3 illustrates the assembly 1 as hereinbefore described after having been assembled
and run at the desired depth, and during cleaning step.
[0033] In a first step S1, the cement plug placing assembly 1 is assembled at the surface.
In particular, as many standardized casing joints as desired plug length are assembled
to form the shoe track 3. The assembly is coupled to the drill pipe DP. The sealing
elements are also made up as part of the assembly prior to running into the well-bore.
The sealing elements slide down the well-bore wall. When the assembly also comprises
the top sealing element 6B, the assembly is more difficult to run because it would
prevent upwards circulation of the fluids. Thus, this particular embodiment is preferably
used on open-hole squeeze cementing applications.
[0034] In a second step S2, the cement plug placing assembly 1 is run to the desired depth
by means of the drill pipe DP of the corresponding length.
[0035] In a third step S3, a cleaning process may begun by closing the circulation through
the casing shoe 5 and circulating fluid F1 through the side conduits 8 of the circulation
element 4. The produced jetting effect towards the bore-hole wall WBW and turbulent
flow TF in the annulus helps in removing the mud cake MC formed on the well-bore wall
WBW. The drill pipe DP may be rotated RT for sweeping the whole circumference of the
well-bore wall WBW. Pumping fluids in turbulent flow allows better removal of the
mud cake MC and thus will improve the cement bond with the well-bore wall WBW.
[0036] Figure 4 illustrates the assembly 1 during a first displacement phase.
[0037] In a fourth step S4, the cement slurry CS is mixed and pump into the drill pipe.
The bottom plug BP is launched upstream of the cement slurry CS to minimize contamination
by fluids inside the drill pipe prior to cementing. The top plug TP is launched downstream
the cement slurry CS. The top TP and bottom BP plugs are rubber or plastics plugs
separating the cement slurry from other fluids present on the drill pipe. The top
and bottom plugs are usual cementing plug typically used in cementing operation. The
top plug comprises a solid core. The bottom plug comprises a hollow core and a rupture
diaphragm RD. The plugs prevent the slurry from depositing on the internal wall of
the drill pipe, reduce contamination and maintain predictable slurry performance.
Shorter thickening time cement slurry could be utilized to reduce the time waiting
on cement (WOC). Other kind of cement slurries may be used for specific applications.
[0038] Figure 5 illustrates the assembly 1 during a second displacement phase.
[0039] In a fifth step S5, the bottom plug BP, cement slurry CS and top plug TP are displaced
through the drill pipe DP towards the cement plug placement assembly 1. In Figure
5, the bottom plug BP already landed in the landing and disconnecting collar 2. The
cement slurry CS is pushed downwards by the top plug TP which is pushed by a fluid
F2, e.g. a mud pumped downwards from the surface. The diaphragm RD in the plug body
ruptures to allow the cement slurry CS to pass through after the plug reaches the
landing and disconnecting collar 2. The cement slurry CS flows through the bottom
plug BP, the internal conduit of the assembly 10. Then the cement slurry CS flows
through the side conduits 8 into the annulus AN2 between the shoe track 3, the sealing
element 6A, 6B and the wall WBW of the well-bore.
[0040] Figure 6 illustrates the assembly 1 at the end of the displacement phase.
[0041] In a sixth step S6, at the end of the displacement, the top plug TP lands onto the
bottom plug BP. This provides a sudden pressure bump PU giving a positive indication
of contact with the landing and disconnecting collar 2 and the bottom plug BP. The
increase in pump pressure may be detected by an appropriate detector (not shown) at
the surface.
[0042] The drill pipe DP is also disconnected from the landing and disconnecting collar
2 of the cement plug placement assembly 1. The disconnection of the drill pipe DP
from the landing and disconnecting collar 2 is triggered by the pressure bump.
[0043] Figure 7 illustrates the assembly 1 during disconnection.
[0044] In a seventh step S7, the drill pipe DP is at least partially pulled out of the hole
POOH of the well-bore. Since the whole assembly 1 is drillable, it is not necessary
to pull the drill pipe DP completely out of the hole. Thus, the chance of contamination
and the risk of the cement setting with the drill pipe DP immersed are also reduced.
With the invention, there is no time spent in plug balancing.
[0045] A fluid may be circulated through the drill pipe for cleaning purpose.
[0046] Once the cement is set, the cement plug PG is formed by the cement filled in landing
and disconnecting collar 2, shoe track 3, circulation element 4, guide shoe 5, internal
conduit 10 and annulus portion AN2. The cement plug CP may be used for a variety of
applications including hydraulic isolation, provision of a secure mechanical platform,
and in window-milling operations for sidetracking a new well-bore, or a horizontal
or deviated well-bore.
FINAL REMARKS
[0047] It is to be mentioned that the invention is not limited to onshore hydrocarbon well
and can also be used in relation with offshore hydrocarbon well. Further, though a
vertical well-bore has been depicted in the drawings, the invention may also apply
in a horizontal or deviated well-bore.
[0048] Furthermore, though, the invention has been presented with a particular cementing
application, it is not limited to the placement of a cement plug which purpose is
to achieve hydraulic isolation at a particular location in the well-bore. The invention
may serve other purposes, for example in remedial cementing through the placement
of drillable casing patch which purpose is to stabilize the well-bore or to seal a
lost circulation zone, or to set a plug in an existing well so that it may be abandoned.
[0049] Also, a particular application of the invention relating to the oilfield industry
has been described. However, the invention is also applicable to other kind of industry,
e.g. the construction industry or the like.
[0050] The drawings and their description hereinbefore illustrate rather than limit the
invention.
[0051] Any reference sign in a claim should not be construed as limiting the claim. The
word "comprising" does not exclude the presence of other elements than those listed
in a claim. The word "a" or "an" preceding an element does not exclude the presence
of a plurality of such element.
1. An assembly for placing a cement plug (1) in a well-bore comprising a landing and
disconnecting collar (2), a shoe track (3), a circulation element (4), and a guide
shoe (5), said elements forming an internal conduit (10), the circulation element
(4) comprising side conduits (8) directed towards a well-bore wall (WBW),
wherein the assembly (1) diameter is such as to create a narrow annulus (AN2) in which
a fluid pumped through the side conduits (8) circulates in the annulus according to
a turbulent flow,
wherein the assembly (1) further comprises a sealing element (6) comprising a bottom
sealing element (6A), and
wherein the landing and disconnecting collar (2), shoe track (3), circulation element
(4), and guide shoe (5) are made of material that are drillable, said elements forming
the cement plug when a cement slurry (CS) is set into the annulus (AN2) and the internal
conduit (10).
2. An assembly for placing a cement plug (1) according to claim 1, wherein the assembly
further comprises a top sealing element (6B).
3. An assembly for placing a cement plug (1) according to claim 1 or 2, wherein the material
is chosen among the group of material comprising Aluminum, fiberglass, cement, plastic,
and carbon fiber reinforced material.
4. An assembly for placing a cement plug (1) according to any one of the preceding claims,
wherein the assembly further comprises a centralizer (7).
5. An assembly for placing a cement plug (1) according to any one of the preceding claims,
wherein the guide shoe (5) further comprises a differential pressure valve (9) for
reducing any piston effect on a geological formation (GF) surrounding the well-bore
(WB).
6. An assembly for placing a cement plug (1) according to any one of the preceding claims,
wherein the sealing element (6) is a flexible cup-like packer or an external casing
packer.
7. A method of placing a cement plug in a well-bore comprising the steps of:
- assembling (S1) a cement plug placing assembly (1) and coupling said assembly to
a drill pipe (DP) at the surface,
- running (S2) the cement plug placing assembly (1) to a desired depth,
- cleaning (S3) the well-bore wall (WBW) by circulating fluid in said assembly by
producing a jetting effect towards the well-bore wall and a turbulent flow in a limited
annulus (AN2) portion defined between the cement plug placing assembly (1) and the
well-bore wall (WBW),
- mixing and pumping (S4) a cement slurry into the drill pipe,
- displacing (S5) the cement slurry towards the cement plug placing assembly (1) and
into the annulus (AN2) portion, and
- disconnecting (S6) the drill pipe after a pressure bump at the end of the displacing
step.
8. A method of placing a cement plug according to claim 7, wherein a length of the cement
plug is defined by coupling casing joints during the assembling step.
9. A method of placing a cement plug according to claim 7, wherein the drill pipe (DP)
is rotated for sweeping a whole circumference of the well-bore wall (WBW) during the
cleaning step.