[0001] The present invention provides a method of protecting one or more flexible risers
which can carry a riser fluid, for instance a hydrocarbon production fluid such as
natural gas, to or from a floating structure and an apparatus therefor. In particular,
the method disclosed herein seeks to protect the flexible risers from buckling caused
by the heave and/or the pitch of the floating structure in response to wave motion
in severe weather conditions.
[0002] The Floating Liquefaction of Natural Gas (FLNG) concept combines the natural gas
treatment, liquefaction process, storage tanks, loading systems and other infrastructure
into a single floating structure. Such a structure is advantageous because it provides
an off-shore alternative to on-shore liquefaction plants. A FLNG vessel can be moored
close to or at a gas field, in waters deep enough to allow off-loading of the LNG
product onto a carrier vessel. It also represents a movable asset, which can be relocated
to a new site when the gas field is nearing the end of its productive life, or when
required by economic, environmental or political conditions.
[0003] The floating structure can be in fluid communication with the producing well heads
of the reservoir. The floating structure can be connected to one or more flexible
risers. The flexible risers can be secured to the sea bed by a riser base manifold.
A subsea flowline can connect the riser base manifold directly to the well heads or
optionally via a well manifold.
[0004] In such a configuration, a production hydrocarbon, such as natural gas, from a hydrocarbon
reservoir, such as a gas field, can be passed along a sub sea pipeline from one or
more well-heads, which can be in the same or different hydrocarbon reservoirs, to
the riser base manifold. The riser base manifold is the point at which the production
and any injection pipelines are connected to the flexible risers which convey the
production hydrocarbon to the floating structure. The flexible risers are connected
to the floating structure at a hangoff point. The hang-off point may be at a side
of the floating structure, or situated within a moonpool in the floating structure,
for example at the bottom of a turret. The floating structure can be moored to the
sea bed by a plurality of mooring lines which are anchored to the sea bed.
[0007] When the vertical motion of the hangoff point from the floating structure is severe,
such as in heavy seas, compressive forces can arise in the flexible risers which can
cause global buckling. The compressive forces are even more severe in those cases
in which the hangoff point is distanced from the centre of motion of the floating
structure because one or both of the heave and pitch of the structure is correspondingly
amplified.
[0008] The paper titled "
Guidelines for compression modelling in flexible risers for deepwater applications"
by McCann et al, Offshore Technology Conference 5-8 May 2003, OTC 15168, identifies the problem of riser buckling associated with compressive loading due
to severe heave in Floating Production Storage and Offloading Vessels (FPSO), which
can be moored in hostile environments. During downward heave and/or pitch, the riser
is said to attempt to follow the applied motion of the structure. As the riser displaces
through the water column, drag forces act opposite to the direction of motion, retarding
the motion of the riser. The motion of the floating vessel is therefore translated
into a reduction in effective tension. When the riser enters compression, it relies
upon cross sectional bending stiffness to limit curvature. However, the cross sectional
bending stiffness of the riser is small in comparison with the distances and forces
involved.
[0009] The present invention seeks to address the problem of riser buckling during severe
heave and/or pitch of the floating structure caused by extreme weather conditions.
[0010] In a first aspect, the present invention provides a method of protecting one or more
flexible risers in a sub sea environment, comprising at least the steps of:
- (a) providing a floating structure, one or more flexible risers, each of said flexible
risers carrying a riser fluid and having a first end connected to the floating structure
and a second end on the sea bed and in fluid connection with one or more riser fluid
reservoirs;
- (b) closing the fluid connection between the one or more flexible risers and the one
or more riser fluid reservoirs;
- (c) replacing at least a portion of the riser fluid in one or more of the flexible
risers with a protection fluid, wherein the density of said protection fluid is greater
than the density of said riser fluid.
[0011] The forces experienced by the flexible riser in the water can most easily be understood
by considering the movement of a free flexible riser. Downward motion of a flexible
riser in water will occur under gravitational acceleration. As the velocity increases,
the restoring drag force increases until it matches the gravitational acceleration
and the flexible riser reaches terminal velocity. At the terminal velocity, the acceleration
of the flexible riser is balanced by the restoring drag force such that:

wherein
m is mass of the flexible riser, including internal fluid,
g is gravity,
Cd is normal drag coefficient,
Ddrag is the drag diameter, ρ is the water density and
VTerm is the terminal velocity.
[0012] When a flexible riser is constrained, such that it is attached at a first end to
a floating structure on the surface of the water and at a second end on the sea bed,
vertical motion of the flexible riser can result from the heave and/or pitch of the
floating structure in response to the water motion on the surface.
[0013] Damage to flexible risers may occur when the terminal velocity of the flexible riser
in the sea water is exceeded by the velocity of the first end of the riser where it
is connected to the floating structure. This point of connection is also called the
hang-off point. When the downward velocity of the flexible riser at the hang-off point
due to the heave and/or pitch of the floating vessel (the "hang-off velocity") is
greater than the terminal velocity of the flexible riser in the water, the riser will
come under compression. Such compressive stresses can lead to buckling and permanent
damage to the flexible riser.
[0014] Compressive stress in the flexible riser can also be viewed as negative riser tension.
Interpreted mathematically, the possibility of buckling can occur when the ratio of
the downward hang-off velocity of the riser to the terminal velocity of the riser
in the water exceeds 1. Compression modelling therefore allows the prediction of potential
riser buckling for particular structure heave and/or pitch, riser type and the distance
of the hang-off point from the centre of motion of the structure.
[0015] By filling at least a portion of a riser with a protection fluid, which has a higher
density than the riser fluid, the apparent weight of the riser is increased. This
leads to an increase in the terminal velocity of the riser in water. By increasing
the terminal velocity of the riser, higher hangoff velocities can be accommodated
without riser buckling. This means that larger vertical heave and/or pitch can be
tolerated by the flexible riser before compression and riser buckling may occur. The
flexible risers carrying protection fluid can therefore survive more severe weather
conditions, and in particular increased wave heights, compared to those which have
not been at least partly filled with protection fluid.
[0016] In a further aspect, the present invention provides an apparatus for protecting one
or more flexible risers in a sub sea environment, said apparatus comprising at least:
- a floating structure comprising a protection fluid storage tank, said protection fluid
storage tank comprising an outlet for a protection fluid stream;
- one or more flexible risers, each of said flexible risers having a first end connected
to said floating structure, said first end in direct fluid communication with a first
end connection for a riser fluid stream and an inlet for the protection fluid stream
in fluid communication with the outlet of the protection fluid storage tank, said
inlet being separate from said first end connection, and each of said flexible risers
having a second end on the sea bed, said second end having a second end connection
for a riser fluid transfer stream in fluid communication with one or more riser fluid
reservoirs.
[0017] Embodiments of the present invention will now be described by way of example only,
and with reference to the accompanying non-limiting drawings in which:
Figure 1 shows a first embodiment of a typical method and apparatus scheme according
to the invention.
Figure 2 shows a second embodiment of a typical method and apparatus scheme according
to the invention.
[0018] For the purpose of this description, a single reference number will be assigned to
a line as well as a stream carried in that line. The same reference numbers refer
to similar components, streams or lines.
[0019] Figure 1 shows a cut-through section of a first method and apparatus 1 for the protection
of one or more flexible risers 10, particularly during severe weather conditions.
The flexible risers convey a riser fluid between one or more riser fluid reservoirs
250 underneath the sea bed and a floating structure 100 on the sea surface. Thus,
the risers can be sub sea risers. As used herein, the term "sub sea" is intended to
encompass both salt water and fresh water environments, and represents the region
between the water surface and the bed of the body of water.
[0020] Thus, the floating structure 100 can be a floating vessel, or an off-shore floating
platform. A floating vessel may be any movable or moored vessel, generally at least
having a hull, and usually being in the form of a ship such as a 'tanker'.
[0021] Such floating vessels can be of any dimensions, but are usually elongated. Whilst
the dimensions of a floating vessel are not limited at sea, building and maintenance
facilities for floating vessels may limit such dimensions. Thus, in one embodiment
of the present invention, the floating vessel or off-shore floating platform is less
than 600m long such as 500m, and a beam of less than 100m, such as 80m, so as to be
able to be accommodated in existing ship-building and maintenance facilities.
[0022] An off-shore floating platform may also be movable, but is generally more-permanently
locatable than a floating vessel.
[0023] The method and apparatus of the invention are for instance advantageous for applications
in deep water, such as water depths greater than 200 m, for instance 250 to 500 m,
or greater than 1000 m.
[0024] In one embodiment, the riser fluid is a hydrocarbon fluid such as natural gas, and
the one or more riser fluid reservoirs 250 are hydrocarbon fluid reservoirs such as
natural gas reservoirs. In this embodiment, the hydrocarbon fluid would be conveyed
from the hydrocarbon fluid reservoirs 250 under the sea bed 500 to the floating structure
100, where the hydrocarbon fluid can be stored and preferably treated. When the hydrocarbon
fluid is natural gas it is preferred that the floating structure 100 comprises natural
gas treatment and/or liquefaction units such that the natural gas can be treated to
remove unwanted impurities and cooled to provide liquefied natural gas. This will
be discussed in more detail in relation to Figure 2.
[0025] In an alternative embodiment, the method and apparatus disclosed herein can be used
for carbon dioxide sequestration.
[0026] Many hydrocarbon reservoirs, such as natural gas reservoirs may contain carbon dioxide,
for instance in contents of 6-10%. This carbon dioxide could be separated in the floating
structure from the hydrocarbon fluid, such as natural gas, removed from the reservoir,
and then re-injected into the a riser fluid reservoir. 250. The riser fluid reservoir
can be any sealed subsurface geological formation such as a hydrocarbon reservoir,
a depleted hydrocarbon reservoir, an aquifer or other sealed water containing layer.
In this case, the riser fluid can comprise carbon dioxide, preferably as a dense phase,
such as supercritical carbon dioxide i.e. carbon dioxide having a pressure and temperature
above the critical point. In contrast to the previous embodiment, the riser fluid
comprising carbon dioxide would for instance be conveyed from a separation unit on
the floating structure 100 to the one or more depleted hydrocarbon reservoirs 250
under the sea bed 500, where the riser fluid comprising carbon dioxide can be stored.
[0027] In a further alternative embodiment, also illustrating a carbon dioxide sequestration
method, the riser fluid comprising carbon dioxide passed to the riser fluid reservoir
250 can come from any source. For example, the carbon dioxide may be generated at
a location different from the floating structure 100, such as an on-shore location,
and transferred to the floating structure 100 for sequestration underneath the sea
bed. The riser fluid and riser fluid reservoir 250 may be as defined in the previous
embodiment.
[0028] For maximum benefit of the invention, it is preferred that the density of the riser
fluid is less than 0.9 g/cm
3, more preferably less than 0.7 g/cm
3, still more preferably less than 0.5 g/cm
3.
[0029] In the exemplary embodiment of Figure 1, the floating structure 100 is a floating
vessel. The floating vessel is held in position by a plurality of mooring lines 610
which are connected to the floating vessel at a mooring point and maintain the mooring
point of the floating vessel in a fixed position. Figure 1 shows a trigonal arrangement
of three bundles 620a, 620b, 620c of mooring lines, each bundle comprising four mooring
lines 610a, b, c, d. The mooring lines 610 are fastened securely to sea bed 500, for
instance using anchor piles.
[0030] The one or more flexible risers 10 may be provided as free-hanging catenaries or
in alternative configurations using buoyancy modules such as lazy wave and lazy S
types. Each flexible riser 10 has a first end 20 connected to the floating vessel
100. Figure 1 shows eight flexible risers 10 a-h, arranged in first and second riser
bundles of four, connected to the floating vessel 100 at first ends 20 a-h respectively.
[0031] The flexible risers 10 a-h each have a second end 30 a-h on the sea bed 500. The
second ends 30 a-h of the flexible risers 10 a-h need not be in direct contact with
the sea bed 500. It is preferred that the second ends 30 a-h of the flexible risers
are adapted to be secured to the sea bed 500. In the embodiment shown in Figure 1,
the second ends 30 of the flexible risers are connected to two riser base manifolds
300. Second ends 30 a-d of the first riser bundle are connected to first riser base
manifold 300a, while second ends 30 e-h of the second riser bundle are connected to
second riser base manifold 300b. The riser base manifolds 300 are fastened securely
to sea bed 500, for instance using fixed piles. In this way, the first and second
ends 20, 30 of the flexible risers 10 are secured to the floating vessel 100 and sea
bed 500 respectively.
[0032] The riser base manifolds 300 provide a fluid connection between the flexible risers
10 and one or more riser fluid transfer streams 210. The one or more riser fluid transfer
streams convey the riser fluid between the riser base manifolds 300 and the riser
well heads 200. Figure 1 shows first riser base manifold 300a connected to four well
heads 200 a-d via an optional well head manifold 220a. Four riser fluid transfer streams
210 a-d connect well heads 200 a-d to the well head manifold 220a. Two further riser
fluid transfer streams 210 i, j connect the well head manifold 220a to the riser base
manifold 300a. Similarly, second riser base manifold 300 is connected to four well
heads 200 e-h via an optional well head manifold 220b. Four riser fluid transfer streams
210 e-h connect well heads 200 e-h to the well head manifold 220b. Two further riser
fluid transfer streams 210 1, m connect the well head manifold 220 b to the riser
base manifold 300b. The well heads 200 are in fluid communication with the one or
more riser fluid reservoirs 250 which lie beneath the sea bed 500.
[0033] In this way, riser fluid such as a hydrocarbon fluid can be conveyed from one or
more hydrocarbon reservoirs 250 to the floating vessel 100. Similarly, a riser fluid
comprising carbon dioxide can be conveyed from the floating vessel 100 to the one
or more riser fluid reservoirs for carbon sequestration.
[0034] The mooring lines 610 are intended to maintain the mooring point of the floating
vessel 100 in a fixed position. However, the mooring lines 610, which may be steel
chains, allow a degree of movement such that the mooring point of the floating vessel
100 can move in response to wave motion, such as the heave and/or pitch of the floating
vessel 100.
[0035] Under severe weather conditions, the wave motion may become so significant that the
one or more flexible risers are in danger of buckling. As previously discussed, riser
buckling may occur when the terminal velocity of the riser in the sea water is exceeded
by the hang-off velocity of the first end 20 of the riser 10 where it is connected
to the floating structure 100.. When the downward velocity of the riser at the hang-off
point due to the heave and/or pitch of the floating vessel 100 is greater than the
terminal velocity of the flexible riser in the water, the riser will come under compression.
Such compressive stresses can lead to buckling and permanent damage to the flexible
riser.
[0036] The method and apparatus disclosed herein seeks to alleviate the problem of riser
damage during severe weather conditions. In particular, at least a portion of the
riser fluid, such as a hydrocarbon fluid or a carbon dioxide comprising fluid, in
one or more of the flexible risers 10 is replaced with a protection fluid. The density
of the protection fluid is greater than the density of the riser fluid, such that
the mass of the fluid in the riser 10 is increased for an equivalent fluid volume.
Increasing the mass of the fluid in the riser increases the overall mass of the riser
(i.e. the mass of the riser plus fluid contents). Increasing the overall mass of the
riser increases the terminal velocity of the riser in the water. This means that greater
hang-off velocities can be tolerated by the flexible riser before the terminal velocity
is exceeded. Greater hang-off velocities correspond to higher heave and/or pitch at
the hang-off point, such that more extreme sea conditions can be tolerated.
[0037] It is preferred that the density of the protection fluid is greater than 0.9 g/cm
3, more preferably greater than 1.0 g/cm
3, still more preferably greater than 1.1 g/cm
3. The greater density of the protection fluid compared to the riser fluid, the greater
the terminal velocity increase of the flexible riser upon substitution of the riser
fluid for the protection fluid. The greater the increase in the terminal velocity
of the flexible riser, the greater the hang-off velocity which can be withstood without
compressing the flexible riser. Thus, it is preferred that the difference in density
between the protection fluid and the riser fluid is at least 0.2 g/cm
3, more preferably at least 0.4 g/cm
3, even more preferably at least 0.6 g/cm
3.
[0038] Examples of suitable protection fluids are one or more of the group comprising monoethylene
glycol and hydrocarbon condensate. These fluids are particularly useful as protection
fluids in the case where the riser fluid is a hydrocarbon fluid. The floating vessel
100 can comprise one or more hydrocarbon treatment units, such as a separation unit,
for instance a low pressure gas/liquid separator, to provide hydrocarbon condensate
from a hydrocarbon riser fluid. The hydrocarbon fluid is preferably in stabilised
form. Thus, a store of hydrocarbon condensate may be present in the floating vessel,
for instance in a condensate storage tank. In those cases where the hydrocarbon condensate
has a density greater than the riser fluid, for example if the riser fluid is an unprocessed
hydrocarbon stream, such as a natural gas stream, the store of hydrocarbon condensate
can comprise one source of protection fluid.
[0039] In an alternative embodiment, in some cases where the riser fluid is hydrocarbon
fluid, it may be necessary to inject a hydrate inhibitor, such as monoethylene glycol
(MEG), into the hydrocarbon fluid. For instance, the hydrate inhibitor can be injected
to the hydrocarbon fluid at or before it emerges from the well heads 200 to prevent
hydrate formation in the riser fluid transfer streams 210 and the flexible risers
10. In this case, the floating vessel 100 could comprise a hydrate inhibitor storage
tank, such as a MEG storage tank. The floating vessel 100 may also comprise a hydrate
inhibitor regeneration unit, to separate the hydrate inhibitor from the riser fluid.
[0040] In those cases where the hydrate inhibitor has a density greater than the riser fluid,
the store of hydrate inhibitor can comprise one source of protection fluid. In one
embodiment, a MEG storage tank is provided having a capacity such that 15-20% of the
tank capacity of MEG can completely fill all of the flexible risers 10 with protection
fluid. In such a case, it is preferred to maintain a minimum content of MEG in the
tank of 15-20% to ensure that sufficient MEG is available to provide maximum protection
(i.e. completely fill) to each of the flexible risers 10.
[0041] It is preferred that the one or more flexible risers 10 are filled with protection
fluid from the first end connected to the floating structure 100. This allows the
protection fluid to be stored on the floating structure 100.
[0042] Preferably, a portion of the riser fluid in each of the one or more flexible risers
10 is replaced with the protection fluid. In this way, all of the flexible risers
10 may be protected from damage during adverse weather conditions. Still more preferably,
the portion of the riser fluid replaced with the protection fluid is the same in each
riser. This is advantageous because the same mass is added to each riser. For identical
risers, each riser will thus have the same terminal velocity in the sea water and
therefore exhibit similar dynamic behaviour.
[0043] It is not advisable to replace different portions of the riser fluid with protection
fluid in each flexible riser, because different risers will exhibit different dynamic
behaviour, which can lead to collisions between adjacent flexible risers in response
to movement of the floating structure 100.
[0044] It is particularly preferred to completely replace all of the riser fluid in the
flexible riser with protection fluid. In the case where each riser was initially completely
filled with riser fluid, this would lead to completely filling each flexible riser
with protection fluid. In doing so, a maximum gain for the overall riser mass using
the method disclosed herein is achieved. This maximises the terminal velocity of the
flexible riser in sea water. Consequently, the severity of the weather conditions
which can be withstood by the flexible risers is increased.
[0045] In order to carry out the method disclosed herein, a decision must be taken to replace
at least a portion of the riser fluid with protection fluid in one or more of the
flexible risers. Thus, the method may comprise the further step of:
- monitoring the weather conditions in a zone around the floating structure 100 for
one or more measured weather variables and carrying out steps (b) and (c) when said
one or more measured weather variables meet predetermined criterion or criteria.
The zone around the floating structure 100 should be of a size sufficient to allow
the method disclosed herein to be carried out before the arrival of the adverse weather
conditions at the floating structure 100. For instance, the zone may be 200 km around
the floating structure 100, and more preferably 500 km around the floating structure
100 to allow sufficient time to replace the riser fluid with protection fluid.
[0046] The adverse weather conditions are evaluated using one or more weather variables.
The one or more weather variables include one or both of wind speed and wave height.
[0047] It is preferred that the predetermined criterion or criteria is indicative or predictive
of a situation in which the hangoff velocity of the first end 20 of the flexible riser
10 approaches the terminal velocity of the flexible riser 10 in operation i.e. when
filled with riser fluid.
[0048] The predetermined criterion can be selected from wind speeds in excess of 60 ms
-1. For instance, wind speeds in the range of 70-74 ms
-1 are indicative of a 10000 year cyclone.
[0049] Alternatively the predetermined criterion can be selected from significant wave heights.
For instance the predetermined criterion can be 16 m or greater significant wave height.
The significant wave height is for instance the wave height which is exceeded by 2/3
of the waves during a storm.
[0050] Once the severe weather has passed, the flexible risers 10 can be returned to normal
operation. Thus, the method may comprise the further steps of:
(d) opening the fluid connection between the one or more flexible risers 10 and the
one or more riser fluid reservoirs 250;
(e) passing the protection fluid from the one or more of the flexible risers 10 to
the floating structure 100 as a spent protection fluid stream; and
(f) treating the spent protection fluid stream on the floating structure 100 to regenerate
the protection fluid.
Although it is possible to provide a dedicated unit for the treatment of the spent
protection fluid on the floating structure 100, it is preferred if the spent protection
fluid can be processed by a unit already present for the treatment of the riser fluid.
For instance, when the riser fluid is a hydrocarbon fluid which has been treated with
a hydrate inhibitor, the spent protection fluid, which will be rich in hydrate inhibitor
such as MEG, but may also contain a small amount of hydrocarbon fluid not displaced
from the flexible riser, can be sent to the hydrate inhibitor treatment unit for processing.
This procedure may result in a plug of hydrate inhibitor, such as MEG, requiring processing.
If this plug of hydrate inhibitor exceeds the capacity of the inlet facilities, which
can be designed to process the hydrate inhibited hydrocarbon fluid, the flow rate
to the inlet facilities can be reduced until all the spent protection fluid rich in
hydrate inhibitor is processed. After the plug of spent protection fluid has been
processed by the inlet facilities of the floating structure 100, normal production
can be resumed.
[0051] Figure 2 provides a further schematic for the method and apparatus disclosed herein,
and in particular shows the connectivity of the first and second ends 20, 30 of the
flexible risers 10 to the sea bed 500 and floating structure 100. For the purposes
of clarity, the numbers of mooring lines 610a, e and flexible risers 10a, 10e have
been reduced to two each, although any number, such as 4-6 arranged in two or more
separate bundles is envisaged.
[0052] The flexible risers 10a, 10e have first ends 20a, 20e connected to the floating structure
100, which is shown as vessel in Figure 2. The first ends 20 a, e of the flexible
risers are secured to the floating vessel 100 at a turret 150. The turret 150 is connected
to the sea bed 500 by the mooring lines 610a, 610b.
[0053] The floating vessel 100 is provided with one or more bearings allowing the rotation
of the vessel around the turret 150. In this way, the floating vessel may weather-vane
around the earth-fixed turret, such that the vessel may be orientated to present the
bow to the direction of the prevailing weather conditions, such as the incoming wave
or wind. In a preferred embodiment, the turret 150 is provided towards an end of the
floating vessel 100, to allow optimal rotation in response to the prevailing weather
conditions. This allows processing units 400, such as a natural gas treatment and
liquefaction unit, which is discussed in greater detail below, to be placed behind
the turret 150 along the deck of the floating vessel.
[0054] The turret 150 comprises one or more bending stiffeners 160a, b which route the flexible
risers 10a, e through one or more I-tubes 170a, b to a hang-off deck 180. The hang-off
deck 180 secures the first end 20 a, e of each of the flexible risers 10a, e.
[0055] The first end 20 a, e of each of the flexible risers 10a, e is in fluid communication
with a first end connection 22a, 22e for the first riser fluid stream 40. The first
ends 20 a, e can be in communication with the first end connections 22 a, e via a
turret piping connection. Each first end connection 22a, 22e for the riser fluid stream
40 is connected to a riser emergency shutdown valve 190a, e. An inlet 24a, 24e for
the protection fluid stream 120, which is in fluid communication with the outlet 112
of a protection fluid storage tank 110, is also in fluid communication with the first
end 20 a, e of each flexible riser 10 a, e. It is apparent from Figure 2 that the
inlets 24a, 24e for the protection fluid stream 120 are separate from the first end
connections 22a, 22e for the first riser fluid stream 40. Rotating pipe connections
in a swivel stack allow the riser fluid stream 40 and protection fluid stream 120
to pass between the turret 150 and the rest of the floating structure 100. Thus a
constant fluid connection is maintained even when the floating vessel is rotating
around the turret 150.
[0056] The protection fluid stream 120 can be passed to each first inlet 22a, g and on to
the first ends of the flexible risers 10a, e. By filling the flexible risers 10a,
e from their first ends, the protection fluid can displace at least a portion of the
riser fluid in one or more of the flexible risers. The displaced riser fluid, which
is less dense than the protection fluid, will be forced upwards as the flexible risers
10a, e fill with protection fluid such that the riser fluid can exit the risers at
first ends 20 a, e, passing out of first end connection 24a, e, which can be an outlet.
The riser fluid can be passed to the processing units 400 as the riser fluid stream
40.
[0057] The second end 30a, 30e of each flexible riser 10a, e is on the sea bed 500. Each
second end comprises a second end connection 32a, e which is in fluid communication
with a riser fluid transfer stream 210a, b, g, h. The riser fluid transfer streams
210a, b, g, h are in fluid communication with one or more riser fluid reservoirs 250.
In a preferred embodiment, the second end 30a, e of each flexible riser 10a, e is
secured to the sea bed 500 by connection to a riser base manifold 300a, b. The riser
base manifold 300a, b is rigidly fixed to the sea bed 500.
[0058] The riser base manifolds 300a, b comprise first manifold connections 302a, b, c,
d to the riser fluid transfer streams 210a, b, g, h. Second manifold connections 304a,
b are connected to the second end connections 32a, e of the flexible risers 10a, e.
[0059] In the embodiment of Figure 2, the riser fluid transfer streams 210 may be natural
gas transfer streams. The one or more riser fluid reservoirs 250 can be natural gas
reservoirs. The riser fluid stream 40 can be a natural gas stream. In this case, the
natural gas reservoirs 250 may be connected to the riser fluid transfer streams 210
via well heads 200a, b, g, h.
[0060] Figure 2 shows a natural gas treatment and liquefaction unit 400 on the floating
structure 100. This unit can be used for the pre-treating and cooling of the riser
fluid when this is natural gas. The arrangement discussed below is exemplary only
and is not limited to the combination of the units described. Other, alternative line-ups
will be known to the skilled person.
[0061] Usually a natural gas stream 40 is comprised substantially of methane. Preferably
the natural gas stream comprises at least 50 mol% methane, more preferably at least
80 mol% methane.
[0062] Depending on the source, natural gas may contain varying amounts of hydrocarbons
heavier than methane such as in particular ethane, propane and the butanes, and possibly
lesser amounts of pentanes and aromatic hydrocarbons. The composition varies depending
upon the type and location of the gas.
[0063] Conventionally, the hydrocarbons heavier than methane are removed as far as efficiently
possible from the natural gas stream prior to any significant cooling for several
reasons, such as having different freezing or liquefaction temperatures that may cause
them to block parts of a methane liquefaction plant.
[0064] The natural gas stream can first undergo acid gas removal by passing through an acid
gas removal (AGR) unit or system, which may be a separate or dedicated unit, or integrated
with one or more other units or apparatus. The AGR system provides a process for the
removal of carbon dioxide and hydrogen sulphide and/or COS in a manner known in the
art, for example one or more of the methods described in
WO 03/057348 A1.
[0065] The AGR system provides a treated natural gas stream. The treated natural gas stream
can then pass into a first cooling stage which may comprise part of a cooling system
and/or liquefaction system. The first cooling stage may comprise one or more heat
exchangers in parallel and/or series, and is able to reduce the temperature of the
treated natural gas stream, preferably below 0 °C, and more preferably in the range
-10 °C to -70 °C, and provide a cooled natural gas stream.
[0066] The first cooling stage may have any configuration known in the art, and generally
includes one or more refrigerant circuits passing one or more refrigerants to provide
cold or cold energy to the treated hydrocarbon stream. An example refrigerant circuit
is a propane refrigerant circuit known in the art.
[0067] A first refrigerant circuit can pass through the first cooling stage, from which
the refrigerant stream, expanded after providing its cooling to treated hydrocarbon
stream, passes into a first stage compressor for recompression. The first stage compressor
may comprise one or more compressors in series or parallel in a manner known in the
art. Compression of the refrigerant usually increases the refrigerant temperature,
such that it is commonly cooled by one or more heat exchangers downstream of the first
stage compressor. The downstream heat exchanger(s) may comprise one or more ambient
water and/or air coolers known in the art.
[0068] The cooled natural gas stream can pass through a second cooling stage, again comprising
one or more heat exchangers in parallel and/or series and designed to further cool
and/or liquefy the cooled natural gas stream, to provide a further cooled natural
gas stream, which is preferably a liquefied natural gas stream. The further cooled
natural gas stream can be passed into storage such as to one or more storage tanks,
or be passed through a further pipeline or conduit to one or more storage tanks located
elsewhere, such as on a land-based facility or other floating vessel. The other floating
vessel may be an LNG carrier.
[0069] As with the first cooling stage, the second cooling stage may involve one or more
refrigerant circuits having a refrigerant adapted to provide the further cooling to
the cooled natural gas stream. An example refrigerant circuit is a mixed refrigerant,
and the second cooling stage could reduce the temperature of the cooled natural gas
stream to below -100 °C, preferably below -150 °C.
[0070] In the second cooling circuit, expanded refrigerant from the second cooling stage
can pass through a second stage compressor (which may comprise one or more compressors
in parallel and/or series), to provide a compressed stream which is usually then cooled
by one or more downstream heat exchangers, for example ambient water and/or air coolers.
The refrigerant stream in the second refrigerant circuit can then pass through the
first cooling stage in a manner known in the art, optionally with a first passage
through the second cooling stage for further cooling, prior to reaching a valve for
expansion and reuse in the second cooling stage in a manner known in the art.
[0071] One or more of the AGR system and the first and second cooling stages may include
one or more generators such as gas turbines, to drive one or more devices, units or
separators therein, such as, by way of example only, the first and second compressors.
[0072] The person skilled in the art will understand that the present invention can be carried
out in many various ways without departing from the scope of the appended claims.
1. A method of protecting one or more flexible risers (10) in a sub sea environment,
comprising at least the steps of:
(a) providing a floating structure (100), one or more flexible risers (10), each of
said flexible risers carrying a riser fluid and having a first end (20) connected
to the floating structure(100) and a second end (30) on the sea bed (500) and in fluid
connection with one or more riser fluid reservoirs (250);
(b) closing the fluid connection between the one or more flexible risers (10) and
the one or more riser fluid reservoirs (250);
(c) replacing at least a portion of the riser fluid in one or more of the flexible
risers (10) with a protection fluid, wherein the density of said protection fluid
is greater than the density of said riser fluid.
2. The method according to any of the preceding claims wherein in step (c) the protection
fluid displaces at least a portion of the riser fluid in one or more of the flexible
risers (10), such that the displaced riser fluid exits at a first end connection (22),
which is an outlet in direct fluid communication with the first end (20) of the flexible
riser (10).
3. The method according to claim 1 or claim 2 wherein said riser fluid comprises carbon
dioxide and said one or more riser fluid reservoirs (250) are sealed subsurface geological
formations; said method further comprising, between steps (a) and (b), the step of:
- passing the riser fluid comprising carbon dioxide from the floating structure (100)
through at least the one or more flexible risers (10) to the one or more sealed subsurface
geological formations (250).
4. The method according to claim 1 or claim 2 wherein said riser fluid is a hydrocarbon
production fluid and said one or more riser fluid reservoirs (250) are hydrocarbon
reservoirs; said method further comprising, between steps (a) and (b), the step of:
- passing the hydrocarbon production fluid from the one or more hydrocarbon reservoirs
(250) through at least the one or more flexible risers (10) to the floating structure
(100).
5. The method according to any of the preceding claims wherein the protection fluid has
a density of greater than 0.9 g/cm3, preferably greater than 1.0 g/cm3, more preferably greater than 1.1 g/cm3.
6. The method according to claim 4 or claim 5 wherein the protection fluid is selected
from one or more of the group comprising monoethylene glycol and hydrocarbon condensate.
7. The method according to any of the preceding claims wherein in step (c) the one or
more of the flexible risers (10) are filled with protection fluid from the first end
(20) connected to the floating structure (100).
8. The method according to any one of the preceding claims, wherein the riser fluid is
a hydrocarbon production fluid and the one or more riser fluid reservoirs (250) are
hydrocarbon sub sea reservoirs, and further comprising the step of treating the hydrocarbon
production fluid on board the floating structure (100) to provide a liquefied hydrocarbon
stream.
9. An apparatus (1) for protecting one or more flexible risers (10) in a sub sea environment,
said apparatus comprising at least:
- a floating structure (100) comprising a protection fluid storage tank (110), said
protection fluid storage tank comprising an outlet (112) for a protection fluid stream
(120);
- one or more flexible risers (10), each of said flexible risers having a first end
(20) connected to said floating structure (100), said first end (20) in direct fluid
communication with a first end connection (22) for a riser fluid stream (40) and an
inlet (24) for the protection fluid stream (120) in fluid communication with the outlet
(112) of the protection fluid storage tank (110), said inlet (24) being separate from
said first end connection (22), and each of said flexible risers (10) having a second
end (30) on the sea bed (500), said second end having a second end connection (32)
for a riser fluid transfer stream (210) in fluid communication with one or more riser
fluid reservoirs (250).
10. The apparatus according to claim 9 wherein the second end (30) of the flexible riser
(10) is connected to a riser base manifold (300) which is rigidly fixed to the sea
bed, said riser base manifold having a first manifold connection (302) for the riser
fluid transfer stream (210) and a second manifold connection (304) connected to the
second end connection (32) of the flexible riser (10).
11. The apparatus according to claim 9 or claim 10 wherein the first end (20) of the flexible
riser (10) is connected to the floating structure (100) at a turret (150) comprising
one or more bending stiffeners (160) to route the one or more flexible risers (10)
through one or more I-tubes (170) to a riser hang-off deck (180) where the first end
(20) of each of said flexible risers (10) is secured, with the first end connection
(22) for the riser fluid stream being connected to a riser emergency shutdown valve
(190).
12. The apparatus according to any on of claims 9 to 11 in which the riser fluid transfer
stream (210) is a natural gas transfer stream, the one or more riser fluid reservoirs
(250) are natural gas reservoirs, the riser fluid stream is a natural gas stream and
the floating structure (100) further comprises one or both of a natural gas treatment
unit and a liquefaction unit (400).